메뉴 건너뛰기




Volumn 20, Issue 1, 2009, Pages 82-98

Extent of the use of Lean concepts proposed for a value stream mapping application

Author keywords

Lean concepts application; Lean production; Value stream mapping

Indexed keywords

PHILOSOPHICAL ASPECTS;

EID: 61449233284     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537280802685322     Document Type: Article
Times cited : (93)

References (79)
  • 1
    • 0037366641 scopus 로고    scopus 로고
    • Value stream analysis of a re-engineered construction supply chain
    • Arbulu, R.J., et al., 2003. Value stream analysis of a re-engineered construction supply chain. Building Research and Information, 31 (2), 161-171.
    • (2003) Building Research and Information , vol.31 , Issue.2 , pp. 161-171
    • Arbulu, R.J.1
  • 2
    • 0034175343 scopus 로고    scopus 로고
    • Lean production: A study of application in a traditional manufacturing environment
    • Bamber, L. and Dale, B.G., 2000. Lean production: a study of application in a traditional manufacturing environment. Production Planning & Control, 11 (3), 291-298.
    • (2000) Production Planning & Control , vol.11 , Issue.3 , pp. 291-298
    • Bamber, L.1    Dale, B.G.2
  • 3
    • 0004275090 scopus 로고    scopus 로고
    • Buckingham, England: Picsie Books
    • Bicheno, J., 2000. The Lean toolbox. Buckingham, England: Picsie Books.
    • (2000) The Lean toolbox
    • Bicheno, J.1
  • 4
    • 0036459854 scopus 로고    scopus 로고
    • The success and failure of performance measurement initiatives: Perceptions of participating managers
    • Bourne, M., et al., 2002. The success and failure of performance measurement initiatives: perceptions of participating managers. International Journal of Operations and Production Management, 22 (11), 1288-1310.
    • (2002) International Journal of Operations and Production Management , vol.22 , Issue.11 , pp. 1288-1310
    • Bourne, M.1
  • 5
    • 0036035970 scopus 로고    scopus 로고
    • Is Lean a universal production system? Batch production in the automotive industry
    • Cooney, R., 2002. Is Lean a universal production system? Batch production in the automotive industry. International Journal of Operations and Production Management, 22, 1130-1147.
    • (2002) International Journal of Operations and Production Management , vol.22 , pp. 1130-1147
    • Cooney, R.1
  • 7
    • 25144444879 scopus 로고    scopus 로고
    • What actually happened to inventories of American companies between 1981 and 2000?
    • Chen, H., Frank, M.Z., and Wu, O.Q., 2005. What actually happened to inventories of American companies between 1981 and 2000? Management Science, 51 (7), 1015-1031.
    • (2005) Management Science , vol.51 , Issue.7 , pp. 1015-1031
    • Chen, H.1    Frank, M.Z.2    Wu, O.Q.3
  • 8
    • 0035501405 scopus 로고    scopus 로고
    • Relationships between implementation of TQM, JIT, and TPM and manufacturing performance
    • Cua, K.O., Mckone, K.E., and Schroeder, R.G., 2001. Relationships between implementation of TQM, JIT, and TPM and manufacturing performance. Journal of Operations Management, 19, 675-694.
    • (2001) Journal of Operations Management , vol.19 , pp. 675-694
    • Cua, K.O.1    Mckone, K.E.2    Schroeder, R.G.3
  • 10
    • 33744819775 scopus 로고    scopus 로고
    • A review of Lean assessment in organizations: An exploratory study of Lean practices by electronics manufacturers
    • Doolen, T. and Hacker, M.E., 2005. A review of Lean assessment in organizations: an exploratory study of Lean practices by electronics manufacturers. Journal of Manufacturing Systems, 24 (1), 55-67.
    • (2005) Journal of Manufacturing Systems , vol.24 , Issue.1 , pp. 55-67
    • Doolen, T.1    Hacker, M.E.2
