메뉴 건너뛰기




Volumn 51, Issue 4, 2004, Pages 426-440

A rework reduction model for construction projects

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION INDUSTRY; MATHEMATICAL MODELS; QUALITY CONTROL; REGRESSION ANALYSIS;

EID: 7944219517     PISSN: 00189391     EISSN: None     Source Type: Journal    
DOI: 10.1109/TEM.2004.835092     Document Type: Article
Times cited : (122)

References (54)
  • 2
    • 0012541491 scopus 로고    scopus 로고
    • Modeling litigation: Mixing qualitative and quantitative approaches
    • F. Ackermann, C. Eden, and T. Williams, "Modeling litigation: Mixing qualitative and quantitative approaches," [i Interfaces i], vol. 27, no. 2, pp. 48-65, 1997.
    • (1997) Interfaces , vol.27 , Issue.2 , pp. 48-65
    • Ackermann, F.1    Eden, C.2    Williams, T.3
  • 5
    • 0038588343 scopus 로고    scopus 로고
    • Computer-based collaborative building design: Conceptual model
    • C. J. Anumba and L. N. Newnham, "Computer-based collaborative building design: Conceptual model," [i Inte. J. Construction Inform. Technol. i], vol. 8, no. 1, pp. 1-14, 2000.
    • (2000) Inte. J. Construction Inform. Technol. , vol.8 , Issue.1 , pp. 1-14
    • Anumba, C.J.1    Newnham, L.N.2
  • 6
    • 7944234429 scopus 로고    scopus 로고
    • Australian Procurement and Construction Council (APCC), Deakin West, ACT, Australia: The Australian Procurement and Construction Council Inc
    • Australian Procurement and Construction Council (APCC), [i Construct Australia: Building a Better Construction Industry in Australia i]. Deakin West, ACT, Australia: The Australian Procurement and Construction Council Inc., 1999.
    • (1999) Construct Australia: Building a Better Construction Industry in Australia
  • 7
    • 22844440688 scopus 로고    scopus 로고
    • Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process
    • S. Austin, A. Baldwin, B. Li, and P. Waskett, "Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process," [i Construction Manage. Econ. i], vol. 18, no. 2, pp. 173-182, 2000.
    • (2000) Construction Manage. Econ. , vol.18 , Issue.2 , pp. 173-182
    • Austin, S.1    Baldwin, A.2    Li, B.3    Waskett, P.4
  • 8
    • 0001326664 scopus 로고    scopus 로고
    • The cost of quality failures in major civil engineering projects
    • P. Barber, D. Sheath, C. Tomkins, and A. Graves, "The cost of quality failures in major civil engineering projects," [i Int. J. Qual. Rel. Manage. i], vol. 17, no. 4/5, pp. 479-492, 2000.
    • (2000) Int. J. Qual. Rel. Manage. , vol.17 , Issue.4-5 , pp. 479-492
    • Barber, P.1    Sheath, D.2    Tomkins, C.3    Graves, A.4
  • 9
    • 7944225605 scopus 로고
    • Building Research Establishment, Garston, U.K.: BRE
    • Building Research Establishment, [i Quality Control on Building Sites i]. Garston, U.K.: BRE, 1981.
    • (1981) Quality Control on Building Sites
  • 11
    • 4143130936 scopus 로고
    • Melbourne, Australia: Quality Assurance in the Construction Industry, Concrete Inst. Australia, Sept
    • G. Burroughs, [i Concrete Quality Assurance: The Contractors Role i]. Melbourne, Australia: Quality Assurance in the Construction Industry, Concrete Inst. Australia, Sept. 1993.
    • (1993) Concrete Quality Assurance: The Contractors Role
    • Burroughs, G.1
  • 12
    • 0242686371 scopus 로고
    • Evaluation of novation contract
    • Sydney, Australia, Feb. 17-18
    • A. P. C. Chan, "Evaluation of novation contract," in [i Proc. National Construction Management Conf. i], Sydney, Australia, Feb. 17-18, 1994, pp. 383-396.
    • (1994) Proc. National Construction Management Conf. , pp. 383-396
    • Chan, A.P.C.1
  • 16
    • 4143124332 scopus 로고
    • Construction Industry Institute (CII), Austin, TX: Univ. Texas at Austin, Apr. 6-10
    • Construction Industry Institute (CII), [i The Impact of Changes on Construction Cost and Schedule i]. Austin, TX: Univ. Texas at Austin, Apr. 6-10, 1990.
