-
1
-
-
0042689968
-
The Management and Cost of Quality for Civil Engineering Projects,
-
Ph.D. dissertation, Univ. Manchester Inst. Sci. Technol, UMIST, Manchester, U.K
-
H. Abdul-Rahman, "The Management and Cost of Quality for Civil Engineering Projects," Ph.D. dissertation, Univ. Manchester Inst. Sci. Technol. (UMIST), Manchester, U.K., 1993.
-
(1993)
-
-
Abdul-Rahman, H.1
-
3
-
-
0012541491
-
Modeling litigation: Mixing qualitative and quantitative approaches
-
F. Ackermann, C. Eden, and T. Williams, "Modeling litigation: Mixing qualitative and quantitative approaches," Interfaces, vol. 27, no. 2, pp. 48-65, 1997.
-
(1997)
Interfaces
, vol.27
, Issue.2
, pp. 48-65
-
-
Ackermann, F.1
Eden, C.2
Williams, T.3
-
4
-
-
0037985358
-
Representing causal mechanism of defective designs: A system approach considering human errors
-
S. Andi and T. Minato, "Representing causal mechanism of defective designs: A system approach considering human errors," Constr. Manage. Econ., vol. 21, no. 8, pp. 297-305, 2003.
-
(2003)
Constr. Manage. Econ
, vol.21
, Issue.8
, pp. 297-305
-
-
Andi, S.1
Minato, T.2
-
5
-
-
1842842998
-
Representing causal mechanism of defective designs: Exploration through case studies
-
S. Andi and T. Minato, "Representing causal mechanism of defective designs: Exploration through case studies," Constr. Manage. Econ. vol. 22, no. 1, pp. 183-192, 2004.
-
(2004)
Constr. Manage. Econ
, vol.22
, Issue.1
, pp. 183-192
-
-
Andi, S.1
Minato, T.2
-
6
-
-
0004451631
-
Human error in the management of building projects
-
A. Atkinson, "Human error in the management of building projects," Constr. Manage. Econ., vol. 16, pp. 339-349, 1998.
-
(1998)
Constr. Manage. Econ
, vol.16
, pp. 339-349
-
-
Atkinson, A.1
-
7
-
-
0024703890
-
Communication failure in Hyatt Regency Disaster
-
E. Banset and G. M. Parsons, "Communication failure in Hyatt Regency Disaster," ASCE J. Prof. Issues Eng., vol. 115, no. 3, pp. 273-288, 1989.
-
(1989)
ASCE J. Prof. Issues Eng
, vol.115
, Issue.3
, pp. 273-288
-
-
Banset, E.1
Parsons, G.M.2
-
8
-
-
0035284272
-
Models for estimating design effort and time
-
H. A. Bashir and V. Thomson, "Models for estimating design effort and time," Des. Stud., vol. 22, pp. 141-155, 2001.
-
(2001)
Des. Stud
, vol.22
, pp. 141-155
-
-
Bashir, H.A.1
Thomson, V.2
-
9
-
-
0036371729
-
Explaining routinized decision-making: A review of theories and model
-
T. Betsch, S. Haberstroh, and C. Höhle, "Explaining routinized decision-making: A review of theories and model," Theory Psychol. vol. 12, pp. 453-488, 2002.
-
(2002)
Theory Psychol
, vol.12
, pp. 453-488
-
-
Betsch, T.1
Haberstroh, S.2
Höhle, C.3
-
10
-
-
1042291501
-
Oops, I did it again - relapse errors in routinized decision-making
-
T. Betsch, S. Haberstroh, B. Molter, and A. Glöckner, "Oops, I did it again - relapse errors in routinized decision-making," Org. Behav. Hum. Decis. Process., vol. 93, pp. 62-74, 2004.
