-
1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
Adams, J., E. Balas, and D. Zawack, The shifting bottleneck procedure for job shop scheduling, Management Science, 3, 391-401 (1988).
-
(1988)
Management Science
, vol.3
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
2
-
-
0242269826
-
Measures of subproblem criticality for decomposition algorithms in job shop scheduling
-
Aytug, H., K. Kempf, and R. Uzsoy, Measures of subproblem criticality for decomposition algorithms in job shop scheduling, International Journal of Production Research, 41, 865-882 (2002).
-
(2002)
International Journal of Production Research
, vol.41
, pp. 865-882
-
-
Aytug, H.1
Kempf, K.2
Uzsoy, R.3
-
3
-
-
5144232431
-
Executing production schedules in the face of uncertainty: A review and some future directions
-
Aytug, H., M. A. Lawley, K. N. McKay, S. Moha, and R. Uzsoy, Executing production schedules in the face of uncertainty: a review and some future directions, European Journal of Operational Research, 161, 86-110 (2005).
-
(2005)
European Journal of Operational Research
, vol.161
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.A.2
McKay, K.N.3
Moha, S.4
Uzsoy, R.5
-
4
-
-
0025536790
-
Hierarchical real-time scheduling of a semiconductor fabrication facility
-
Washington DC, October
-
Bai, X., N. Srivatsan, and S. B. Gershwin, Hierarchical real-time scheduling of a semiconductor fabrication facility, in Proceedings Ninth IEEE International Electronics Manufacturing Technology Symposium, Washington DC, October 1990.
-
(1990)
Proceedings Ninth IEEE International Electronics Manufacturing Technology Symposium
-
-
Bai, X.1
Srivatsan, N.2
Gershwin, S.B.3
-
5
-
-
0029195265
-
The one machine problem with delayed precedence constraints and its use in job shop scheduling
-
Balas, E., J. K. Lenstra, and A. Vazacopoulos, The one machine problem with delayed precedence constraints and its use in job shop scheduling, Management Science, 41, 94-109 (1995).
-
(1995)
Management Science
, vol.41
, pp. 94-109
-
-
Balas, E.1
Lenstra, J.K.2
Vazacopoulos, A.3
-
6
-
-
0031997369
-
Guided local search with shifting bottleneck for job shop scheduling
-
Balas, E. and A. Vazacopoulos, Guided local search with shifting bottleneck for job shop scheduling, Management Science, 44, 262-275 (1998).
-
(1998)
Management Science
, vol.44
, pp. 262-275
-
-
Balas, E.1
Vazacopoulos, A.2
-
9
-
-
0000332876
-
Decomposition methods for reentrant flow shops with sequence dependent setup times
-
Demirkol, E. and R. Uzsoy, Decomposition methods for reentrant flow shops with sequence dependent setup times, Journal of Scheduling, 3, 155-177 (2000).
-
(2000)
Journal of Scheduling
, vol.3
, pp. 155-177
-
-
Demirkol, E.1
Uzsoy, R.2
-
11
-
-
0035521426
-
Generating experimental data for computational testing with machine scheduling applications
-
Hall, N.G. and N.G. Posner, Generating experimental data for computational testing with machine scheduling applications, Operations Research, 49(6), 854-865 (2001).
-
(2001)
Operations Research
, vol.49
, Issue.6
, pp. 854-865
-
-
Hall, N.G.1
Posner, N.G.2
-
12
-
-
0342794007
-
Intelligently scheduling semiconductor wafer fabrication
-
M. Zweben and M. Fox (eds.), Morgan Kaufman San Fransisco
-
Kempf, K. G., Intelligently scheduling semiconductor wafer fabrication, in M. Zweben and M. Fox (eds.), Knowledge-Based Scheduling, Morgan Kaufman San Fransisco (1994).
-
(1994)
Knowledge-based Scheduling
-
-
Kempf, K.G.1
-
14
-
-
0001829813
-
Modeling techniques for automated production planning in the semiconductor industry
-
T. A. Ciriani and R. C. Leachman (eds.), Wiley, New York
-
Leachman, R. C., Modeling techniques for automated production planning in the semiconductor industry, in T. A. Ciriani and R. C. Leachman (eds.), Optimization in Industry: Mathematical Programming and Modelling Techniques in Practice, Wiley, New York (1993).
