메뉴 건너뛰기




Volumn 23, Issue 6, 2009, Pages 480-488

Divergence or congruence? A path model of rework for building and civil engineering projects

Author keywords

Buildings; Construction costs; Construction management; Quality control

Indexed keywords

CIVIL ENGINEERING PROJECTS; CONSTRUCTION COSTS; CONSTRUCTION MANAGEMENT; CONSTRUCTION PROJECTS; COST AND SCHEDULE; DIRECT AND INDIRECT COSTS; GENERIC STRATEGIES; KEY DETERMINANTS; LIMITED DATA; PATH ANALYSIS; PATH MODELS; PROJECT COMMUNICATIONS; PROJECT MANAGEMENT PRACTICES; REWORK COSTS; SITE MANAGEMENT; STRUCTURAL MODELS;

EID: 70450206280     PISSN: 08873828     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CF.1943-5509.0000054     Document Type: Article
Times cited : (68)

References (51)
  • 1
    • 4143062424 scopus 로고    scopus 로고
    • Some observations on the issues of quality cost in construction
    • 0265-671X, (),. 10.1108/02656719710170693
    • Abdul-Rahman, H. (1997). " Some observations on the issues of quality cost in construction.." Int. J. Qual. Reliab. Manage. 0265-671X, 14 (5), 464-481. 10.1108/02656719710170693
    • (1997) Int. J. Qual. Reliab. Manage. , vol.14 , Issue.5 , pp. 464-481
    • Abdul-Rahman, H.1
  • 4
    • 0001326664 scopus 로고    scopus 로고
    • The cost of quality failures in major civil engineering projects
    • " 0265-671X, (),. 10.1108/02656710010298544
    • Barber, P., Sheath, D., Tomkins, C., and Graves, A. (2000). " The cost of quality failures in major civil engineering projects.." Int. J. Qual. Reliab. Manage. 0265-671X, 17 (4/5), 479-492. 10.1108/02656710010298544
    • (2000) Int. J. Qual. Reliab. Manage. , vol.17 , Issue.4-5 , pp. 479-492
    • Barber, P.1    Sheath, D.2    Tomkins, C.3    Graves, A.4
  • 6
    • 0026837054 scopus 로고
    • Causes of quality deviations in design and construction
    • " 0733-9364, (),. 10.1061/(ASCE)0733-9364(1992)118:1(34)
    • Burati, J. L., Farrington, J. J., and Ledbetter, W. B. (1992). " Causes of quality deviations in design and construction.." J. Constr. Eng. Manage. 0733-9364, 118 (1), 34-49. 10.1061/(ASCE)0733-9364(1992)118:1(34)
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.1 , pp. 34-49
    • Burati, J.L.1    Farrington, J.J.2    Ledbetter, W.B.3
  • 7
    • 14844336201 scopus 로고
    • Concrete quality assurance: The contractors role
    • Concrete Institute of Australia, Melbourne, Australia.
    • Burroughs, G. (1993). " Concrete quality assurance: The contractors role.." Quality assurance in the construction industry, Concrete Institute of Australia, Melbourne, Australia.
    • (1993) Quality Assurance in the Construction Industry
    • Burroughs, G.1
  • 8
    • 1942530583 scopus 로고    scopus 로고
    • Projects, pathogens and incubation periods
    • DOI 10.1016/j.ijproman.2003.09.002, PII S0263786303001121
    • Busby, J. S., and Hughes, E. J. (2004). " Projects, pathogens, and incubation periods.." Int. J. Proj. Manage. 0263-7863, 22, 425-434. 10.1016/j.ijproman.2003.09.002 (Pubitemid 38531832)
    • (2004) International Journal of Project Management , vol.22 , Issue.5 , pp. 425-434
    • Busby, J.S.1    Hughes, E.J.2
  • 9
    • 84937549955 scopus 로고
    • The scree test for the number of factors
    • 0027-3171,. 10.1207/s15327906mbr0102-10
    • Cattel, R. B. (1966). " The scree test for the number of factors.." Multivar. Behav. Res. 0027-3171, 1, 245-276. 10.1207/s15327906mbr0102-10
    • (1966) Multivar. Behav. Res. , vol.1 , pp. 245-276
    • Cattel, R.B.1
  • 10
    • 0032491753 scopus 로고    scopus 로고
    • Collapse of the Ramsgate Walkway
    • 1466-5123.
