-
1
-
-
0037366641
-
Value stream analysis of a re-engineered construction supply chain
-
Arbulu, R.J., et al., 2003. Value stream analysis of a re-engineered construction supply chain. Building Research and Information, 31 (2), 161-171.
-
(2003)
Building Research and Information
, vol.31
, Issue.2
, pp. 161-171
-
-
Arbulu, R.J.1
-
2
-
-
0034175343
-
Lean production: A study of application in a traditional manufacturing environment
-
Bamber, L. and Dale, B.G., 2000. Lean production: a study of application in a traditional manufacturing environment. Production Planning & Control, 11 (3), 291-298.
-
(2000)
Production Planning & Control
, vol.11
, Issue.3
, pp. 291-298
-
-
Bamber, L.1
Dale, B.G.2
-
3
-
-
0004275090
-
-
Buckingham, England: Picsie Books
-
Bicheno, J., 2000. The Lean toolbox. Buckingham, England: Picsie Books.
-
(2000)
The Lean toolbox
-
-
Bicheno, J.1
-
4
-
-
0036459854
-
The success and failure of performance measurement initiatives: Perceptions of participating managers
-
Bourne, M., et al., 2002. The success and failure of performance measurement initiatives: perceptions of participating managers. International Journal of Operations and Production Management, 22 (11), 1288-1310.
-
(2002)
International Journal of Operations and Production Management
, vol.22
, Issue.11
, pp. 1288-1310
-
-
Bourne, M.1
-
5
-
-
0036035970
-
Is Lean a universal production system? Batch production in the automotive industry
-
Cooney, R., 2002. Is Lean a universal production system? Batch production in the automotive industry. International Journal of Operations and Production Management, 22, 1130-1147.
-
(2002)
International Journal of Operations and Production Management
, vol.22
, pp. 1130-1147
-
-
Cooney, R.1
-
7
-
-
25144444879
-
What actually happened to inventories of American companies between 1981 and 2000?
-
Chen, H., Frank, M.Z., and Wu, O.Q., 2005. What actually happened to inventories of American companies between 1981 and 2000? Management Science, 51 (7), 1015-1031.
-
(2005)
Management Science
, vol.51
, Issue.7
, pp. 1015-1031
-
-
Chen, H.1
Frank, M.Z.2
Wu, O.Q.3
-
8
-
-
0035501405
-
Relationships between implementation of TQM, JIT, and TPM and manufacturing performance
-
Cua, K.O., Mckone, K.E., and Schroeder, R.G., 2001. Relationships between implementation of TQM, JIT, and TPM and manufacturing performance. Journal of Operations Management, 19, 675-694.
-
(2001)
Journal of Operations Management
, vol.19
, pp. 675-694
-
-
Cua, K.O.1
Mckone, K.E.2
Schroeder, R.G.3
-
9
-
-
0035600835
-
Manufacturing strategy. Literature review and some issues
-
Dangayach, G.S. and Deshmukh, S.G., 2001. Manufacturing strategy. Literature review and some issues. International Journal of Operations and Production Management, 21 (7), 884-932.
-
(2001)
International Journal of Operations and Production Management
, vol.21
, Issue.7
, pp. 884-932
-
-
Dangayach, G.S.1
Deshmukh, S.G.2
-
10
-
-
33744819775
-
A review of Lean assessment in organizations: An exploratory study of Lean practices by electronics manufacturers
-
Doolen, T. and Hacker, M.E., 2005. A review of Lean assessment in organizations: an exploratory study of Lean practices by electronics manufacturers. Journal of Manufacturing Systems, 24 (1), 55-67.
-
(2005)
Journal of Manufacturing Systems
, vol.24
, Issue.1
, pp. 55-67
-
-
Doolen, T.1
Hacker, M.E.2
-
11
-
-
0347034968
-
From mass production to flexible-agile production
-
Duguay, C., Landry, S., and Pasin, F., 1997. From mass production to flexible-agile production. International Journal of Production and Operations Management, 17(12), 1183-1195.
-
(1997)
International Journal of Production and Operations Management
, vol.17
, Issue.12
, pp. 1183-1195
-
-
Duguay, C.1
Landry, S.2
Pasin, F.3
-
13
-
-
0001073758
-
Building theories from case study research
-
Eisenhardt, K.M., 1989. Building theories from case study research. Academy of Management Review, 14, 532-550.
-
(1989)
Academy of Management Review
, vol.14
, pp. 532-550
-
-
Eisenhardt, K.M.1
-
15
-
-
0003710588
-
-
Massachusetts: North River Press
-
Goldratt, E.M. and Fox, R.E., 1986. The race. Massachusetts: North River Press.