-
(2004)
Org. Behav. Hum. Decis. Process
, vol.93
, pp. 62-74
-
-
Betsch, T.1
Haberstroh, S.2
Molter, B.3
Glöckner, A.4
-
11
-
-
0017458025
-
Analysis of structural failures
-
D. Blockley, "Analysis of structural failures," in Proc. Inst. Civil Eng. Part 1, 1977, vol. 62, pp. 51-74.
-
(1977)
Proc. Inst. Civil Eng. Part 1
, vol.62
, pp. 51-74
-
-
Blockley, D.1
-
12
-
-
84930770156
-
Errors in structural engineering
-
C. B. Brown and X. Yin, "Errors in structural engineering," ASCE J. Struct. Eng., vol. 114, pp. 2575-2593, 1988.
-
(1988)
ASCE J. Struct. Eng
, vol.114
, pp. 2575-2593
-
-
Brown, C.B.1
Yin, X.2
-
13
-
-
0026837054
-
Causes of quality deviations in design and construction
-
J. L. Burati, J. J. Farrington, and W. B. Ledbetter, "Causes of quality deviations in design and construction," ASCE J. Constr. Eng. Manage. vol. 118, no. 1, pp. 34-49, 1992.
-
(1992)
ASCE J. Constr. Eng. Manage
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati, J.L.1
Farrington, J.J.2
Ledbetter, W.B.3
-
14
-
-
0035341601
-
Error and distributed cognition in design
-
J. S. Busby, "Error and distributed cognition in design," Des. Stud., vol. 22, pp. 233-254, 2001.
-
(2001)
Des. Stud
, vol.22
, pp. 233-254
-
-
Busby, J.S.1
-
15
-
-
84858492197
-
A garbage can model of organizational choice
-
M. D. Cohen, J. March, and J. P. Olsen, "A garbage can model of organizational choice," Adm. Sci. Quart., vol. 17, pp. 1-25, 1972.
-
(1972)
Adm. Sci. Quart
, vol.17
, pp. 1-25
-
-
Cohen, M.D.1
March, J.2
Olsen, J.P.3
-
16
-
-
83755202997
-
Naval shipyard production: A claim settled and a framework built
-
K. G. Cooper, "Naval shipyard production: A claim settled and a framework built," Interfaces, vol. 10, no. 6, pp. 30-36, 1980.
-
(1980)
Interfaces
, vol.10
, Issue.6
, pp. 30-36
-
-
Cooper, K.G.1
-
17
-
-
0001906688
-
The rework cycle: Benchmarking for the project manager
-
K. G. Cooper, "The rework cycle: Benchmarking for the project manager," Proj. Manage. J., vol. 24, no. 1, pp. 17-22, 1993.
-
(1993)
Proj. Manage. J
, vol.24
, Issue.1
, pp. 17-22
-
-
Cooper, K.G.1
-
18
-
-
0004603683
-
A quantitative study of post contract award design changes in construction
-
I. D. Cox, J. Morris, J. H. Rogerson, and G. E. Jared, "A quantitative study of post contract award design changes in construction," Constr. Manage. Econ., vol. 17, no. 4, pp. 427-439, 1999.
-
(1999)
Constr. Manage. Econ
, vol.17
, Issue.4
, pp. 427-439
-
-
Cox, I.D.1
Morris, J.2
Rogerson, J.H.3
Jared, G.E.4
-
19
-
-
14744287489
-
Qualification based selection of professional A/E services
-
S. Christodoulou, F. H. Griffis, L. Barrett, and M. Okungbowa, "Qualification based selection of professional A/E services," ASCE J. Manage. Eng., vol. 20, no. 2, pp. 34-41, 2004.
-
(2004)
ASCE J. Manage. Eng
, vol.20
, Issue.2
, pp. 34-41
-
-
Christodoulou, S.1
Griffis, F.H.2
Barrett, L.3
Okungbowa, M.4
-
20
-
-
84992974815
-
Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling
-
S. Chritamara, S. O. Ogunlana, and N. N. Bach, "Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling," Eng., Constr. Arch. Manage., vol. 8, pp. 381-392, 2001.
