메뉴 건너뛰기




Volumn 55, Issue 2, 2008, Pages 234-247

Forensic project management: An exploratory examination of the causal behavior of design-induced rework

Author keywords

Design; Errors; Learning; Rework; System dynamics

Indexed keywords

BEHAVIORAL RESEARCH; COMPUTER SIMULATION; DECISION MAKING; ERRORS; INDUSTRIAL ENGINEERING;

EID: 43749116883     PISSN: 00189391     EISSN: None     Source Type: Journal    
DOI: 10.1109/TEM.2008.919677     Document Type: Article
Times cited : (122)

References (79)
  • 1
    • 0042689968 scopus 로고
    • The Management and Cost of Quality for Civil Engineering Projects,
    • Ph.D. dissertation, Univ. Manchester Inst. Sci. Technol, UMIST, Manchester, U.K
    • H. Abdul-Rahman, "The Management and Cost of Quality for Civil Engineering Projects," Ph.D. dissertation, Univ. Manchester Inst. Sci. Technol. (UMIST), Manchester, U.K., 1993.
    • (1993)
    • Abdul-Rahman, H.1
  • 3
    • 0012541491 scopus 로고    scopus 로고
    • Modeling litigation: Mixing qualitative and quantitative approaches
    • F. Ackermann, C. Eden, and T. Williams, "Modeling litigation: Mixing qualitative and quantitative approaches," Interfaces, vol. 27, no. 2, pp. 48-65, 1997.
    • (1997) Interfaces , vol.27 , Issue.2 , pp. 48-65
    • Ackermann, F.1    Eden, C.2    Williams, T.3
  • 4
    • 0037985358 scopus 로고    scopus 로고
    • Representing causal mechanism of defective designs: A system approach considering human errors
    • S. Andi and T. Minato, "Representing causal mechanism of defective designs: A system approach considering human errors," Constr. Manage. Econ., vol. 21, no. 8, pp. 297-305, 2003.
    • (2003) Constr. Manage. Econ , vol.21 , Issue.8 , pp. 297-305
    • Andi, S.1    Minato, T.2
  • 5
    • 1842842998 scopus 로고    scopus 로고
    • Representing causal mechanism of defective designs: Exploration through case studies
    • S. Andi and T. Minato, "Representing causal mechanism of defective designs: Exploration through case studies," Constr. Manage. Econ. vol. 22, no. 1, pp. 183-192, 2004.
    • (2004) Constr. Manage. Econ , vol.22 , Issue.1 , pp. 183-192
    • Andi, S.1    Minato, T.2
  • 6
    • 0004451631 scopus 로고    scopus 로고
    • Human error in the management of building projects
    • A. Atkinson, "Human error in the management of building projects," Constr. Manage. Econ., vol. 16, pp. 339-349, 1998.
    • (1998) Constr. Manage. Econ , vol.16 , pp. 339-349
    • Atkinson, A.1
  • 7
    • 0024703890 scopus 로고
    • Communication failure in Hyatt Regency Disaster
    • E. Banset and G. M. Parsons, "Communication failure in Hyatt Regency Disaster," ASCE J. Prof. Issues Eng., vol. 115, no. 3, pp. 273-288, 1989.
    • (1989) ASCE J. Prof. Issues Eng , vol.115 , Issue.3 , pp. 273-288
    • Banset, E.1    Parsons, G.M.2
  • 8
    • 0035284272 scopus 로고    scopus 로고
    • Models for estimating design effort and time
    • H. A. Bashir and V. Thomson, "Models for estimating design effort and time," Des. Stud., vol. 22, pp. 141-155, 2001.
    • (2001) Des. Stud , vol.22 , pp. 141-155
    • Bashir, H.A.1    Thomson, V.2
  • 9
    • 0036371729 scopus 로고    scopus 로고
    • Explaining routinized decision-making: A review of theories and model
    • T. Betsch, S. Haberstroh, and C. Höhle, "Explaining routinized decision-making: A review of theories and model," Theory Psychol. vol. 12, pp. 453-488, 2002.
