메뉴 건너뛰기




Volumn 44, Issue 4, 2006, Pages 639-652

Minimizing the cycle time in serial manufacturing systems with multiple dual-gripper robots

Author keywords

Dual gripper; Flow shop; Multi robot; Robotic cell

Indexed keywords

AGILE MANUFACTURING SYSTEMS; GRIPPERS; MATERIALS HANDLING; PRODUCTIVITY; ROBOTICS; ROBOTS;

EID: 30844461467     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500337544     Document Type: Article
Times cited : (16)

References (11)
  • 1
    • 0032791011 scopus 로고    scopus 로고
    • Scheduling of parts and robot activities in a two machine robotic cell
    • Aneja, Y.P. and Kamoun, H., Scheduling of parts and robot activities in a two machine robotic cell. Computers & Op. Res., 1999, 26, 297-312.
    • (1999) Computers & Op. Res. , vol.26 , pp. 297-312
    • Aneja, Y.P.1    Kamoun, H.2
  • 3
    • 0035546060 scopus 로고    scopus 로고
    • Optimal moves of the material handling system in a robotic cell
    • Brauner, N. and Finke, G., Optimal moves of the material handling system in a robotic cell. Int. J. Prod. Econ., 2001, 74, 269-277.
    • (2001) Int. J. Prod. Econ. , vol.74 , pp. 269-277
    • Brauner, N.1    Finke, G.2
  • 4
    • 0031139162 scopus 로고    scopus 로고
    • Combinatorial optimisation models for production scheduling in automated manufacturing systems
    • Cama, Y., Combinatorial optimisation models for production scheduling in automated manufacturing systems. Eur. J. Oper. Res., 1997, 99, 136-153.
    • (1997) Eur. J. Oper. Res. , vol.99 , pp. 136-153
    • Cama, Y.1
  • 5
    • 0033312656 scopus 로고    scopus 로고
    • Scheduling in robotic cells: Heuristics and cell design
    • Kamoun, H., Hall, N.G. and Sriskandarajah, C., Scheduling in robotic cells: heuristics and cell design. Op. Res., 1999, 47, 821-835.
    • (1999) Op. Res. , vol.47 , pp. 821-835
    • Kamoun, H.1    Hall, N.G.2    Sriskandarajah, C.3
  • 6
  • 9
    • 9644286254 scopus 로고    scopus 로고
    • Scheduling multiple parts in a robotic cell served by a dual gripper robot
    • Sriskandarajah, C., Drobouchevitch, I.G., Sethi, S.P. and Chandrasekaran, R., Scheduling multiple parts in a robotic cell served by a dual gripper robot. Op. Res., 2004, 52(1), 65-82.
    • (2004) Op. Res. , vol.52 , Issue.1 , pp. 65-82
    • Sriskandarajah, C.1    Drobouchevitch, I.G.2    Sethi, S.P.3    Chandrasekaran, R.4
  • 10
    • 0030086424 scopus 로고    scopus 로고
    • Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems
    • Su, Q. and Chen, F., Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems. IEEE Trans, on Robot. & Autom., 1996, 12(1), 22-30.
    • (1996) IEEE Trans, on Robot. & Autom. , vol.12 , Issue.1 , pp. 22-30
    • Su, Q.1    Chen, F.2
  • 11
    • 0021897849 scopus 로고
    • A structure for sequencing robot activities in machine tending applications
    • Wilhelm, W.E. and Sarin, S.C., A structure for sequencing robot activities in machine tending applications. Int. J. Prod. Res., 1985, 23(1), 47-64.
    • (1985) Int. J. Prod. Res. , vol.23 , Issue.1 , pp. 47-64
    • Wilhelm, W.E.1    Sarin, S.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.