-
(2001)
Eng., Constr. Arch. Manage
, vol.8
, pp. 381-392
-
-
Chritamara, S.1
Ogunlana, S.O.2
Bach, N.N.3
-
21
-
-
84992974814
-
System dynamics modelling of design and build projects
-
S. Chritamara, S. O. Ogunlana, and N. N. Bach, "System dynamics modelling of design and build projects," Constr. Innov., vol. 2, pp. 269-295, 2002.
-
(2002)
Constr. Innov
, vol.2
, pp. 269-295
-
-
Chritamara, S.1
Ogunlana, S.O.2
Bach, N.N.3
-
24
-
-
0343896506
-
Galileo's confirmation of a false hypothesis: A paradigm of logical error in design
-
W. P. S. Dais and D. Blockley, "Galileo's confirmation of a false hypothesis: A paradigm of logical error in design," Civil Eng. Syst. vol. 11, pp. 75-77, 1994.
-
(1994)
Civil Eng. Syst
, vol.11
, pp. 75-77
-
-
Dais, W.P.S.1
Blockley, D.2
-
25
-
-
4143060657
-
Impacts of CAD on design realization
-
J. A. De Lapp, D. N. Ford, J. A. Bryant, and J. Horlen, "Impacts of CAD on design realization," Eng., Constr. Arch. Manage., vol. 11, no. 4, pp. 284-291, 2004.
-
(2004)
Eng., Constr. Arch. Manage
, vol.11
, Issue.4
, pp. 284-291
-
-
De Lapp, J.A.1
Ford, D.N.2
Bryant, J.A.3
Horlen, J.4
-
26
-
-
14744282650
-
Improved design review through Web collaboration
-
E. W. East, J. G. Kirby, and G. Perez, "Improved design review through Web collaboration," ASCE J. Manage. Eng., vol. 20, no. 2, pp. 51-57, 2004.
-
(2004)
ASCE J. Manage. Eng
, vol.20
, Issue.2
, pp. 51-57
-
-
East, E.W.1
Kirby, J.G.2
Perez, G.3
-
27
-
-
0033888428
-
The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects
-
C. Eden, T. Williams, and S. Howick, "The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects," J. Oper. Res. Soc., vol. 51, no. 3, pp. 291-300, 2000.
-
(2000)
J. Oper. Res. Soc
, vol.51
, Issue.3
, pp. 291-300
-
-
Eden, C.1
Williams, T.2
Howick, S.3
-
28
-
-
0042188852
-
A methodology to identify and categorize costs of quality deviations in design and construction,
-
Ph.D. dissertation, Grad. Sch, Clemson Univ, Clemson, SC
-
J. J. Farrington, "A methodology to identify and categorize costs of quality deviations in design and construction," Ph.D. dissertation, Grad. Sch., Clemson Univ., Clemson, SC, 1987.
-
(1987)
-
-
Farrington, J.J.1
-
29
-
-
43749092461
-
Paris accident probe focuses on ceiling struts
-
July 7, Online, Available
-
R. Graham. (2004, July 7). Paris accident probe focuses on ceiling struts. Financ. Times [Online]. Available: http://news.ft/com
-
(2004)
Financ. Times
-
-
Graham, R.1
-
31
-
-
0019566207
-
Human factors engineering in the US nuclear arena
-
E. Hagan and G. Mays, "Human factors engineering in the US nuclear arena," Nucl. Safety, vol. 22, pp. 337-346, 1981.
-
(1981)
Nucl. Safety
, vol.22
, pp. 337-346
-
-
Hagan, E.1
Mays, G.2
-
32
-
-
0040941588
-
-
Ind. Inst, Univ. Texas, Austin
-
W. T., Hester, J. A. Kuprenas, and T. C. Chang, Construction Changes Change Orders: Their Magnitude and Impact, Source Document 66, Constr. Ind. Inst., Univ. Texas, Austin, 1991.