    • (2002) Theory Psychol , vol.12 , pp. 453-488
    • Betsch, T.1    Haberstroh, S.2    Höhle, C.3
  • 11
    • 0017458025 scopus 로고
    • Analysis of structural failures
    • D. Blockley, "Analysis of structural failures," in Proc. Inst. Civil Eng. Part 1, 1977, vol. 62, pp. 51-74.
    • (1977) Proc. Inst. Civil Eng. Part 1 , vol.62 , pp. 51-74
    • Blockley, D.1
  • 12
    • 84930770156 scopus 로고
    • Errors in structural engineering
    • C. B. Brown and X. Yin, "Errors in structural engineering," ASCE J. Struct. Eng., vol. 114, pp. 2575-2593, 1988.
    • (1988) ASCE J. Struct. Eng , vol.114 , pp. 2575-2593
    • Brown, C.B.1    Yin, X.2
  • 13
  • 14
    • 0035341601 scopus 로고    scopus 로고
    • Error and distributed cognition in design
    • J. S. Busby, "Error and distributed cognition in design," Des. Stud., vol. 22, pp. 233-254, 2001.
    • (2001) Des. Stud , vol.22 , pp. 233-254
    • Busby, J.S.1
  • 15
    • 84858492197 scopus 로고
    • A garbage can model of organizational choice
    • M. D. Cohen, J. March, and J. P. Olsen, "A garbage can model of organizational choice," Adm. Sci. Quart., vol. 17, pp. 1-25, 1972.
    • (1972) Adm. Sci. Quart , vol.17 , pp. 1-25
    • Cohen, M.D.1    March, J.2    Olsen, J.P.3
  • 16
    • 83755202997 scopus 로고
    • Naval shipyard production: A claim settled and a framework built
    • K. G. Cooper, "Naval shipyard production: A claim settled and a framework built," Interfaces, vol. 10, no. 6, pp. 30-36, 1980.
    • (1980) Interfaces , vol.10 , Issue.6 , pp. 30-36
    • Cooper, K.G.1
  • 17
    • 0001906688 scopus 로고
    • The rework cycle: Benchmarking for the project manager
    • K. G. Cooper, "The rework cycle: Benchmarking for the project manager," Proj. Manage. J., vol. 24, no. 1, pp. 17-22, 1993.
    • (1993) Proj. Manage. J , vol.24 , Issue.1 , pp. 17-22
    • Cooper, K.G.1
  • 18
    • 0004603683 scopus 로고    scopus 로고
    • A quantitative study of post contract award design changes in construction
    • I. D. Cox, J. Morris, J. H. Rogerson, and G. E. Jared, "A quantitative study of post contract award design changes in construction," Constr. Manage. Econ., vol. 17, no. 4, pp. 427-439, 1999.
    • (1999) Constr. Manage. Econ , vol.17 , Issue.4 , pp. 427-439
    • Cox, I.D.1    Morris, J.2    Rogerson, J.H.3    Jared, G.E.4
  • 19
  • 20
    • 84992974815 scopus 로고    scopus 로고
    • Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling
    • S. Chritamara, S. O. Ogunlana, and N. N. Bach, "Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling," Eng., Constr. Arch. Manage., vol. 8, pp. 381-392, 2001.
    • (2001) Eng., Constr. Arch. Manage , vol.8 , pp. 381-392
    • Chritamara, S.1    Ogunlana, S.O.2    Bach, N.N.3
  • 21
    • 84992974814 scopus 로고    scopus 로고
    • System dynamics modelling of design and build projects
    • S. Chritamara, S. O. Ogunlana, and N. N. Bach, "System dynamics modelling of design and build projects," Constr. Innov., vol. 2, pp. 269-295, 2002.
    • (2002) Constr. Innov , vol.2 , pp. 269-295
    • Chritamara, S.1    Ogunlana, S.O.2    Bach, N.N.3
  • 24
    • 0343896506 scopus 로고
    • Galileo's confirmation of a false hypothesis: A paradigm of logical error in design
    • W. P. S. Dais and D. Blockley, "Galileo's confirmation of a false hypothesis: A paradigm of logical error in design," Civil Eng. Syst. vol. 11, pp. 75-77, 1994.