-
(1993)
Optimization in Industry: Mathematical Programming and Modelling Techniques in Practice
-
-
Leachman, R.C.1
-
15
-
-
0028481114
-
Efficient scheduling policies to reduce mean and variance of cycle-time semiconductor plants
-
Lu, S. C. H., D. Ramaswamy, and P. R. Kumar, Efficient scheduling policies to reduce mean and variance of cycle-time semiconductor plants, IEEE Transactions on Semiconductor Manufacturing, 7 (3), 374-388 (1994).
-
(1994)
IEEE Transactions on Semiconductor Manufacturing
, vol.7
, Issue.3
, pp. 374-388
-
-
Lu, S.C.H.1
Ramaswamy, D.2
Kumar, P.R.3
-
16
-
-
0042622980
-
A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
-
Mason, S. J., J. W. Fowler, and W. M. Carlyle, A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops, Journal of Scheduling, 5, 247-262 (2002).
-
(2002)
Journal of Scheduling
, vol.5
, pp. 247-262
-
-
Mason, S.J.1
Fowler, J.W.2
Carlyle, W.M.3
-
17
-
-
0032070778
-
Maintenance scheduling and staffing policies in a wafer fabrication facility
-
Mosley, S. A., T. Teyner, and R. M. Uzsoy, Maintenance scheduling and staffing policies in a wafer fabrication facility, IEEE Transactions on Semiconductor Manufacturing, 11(2), 316-323 (1998).
-
(1998)
IEEE Transactions on Semiconductor Manufacturing
, vol.11
, Issue.2
, pp. 316-323
-
-
Mosley, S.A.1
Teyner, T.2
Uzsoy, R.M.3
-
19
-
-
0003438602
-
-
Prentice Hall, Upper Saddle River, NJC
-
Pinedo, M., Scheduling: Theory, Algorithms, and Systems, Prentice Hall, Upper Saddle River, NJC (1995).
-
(1995)
Scheduling: Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
20
-
-
0033079535
-
A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop
-
Pinedo, M. and M. Singer, A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop, Naval Research Logistics, 46, 1-17 (1999).
-
(1999)
Naval Research Logistics
, vol.46
, pp. 1-17
-
-
Pinedo, M.1
Singer, M.2
-
21
-
-
0035335852
-
Experimental evaluation of heuristic optimization algorithms: A tutorial
-
Rardin, R. L. and R. Uzsoy, Experimental evaluation of heuristic optimization algorithms: A tutorial, Journal of Heuristics, 7(3), 261-304 (2001).
-
(2001)
Journal of Heuristics
, vol.7
, Issue.3
, pp. 261-304
-
-
Rardin, R.L.1
Uzsoy, R.2
-
24
-
-
0037657876
-
An approach to job shop scheduling with sequence-dependent setups
-
Sun, X. and J. S. Noble, An approach to job shop scheduling with sequence-dependent setups, Journal of Manufacturing Systems, 18, 416-430 (1999).
-
(1999)
Journal of Manufacturing Systems
, vol.18
, pp. 416-430
-
-
Sun, X.1
Noble, J.S.2
-
25
-
-
0029387205
-
Scheduling batch processing machines with incompatible job families
-
Uzsoy, R., Scheduling batch processing machines with incompatible job families, International Journal of Production Research, 33, 2605-2708 (1995).
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2605-2708
-
-
Uzsoy, R.1
-
26
-
-
0028496979
-
A review of production planning and scheduling models in the semiconductor industry. 2. shop-floor control
-
Uzsoy, R., C.Y. Lee, and L.A. Martin-Vega, A review of production planning and scheduling models in the semiconductor industry. 2. shop-floor control, IEE Transactions, 26(5), 44-55 (1994).
-
(1994)
IEE Transactions
, vol.26
, Issue.5
, pp. 44-55
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
27
-
-
0034655062
-
Performance of decomposition procedures for job shop scheduling problems with bottleneck machines
-
Uzsoy, R. and C.-S.Wang, performance of decomposition procedures for job shop scheduling problems with bottleneck machines, International Journal of Production Research, 38(6), 1271-1286 (2000).
-
(2000)
International Journal of Production Research
, vol.38
, Issue.6
, pp. 1271-1286
-
-
Uzsoy, R.1
Wang, C.-S.2
-
28
-
-
33845488594
-
-
Ph.D. Thesis, School of Industrial Engineering, Purdue University, West Lafayette
-
Wang, C.-S., Decomposition heuristics for complex job shop scheduling, Ph.D. Thesis, School of Industrial Engineering, Purdue University, West Lafayette (2000).
-
(2000)
Decomposition Heuristics for Complex Job Shop Scheduling
-
-
Wang, C.-S.1
|