-
(1991)
Construction Changes Change Orders: Their Magnitude and Impact, Source Document 66, Constr
-
-
Hester, W.T.1
Kuprenas, J.A.2
Chang, T.C.3
-
33
-
-
0033438622
-
Limits to concurreny
-
G. M. Hoedemaker, J. D. Blackburn, and L. N. Van Wassenhove, "Limits to concurreny," Decis. Sci., vol. 30, no. 1, pp. 1-17, 1999.
-
(1999)
Decis. Sci
, vol.30
, Issue.1
, pp. 1-17
-
-
Hoedemaker, G.M.1
Blackburn, J.D.2
Van Wassenhove, L.N.3
-
34
-
-
0026117365
-
A classification scheme for pipework failures to include human and socio-technical errors and their contribution to pipework failure frequencies
-
N. W. Hurst, L. J. Bellamy, T. A. W. Geyer, and J. A. Astley, "A classification scheme for pipework failures to include human and socio-technical errors and their contribution to pipework failure frequencies," J. Hazard. Mater., vol. 26, pp. 159-186, 1991.
-
(1991)
J. Hazard. Mater
, vol.26
, pp. 159-186
-
-
Hurst, N.W.1
Bellamy, L.J.2
Geyer, T.A.W.3
Astley, J.A.4
-
36
-
-
0043124457
-
Can project dynamics be modelled?
-
Albany, NY
-
S. A. Jensen, "Can project dynamics be modelled?," in Proc. 1988, Int. Conf. Syst. Dyn. Soc., Albany, NY, 1988, pp. 171-187.
-
(1988)
Proc. 1988, Int. Conf. Syst. Dyn. Soc
, pp. 171-187
-
-
Jensen, S.A.1
-
39
-
-
0003888005
-
-
London, U.K, Butterworth Architecture
-
B. Lawson, How Designers Think. London, U.K.: Butterworth Architecture, 1980.
-
(1980)
How Designers Think
-
-
Lawson, B.1
-
40
-
-
0001187120
-
Determining the causal structure of rework in construction projects
-
P. E. D. Love, P. Mandal, and H. Li, "Determining the causal structure of rework in construction projects," Constr. Manage. Econ., vol. 17, no. 4, pp. 505-517, 1999.
-
(1999)
Constr. Manage. Econ
, vol.17
, Issue.4
, pp. 505-517
-
-
Love, P.E.D.1
Mandal, P.2
Li, H.3
-
41
-
-
0033096295
-
Rework: A symptom of a dysfunctional supply chain
-
P. E. D. Love, H. Li, and P. Mandal, "Rework: A symptom of a dysfunctional supply chain," Eur. J. Purch. Supply Manage., vol. 5, no. 1, pp. 1-11, 1999.
-
(1999)
Eur. J. Purch. Supply Manage
, vol.5
, Issue.1
, pp. 1-11
-
-
Love, P.E.D.1
Li, H.2
Mandal, P.3
-
42
-
-
0000797825
-
Quantifying the causes and costs of rework in construction
-
P. E. D. Love and H. Li, "Quantifying the causes and costs of rework in construction," Constr. Manage. Econ., vol. 18, no. 4, pp. 479-490, 2000.
-
(2000)
Constr. Manage. Econ
, vol.18
, Issue.4
, pp. 479-490
-
-
Love, P.E.D.1
Li, H.2
-
43
-
-
0042689966
-
Influence of project type and procurement method on rework costs in building construction projects
-
P. E. D. Love, "Influence of project type and procurement method on rework costs in building construction projects," ASCE J. Constr. Eng. Manage., vol. 128, no. 1, pp. 188-29, 2002.
-
(2002)
ASCE J. Constr. Eng. Manage
, vol.128
, Issue.1
, pp. 188-229
-
-
Love, P.E.D.1
-
44
-
-
0036680986
-
Using system dynamics to understand charge and rework within construction project management systems
-
P. E. D. Love, L. Y. Shen, H. Li, G. D. Holt, and Z. Irani, "Using system dynamics to understand charge and rework within construction project management systems," Int. J. Proj. Manage., vol. 20, no. 6, pp. 425-436, 2002.