    • Chapman, J. C. (1998). " Collapse of the Ramsgate Walkway.." Struct. Eng. 1466-5123, 76 (1), 1-10.
    • (1998) Struct. Eng. , vol.76 , Issue.1 , pp. 1-10
    • Chapman, J.C.1
  • 13
    • 70450196501 scopus 로고    scopus 로고
    • Construction Owners Association of Alberta.. Project rework reduction tool, 〈〉 (Oct. 31, 2008).
    • Construction Owners Association of Alberta. (2002). Project rework reduction tool, 〈 http://www.coaa.ab.ca 〉 (Oct. 31, 2008).
    • (2002)
  • 14
    • 4143074659 scopus 로고
    • Implementation of ISO 9000 in Construction
    • Institution of Engineers, Gold Coast, Australia.
    • Cusack, D. (1992). " Implementation of ISO 9000 in Construction.." Proc., ISO 9000 Forum Symp., Institution of Engineers, Gold Coast, Australia.
    • (1992) Proc., ISO 9000 Forum Symp.
    • Cusack, D.1
  • 15
    • 0022025262 scopus 로고
    • Construction claims: Frequency and severity
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1985)111:1(74)
    • Diekmann, J. E., and Nelson, J. C. (1985). " Construction claims: Frequency and severity.." J. Constr. Eng. Manage. 0733-9364, 111 (1), 74-81. 10.1061/(ASCE)0733-9364(1985)111:1(74)
    • (1985) J. Constr. Eng. Manage. , vol.111 , Issue.1 , pp. 74-81
    • Diekmann, J.E.1    Nelson, J.C.2
  • 17
    • 0029134625 scopus 로고
    • Factor analysis in the development and refinement of clinical assessment instruments
    • 10.1037/1040-3590.7.3.286 1040-3590
    • Floyd, F. J., and Widaman, K. F. (1995). " Factor analysis in the development and refinement of clinical assessment instruments.." Psychol. Assess., 7, 286-299. 10.1037/1040-3590.7.3.286 1040-3590
    • (1995) Psychol. Assess. , vol.7 , pp. 286-299
    • Floyd, F.J.1    Widaman, K.F.2
  • 18
    • 18144415600 scopus 로고    scopus 로고
    • How (in)accurate are demand forecasts in public works projects
    • " 0194-4363, (),. 10.1080/01944360508976688
    • Flyvberg, B., Skamris, M. K., and Buhl, S. L. (2005). " How (in)accurate are demand forecasts in public works projects.." J. Am. Plan. Assn. 0194-4363, 71 (2), 131-146. 10.1080/01944360508976688
    • (2005) J. Am. Plan. Assn. , vol.71 , Issue.2 , pp. 131-146
    • Flyvberg, B.1    Skamris, M.K.2    Buhl, S.L.3
  • 19
    • 4143080221 scopus 로고
    • Management of design documentation, where do we go from here?
    • R. R. Wakefield and D. G. Carmichael, eds., Balkema, Rotterdam, The Netherlands.
    • Gardiner, J. (1994). " Management of design documentation, where do we go from here? " Construction and management, recent advances, R. R. Wakefield, and, D. G. Carmichael, eds., Balkema, Rotterdam, The Netherlands, 113-118.
    • (1994) Construction and Management, Recent Advances , pp. 113-118
    • Gardiner, J.1
  • 20
    • 0035406839 scopus 로고    scopus 로고
    • The application of ethics to engineering and the engineer's moral responsibility: Perspectives for a research agenda
    • Grunwald, A. (2001). " The application of ethics to engineering and the engineer's moral responsibility: Perspectives for a research agenda.." Science and Engineering Ethics, 7, 415-428.
    • (2001) Science and Engineering Ethics , vol.7 , pp. 415-428
    • Grunwald, A.1
  • 22
    • 34248982435 scopus 로고
    • Some necessary conditions for common-factor analysis
    • 0033-3123,. 10.1007/BF02289162
    • Guttman, L. (1954). " Some necessary conditions for common-factor analysis.." Psychometrika 0033-3123, 19, 149-161. 10.1007/BF02289162
    • (1954) Psychometrika , vol.19 , pp. 149-161
    • Guttman, L.1
  • 23
    • 14744286845 scopus 로고
    • Quality failure costs in building construction
    • ", Int. Council for Building Research Studies and Documentation, Sydney, Australia.