  • 13
    • 0001073758 scopus 로고
    • Building theories from case study research
    • Eisenhardt, K.M., 1989. Building theories from case study research. Academy of Management Review, 14, 532-550.
    • (1989) Academy of Management Review , vol.14 , pp. 532-550
    • Eisenhardt, K.M.1
  • 15
    • 0003710588 scopus 로고
    • Massachusetts: North River Press
    • Goldratt, E.M. and Fox, R.E., 1986. The race. Massachusetts: North River Press.
    • (1986) The race
    • Goldratt, E.M.1    Fox, R.E.2
  • 17
    • 46649107399 scopus 로고    scopus 로고
    • Running like clockwork
    • Gregory, A., 2004. Running like clockwork. Works Management, 57 (2), 14-16.
    • (2004) Works Management , vol.57 , Issue.2 , pp. 14-16
    • Gregory, A.1
  • 18
    • 61449236423 scopus 로고    scopus 로고
    • Team defines stream
    • Gregory, A., 2006. Team defines stream. Works Management, 59 (5), 14-17.
    • (2006) Works Management , vol.59 , Issue.5 , pp. 14-17
    • Gregory, A.1
  • 19
    • 0032099751 scopus 로고    scopus 로고
    • Lean production. Implementation problems
    • Hancock, W.M. and Zayko, M.J., 1998. Lean production. Implementation problems. IIE Solutions, 30 (6), 38-42.
    • (1998) IIE Solutions , vol.30 , Issue.6 , pp. 38-42
    • Hancock, W.M.1    Zayko, M.J.2
  • 22
    • 0000618550 scopus 로고
    • Link manufacturing process and product life cycle
    • Hayes, R.H. and Wheelwright, S.C., 1979a. Link manufacturing process and product life cycle. Harvard Business Review, 57, 133-140.
    • (1979) Harvard Business Review , vol.57 , pp. 133-140
    • Hayes, R.H.1    Wheelwright, S.C.2
  • 23
    • 0000618550 scopus 로고
    • The dynamics of product-process life cycles
    • Hayes, R.H. and Wheelwright, S.C., 1979b. The dynamics of product-process life cycles. Harvard Business Review, 57, 127-136.
    • (1979) Harvard Business Review , vol.57 , pp. 127-136
    • Hayes, R.H.1    Wheelwright, S.C.2
  • 29
    • 27744511487 scopus 로고    scopus 로고
    • A novel approach to Lean control for Taiwan-funded enterprises in mainland China
    • Huang, C.C. and Liu, S.H., 2005. A novel approach to Lean control for Taiwan-funded enterprises in mainland China. International Journal of Production Research, 43 (12), 2553-2575.
    • (2005) International Journal of Production Research , vol.43 , Issue.12 , pp. 2553-2575
    • Huang, C.C.1    Liu, S.H.2
  • 30
    • 2442495364 scopus 로고    scopus 로고
    • Survey of manufacturing curricula from around the world
    • Hunt, I., el al., 2004. Survey of manufacturing curricula from around the world. Production Planning & Control, 15, 171-179.
    • (2004) Production Planning & Control , vol.15 , pp. 171-179
    • Hunt, I.1    el al2
  • 31
    • 33645521541 scopus 로고    scopus 로고
    • Powering the transformation
    • James, T., 2006. Powering the transformation. Manufacturing Engineer, 85 (1), 26-31.
    • (2006) Manufacturing Engineer , vol.85 , Issue.1 , pp. 26-31
    • James, T.1
  • 32
    • 15844398088 scopus 로고    scopus 로고
    • Massachusetts: The Lean Enterprise Institute
    • Jones, D. and Womack, J., 2003. Seeing the whole. Massachusetts: The Lean Enterprise Institute.
    • (2003) Seeing the whole
    • Jones, D.1    Womack, J.2
  • 33
    • 46649101398 scopus 로고    scopus 로고
    • Softly, softly
    • Jones, M., 2003. Softly, softly. Works Management, 56, 14-15.
    • (2003) Works Management , vol.56 , pp. 14-15
    • Jones, M.1
  • 34
  • 35
    • 33745604543 scopus 로고    scopus 로고
    • Implementing the Lean sigma framework in an Indian SME: A case study
    • Kumar, M., et al., 2006. Implementing the Lean sigma framework in an Indian SME: a case study. Production Planning & Control, 17 (4), 407-423.