    • (1990) The Impact of Changes on Construction Cost and Schedule
  • 17
    • 0001906688 scopus 로고
    • The rework cycle: Benchmarking for the project manager
    • K. G. Cooper, "The rework cycle: Benchmarking for the project manager," [i Project Manage. J. i], vol. 24, no. 1, pp. 17-22, 1993.
    • (1993) Project Manage. J. , vol.24 , Issue.1 , pp. 17-22
    • Cooper, K.G.1
  • 18
    • 33845945922 scopus 로고
    • Coefficient alpha and the internal structure of tests
    • L. J Cronbach, "Coefficient alpha and the internal structure of tests," [i Psychometrika i], vol. 16, pp. 297-334, 1951.
    • (1951) Psychometrika , vol.16 , pp. 297-334
    • Cronbach L.J1
  • 19
    • 0004603683 scopus 로고    scopus 로고
    • A quantitative study of post contract award design changes in construction
    • I. D. Cox, J. Morris, J. H. Rogerson, and G. E. Jared, "A quantitative study of post contract award design changes in construction," [i Construction Manage. Econ. i], vol. 17, no. 4, pp. 427-439, 1999.
    • (1999) Construction Manage. Econ. , vol.17 , Issue.4 , pp. 427-439
    • Cox, I.D.1    Morris, J.2    Rogerson, J.H.3    Jared, G.E.4
  • 20
    • 7944238314 scopus 로고    scopus 로고
    • A report for government by the national building and construction committee
    • Department of Industry, Science and Tourism (DISR), DISR, Canberra, Australia
    • Department of Industry, Science and Tourism (DISR), "A report for government by the national building and construction committee," DISR, Canberra, Australia, Building for Growth: An Action Agenda for the Building and Construction Industries, 1999.
    • (1999) Building for Growth: an Action Agenda for the Building and Construction Industries
  • 21
    • 0033888428 scopus 로고    scopus 로고
    • The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D and D) in major projects
    • C. Eden, T. Williams, and S. Howick, "The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects," [i J. Oper. Res. Soc. i], vol. 51, no. 3, pp. 291-300, 2000.
    • (2000) J. Oper. Res. Soc. , vol.51 , Issue.3 , pp. 291-300
    • Eden, C.1    Williams, T.2    Howick, S.3
  • 22
    • 0032691228 scopus 로고    scopus 로고
    • Optimal allocation of construction planning resources
    • O. O. Faniran, P. E. D. Love, and H. Li, "Optimal allocation of construction planning resources," [i ASCE J. Construction. Eng. Manage. i], vol. 125 no. 5, pp. 311-319, 1999.
    • (1999) ASCE J. Construction. Eng. Manage. , vol.125 , Issue.5 , pp. 311-319
    • Faniran, O.O.1    Love, P.E.D.2    Li, H.3
  • 23
    • 4143080221 scopus 로고
    • Management of design documentation, where do we go from here?
    • R. R. Wakefield and D. G. Carmichael, Eds. Rotterdam: Balkema
    • J. Gardiner, "Management of design documentation, where do we go from here?," in [i Construction and Management, Recent Advances i], R. R. Wakefield and D. G. Carmichael, Eds. Rotterdam: Balkema, 1994. pp. 113-118.
    • (1994) Construction and Management, Recent Advances , pp. 113-118
    • Gardiner, J.1
  • 24
    • 0004525871 scopus 로고    scopus 로고
    • Evaluation of methods for studying environmental errors in building and civil engineering projects
    • Göteborg, Sweden: Chalmers Univ. Technol., Apr. 12-13
    • P. Gluch and P.-E. Josephson, "Evaluation of methods for studying environmental errors in building and civil engineering projects," in [i Proc. Nordic Seminar Construction Economics and Organization i]. Göteborg, Sweden: Chalmers Univ. Technol., Apr. 12-13, 1999, pp. 137-144.
    • (1999) Proc. Nordic Seminar Construction Economics and Organization , pp. 137-144
    • Gluch, P.1    Josephson, P.-E.2
  • 26
    • 2342638600 scopus 로고    scopus 로고
    • Survey findings on U.K. construction procurement: Is it achieving lowest cost, or value?
    • G. D. Holt, D. Proverbs, and P. E. D. Love, "Survey findings on U.K. construction procurement: Is it achieving lowest cost, or value?," [i Asia-Pacific Building Construction Manage. J. i], vol 5, no. 2, pp. 13-20, 2000.