    • Hammarlund, Y., Jacobsson, S., and Josephson, P. E. (1990). " Quality failure costs in building construction.." Proc., CIB W55/W65 Joint Symp., Int. Council for Building Research Studies and Documentation, Sydney, Australia, 77-89.
    • (1990) Proc., CIB W55/W65 Joint Symp. , pp. 77-89
    • Hammarlund, Y.1    Jacobsson, S.2    Josephson, P.E.3
  • 25
    • 60449091309 scopus 로고    scopus 로고
    • Measuring the impacts of rework on construction cost performance by project characteristics and sources of rework
    • " 0733-9364.
    • Hwang, B. -G., Thomas, S. R., Haas, C. T., and Caldas, H. (2008). " Measuring the impacts of rework on construction cost performance by project characteristics and sources of rework.." J. Constr. Eng. Manage. 0733-9364, 135 (3), 187-198.
    • (2008) J. Constr. Eng. Manage. , vol.135 , Issue.3 , pp. 187-198
    • Hwang, B.-G.1    Thomas, S.R.2    Haas, C.T.3    Caldas, H.4
  • 26
    • 0032593163 scopus 로고    scopus 로고
    • The causes and costs of defects in construction: A study of seven building projects
    • 10.1016/S0926-5805(98)00114-9 0926-5805
    • Josephson, P. -E., and Hammarlund, Y. (1999). " The causes and costs of defects in construction: A study of seven building projects.." Autom. Construct., 8 (6), 681-687. 10.1016/S0926-5805(98)00114-9 0926-5805
    • (1999) Autom. Construct. , vol.8 , Issue.6 , pp. 681-687
    • Josephson, P.-E.1    Hammarlund, Y.2
  • 27
    • 4143067931 scopus 로고    scopus 로고
    • Illustrative benchmarking rework and rework costs in Swedish construction industry
    • DOI 10.1061/(ASCE)0742-597X(2002)18:2(76)
    • Josephson, P. -E., Larsson, B., and Li, H. (2002). " Illustrative benchmarking rework and rework costs in the Swedish construction industry.." J. Manage. Eng. 0742-597X, 18 (2), 76-83. 10.1061/(ASCE)0742- 597X(2002)18:2(76) (Pubitemid 40329148)
    • (2002) Journal of Management in Engineering , vol.18 , Issue.2 , pp. 76-83
    • Josephson, P.-E.1    Larsson, B.2    Li, H.3
  • 29
    • 70450193789 scopus 로고    scopus 로고
    • " Final Re Prepared for the Department of Housing and Works (WA), The Curtin Institute of Public Policy at Curtin Univ. of Technology, Perth, Australia.
    • Koshy, P., Seymour, R., Baccarini, D., and Love, P. E. D. (2008). " Capacity study for the built environment profession in WA.." Final Rep. Prepared for the Department of Housing and Works (WA), The Curtin Institute of Public Policy at Curtin Univ. of Technology, Perth, Australia, 25.
    • (2008) Capacity Study for the Built Environment Profession in WA , pp. 25
    • Koshy, P.1    Seymour, R.2    Baccarini, D.3    Love, P.E.D.4
  • 30
    • 70450188031 scopus 로고    scopus 로고
    • KPMG.. "." KPMG International, 〈〉 (June 18, 2008).
    • KPMG. (2008). " Embracing change? Global Construction Survey 2008.." KPMG International, 〈 http://www.KPMG.com 〉 (June 18, 2008).
