메뉴 건너뛰기




Volumn 10, Issue 1, 2007, Pages 41-65

Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication

Author keywords

Computational evaluation; Job shop scheduling; Maximum lateness; Shifting bottleneck

Indexed keywords

COMPUTATION THEORY; COMPUTER SIMULATION; DECOMPOSITION; GLOBAL OPTIMIZATION; HEURISTIC METHODS; PROBLEM SOLVING; REAL TIME SYSTEMS; SCHEDULING;

EID: 33845487579     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-006-0325-5     Document Type: Article
Times cited : (65)

References (29)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., E. Balas, and D. Zawack, The shifting bottleneck procedure for job shop scheduling, Management Science, 3, 391-401 (1988).
    • (1988) Management Science , vol.3 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 0242269826 scopus 로고    scopus 로고
    • Measures of subproblem criticality for decomposition algorithms in job shop scheduling
    • Aytug, H., K. Kempf, and R. Uzsoy, Measures of subproblem criticality for decomposition algorithms in job shop scheduling, International Journal of Production Research, 41, 865-882 (2002).
    • (2002) International Journal of Production Research , vol.41 , pp. 865-882
    • Aytug, H.1    Kempf, K.2    Uzsoy, R.3
  • 3
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainty: A review and some future directions
    • Aytug, H., M. A. Lawley, K. N. McKay, S. Moha, and R. Uzsoy, Executing production schedules in the face of uncertainty: a review and some future directions, European Journal of Operational Research, 161, 86-110 (2005).
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.N.3    Moha, S.4    Uzsoy, R.5
  • 5
    • 0029195265 scopus 로고
    • The one machine problem with delayed precedence constraints and its use in job shop scheduling
    • Balas, E., J. K. Lenstra, and A. Vazacopoulos, The one machine problem with delayed precedence constraints and its use in job shop scheduling, Management Science, 41, 94-109 (1995).
    • (1995) Management Science , vol.41 , pp. 94-109
    • Balas, E.1    Lenstra, J.K.2    Vazacopoulos, A.3
  • 6
    • 0031997369 scopus 로고    scopus 로고
    • Guided local search with shifting bottleneck for job shop scheduling
    • Balas, E. and A. Vazacopoulos, Guided local search with shifting bottleneck for job shop scheduling, Management Science, 44, 262-275 (1998).
    • (1998) Management Science , vol.44 , pp. 262-275
    • Balas, E.1    Vazacopoulos, A.2
  • 9
    • 0000332876 scopus 로고    scopus 로고
    • Decomposition methods for reentrant flow shops with sequence dependent setup times
    • Demirkol, E. and R. Uzsoy, Decomposition methods for reentrant flow shops with sequence dependent setup times, Journal of Scheduling, 3, 155-177 (2000).
    • (2000) Journal of Scheduling , vol.3 , pp. 155-177
    • Demirkol, E.1    Uzsoy, R.2
  • 11
    • 0035521426 scopus 로고    scopus 로고
    • Generating experimental data for computational testing with machine scheduling applications
    • Hall, N.G. and N.G. Posner, Generating experimental data for computational testing with machine scheduling applications, Operations Research, 49(6), 854-865 (2001).
    • (2001) Operations Research , vol.49 , Issue.6 , pp. 854-865
    • Hall, N.G.1    Posner, N.G.2
  • 12
    • 0342794007 scopus 로고
    • Intelligently scheduling semiconductor wafer fabrication
    • M. Zweben and M. Fox (eds.), Morgan Kaufman San Fransisco
    • Kempf, K. G., Intelligently scheduling semiconductor wafer fabrication, in M. Zweben and M. Fox (eds.), Knowledge-Based Scheduling, Morgan Kaufman San Fransisco (1994).
    • (1994) Knowledge-based Scheduling
    • Kempf, K.G.1
  • 14
    • 0001829813 scopus 로고
    • Modeling techniques for automated production planning in the semiconductor industry
    • T. A. Ciriani and R. C. Leachman (eds.), Wiley, New York
    • Leachman, R. C., Modeling techniques for automated production planning in the semiconductor industry, in T. A. Ciriani and R. C. Leachman (eds.), Optimization in Industry: Mathematical Programming and Modelling Techniques in Practice, Wiley, New York (1993).
    • (1993) Optimization in Industry: Mathematical Programming and Modelling Techniques in Practice
    • Leachman, R.C.1
  • 15
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle-time semiconductor plants
    • Lu, S. C. H., D. Ramaswamy, and P. R. Kumar, Efficient scheduling policies to reduce mean and variance of cycle-time semiconductor plants, IEEE Transactions on Semiconductor Manufacturing, 7 (3), 374-388 (1994).
    • (1994) IEEE Transactions on Semiconductor Manufacturing , vol.7 , Issue.3 , pp. 374-388
    • Lu, S.C.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 16
    • 0042622980 scopus 로고    scopus 로고
    • A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
    • Mason, S. J., J. W. Fowler, and W. M. Carlyle, A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops, Journal of Scheduling, 5, 247-262 (2002).
    • (2002) Journal of Scheduling , vol.5 , pp. 247-262
    • Mason, S.J.1    Fowler, J.W.2    Carlyle, W.M.3
  • 17
  • 20
    • 0033079535 scopus 로고    scopus 로고
    • A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop
    • Pinedo, M. and M. Singer, A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop, Naval Research Logistics, 46, 1-17 (1999).
    • (1999) Naval Research Logistics , vol.46 , pp. 1-17
    • Pinedo, M.1    Singer, M.2
  • 21
    • 0035335852 scopus 로고    scopus 로고
    • Experimental evaluation of heuristic optimization algorithms: A tutorial
    • Rardin, R. L. and R. Uzsoy, Experimental evaluation of heuristic optimization algorithms: A tutorial, Journal of Heuristics, 7(3), 261-304 (2001).
    • (2001) Journal of Heuristics , vol.7 , Issue.3 , pp. 261-304
    • Rardin, R.L.1    Uzsoy, R.2
  • 24
    • 0037657876 scopus 로고    scopus 로고
    • An approach to job shop scheduling with sequence-dependent setups
    • Sun, X. and J. S. Noble, An approach to job shop scheduling with sequence-dependent setups, Journal of Manufacturing Systems, 18, 416-430 (1999).
    • (1999) Journal of Manufacturing Systems , vol.18 , pp. 416-430
    • Sun, X.1    Noble, J.S.2
  • 25
    • 0029387205 scopus 로고
    • Scheduling batch processing machines with incompatible job families
    • Uzsoy, R., Scheduling batch processing machines with incompatible job families, International Journal of Production Research, 33, 2605-2708 (1995).
    • (1995) International Journal of Production Research , vol.33 , pp. 2605-2708
    • Uzsoy, R.1
  • 26
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. 2. shop-floor control
    • Uzsoy, R., C.Y. Lee, and L.A. Martin-Vega, A review of production planning and scheduling models in the semiconductor industry. 2. shop-floor control, IEE Transactions, 26(5), 44-55 (1994).
    • (1994) IEE Transactions , vol.26 , Issue.5 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 27
    • 0034655062 scopus 로고    scopus 로고
    • Performance of decomposition procedures for job shop scheduling problems with bottleneck machines
    • Uzsoy, R. and C.-S.Wang, performance of decomposition procedures for job shop scheduling problems with bottleneck machines, International Journal of Production Research, 38(6), 1271-1286 (2000).
    • (2000) International Journal of Production Research , vol.38 , Issue.6 , pp. 1271-1286
    • Uzsoy, R.1    Wang, C.-S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.