-
1
-
-
0023977010
-
The shifting bottleneck procedure for job-shop scheduling
-
Adams J., Balas E., Zawack D. The shifting bottleneck procedure for job-shop scheduling. Management Science. 34:1988;391-401
-
(1988)
Management Science
, vol.34
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
3
-
-
0002381223
-
Machine sequencing via disjunctive graphs: An implicit enumeration approach
-
Balas E. Machine sequencing via disjunctive graphs: An implicit enumeration approach. Operations Research. 17:1969;941-957
-
(1969)
Operations Research
, vol.17
, pp. 941-957
-
-
Balas, E.1
-
4
-
-
0029195265
-
The one-machine problem with delayed precedence constraints and its use in job shop scheduling
-
Balas E., Lenstra J.K., Vazacopoulos A. The one-machine problem with delayed precedence constraints and its use in job shop scheduling. Management Science. 41:1995;94-109
-
(1995)
Management Science
, vol.41
, pp. 94-109
-
-
Balas, E.1
Lenstra, J.K.2
Vazacopoulos, A.3
-
5
-
-
0041850391
-
A review and synthesis of tabu search applications to production scheduling problems
-
The University of Texas, Austin, July
-
J.W. Barnes, M. Laguna, A review and synthesis of tabu search applications to production scheduling problems, Technical Report ORP91-05, The University of Texas, Austin, July 1991
-
(1991)
Technical Report
, vol.ORP91-05
-
-
Barnes, J.W.1
Laguna, M.2
-
6
-
-
0027562546
-
Solving the multiple-machine weighted flow time problem using tabu search
-
Barnes J.W., Laguna M. Solving the multiple-machine weighted flow time problem using tabu search. IIE Transactions. 25:1993;121-128
-
(1993)
IIE Transactions
, vol.25
, pp. 121-128
-
-
Barnes, J.W.1
Laguna, M.2
-
8
-
-
0033093715
-
Production scheduling and rescheduling with genetic algorithms
-
Bierwirth C., Mattfeld D.C. Production scheduling and rescheduling with genetic algorithms. Evolutionary Computation. 7:1999;1-17
-
(1999)
Evolutionary Computation
, vol.7
, pp. 1-17
-
-
Bierwirth, C.1
Mattfeld, D.C.2
-
10
-
-
0001343733
-
A branch and bound method for the general-shop problem with sequence dependent setup-times
-
Brucker P., Thiele O. A branch and bound method for the general-shop problem with sequence dependent setup-times. OR Spektrum. 18:1996;145-161
-
(1996)
OR Spektrum
, vol.18
, pp. 145-161
-
-
Brucker, P.1
Thiele, O.2
-
11
-
-
0033282253
-
A genetic algorithm for job-shop scheduling in a semiconductor manufacturing system
-
San Jose, CA
-
S. Cavalieri, F. Crisafulli, O. Mirabella, A genetic algorithm for job-shop scheduling in a semiconductor manufacturing system, presented at IECON Proceedings of the Industrial Electronics Society, San Jose, CA, 1999
-
(1999)
IECON Proceedings of the Industrial Electronics Society
-
-
Cavalieri, S.1
Crisafulli, F.2
Mirabella, O.3
-
13
-
-
13544253113
-
Reactive search for flexible job shop scheduling
-
The University of Texas, Austin, October
-
J. Chambers, J.W. Barnes, Reactive search for flexible job shop scheduling, Technical Report ORP98-04, The University of Texas, Austin, October 1998
-
(1998)
Technical Report
, vol.ORP98-04
-
-
Chambers, J.1
Barnes, J.W.2
-
22
-
-
0030121742
-
Extending the shifting bottleneck procedure to real-life applications
-
Ivens P., Lambrecht M. Extending the shifting bottleneck procedure to real-life applications. European Journal of Operational Research. 90:1996;252-268
-
(1996)