    • (2008) Embracing Change? Global Construction Survey 2008
  • 31
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • DOI 10.1061/(ASCE)0733-9364(2002)128:1(18)
    • Love, P. E. D. (2002a). " Influence of project type and procurement method on rework costs in building construction projects.." J. Constr. Eng. Manage. 0733-9364, 128 (1), 18-29. 10.1061/(ASCE)0733-9364(2002)128:1(18) (Pubitemid 40264891)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1
  • 32
    • 84986104505 scopus 로고    scopus 로고
    • Auditing the indirect consequences of rework in construction: A case based approach
    • 0268-6902, (),. 10.1108/02686900210419921
    • Love, P. E. D. (2002b). " Auditing the indirect consequences of rework in construction: A case based approach.." Manage. Audit. J. 0268-6902, 17 (3), 138-146. 10.1108/02686900210419921
    • (2002) Manage. Audit. J. , vol.17 , Issue.3 , pp. 138-146
    • Love, P.E.D.1
  • 33
    • 27944504058 scopus 로고    scopus 로고
    • Forensic project management: The underlying causes of rework in construction projects
    • DOI 10.1080/10286600412331295955, PII XG0Y761JXKWEY0PP
    • Love, P. E. D., and Edwards, D. (2004). " Forensic project management: The underlying causes of rework in construction projects.." Civ. Eng. Environ. Syst. 1028-6628, 12 (3), 207-228. 10.1080/ 10286600412331295955 (Pubitemid 44121663)
    • (2004) Civil Engineering and Environmental Systems , vol.21 , Issue.3 , pp. 207-228
    • Love, P.1    Edwards, D.J.2
  • 34
    • 7944219517 scopus 로고    scopus 로고
    • A rework reduction model for construction
    • " 0018-9391, (),. 10.1109/TEM.2004.835092
    • Love, P. E. D., Edwards, D. J., and Irani, Z. (2004). " A rework reduction model for construction.." IEEE Trans. Eng. Manage. 0018-9391, 51 (4), 426-440. 10.1109/TEM.2004.835092
    • (2004) IEEE Trans. Eng. Manage. , vol.51 , Issue.4 , pp. 426-440
    • Love, P.E.D.1    Edwards, D.J.2    Irani, Z.3
  • 35
    • 43749116883 scopus 로고    scopus 로고
    • Forensic project management: An exploratory examination of the causal behavior of design-induced rework
    • DOI 10.1109/TEM.2008.919677
    • Love, P. E. D., Edwards, D. J., and Irani, Z. (2008). " Forensic project management: An exploratory examination of the causal behaviour of design-induced error.." IEEE Trans. Eng. Manage. 0018-9391, 55 (2), 234-248. 10.1109/TEM.2008.919677 (Pubitemid 351689525)
    • (2008) IEEE Transactions on Engineering Management , vol.55 , Issue.2 , pp. 234-247
    • Love, P.E.D.1    Edwards, D.J.2    Irani, Z.3
  • 36
    • 68349117209 scopus 로고    scopus 로고
    • The anatomy of omission errors in resource and engineering projects
    • " 0018-9391, in press.
    • Love, P. E. D., Edwards, D. J., Irani, Z., and Walker, D. H. T. (2009). " The anatomy of omission errors in resource and engineering projects.." IEEE Trans. Eng. Manage. 0018-9391, in press.
    • (2009) IEEE Trans. Eng. Manage.
    • Love, P.E.D.1    Edwards, D.J.2    Irani, Z.3    Walker, D.H.T.4
  • 37
    • 0042131539 scopus 로고    scopus 로고
    • Project management quality cost information system for the construction industry
    • 10.1016/S0378-7206(02)00094-0
    • Love, P. E. D., and Irani, Z. (2003). " Project management quality cost information system for the construction industry.." Inf. Manage., 40, 649-661. 10.1016/S0378-7206(02)00094-0
    • (2003) Inf. Manage. , vol.40 , pp. 649-661
    • Love, P.E.D.1    Irani, Z.2
  • 38
    • 14744282966 scopus 로고    scopus 로고
    • Role of error-recovery process in projects
    • DOI 10.1061/(ASCE)0742-597X(2004)20:2(70)
    • Love, P. E. D., and Josephson, P. -E. (2004). " Role of the error-recovery process in projects.." J. Manage. Eng. 0742-597X, 20 (2), 70-79. 10.1061/(ASCE)0742-597X(2004)20:2(70) (Pubitemid 40329304)
    • (2004) Journal of Management in Engineering , vol.20 , Issue.2 , pp. 70-79
    • Love, P.E.D.1    Josephson, P.-E.2
  • 39
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • 10.1080/01446190050024897 0144-6193
    • Love, P. E. D., and Li, H. (2000). " Quantifying the causes and costs of rework in construction.." Construct. Manag. Econ., 18 (4), 479-490. 10.1080/01446190050024897 0144-6193
    • (2000) Construct. Manag. Econ. , vol.18 , Issue.4 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 40
    • 0000421913 scopus 로고    scopus 로고
    • A construction quality costs quantifying system for the building industry
    • 0265-671X, (),. 10.1108/02656719810198926
    • Low, S. P., and Yeo, H. K. C. (1998). " A construction quality costs quantifying system for the building industry.." Int. J. Qual. Reliab. Manage. 0265-671X, 15 (3), 329-349. 10.1108/02656719810198926
    • (1998) Int. J. Qual. Reliab. Manage. , vol.15 , Issue.3 , pp. 329-349
    • Low, S.P.1    Yeo, H.K.C.2
  • 41
    • 70450199741 scopus 로고    scopus 로고
    • Melbourne Institute.. "." Re Prepared for Melbourne Institute of Applied Economic and Social Research, Univ. of Melbourne, Melbourne, Australia, 〈〉 (Oct. 17, 2008).