    • (1994) Civil Eng. Syst , vol.11 , pp. 75-77
    • Dais, W.P.S.1    Blockley, D.2
  • 26
    • 14744282650 scopus 로고    scopus 로고
    • Improved design review through Web collaboration
    • E. W. East, J. G. Kirby, and G. Perez, "Improved design review through Web collaboration," ASCE J. Manage. Eng., vol. 20, no. 2, pp. 51-57, 2004.
    • (2004) ASCE J. Manage. Eng , vol.20 , Issue.2 , pp. 51-57
    • East, E.W.1    Kirby, J.G.2    Perez, G.3
  • 27
    • 0033888428 scopus 로고    scopus 로고
    • The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects
    • C. Eden, T. Williams, and S. Howick, "The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects," J. Oper. Res. Soc., vol. 51, no. 3, pp. 291-300, 2000.
    • (2000) J. Oper. Res. Soc , vol.51 , Issue.3 , pp. 291-300
    • Eden, C.1    Williams, T.2    Howick, S.3
  • 28
    • 0042188852 scopus 로고
    • A methodology to identify and categorize costs of quality deviations in design and construction,
    • Ph.D. dissertation, Grad. Sch, Clemson Univ, Clemson, SC
    • J. J. Farrington, "A methodology to identify and categorize costs of quality deviations in design and construction," Ph.D. dissertation, Grad. Sch., Clemson Univ., Clemson, SC, 1987.
    • (1987)
    • Farrington, J.J.1
  • 29
    • 43749092461 scopus 로고    scopus 로고
    • Paris accident probe focuses on ceiling struts
    • July 7, Online, Available
    • R. Graham. (2004, July 7). Paris accident probe focuses on ceiling struts. Financ. Times [Online]. Available: http://news.ft/com
    • (2004) Financ. Times
    • Graham, R.1
  • 31
    • 0019566207 scopus 로고
    • Human factors engineering in the US nuclear arena
    • E. Hagan and G. Mays, "Human factors engineering in the US nuclear arena," Nucl. Safety, vol. 22, pp. 337-346, 1981.
    • (1981) Nucl. Safety , vol.22 , pp. 337-346
    • Hagan, E.1    Mays, G.2
  • 34
    • 0026117365 scopus 로고
    • A classification scheme for pipework failures to include human and socio-technical errors and their contribution to pipework failure frequencies
    • N. W. Hurst, L. J. Bellamy, T. A. W. Geyer, and J. A. Astley, "A classification scheme for pipework failures to include human and socio-technical errors and their contribution to pipework failure frequencies," J. Hazard. Mater., vol. 26, pp. 159-186, 1991.
    • (1991) J. Hazard. Mater , vol.26 , pp. 159-186
    • Hurst, N.W.1    Bellamy, L.J.2    Geyer, T.A.W.3    Astley, J.A.4
  • 36
    • 0043124457 scopus 로고
    • Can project dynamics be modelled?
    • Albany, NY
    • S. A. Jensen, "Can project dynamics be modelled?," in Proc. 1988, Int. Conf. Syst. Dyn. Soc., Albany, NY, 1988, pp. 171-187.
    • (1988) Proc. 1988, Int. Conf. Syst. Dyn. Soc , pp. 171-187
    • Jensen, S.A.1
  • 39
    • 0003888005 scopus 로고
    • London, U.K, Butterworth Architecture
    • B. Lawson, How Designers Think. London, U.K.: Butterworth Architecture, 1980.
    • (1980) How Designers Think
    • Lawson, B.1
  • 40
    • 0001187120 scopus 로고    scopus 로고
    • Determining the causal structure of rework in construction projects
    • P. E. D. Love, P. Mandal, and H. Li, "Determining the causal structure of rework in construction projects," Constr. Manage. Econ., vol. 17, no. 4, pp. 505-517, 1999.