    • (2006) Production Planning & Control , vol.17 , Issue.4 , pp. 407-423
    • Kumar, M.1
  • 36
    • 61449256115 scopus 로고    scopus 로고
    • Take a walk downstream
    • Mackle, K., 2003. Take a walk downstream. Metalworking production, 14, 5-8.
    • (2003) Metalworking production , vol.14 , pp. 5-8
    • Mackle, K.1
  • 38
    • 61449213059 scopus 로고    scopus 로고
    • online, Available from:, Accessed 12 April 2006
    • Marchwinski, C., 2004. 2004 state of Lean report [online]. Available from: http://www.lean.org/WhoWeAre/News ArticleDocuments/ State%20of%20Lean%20Report%202% 2004.doc [Accessed 12 April 2006].
    • (2004) 2004 state of Lean report
    • Marchwinski, C.1
  • 39
    • 0032119946 scopus 로고    scopus 로고
    • Building operations management theory through case and field research
    • Meredith, J., 1998. Building operations management theory through case and field research. Journal of Operations Management, 16, 441-454.
    • (1998) Journal of Operations Management , vol.16 , pp. 441-454
    • Meredith, J.1
  • 43
    • 0036492249 scopus 로고    scopus 로고
    • How to compare six sigma, Lean and the theory of constraints
    • Nave, D., 2002. How to compare six sigma, Lean and the theory of constraints. Quality Progress, 35 (3), 73-78.
    • (2002) Quality Progress , vol.35 , Issue.3 , pp. 73-78
    • Nave, D.1
  • 45
    • 0037810496 scopus 로고    scopus 로고
    • Strategic positioning of the order penetration point
    • Olhager, J., 2003. Strategic positioning of the order penetration point. International Journal of Production Economics, 85(3), 319-329.
    • (2003) International Journal of Production Economics , vol.85 , Issue.3 , pp. 319-329
    • Olhager, J.1
  • 46
    • 29144455158 scopus 로고    scopus 로고
    • Manufacturing lite with Lean. Delphi and Visteon Lean initiatives
    • Olexa, R., 2002. Manufacturing lite with Lean. Delphi and Visteon Lean initiatives. Forming and Fabricating, 9, 1-6.
    • (2002) Forming and Fabricating , vol.9 , pp. 1-6
    • Olexa, R.1
  • 53
    • 0031235185 scopus 로고    scopus 로고
    • The impact of just in time manufacturing and its infrastructure on manufacturing performance
    • Sakakibara, S., et al., 1997. The impact of just in time manufacturing and its infrastructure on manufacturing performance. Management Science, 43 (9), 1246-1257.
    • (1997) Management Science , vol.43 , Issue.9 , pp. 1246-1257
    • Sakakibara, S.1
  • 55
    • 27844589388 scopus 로고    scopus 로고
    • Application of value stream mapping for lean operations and cycle time reduction: An Indian case study
    • Seth, D. and Gupta, V., 2005. Application of value stream mapping for lean operations and cycle time reduction: an Indian case study. Production Planning & Control, 16 (1), 44-59.
    • (2005) Production Planning & Control , vol.16 , Issue.1 , pp. 44-59
    • Seth, D.1    Gupta, V.2
  • 56
    • 0033100694 scopus 로고    scopus 로고
    • Escape from the unnecessary-some guidelines for production management
    • Segerstedt, A., 1999. Escape from the unnecessary-some guidelines for production management. Production Planning & Control, 10 (2), 194-199.
    • (1999) Production Planning & Control , vol.10 , Issue.2 , pp. 194-199
    • Segerstedt, A.1
  • 57
    • 0037357671 scopus 로고    scopus 로고
    • Lean manufacturing: Context, practice bundles, and performance
    • Shah, R. and Ward, P.T., 2003. Lean manufacturing: context, practice bundles, and performance. Journal of Operations Management, 21 (2), 129-149.
    • (2003) Journal of Operations Management , vol.21 , Issue.2 , pp. 129-149
    • Shah, R.1    Ward, P.T.2
  • 59
    • 32644470629 scopus 로고    scopus 로고
    • Lean tool selection in a die casting unit: A fuzzy-based decision support heuristic