-
(2002)
Int. J. Proj. Manage
, vol.20
, Issue.6
, pp. 425-436
-
-
Love, P.E.D.1
Shen, L.Y.2
Li, H.3
Holt, G.D.4
Irani, Z.5
-
45
-
-
2542461920
-
Learning to reduce rework in projects: Analysis of firms learning and quality practices
-
P. E. D. Love, Z. Irani, and D. Edwards, "Learning to reduce rework in projects: Analysis of firms learning and quality practices," Proj. Manage. J., vol. 34, no. 3, pp. 13-25, 2003.
-
(2003)
Proj. Manage. J
, vol.34
, Issue.3
, pp. 13-25
-
-
Love, P.E.D.1
Irani, Z.2
Edwards, D.3
-
46
-
-
7944219517
-
A rework reduction model for construction projects
-
Nov
-
P. E. D. Love, Z. Irani, and D. J. Edwards, "A rework reduction model for construction projects," IEEE Trans. Eng. Manage., vol. 51, no. 4, pp. 426-440, Nov. 2004.
-
(2004)
IEEE Trans. Eng. Manage
, vol.51
, Issue.4
, pp. 426-440
-
-
Love, P.E.D.1
Irani, Z.2
Edwards, D.J.3
-
47
-
-
14744282966
-
Role of the error-recovery process in projects
-
P. E. D. Love and P.-E. Josephson, "Role of the error-recovery process in projects," ASCE J. Manage. Eng., vol. 20, no. 2, pp. 70-79, 2004.
-
(2004)
ASCE J. Manage. Eng
, vol.20
, Issue.2
, pp. 70-79
-
-
Love, P.E.D.1
Josephson, P.-E.2
-
48
-
-
58149321773
-
A theory of the temporary organization
-
R. A. Lundin and A. Söderham, "A theory of the temporary organization," Scand. J. Manage., vol. 11, no. 4, pp. 437-455, 1995.
-
(1995)
Scand. J. Manage
, vol.11
, Issue.4
, pp. 437-455
-
-
Lundin, R.A.1
Söderham, A.2
-
49
-
-
0012302430
-
Can we learn from project histories?
-
G. McMaster, "Can we learn from project histories?," PM Network. vol. 14, no. 7, pp. 66-67, 2000.
-
(2000)
PM Network
, vol.14
, Issue.7
, pp. 66-67
-
-
McMaster, G.1
-
52
-
-
0024702772
-
Human error in structural design tasks
-
R. E. Melchers, "Human error in structural design tasks," ASCE J. Struct. Eng., vol. 115, no. 7, pp. 1795-1807, 1989.
-
(1989)
ASCE J. Struct. Eng
, vol.115
, Issue.7
, pp. 1795-1807
-
-
Melchers, R.E.1
-
53
-
-
4244208223
-
Cost of failure in a major civil engineering project,
-
Licentiate Thesis, Div. Constr. Manage. Econ, Dept. Real Estate Constr. Manage, Royal Inst. Technol, Stockholm, Sweden
-
K.-O. Nylén, "Cost of failure in a major civil engineering project," Licentiate Thesis, Div. Constr. Manage. Econ., Dept. Real Estate Constr. Manage., Royal Inst. Technol., Stockholm, Sweden, 1996.
-
(1996)
-
-
Nylén, K.-O.1
-
54
-
-
0032089668
-
DESMAN: A dynamic model for managing civil engineering design projects
-
S. Ogunlana, J. Lim, and K. Saeed, "DESMAN: A dynamic model for managing civil engineering design projects," Comput. Struct., vol. 76, pp. 401-419, 1998.