    • (1999) Constr. Manage. Econ , vol.17 , Issue.4 , pp. 505-517
    • Love, P.E.D.1    Mandal, P.2    Li, H.3
  • 41
    • 0033096295 scopus 로고    scopus 로고
    • Rework: A symptom of a dysfunctional supply chain
    • P. E. D. Love, H. Li, and P. Mandal, "Rework: A symptom of a dysfunctional supply chain," Eur. J. Purch. Supply Manage., vol. 5, no. 1, pp. 1-11, 1999.
    • (1999) Eur. J. Purch. Supply Manage , vol.5 , Issue.1 , pp. 1-11
    • Love, P.E.D.1    Li, H.2    Mandal, P.3
  • 42
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • P. E. D. Love and H. Li, "Quantifying the causes and costs of rework in construction," Constr. Manage. Econ., vol. 18, no. 4, pp. 479-490, 2000.
    • (2000) Constr. Manage. Econ , vol.18 , Issue.4 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 43
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • P. E. D. Love, "Influence of project type and procurement method on rework costs in building construction projects," ASCE J. Constr. Eng. Manage., vol. 128, no. 1, pp. 188-29, 2002.
    • (2002) ASCE J. Constr. Eng. Manage , vol.128 , Issue.1 , pp. 188-229
    • Love, P.E.D.1
  • 44
    • 0036680986 scopus 로고    scopus 로고
    • Using system dynamics to understand charge and rework within construction project management systems
    • P. E. D. Love, L. Y. Shen, H. Li, G. D. Holt, and Z. Irani, "Using system dynamics to understand charge and rework within construction project management systems," Int. J. Proj. Manage., vol. 20, no. 6, pp. 425-436, 2002.
    • (2002) Int. J. Proj. Manage , vol.20 , Issue.6 , pp. 425-436
    • Love, P.E.D.1    Shen, L.Y.2    Li, H.3    Holt, G.D.4    Irani, Z.5
  • 45
    • 2542461920 scopus 로고    scopus 로고
    • Learning to reduce rework in projects: Analysis of firms learning and quality practices
    • P. E. D. Love, Z. Irani, and D. Edwards, "Learning to reduce rework in projects: Analysis of firms learning and quality practices," Proj. Manage. J., vol. 34, no. 3, pp. 13-25, 2003.
    • (2003) Proj. Manage. J , vol.34 , Issue.3 , pp. 13-25
    • Love, P.E.D.1    Irani, Z.2    Edwards, D.3
  • 46
    • 7944219517 scopus 로고    scopus 로고
    • A rework reduction model for construction projects
    • Nov
    • P. E. D. Love, Z. Irani, and D. J. Edwards, "A rework reduction model for construction projects," IEEE Trans. Eng. Manage., vol. 51, no. 4, pp. 426-440, Nov. 2004.
    • (2004) IEEE Trans. Eng. Manage , vol.51 , Issue.4 , pp. 426-440
    • Love, P.E.D.1    Irani, Z.2    Edwards, D.J.3
  • 47
    • 14744282966 scopus 로고    scopus 로고
    • Role of the error-recovery process in projects
    • P. E. D. Love and P.-E. Josephson, "Role of the error-recovery process in projects," ASCE J. Manage. Eng., vol. 20, no. 2, pp. 70-79, 2004.
    • (2004) ASCE J. Manage. Eng , vol.20 , Issue.2 , pp. 70-79
    • Love, P.E.D.1    Josephson, P.-E.2
  • 48
    • 58149321773 scopus 로고
    • A theory of the temporary organization
    • R. A. Lundin and A. Söderham, "A theory of the temporary organization," Scand. J. Manage., vol. 11, no. 4, pp. 437-455, 1995.
    • (1995) Scand. J. Manage , vol.11 , Issue.4 , pp. 437-455
    • Lundin, R.A.1    Söderham, A.2
  • 49
    • 0012302430 scopus 로고    scopus 로고
    • Can we learn from project histories?