    • (2000) Asia-Pacific Building Construction Manage. J. , vol.5 , Issue.2 , pp. 13-20
    • Holt, G.D.1    Proverbs, D.2    Love, P.E.D.3
  • 27
    • 0032593163 scopus 로고    scopus 로고
    • The causes and costs of defects in construction. A study of seven building projects
    • P.-E. Josephson and Y. Hammarlund, "The causes and costs of defects in construction. A study of seven building projects," [i Automat. Construction i], vol. 8, no. 6, pp. 642-681, 1999.
    • (1999) Automat. Construction , vol.8 , Issue.6 , pp. 642-681
    • Josephson, P.-E.1    Hammarlund, Y.2
  • 29
    • 0002178218 scopus 로고    scopus 로고
    • Developments in the implementation of concurrent engineering in construction
    • J. M. Karma, C. J. Anumba, and N. F. O. Evbuomwan, "Developments in the implementation of concurrent engineering in construction," [i Comput.-Integrated Design and Construction i], vol. 2, no. 1, pp. 68-78, 2000.
    • (2000) Comput.-Integrated Design and Construction , vol.2 , Issue.1 , pp. 68-78
    • Karma, J.M.1    Anumba, C.J.2    Evbuomwan, N.F.O.3
  • 30
    • 0031642811 scopus 로고    scopus 로고
    • Visualization of building interior design to reduce rework
    • London, U.K.: School of Oriental and African Studies, Univ. London, July 29-31
    • H. Li and P. E. D. Love, "Visualization of building interior design to reduce rework," in [i Proc. Int. Conf. Information Visualization i]. London, U.K.: School of Oriental and African Studies, Univ. London, July 29-31, 1998, pp. 187-191.
    • (1998) Proc. Int. Conf. Information Visualization , pp. 187-191
    • Li, H.1    Love, P.E.D.2
  • 32
    • 0043191027 scopus 로고    scopus 로고
    • Engineers Australia, Feb
    • K. Lomas, [i Quality Pays i]: Engineers Australia, Feb. 1996, p. 26.
    • (1996) Quality Pays , pp. 26
    • Lomas, K.1
  • 33
    • 0042689966 scopus 로고    scopus 로고
    • The influence of project type and procurement method on rework costs in building construction projects
    • P. E. D. Love, "The influence of project type and procurement method on rework costs in building construction projects," [i ASCE J. Construction Eng. Manage. i], vol. 128, no. 1, pp. 18-29, 2002.
    • (2002) ASCE J. Construction Eng. Manage. , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1
  • 34
    • 84986104505 scopus 로고    scopus 로고
    • Auditing the indirect consequences of rework in construction: A case based approach
    • P. E. D. Love, "Auditing the indirect consequences of rework in construction: A case based approach," [i Manage. Auditing J. i], vol. 17, no. 3, 2002.
    • (2002) Manage. Auditing J. , vol.17 , Issue.3
    • Love, P.E.D.1
  • 35
    • 2642539100 scopus 로고    scopus 로고
    • Bench-marking, bench-action and bench-learning: Rework mitigation in projects
    • P. E. D. Love and J. Smith, "Bench-marking, bench-action and bench-learning: Rework mitigation in projects," [i ASCE J. Manage. Eng. i], vol. 19, no. 4, pp. 147-159, 2003.
    • (2003) ASCE J. Manage. Eng. , vol.19 , Issue.4 , pp. 147-159
    • Love, P.E.D.1    Smith, J.2
  • 36
    • 0032342510 scopus 로고    scopus 로고
    • Concurrent engineering: A strategy for procuring construction projects
    • P. E. D. Love, A. Gunasekaran, and H. Li, "Concurrent engineering: A strategy for procuring construction projects," [i Int. J. Proj. Manage. i], vol. 16, no. 6, pp. 375-383, 1998.
    • (1998) Int. J. Proj. Manage. , vol.16 , Issue.6 , pp. 375-383
    • Love, P.E.D.1    Gunasekaran, A.2    Li, H.3
  • 37
    • 0033096295 scopus 로고    scopus 로고
    • Rework: A symptom of a dysfunctional supply chain
    • P. E. D. Love, H. Li, and P. Mandal, "Rework: A symptom of a dysfunctional supply chain," [i Eur. J. Purchasing and Supply Manage. i], vol. 5, no. 1, pp. 1-11, 1999.