-
(1998)
Comput. Struct
, vol.76
, pp. 401-419
-
-
Ogunlana, S.1
Lim, J.2
Saeed, K.3
-
55
-
-
0022673947
-
Errors and omissions: Fertile ground for high costs
-
D. Orndoff, "Errors and omissions: Fertile ground for high costs," Mil. Eng., vol. 506, pp. 107-109, 1986.
-
(1986)
Mil. Eng
, vol.506
, pp. 107-109
-
-
Orndoff, D.1
-
56
-
-
85044807673
-
Some suggestions about the transitory-permanence dimension of organization
-
B. J. Palisi, "Some suggestions about the transitory-permanence dimension of organization," Br. J. Sociol., vol. 21, pp. 200-206, 1970.
-
(1970)
Br. J. Sociol
, vol.21
, pp. 200-206
-
-
Palisi, B.J.1
-
57
-
-
0035510392
-
Dynamic planning for fast tracking building construction projects
-
F. Pena-Mora and M. Park, "Dynamic planning for fast tracking building construction projects," ASCE J. Constr. Eng. Manage., vol. 127, no. 6, pp. 445-456, 2001.
-
(2001)
ASCE J. Constr. Eng. Manage
, vol.127
, Issue.6
, pp. 445-456
-
-
Pena-Mora, F.1
Park, M.2
-
61
-
-
0004223940
-
-
Cambridge, U.K, Cambridge Univ. Press
-
J. Reason, Human Error. Cambridge, U.K.: Cambridge Univ. Press, 1990.
-
(1990)
Human Error
-
-
Reason, J.1
-
62
-
-
0038463109
-
Human error: Models and management
-
J. Reason, "Human error: Models and management," West. J. Med., vol. 172, no. 6, pp. 393- 396, 2000.
-
(2000)
West. J. Med
, vol.172
, Issue.6
, pp. 393-396
-
-
Reason, J.1
-
65
-
-
0000228602
-
System dynamics in project management: A comparative analysis with traditional methods
-
A. G. Rodrigues and J. Bowers, "System dynamics in project management: A comparative analysis with traditional methods," Syst. Dyn. Rev. vol. 12, no. 2, pp. 121-139, 1996.
-
(1996)
Syst. Dyn. Rev
, vol.12
, Issue.2
, pp. 121-139
-
-
Rodrigues, A.G.1
Bowers, J.2
-
66
-
-
0032048057
-
Quality, waste, and cost in architectural and building design management
-
G. Rounce. "Quality, waste, and cost in architectural and building design management," Int. J. Proj. Manage., vol. 16, no. 2, pp. 123-127, 1998.
-
(1998)
Int. J. Proj. Manage
, vol.16
, Issue.2
, pp. 123-127
-
-
Rounce, G.1
-
67
-
-
0030474971
-
Contact design for profitability in macro-engineering projects
-
K. Saeed and K. Brook, "Contact design for profitability in macro-engineering projects," Syst. Dyn. Rev., vol. 12, no. 3, pp. 235-246, 1996.
-
(1996)
Syst. Dyn. Rev
, vol.12
, Issue.3
, pp. 235-246
-
-
Saeed, K.1
Brook, K.2
-
68
-
-
0027542512
-
Human factors in civil and geotechnical engineering failures
-
G. F. Sowers, "Human factors in civil and geotechnical engineering failures," ASCE J. Geotech. Eng., vol. 119, no. 2, pp. 238-256, 1993.
-
(1993)
ASCE J. Geotech. Eng
, vol.119
, Issue.2
, pp. 238-256
-
-
Sowers, G.F.1
-
69
-
-
0003391719
-
-
Systems Dynamics Group, Sloan School of Management, MIT, Cambridge, MA
-
J. D. Sterman, Systems Dynamics Modeling for Project Management, Systems Dynamics Group, Sloan School of Management, MIT, Cambridge, MA, 1992.
-
(1992)
Systems Dynamics Modeling for Project Management
-
-
Sterman, J.D.1
-
70
-
-
0024685217
-
Checking models in structural design
-
M. G. Stewart and R. E. Melchers, "Checking models in structural design," ASCE J. Struct. Eng., vol. 115, no. 6, pp. 1309 1324, 1989.