-
(1986)
The race
-
-
Goldratt, E.M.1
Fox, R.E.2
-
17
-
-
46649107399
-
Running like clockwork
-
Gregory, A., 2004. Running like clockwork. Works Management, 57 (2), 14-16.
-
(2004)
Works Management
, vol.57
, Issue.2
, pp. 14-16
-
-
Gregory, A.1
-
18
-
-
61449236423
-
Team defines stream
-
Gregory, A., 2006. Team defines stream. Works Management, 59 (5), 14-17.
-
(2006)
Works Management
, vol.59
, Issue.5
, pp. 14-17
-
-
Gregory, A.1
-
19
-
-
0032099751
-
Lean production. Implementation problems
-
Hancock, W.M. and Zayko, M.J., 1998. Lean production. Implementation problems. IIE Solutions, 30 (6), 38-42.
-
(1998)
IIE Solutions
, vol.30
, Issue.6
, pp. 38-42
-
-
Hancock, W.M.1
Zayko, M.J.2
-
22
-
-
0000618550
-
Link manufacturing process and product life cycle
-
Hayes, R.H. and Wheelwright, S.C., 1979a. Link manufacturing process and product life cycle. Harvard Business Review, 57, 133-140.
-
(1979)
Harvard Business Review
, vol.57
, pp. 133-140
-
-
Hayes, R.H.1
Wheelwright, S.C.2
-
23
-
-
0000618550
-
The dynamics of product-process life cycles
-
Hayes, R.H. and Wheelwright, S.C., 1979b. The dynamics of product-process life cycles. Harvard Business Review, 57, 127-136.
-
(1979)
Harvard Business Review
, vol.57
, pp. 127-136
-
-
Hayes, R.H.1
Wheelwright, S.C.2
-
24
-
-
12444323920
-
-
New Jersey: Wiley
-
Hayes, R.H., Pisano, G., Upton, D., and Wheelwright, S.C., 2005. Pursuing the competitive edge. New Jersey: Wiley.
-
(2005)
Pursuing the competitive edge
-
-
Hayes, R.H.1
Pisano, G.2
Upton, D.3
Wheelwright, S.C.4
-
26
-
-
8844263039
-
Learning to evolve. A review of contemporary Lean thinking
-
Hines, P., Holweg, M., and Rich, N., 2004. Learning to evolve. A review of contemporary Lean thinking. International Journal of Production Management, 24 (17), 994-1011.
-
(2004)
International Journal of Production Management
, vol.24
, Issue.17
, pp. 994-1011
-
-
Hines, P.1
Holweg, M.2
Rich, N.3
-
29
-
-
27744511487
-
A novel approach to Lean control for Taiwan-funded enterprises in mainland China
-
Huang, C.C. and Liu, S.H., 2005. A novel approach to Lean control for Taiwan-funded enterprises in mainland China. International Journal of Production Research, 43 (12), 2553-2575.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.12
, pp. 2553-2575
-
-
Huang, C.C.1
Liu, S.H.2
-
30
-
-
2442495364
-
Survey of manufacturing curricula from around the world
-
Hunt, I., el al., 2004. Survey of manufacturing curricula from around the world. Production Planning & Control, 15, 171-179.
-
(2004)
Production Planning & Control
, vol.15
, pp. 171-179
-
-
Hunt, I.1
el al2
-
31
-
-
33645521541
-
Powering the transformation
-
James, T., 2006. Powering the transformation. Manufacturing Engineer, 85 (1), 26-31.
-
(2006)
Manufacturing Engineer
, vol.85
, Issue.1
, pp. 26-31
-
-
James, T.1
-
32
-
-
15844398088
-
-
Massachusetts: The Lean Enterprise Institute
-
Jones, D. and Womack, J., 2003. Seeing the whole. Massachusetts: The Lean Enterprise Institute.
-
(2003)
Seeing the whole
-
-
Jones, D.1
Womack, J.2
-
33
-
-
46649101398
-
Softly, softly
-
Jones, M., 2003. Softly, softly. Works Management, 56, 14-15.
-
(2003)
Works Management
, vol.56
, pp. 14-15
-
-
Jones, M.1
-
34
-
-
0029343450
-
Case studies for method and tool evaluation
-
Kitchenham, B., Pickard, L., and Pfleeger, S.L., 1995. Case studies for method and tool evaluation. IEEE Software, 12, 52-62.
-
(1995)
IEEE Software
, vol.12
, pp. 52-62
-
-
Kitchenham, B.1
Pickard, L.2
Pfleeger, S.L.3
-
35
-
-
33745604543
-
Implementing the Lean sigma framework in an Indian SME: A case study
-
Kumar, M., et al., 2006. Implementing the Lean sigma framework in an Indian SME: a case study. Production Planning & Control, 17 (4), 407-423.