    • (1999) Eur. J. Purchasing and Supply Manage. , vol.5 , Issue.1 , pp. 1-11
    • Love, P.E.D.1    Li, H.2    Mandal, P.3
  • 38
    • 2042443603 scopus 로고    scopus 로고
    • The propagation of rework benchmark metrics for construction
    • P. E. D. Love, J. Smith, and H. Li, "The propagation of rework benchmark metrics for construction," [i Int. J. Qual. Rel. Manage. i], vol. 16, no. 7, pp. 638-658, 1999.
    • (1999) Int. J. Qual. Rel. Manage. , vol.16 , Issue.7 , pp. 638-658
    • Love, P.E.D.1    Smith, J.2    Li, H.3
  • 39
    • 0001187120 scopus 로고    scopus 로고
    • Determining the causal structure of rework in construction projects
    • P. E. D. Love, P. Mandal, and H. Li, "Determining the causal structure of rework in construction projects," [i Construction Manage. Econ. i], vol. 17, no. 4, pp. 505-517, 1999.
    • (1999) Construction Manage. Econ. , vol.17 , Issue.4 , pp. 505-517
    • Love, P.E.D.1    Mandal, P.2    Li, H.3
  • 41
    • 0011269229 scopus 로고
    • Nat. Economic Development Office
    • Nat. Economic Development Office, Achieving quality on building sites, pp. 18-19, 1987.
    • (1987) Achieving Quality on Building Sites , pp. 18-19
  • 43
    • 7944238083 scopus 로고
    • NWPC and NBCC, Nat. Public Works Conf. Nat. Build. Construction Council Joint Working Party Rep., Canberra, ACT, Australia, May
    • NWPC and NBCC, "No dispute - strategies for improvement in the Australian building and construction industry," Nat. Public Works Conf. Nat. Build. Construction Council Joint Working Party Rep., Canberra, ACT, Australia, May 1990.
    • (1990) No Dispute - Strategies for Improvement in the Australian Building and Construction Industry
  • 44
    • 0022413469 scopus 로고
    • Impacts of constructability improvement
    • J. T. O'Connor, "Impacts of constructability improvement," [i ASCE J. Construction Eng. Manage. i], vol. 111, no. 4, pp. 404-410 1985.
    • (1985) ASCE J. Construction Eng. Manage. , vol.111 , Issue.4 , pp. 404-410
    • O'Connor, J.T.1
  • 46
    • 0032048057 scopus 로고    scopus 로고
    • Quality, waste, and cost consideration in architectural building design management
    • G. Rounce, "Quality, waste, and cost consideration in architectural building design management," [i Int. J. Proj. Manage. i], vol. 16. no. 2, pp. 123-127, 1998.
    • (1998) Int. J. Proj. Manage. , vol.16 , Issue.2 , pp. 123-127
    • Rounce, G.1
  • 49
    • 84986085484 scopus 로고    scopus 로고
    • Strategic needs analysis: Its role in brief development
    • J. Smith and N. Jackson, "Strategic needs analysis: Its role in brief development," [i Facilities i], vol. 18, no. 13/14, pp. 502-512, 2000.
    • (2000) Facilities , vol.18 , Issue.13-14 , pp. 502-512
    • Smith, J.1    Jackson, N.2
  • 50
    • 0019597497 scopus 로고
    • The design structure system: A method for managing the design of complex systems
    • D. V. Steward, "The design structure system: A method for managing the design of complex systems," [i IEEE Trans. Eng. Manage. i], vol. TEM-1, pp. 71-74, 1981.
    • (1981) IEEE Trans. Eng. Manage. , vol.TEM-1 , pp. 71-74
    • Steward, D.V.1
  • 52
    • 0026131327 scopus 로고
    • Constructability and constructability programs: While paper
    • Construction Management Committee of the ASCE Construction Division
    • Construction Management Committee of the ASCE Construction Division, "Constructability and constructability programs: While paper," [i ASCE J. Construction Eng. Manage. i], vol. 117, no. 1, pp. 67-89, 1991.
    • (1991) ASCE J. Construction Eng. Manage. , vol.117 , Issue.1 , pp. 67-89
  • 54
    • 2342559532 scopus 로고    scopus 로고
    • Prequalification criteria - a survey of U.K. construction practitioners' opinions
    • C. H. Wong, G. D. Holt, and P. T. Harris, "Prequalification criteria - A survey of U.K. construction practitioners' opinions," [i J. Construction Res. i], vol. 2, no. 1, pp. 41-56, 2001.
    • (2001) J. Construction Res. , vol.2 , Issue.1 , pp. 41-56
    • Wong, C.H.1    Holt, G.D.2    Harris, P.T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.