-
(1989)
ASCE J. Struct. Eng
, vol.115
, Issue.6
, pp. 1309-1324
-
-
Stewart, M.G.1
Melchers, R.E.2
-
71
-
-
0342585955
-
-
Organisational coordination in the design phase, Rep. 44, Inst. byggnadsekonomi och byggnadsoganisation, Chalmers techiska högskola, Göteborg, Sweden
-
P.-O. Svelinger, Organisatorisk samordning vid projektering (Organisational coordination in the design phase), Rep. 44, Inst. byggnadsekonomi och byggnadsoganisation, Chalmers techiska högskola, Göteborg, Sweden, 1996.
-
(1996)
Organisatorisk samordning vid projektering
-
-
Svelinger, P.-O.1
-
72
-
-
43749117203
-
-
P. A. Tilley and S.L. McFallari, Design and Documentation Quality Survey Designers' Perspectives, presented at the CSIRO Build. Constr. Eng., Melbourne, Australia, 2000.
-
P. A. Tilley and S.L. McFallari, Design and Documentation Quality Survey Designers' Perspectives, presented at the CSIRO Build. Constr. Eng., Melbourne, Australia, 2000.
-
-
-
-
73
-
-
84993009940
-
Management errors in construction
-
D. Wantanakom, M. J. Mawdesley, and W. H. Askew, "Management errors in construction," Eng. Constr. Arch. Manage., vol. 6, no. 2, pp. 112-120, 1999.
-
(1999)
Eng. Constr. Arch. Manage
, vol.6
, Issue.2
, pp. 112-120
-
-
Wantanakom, D.1
Mawdesley, M.J.2
Askew, W.H.3
-
74
-
-
0042188854
-
A quality performance management system lot industrial construction engineering projects
-
T. H. Willis and W. D. Willis, "A quality performance management system lot industrial construction engineering projects," Int. J. Qual. Rel. Manage., vol. 13, no. 9. pp. 38-48, 1996.
-
(1996)
Int. J. Qual. Rel. Manage
, vol.13
, Issue.9
, pp. 38-48
-
-
Willis, T.H.1
Willis, W.D.2
-
75
-
-
0029342363
-
The effects of design changes and delays on project costs
-
T. M. Williams, C. Eden, F. Ackermann, and A. Tait, "The effects of design changes and delays on project costs," J. Oper. Res. Soc., vol. 46, no. 7, pp 809-818, 1995.
-
(1995)
J. Oper. Res. Soc
, vol.46
, Issue.7
, pp. 809-818
-
-
Williams, T.M.1
Eden, C.2
Ackermann, F.3
Tait, A.4
-
76
-
-
0029316324
-
Vicious circles of parallelism
-
T. M. Williams, C. Eden, F. Ackermann, and A. Tait, "Vicious circles of parallelism," Int. J. Proj. Manage., vol. 13, no. 3, pp. 151-155, 1995.
-
(1995)
Int. J. Proj. Manage
, vol.13
, Issue.3
, pp. 151-155
-
-
Williams, T.M.1
Eden, C.2
Ackermann, F.3
Tait, A.4
-
78
-
-
24944534114
-
-
Ind. Inst, Univ. Texas, Austin
-
A. Zeitoun and G. Oberlander, Early Warning Signs of Project Changes Source Document 91, Constr. Ind. Inst., Univ. Texas, Austin, 1993.
-
(1993)
Early Warning Signs of Project Changes Source Document 91, Constr
-
-
Zeitoun, A.1
Oberlander, G.2
-
79
-
-
0004169047
-
-
Cambridge, U.K: Cambridge Univ. Press
-
J. Zeisel. Inquiry by Design. Cambridge, U.K: Cambridge Univ. Press, 1984.
-
(1984)
Inquiry by Design
-
-
Zeisel, J.1
|