-
(2006)
Production Planning & Control
, vol.17
, Issue.4
, pp. 407-423
-
-
Kumar, M.1
-
36
-
-
61449256115
-
Take a walk downstream
-
Mackle, K., 2003. Take a walk downstream. Metalworking production, 14, 5-8.
-
(2003)
Metalworking production
, vol.14
, pp. 5-8
-
-
Mackle, K.1
-
38
-
-
61449213059
-
-
online, Available from:, Accessed 12 April 2006
-
Marchwinski, C., 2004. 2004 state of Lean report [online]. Available from: http://www.lean.org/WhoWeAre/News ArticleDocuments/ State%20of%20Lean%20Report%202% 2004.doc [Accessed 12 April 2006].
-
(2004)
2004 state of Lean report
-
-
Marchwinski, C.1
-
39
-
-
0032119946
-
Building operations management theory through case and field research
-
Meredith, J., 1998. Building operations management theory through case and field research. Journal of Operations Management, 16, 441-454.
-
(1998)
Journal of Operations Management
, vol.16
, pp. 441-454
-
-
Meredith, J.1
-
41
-
-
27844474784
-
Kaizen costing for Lean manufacturing: A case study
-
Modarress, B., Ansari, A., and Lockwood, D.L., 2005. Kaizen costing for Lean manufacturing: a case study. International Journal of Production Research, 43 (9), 1751-1760.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.9
, pp. 1751-1760
-
-
Modarress, B.1
Ansari, A.2
Lockwood, D.L.3
-
43
-
-
0036492249
-
How to compare six sigma, Lean and the theory of constraints
-
Nave, D., 2002. How to compare six sigma, Lean and the theory of constraints. Quality Progress, 35 (3), 73-78.
-
(2002)
Quality Progress
, vol.35
, Issue.3
, pp. 73-78
-
-
Nave, D.1
-
45
-
-
0037810496
-
Strategic positioning of the order penetration point
-
Olhager, J., 2003. Strategic positioning of the order penetration point. International Journal of Production Economics, 85(3), 319-329.
-
(2003)
International Journal of Production Economics
, vol.85
, Issue.3
, pp. 319-329
-
-
Olhager, J.1
-
46
-
-
29144455158
-
Manufacturing lite with Lean. Delphi and Visteon Lean initiatives
-
Olexa, R., 2002. Manufacturing lite with Lean. Delphi and Visteon Lean initiatives. Forming and Fabricating, 9, 1-6.
-
(2002)
Forming and Fabricating
, vol.9
, pp. 1-6
-
-
Olexa, R.1
-
47
-
-
0242364676
-
Classification scheme for Lean manufacturing tools
-
Pavnaskar, S.J., Gershenson, J.K., and Jambekar, A.B., 2003. Classification scheme for Lean manufacturing tools. International Journal of Production Research, 41 (13), 3075-3090.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.13
, pp. 3075-3090
-
-
Pavnaskar, S.J.1
Gershenson, J.K.2
Jambekar, A.B.3
-
53
-
-
0031235185
-
The impact of just in time manufacturing and its infrastructure on manufacturing performance
-
Sakakibara, S., et al., 1997. The impact of just in time manufacturing and its infrastructure on manufacturing performance. Management Science, 43 (9), 1246-1257.
-
(1997)
Management Science
, vol.43
, Issue.9
, pp. 1246-1257
-
-
Sakakibara, S.1
-
55
-
-
27844589388
-
Application of value stream mapping for lean operations and cycle time reduction: An Indian case study
-
Seth, D. and Gupta, V., 2005. Application of value stream mapping for lean operations and cycle time reduction: an Indian case study. Production Planning & Control, 16 (1), 44-59.
-
(2005)
Production Planning & Control
, vol.16
, Issue.1
, pp. 44-59
-
-
Seth, D.1
Gupta, V.2
-
56
-
-
0033100694
-
Escape from the unnecessary-some guidelines for production management
-
Segerstedt, A., 1999. Escape from the unnecessary-some guidelines for production management. Production Planning & Control, 10 (2), 194-199.
-
(1999)
Production Planning & Control
, vol.10
, Issue.2
, pp. 194-199
-
-
Segerstedt, A.1
-
57
-
-
0037357671
-
Lean manufacturing: Context, practice bundles, and performance
-
Shah, R. and Ward, P.T., 2003. Lean manufacturing: context, practice bundles, and performance. Journal of Operations Management, 21 (2), 129-149.
-
(2003)
Journal of Operations Management
, vol.21
, Issue.2
, pp. 129-149
-
-
Shah, R.1
Ward, P.T.2
-
59
-
-
32644470629
-
Lean tool selection in a die casting unit: A fuzzy-based decision support heuristic
-
Singh, R.K., et al., 2006., Lean tool selection in a die casting unit: a fuzzy-based decision support heuristic. International Journal of Production Research, 44 (7), 1399-1429.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.7
, pp. 1399-1429
-
-
Singh, R.K.1
-
60
-
-
34250818294
-
-
Massachusetts: The Lean Enterprise Institute
-
Smalley, A., 2004. Creating level pull. Massachusetts: The Lean Enterprise Institute.