    • Singh, R.K., et al., 2006., Lean tool selection in a die casting unit: a fuzzy-based decision support heuristic. International Journal of Production Research, 44 (7), 1399-1429.
    • (2006) International Journal of Production Research , vol.44 , Issue.7 , pp. 1399-1429
    • Singh, R.K.1
  • 60
    • 34250818294 scopus 로고    scopus 로고
    • Massachusetts: The Lean Enterprise Institute
    • Smalley, A., 2004. Creating level pull. Massachusetts: The Lean Enterprise Institute.
    • (2004) Creating level pull
    • Smalley, A.1
  • 61
    • 84995344654 scopus 로고
    • Field research methods in strategic management: Contributions to theory building and testing
    • Snow, C.C. and Thomas, J.B., 1994. Field research methods in strategic management: contributions to theory building and testing. Journal of Management Studies, 31 (4), 457-480.
    • (1994) Journal of Management Studies , vol.31 , Issue.4 , pp. 457-480
    • Snow, C.C.1    Thomas, J.B.2
  • 66
    • 0035252557 scopus 로고    scopus 로고
    • The rediscovery of postponement a literature review and directions for further research
    • Van Hoek, R., 2001. The rediscovery of postponement a literature review and directions for further research. Journal of Operations Management, 19, 161-184.
    • (2001) Journal of Operations Management , vol.19 , pp. 161-184
    • Van Hoek, R.1
  • 67
    • 0038813905 scopus 로고    scopus 로고
    • Value stream mapping: This tool puts you and your customer on the same page
    • Voelkel, J.G. and Chapman, C., 2003. Value stream mapping: this tool puts you and your customer on the same page. Quality Progress, 36, 65-69.
    • (2003) Quality Progress , vol.36 , pp. 65-69
    • Voelkel, J.G.1    Chapman, C.2
  • 72
    • 21844449924 scopus 로고    scopus 로고
    • Integrating production and engineering perspectives on the customer order decoupling point
    • Wikner, J. and Rudberg, M., 2005. Integrating production and engineering perspectives on the customer order decoupling point. International Journal of Operations and Production Management, 25, 623-641.
    • (2005) International Journal of Operations and Production Management , vol.25 , pp. 623-641
    • Wikner, J.1    Rudberg, M.2
  • 73
    • 61449183696 scopus 로고    scopus 로고
    • online, Available from:, Accessed 24 February 2008
    • Womack, J.P., 2001. 10 Lean steps for surviving the recession [online]. Available from: http://www.lean.org/Community/Registered/ShowEmail. cfm?JimsEmailId=13 [Accessed 24 February 2008].
    • (2001) 10 Lean steps for surviving the recession
    • Womack, J.P.1
  • 77
    • 84922184183 scopus 로고    scopus 로고
    • Yang Hua, L. and Van Landeghem, H., 2005. Simulation based value stream mapping: the formal modelling procedure. In: A. Benzekri and J.C. Hochon, eds. ECEC'2005, 12th European Concurrent Engineering Conference. Toulouse: Eurosis, 79-85.
    • Yang Hua, L. and Van Landeghem, H., 2005. Simulation based value stream mapping: the formal modelling procedure. In: A. Benzekri and J.C. Hochon, eds. ECEC'2005, 12th European Concurrent Engineering Conference. Toulouse: Eurosis, 79-85.
  • 79
    • 0037146416 scopus 로고    scopus 로고
    • A comparative study of Lean and agile manufacturing with a related survey of current practices in the UK
    • Yusuf, Y.Y. and Adeleye, E.O., 2002. A comparative study of Lean and agile manufacturing with a related survey of current practices in the UK. International Journal of Production Research, 40 (17), 4545-4562.
    • (2002) International Journal of Production Research , vol.40 , Issue.17 , pp. 4545-4562
    • Yusuf, Y.Y.1    Adeleye, E.O.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.