    • Melbourne Institute. (2008). " Outlook for Australia.." Rep. Prepared for Melbourne Institute of Applied Economic and Social Research, Univ. of Melbourne, Melbourne, Australia, 〈 http://www.melbourneinstitute.com/ 〉 (Oct. 17, 2008).
    • (2008) Outlook for Australia
  • 42
    • 4244208223 scopus 로고    scopus 로고
    • Licentiate thesis, Division of Construction Management and Economics, Department of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden.
    • Nyĺn, K.-O. (1996). " Cost of failure in a major civil engineering project.." Licentiate thesis, Division of Construction Management and Economics, Department of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden.
    • (1996) Cost of Failure in A Major Civil Engineering Project
    • Nyĺn, K.-O.1
  • 44
    • 49549113153 scopus 로고    scopus 로고
    • Mapping rework causes and effects using artificial neural networks
    • " 0961-3218, (),. 10.1080/09613210802128269
    • Palaneeswaran, E., Love, P. E. D., Kumaraswamy, M. M., and Ng, S. T. (2008). " Mapping rework causes and effects using artificial neural networks.." Build. Res. Inf. 0961-3218, 36 (5), 450-465. 10.1080/09613210802128269
    • (2008) Build. Res. Inf. , vol.36 , Issue.5 , pp. 450-465
    • Palaneeswaran, E.1    Love, P.E.D.2    Kumaraswamy, M.M.3    Ng, S.T.4
  • 46
    • 15844361911 scopus 로고    scopus 로고
    • Developing a standard methodology for measuring and classifying construction field rework
    • DOI 10.1139/L04-068
    • Robinson-Fayek, A., Dissanayake, M., and Campero, O. (2004). " Developing a standard methodology for measuring and classifying construction field rework.." Can. J. Civ. Eng. 0315-1468, 31 (6), 1077-1089. 10.1139/l04-068 (Pubitemid 40426909)
    • (2004) Canadian Journal of Civil Engineering , vol.31 , Issue.6 , pp. 1077-1089
    • Fayek, A.R.1    Dissanayake, M.2    Campero, O.3
  • 48
    • 0032048057 scopus 로고    scopus 로고
    • Quality, waste, and cost consideration in architectural building design management
    • 0263-7863, (),. 10.1016/S0263-7863(97)00042-2
    • Rounce, G. (1998). " Quality, waste, and cost consideration in architectural building design management.." Int. J. Proj. Manage. 0263-7863, 16 (2), 123-127. 10.1016/S0263-7863(97)00042-2
    • (1998) Int. J. Proj. Manage. , vol.16 , Issue.2 , pp. 123-127
    • Rounce, G.1
  • 50
    • 0002907706 scopus 로고    scopus 로고
    • Structural equation modelling
    • 3rd Ed., B. G. Tabachnick and L. S. Fidell, eds. HarperCollins, New York.
    • Ullman, J. B. (1996). " Structural equation modelling.." Using multivariate statistics, 3rd Ed., B. G. Tabachnick, and, L. S. Fidell, eds. HarperCollins, New York, 709-819.
    • (1996) Using Multivariate Statistics , pp. 709-819
    • Ullman, J.B.1
  • 51
    • 0042188854 scopus 로고    scopus 로고
    • A quality performance management system for industrial construction engineering projects
    • 0265-671X, (),. 10.1108/02656719610150605
    • Willis, T. H., and Willis, W. D. (1996). " A quality performance management system for industrial construction engineering projects.." Int. J. Qual. Reliab. Manage. 0265-671X, 13 (9), 38-48. 10.1108/02656719610150605
    • (1996) Int. J. Qual. Reliab. Manage. , vol.13 , Issue.9 , pp. 38-48
    • Willis, T.H.1    Willis, W.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.