-
(2004)
Creating level pull
-
-
Smalley, A.1
-
61
-
-
84995344654
-
Field research methods in strategic management: Contributions to theory building and testing
-
Snow, C.C. and Thomas, J.B., 1994. Field research methods in strategic management: contributions to theory building and testing. Journal of Management Studies, 31 (4), 457-480.
-
(1994)
Journal of Management Studies
, vol.31
, Issue.4
, pp. 457-480
-
-
Snow, C.C.1
Thomas, J.B.2
-
62
-
-
0036609510
-
Equipment replacement decisions and Lean manufacturing
-
Sullivan, G.W., Mc Donalds, T.N., and Van Aken, E.M., 2002. Equipment replacement decisions and Lean manufacturing. Robotics and Computer Integrated Manufacturing, 18 (3-4), 255-265.
-
(2002)
Robotics and Computer Integrated Manufacturing
, vol.18
, Issue.3-4
, pp. 255-265
-
-
Sullivan, G.W.1
Mc Donalds, T.N.2
Van Aken, E.M.3
-
64
-
-
1842465687
-
-
New York: The Productivity Press
-
Tapping, D., Luyster, T., and Shuker, T., 2002. Value stream management. Eight steps to planning, mapping and sustaining Lean improvements. New York: The Productivity Press.
-
(2002)
Value stream management. Eight steps to planning, mapping and sustaining Lean improvements
-
-
Tapping, D.1
Luyster, T.2
Shuker, T.3
-
66
-
-
0035252557
-
The rediscovery of postponement a literature review and directions for further research
-
Van Hoek, R., 2001. The rediscovery of postponement a literature review and directions for further research. Journal of Operations Management, 19, 161-184.
-
(2001)
Journal of Operations Management
, vol.19
, pp. 161-184
-
-
Van Hoek, R.1
-
67
-
-
0038813905
-
Value stream mapping: This tool puts you and your customer on the same page
-
Voelkel, J.G. and Chapman, C., 2003. Value stream mapping: this tool puts you and your customer on the same page. Quality Progress, 36, 65-69.
-
(2003)
Quality Progress
, vol.36
, pp. 65-69
-
-
Voelkel, J.G.1
Chapman, C.2
-
69
-
-
0036017711
-
Case research in operations management
-
Voss, C., Tsikriktsis, N., and Frohlich, M., 2002. Case research in operations management. International Journal of Operations and Production Management, 22, 195-219.
-
(2002)
International Journal of Operations and Production Management
, vol.22
, pp. 195-219
-
-
Voss, C.1
Tsikriktsis, N.2
Frohlich, M.3
-
72
-
-
21844449924
-
Integrating production and engineering perspectives on the customer order decoupling point
-
Wikner, J. and Rudberg, M., 2005. Integrating production and engineering perspectives on the customer order decoupling point. International Journal of Operations and Production Management, 25, 623-641.
-
(2005)
International Journal of Operations and Production Management
, vol.25
, pp. 623-641
-
-
Wikner, J.1
Rudberg, M.2
-
73
-
-
61449183696
-
-
online, Available from:, Accessed 24 February 2008
-
Womack, J.P., 2001. 10 Lean steps for surviving the recession [online]. Available from: http://www.lean.org/Community/Registered/ShowEmail. cfm?JimsEmailId=13 [Accessed 24 February 2008].
-
(2001)
10 Lean steps for surviving the recession
-
-
Womack, J.P.1
-
77
-
-
84922184183
-
-
Yang Hua, L. and Van Landeghem, H., 2005. Simulation based value stream mapping: the formal modelling procedure. In: A. Benzekri and J.C. Hochon, eds. ECEC'2005, 12th European Concurrent Engineering Conference. Toulouse: Eurosis, 79-85.
-
Yang Hua, L. and Van Landeghem, H., 2005. Simulation based value stream mapping: the formal modelling procedure. In: A. Benzekri and J.C. Hochon, eds. ECEC'2005, 12th European Concurrent Engineering Conference. Toulouse: Eurosis, 79-85.
-
-
-
-
79
-
-
0037146416
-
A comparative study of Lean and agile manufacturing with a related survey of current practices in the UK
-
Yusuf, Y.Y. and Adeleye, E.O., 2002. A comparative study of Lean and agile manufacturing with a related survey of current practices in the UK. International Journal of Production Research, 40 (17), 4545-4562.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.17
, pp. 4545-4562
-
-
Yusuf, Y.Y.1
Adeleye, E.O.2
|