    • G. McMaster, "Can we learn from project histories?," PM Network. vol. 14, no. 7, pp. 66-67, 2000.
    • (2000) PM Network , vol.14 , Issue.7 , pp. 66-67
    • McMaster, G.1
  • 52
    • 0024702772 scopus 로고
    • Human error in structural design tasks
    • R. E. Melchers, "Human error in structural design tasks," ASCE J. Struct. Eng., vol. 115, no. 7, pp. 1795-1807, 1989.
    • (1989) ASCE J. Struct. Eng , vol.115 , Issue.7 , pp. 1795-1807
    • Melchers, R.E.1
  • 53
    • 4244208223 scopus 로고    scopus 로고
    • Cost of failure in a major civil engineering project,
    • Licentiate Thesis, Div. Constr. Manage. Econ, Dept. Real Estate Constr. Manage, Royal Inst. Technol, Stockholm, Sweden
    • K.-O. Nylén, "Cost of failure in a major civil engineering project," Licentiate Thesis, Div. Constr. Manage. Econ., Dept. Real Estate Constr. Manage., Royal Inst. Technol., Stockholm, Sweden, 1996.
    • (1996)
    • Nylén, K.-O.1
  • 54
    • 0032089668 scopus 로고    scopus 로고
    • DESMAN: A dynamic model for managing civil engineering design projects
    • S. Ogunlana, J. Lim, and K. Saeed, "DESMAN: A dynamic model for managing civil engineering design projects," Comput. Struct., vol. 76, pp. 401-419, 1998.
    • (1998) Comput. Struct , vol.76 , pp. 401-419
    • Ogunlana, S.1    Lim, J.2    Saeed, K.3
  • 55
    • 0022673947 scopus 로고
    • Errors and omissions: Fertile ground for high costs
    • D. Orndoff, "Errors and omissions: Fertile ground for high costs," Mil. Eng., vol. 506, pp. 107-109, 1986.
    • (1986) Mil. Eng , vol.506 , pp. 107-109
    • Orndoff, D.1
  • 56
    • 85044807673 scopus 로고
    • Some suggestions about the transitory-permanence dimension of organization
    • B. J. Palisi, "Some suggestions about the transitory-permanence dimension of organization," Br. J. Sociol., vol. 21, pp. 200-206, 1970.
    • (1970) Br. J. Sociol , vol.21 , pp. 200-206
    • Palisi, B.J.1
  • 57
    • 0035510392 scopus 로고    scopus 로고
    • Dynamic planning for fast tracking building construction projects
    • F. Pena-Mora and M. Park, "Dynamic planning for fast tracking building construction projects," ASCE J. Constr. Eng. Manage., vol. 127, no. 6, pp. 445-456, 2001.
    • (2001) ASCE J. Constr. Eng. Manage , vol.127 , Issue.6 , pp. 445-456
    • Pena-Mora, F.1    Park, M.2
  • 61
    • 0004223940 scopus 로고
    • Cambridge, U.K, Cambridge Univ. Press
    • J. Reason, Human Error. Cambridge, U.K.: Cambridge Univ. Press, 1990.
    • (1990) Human Error
    • Reason, J.1
  • 62
    • 0038463109 scopus 로고    scopus 로고
    • Human error: Models and management
    • J. Reason, "Human error: Models and management," West. J. Med., vol. 172, no. 6, pp. 393- 396, 2000.
    • (2000) West. J. Med , vol.172 , Issue.6 , pp. 393-396
    • Reason, J.1
  • 65
    • 0000228602 scopus 로고    scopus 로고
    • System dynamics in project management: A comparative analysis with traditional methods
    • A. G. Rodrigues and J. Bowers, "System dynamics in project management: A comparative analysis with traditional methods," Syst. Dyn. Rev. vol. 12, no. 2, pp. 121-139, 1996.