European Journal of Operational Research
, vol.90
, pp. 252-268
-
-
Ivens, P.1
Lambrecht, M.2
-
24
-
-
0030286613
-
A genetic algorithm for job shop scheduling - A case study
-
Kumar N.S.H., Srinivasan G. A genetic algorithm for job shop scheduling - A case study. Computers in Industry. 31:1996;155-160
-
(1996)
Computers in Industry
, vol.31
, pp. 155-160
-
-
Kumar, N.S.H.1
Srinivasan, G.2
-
25
-
-
0004288638
-
Intelligent scheduling with tabu search: An application to jobs with linear delay penalties and sequence-dependent setup costs and times
-
Laguna M., Barnes J.W., Glover F. Intelligent scheduling with tabu search: An application to jobs with linear delay penalties and sequence-dependent setup costs and times. Journal of Applied Intelligence. 3:1993;159-172
-
(1993)
Journal of Applied Intelligence
, vol.3
, pp. 159-172
-
-
Laguna, M.1
Barnes, J.W.2
Glover, F.3
-
27
-
-
0003494534
-
Production planning and scheduling practices across the semiconductor industry
-
Sematech, Austin, March 2
-
R.C. Leachman, Production planning and scheduling practices across the semiconductor industry, Technical Report 94092559A-XFR, Sematech, Austin, March 2, 1995
-
(1995)
Technical Report 94092559A-XFR
-
-
Leachman, R.C.1
-
29
-
-
0028481114
-
Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor manufacturing plants
-
Lu S.C.H., Ramaswamy D., Kumar P.R. Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor manufacturing plants. IEEE Transactions on Semiconductor Manufacturing. 7:1994;374-388
-
(1994)
IEEE Transactions on Semiconductor Manufacturing
, vol.7
, pp. 374-388
-
-
Lu, S.C.H.1
Ramaswamy, D.2
Kumar, P.R.3
-
30
-
-
0026369803
-
Distributed scheduling based on due dates and buffer priorities
-
Lu S.H., Kumar P.R. Distributed scheduling based on due dates and buffer priorities. IEEE Transactions on Automatic Control. 36:1991;1406-1416
-
(1991)
IEEE Transactions on Automatic Control
, vol.36
, pp. 1406-1416
-
-
Lu, S.H.1
Kumar, P.R.2
-
31
-
-
0033284621
-
Using genetic algorithm for job-shop scheduling problems with reentrant product flows
-
Barcelona, Spain
-
K. Nose, A. Hiramatsu, M. Konishi, Using genetic algorithm for job-shop scheduling problems with reentrant product flows, presented at Proceedings of Emerging Technologies and Factory Automation, Barcelona, Spain, 1999
-
(1999)
Proceedings of Emerging Technologies and Factory Automation
-
-
Nose, K.1
Hiramatsu, A.2
Konishi, M.3
-
34
-
-
13544266865
-
Les problèmes d'ordonnancement avec contraintes disjonctives
-
Montrouge
-
B. Roy, B. Sussman, Les problèmes d'ordonnancement avec contraintes disjonctives, presented at Proceedings of SEMA, Montrouge, 1964
-
(1964)
Proceedings of SEMA
-
-
Roy, B.1
Sussman, B.2
-
36
-
-
13544269897
-
Building a decision support system for operations scheduling in a large industrial department: A preliminary algorithmic study
-
University of Udine, Udine, Italy
-
F. Tiozzo, Building a decision support system for operations scheduling in a large industrial department: A preliminary algorithmic study, Internal Report, University of Udine, Udine, Italy, 1988
-
(1988)
Internal Report
-
-
Tiozzo, F.1
-
38
-
-
0003814373
-
Microchip Fabrication - A Practical Guide to Semiconductor Processing
-
New York: McGraw-Hill
-
Zant P.V. Microchip Fabrication - A Practical Guide to Semiconductor Processing. 3rd ed.:1997;McGraw-Hill, New York
-
(1997)
3rd Ed.
-
-
Zant, P.V.1
|