메뉴 건너뛰기




Volumn , Issue , 2006, Pages 1119-1128

About the need for distributed simulation technology for the resolution of real-world manufacturing and logistics problems

Author keywords

[No Author keywords available]

Indexed keywords

LOGISTICS; MANAGEMENT; MILITARY OPERATIONS; SUPPLY CHAINS;

EID: 46149096495     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2006.323202     Document Type: Conference Paper
Times cited : (17)

References (27)
  • 2
    • 33746431770 scopus 로고    scopus 로고
    • Distributed Simulation in Industry
    • Erasmus Research Institute of Management. ERIM Ph.D
    • Boer, C.A. 2005. Distributed Simulation in Industry. Erasmus Research Institute of Management. ERIM Ph.D. Series Research in Management 65.
    • (2005) Series Research in Management , vol.65
    • Boer, C.A.1
  • 5
    • 46149106803 scopus 로고    scopus 로고
    • accessed May 22, 2006
    • Brooks. 2006. 〈http://www.brookssoftware.com/〉 [accessed May 22, 2006].
    • (2006)
    • Brooks1
  • 6
    • 0036932043 scopus 로고    scopus 로고
    • Design, Development and Application of an Object Oriented Simulation Toolkit for Real-time Semiconductor Manufacturing Scheduling
    • Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
    • Chong, C. S., A. I. Sivakumar, and R. Gay. 2002. Design, Development and Application of an Object Oriented Simulation Toolkit for Real-time Semiconductor Manufacturing Scheduling. Proceedings of the 2002 Winter Simulation Conference. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • (2002) Proceedings of the 2002 Winter Simulation Conference
    • Chong, C.S.1    Sivakumar, A.I.2    Gay, R.3
  • 8
    • 24044461426 scopus 로고    scopus 로고
    • Zero Lookahead and Repeatability in the High Level Architecture
    • accessed May 16, 2006
    • Fujimoto. R. M. 1997. Zero Lookahead and Repeatability in the High Level Architecture. In Spring Simulation Interoperability Workshop 1997. 〈http://www-static.cc.gatech.edu/computing/pads/papers.html#1337〉 [accessed May 16, 2006].
    • (1997) Spring Simulation Interoperability Workshop 1997
    • Fujimoto, R.M.1
  • 11
    • 0034429511 scopus 로고    scopus 로고
    • Distributed Supply Chain Simulation Across the Enterprise Boundaries
    • Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
    • Gan, B. P., L. Liu, S. Jain, S. J. Turner, W. T. Cai, and W. J. Hsu. 2000. Distributed Supply Chain Simulation Across the Enterprise Boundaries. Proceeding of the 2000 Winter Simulation Conference. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • (2000) Proceeding of the 2000 Winter Simulation Conference
    • Gan, B.P.1    Liu, L.2    Jain, S.3    Turner, S.J.4    Cai, W.T.5    Hsu, W.J.6
  • 12
    • 33846676237 scopus 로고    scopus 로고
    • Gan, B. P., P. Lendermann, M. Y. H. Low, S. J. Turner, X. G. Wang, and S. J. E. Taylor. 2005a. Interoperating AutoSched AP Using the High Level Architecture. Proceedings of the 2005 Winter Simulation Conference. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • Gan, B. P., P. Lendermann, M. Y. H. Low, S. J. Turner, X. G. Wang, and S. J. E. Taylor. 2005a. Interoperating AutoSched AP Using the High Level Architecture. Proceedings of the 2005 Winter Simulation Conference. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
  • 13
    • 31344448775 scopus 로고    scopus 로고
    • Gan, B. P., M. Y. H. Low, X. G. Wang, and S. J. Turner. 2005b. Using Manufacturing Process Flow for Time Synchronization in HLA-Based Simulation, 9th IEEE International Symposium on Distributed Simulation and Real-Time Applications. Montreal, Canada. October 10-12, 2005. pp.148-157.
    • Gan, B. P., M. Y. H. Low, X. G. Wang, and S. J. Turner. 2005b. Using Manufacturing Process Flow for Time Synchronization in HLA-Based Simulation, 9th IEEE International Symposium on Distributed Simulation and Real-Time Applications. Montreal, Canada. October 10-12, 2005. pp.148-157.
  • 17
    • 0036924014 scopus 로고    scopus 로고
    • Development of a Distributed Simulation Model for the Transporter Entity in a Supply Chain Process
    • Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
    • Linn, R. J., C. S. Chen, and J. A. Lozan. 2002. Development of a Distributed Simulation Model for the Transporter Entity in a Supply Chain Process. Proceedings of the 2002 Winter Simulation Conference. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • (2002) Proceedings of the 2002 Winter Simulation Conference
    • Linn, R.J.1    Chen, C.S.2    Lozan, J.A.3
  • 19
    • 46149087999 scopus 로고    scopus 로고
    • Quadt, D., and H. Kuhn. 2001. Lot Sizing and Scheduling in Semiconductor Assembly - A Hierarchical Planning Approach. Proceedings of the International Conference on Modeling and Analysis of Semiconductor Manufacturing (MASM 2002). Tempe AZ, USA. April 10-12, 2002. pp. 211-216, 2002.
    • Quadt, D., and H. Kuhn. 2001. Lot Sizing and Scheduling in Semiconductor Assembly - A Hierarchical Planning Approach. Proceedings of the International Conference on Modeling and Analysis of Semiconductor Manufacturing (MASM 2002). Tempe AZ, USA. April 10-12, 2002. pp. 211-216, 2002.
  • 25
    • 46149106122 scopus 로고    scopus 로고
    • Verbraeck, A. 2004. Applying Distributed Simulation for Analyzing Port Extensions. Invited presentation at the Annual Conference of the Operations Research Society of South-Africa (ORSSA'04). Cape Town, SouthAfrica. September 6-8, 2004.
    • Verbraeck, A. 2004. Applying Distributed Simulation for Analyzing Port Extensions. Invited presentation at the Annual Conference of the Operations Research Society of South-Africa (ORSSA'04). Cape Town, SouthAfrica. September 6-8, 2004.
  • 27
    • 33846664563 scopus 로고    scopus 로고
    • Time Management in Distributed Factory Simulation, a Case Study Using HLA
    • Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
    • Wang, K., S. Xu, and L. F. McGinnis. 2005b. Time Management in Distributed Factory Simulation, a Case Study Using HLA. Proceedings of the 2005 Winter Simulation Conference. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • (2005) Proceedings of the 2005 Winter Simulation Conference
    • Wang, K.1    Xu, S.2    McGinnis, L.F.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.