    • (1996) Syst. Dyn. Rev , vol.12 , Issue.2 , pp. 121-139
    • Rodrigues, A.G.1    Bowers, J.2
  • 66
    • 0032048057 scopus 로고    scopus 로고
    • Quality, waste, and cost in architectural and building design management
    • G. Rounce. "Quality, waste, and cost in architectural and building design management," Int. J. Proj. Manage., vol. 16, no. 2, pp. 123-127, 1998.
    • (1998) Int. J. Proj. Manage , vol.16 , Issue.2 , pp. 123-127
    • Rounce, G.1
  • 67
    • 0030474971 scopus 로고    scopus 로고
    • Contact design for profitability in macro-engineering projects
    • K. Saeed and K. Brook, "Contact design for profitability in macro-engineering projects," Syst. Dyn. Rev., vol. 12, no. 3, pp. 235-246, 1996.
    • (1996) Syst. Dyn. Rev , vol.12 , Issue.3 , pp. 235-246
    • Saeed, K.1    Brook, K.2
  • 68
    • 0027542512 scopus 로고
    • Human factors in civil and geotechnical engineering failures
    • G. F. Sowers, "Human factors in civil and geotechnical engineering failures," ASCE J. Geotech. Eng., vol. 119, no. 2, pp. 238-256, 1993.
    • (1993) ASCE J. Geotech. Eng , vol.119 , Issue.2 , pp. 238-256
    • Sowers, G.F.1
  • 70
    • 0024685217 scopus 로고
    • Checking models in structural design
    • M. G. Stewart and R. E. Melchers, "Checking models in structural design," ASCE J. Struct. Eng., vol. 115, no. 6, pp. 1309 1324, 1989.
    • (1989) ASCE J. Struct. Eng , vol.115 , Issue.6 , pp. 1309-1324
    • Stewart, M.G.1    Melchers, R.E.2
  • 71
    • 0342585955 scopus 로고    scopus 로고
    • Organisational coordination in the design phase, Rep. 44, Inst. byggnadsekonomi och byggnadsoganisation, Chalmers techiska högskola, Göteborg, Sweden
    • P.-O. Svelinger, Organisatorisk samordning vid projektering (Organisational coordination in the design phase), Rep. 44, Inst. byggnadsekonomi och byggnadsoganisation, Chalmers techiska högskola, Göteborg, Sweden, 1996.
    • (1996) Organisatorisk samordning vid projektering
    • Svelinger, P.-O.1
  • 72
    • 43749117203 scopus 로고    scopus 로고
    • P. A. Tilley and S.L. McFallari, Design and Documentation Quality Survey Designers' Perspectives, presented at the CSIRO Build. Constr. Eng., Melbourne, Australia, 2000.
    • P. A. Tilley and S.L. McFallari, Design and Documentation Quality Survey Designers' Perspectives, presented at the CSIRO Build. Constr. Eng., Melbourne, Australia, 2000.
  • 74
    • 0042188854 scopus 로고    scopus 로고
    • A quality performance management system lot industrial construction engineering projects
    • T. H. Willis and W. D. Willis, "A quality performance management system lot industrial construction engineering projects," Int. J. Qual. Rel. Manage., vol. 13, no. 9. pp. 38-48, 1996.
    • (1996) Int. J. Qual. Rel. Manage , vol.13 , Issue.9 , pp. 38-48
    • Willis, T.H.1    Willis, W.D.2
  • 75
    • 0029342363 scopus 로고
    • The effects of design changes and delays on project costs
    • T. M. Williams, C. Eden, F. Ackermann, and A. Tait, "The effects of design changes and delays on project costs," J. Oper. Res. Soc., vol. 46, no. 7, pp 809-818, 1995.
    • (1995) J. Oper. Res. Soc , vol.46 , Issue.7 , pp. 809-818
    • Williams, T.M.1    Eden, C.2    Ackermann, F.3    Tait, A.4
  • 79
    • 0004169047 scopus 로고
    • Cambridge, U.K: Cambridge Univ. Press
    • J. Zeisel. Inquiry by Design. Cambridge, U.K: Cambridge Univ. Press, 1984.
    • (1984) Inquiry by Design
    • Zeisel, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.