Modeling litigation: Mixing qualitative and quantitative approaches
-
F. Ackermann, C. Eden, and T. Williams, "Modeling litigation: Mixing qualitative and quantitative approaches," [i Interfaces i], vol. 27, no. 2, pp. 48-65, 1997.
-
(1997)
Interfaces
, vol.27
, Issue.2
, pp. 48-65
-
-
Ackermann, F.1
Eden, C.2
Williams, T.3
-
5
-
-
0038588343
-
Computer-based collaborative building design: Conceptual model
-
C. J. Anumba and L. N. Newnham, "Computer-based collaborative building design: Conceptual model," [i Inte. J. Construction Inform. Technol. i], vol. 8, no. 1, pp. 1-14, 2000.
-
(2000)
Inte. J. Construction Inform. Technol.
, vol.8
, Issue.1
, pp. 1-14
-
-
Anumba, C.J.1
Newnham, L.N.2
-
6
-
-
7944234429
-
-
Australian Procurement and Construction Council (APCC), Deakin West, ACT, Australia: The Australian Procurement and Construction Council Inc
-
Australian Procurement and Construction Council (APCC), [i Construct Australia: Building a Better Construction Industry in Australia i]. Deakin West, ACT, Australia: The Australian Procurement and Construction Council Inc., 1999.
-
(1999)
Construct Australia: Building a Better Construction Industry in Australia
-
-
-
7
-
-
22844440688
-
Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process
-
S. Austin, A. Baldwin, B. Li, and P. Waskett, "Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process," [i Construction Manage. Econ. i], vol. 18, no. 2, pp. 173-182, 2000.
-
(2000)
Construction Manage. Econ.
, vol.18
, Issue.2
, pp. 173-182
-
-
Austin, S.1
Baldwin, A.2
Li, B.3
Waskett, P.4
-
8
-
-
0001326664
-
The cost of quality failures in major civil engineering projects
-
P. Barber, D. Sheath, C. Tomkins, and A. Graves, "The cost of quality failures in major civil engineering projects," [i Int. J. Qual. Rel. Manage. i], vol. 17, no. 4/5, pp. 479-492, 2000.
-
(2000)
Int. J. Qual. Rel. Manage.
, vol.17
, Issue.4-5
, pp. 479-492
-
-
Barber, P.1
Sheath, D.2
Tomkins, C.3
Graves, A.4
-
9
-
-
7944225605
-
-
Building Research Establishment, Garston, U.K.: BRE
-
Building Research Establishment, [i Quality Control on Building Sites i]. Garston, U.K.: BRE, 1981.
-
(1981)
Quality Control on Building Sites
-
-
-
10
-
-
0042960668
-
-
Univ. Texas at Austin, Austin, TX, Rep. Construction Ind. Inst
-
J. Burati and J. Farrington, "Cost of quality deviations in design and construction," Univ. Texas at Austin, Austin, TX, Rep. Construction Ind. Inst., 1987.
-
(1987)
Cost of Quality Deviations in Design and Construction
-
-
Burati, J.1
Farrington, J.2
-
11
-
-
4143130936
-
-
Melbourne, Australia: Quality Assurance in the Construction Industry, Concrete Inst. Australia, Sept
-
G. Burroughs, [i Concrete Quality Assurance: The Contractors Role i]. Melbourne, Australia: Quality Assurance in the Construction Industry, Concrete Inst. Australia, Sept. 1993.
-
(1993)
Concrete Quality Assurance: The Contractors Role
-
-
Burroughs, G.1
-
12
-
-
0242686371
-
Evaluation of novation contract
-
Sydney, Australia, Feb. 17-18
-
A. P. C. Chan, "Evaluation of novation contract," in [i Proc. National Construction Management Conf. i], Sydney, Australia, Feb. 17-18, 1994, pp. 383-396.
-
(1994)
Proc. National Construction Management Conf.
, pp. 383-396
-
-
Chan, A.P.C.1
-
13
-
-
7944229862
-
Lack of quality in construction - economic losses
-
Lisbon, Portugal, Sept. 30-Oct
-
M. Cnudde, "Lack of quality in construction - economic losses," in [i Proc. Eur. Symp. Management, Quality, Economics in Housing and Other Building Sectors i], Lisbon, Portugal, Sept. 30-Oct. 4 1991, pp. 508-515.
-
(1991)
Proc. Eur. Symp. Management, Quality, Economics in Housing and Other Building Sectors
, vol.4
, pp. 508-515
-
-
Cnudde, M.1
-
16
-
-
4143124332
-
-
Construction Industry Institute (CII), Austin, TX: Univ. Texas at Austin, Apr. 6-10
-
Construction Industry Institute (CII), [i The Impact of Changes on Construction Cost and Schedule i]. Austin, TX: Univ. Texas at Austin, Apr. 6-10, 1990.
-
(1990)
The Impact of Changes on Construction Cost and Schedule
-
-
-
17
-
-
0001906688
-
The rework cycle: Benchmarking for the project manager
-
K. G. Cooper, "The rework cycle: Benchmarking for the project manager," [i Project Manage. J. i], vol. 24, no. 1, pp. 17-22, 1993.
-
(1993)
Project Manage. J.
, vol.24
, Issue.1
, pp. 17-22
-
-
Cooper, K.G.1
-
18
-
-
33845945922
-
Coefficient alpha and the internal structure of tests
-
L. J Cronbach, "Coefficient alpha and the internal structure of tests," [i Psychometrika i], vol. 16, pp. 297-334, 1951.
-
(1951)
Psychometrika
, vol.16
, pp. 297-334
-
-
Cronbach L.J1
-
19
-
-
0004603683
-
A quantitative study of post contract award design changes in construction
-
I. D. Cox, J. Morris, J. H. Rogerson, and G. E. Jared, "A quantitative study of post contract award design changes in construction," [i Construction Manage. Econ. i], vol. 17, no. 4, pp. 427-439, 1999.
-
(1999)
Construction Manage. Econ.
, vol.17
, Issue.4
, pp. 427-439
-
-
Cox, I.D.1
Morris, J.2
Rogerson, J.H.3
Jared, G.E.4
-
20
-
-
7944238314
-
A report for government by the national building and construction committee
-
Department of Industry, Science and Tourism (DISR), DISR, Canberra, Australia
-
Department of Industry, Science and Tourism (DISR), "A report for government by the national building and construction committee," DISR, Canberra, Australia, Building for Growth: An Action Agenda for the Building and Construction Industries, 1999.
-
(1999)
Building for Growth: an Action Agenda for the Building and Construction Industries
-
-
-
21
-
-
0033888428
-
The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D and D) in major projects
-
C. Eden, T. Williams, and S. Howick, "The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects," [i J. Oper. Res. Soc. i], vol. 51, no. 3, pp. 291-300, 2000.
-
(2000)
J. Oper. Res. Soc.
, vol.51
, Issue.3
, pp. 291-300
-
-
Eden, C.1
Williams, T.2
Howick, S.3
-
22
-
-
0032691228
-
Optimal allocation of construction planning resources
-
O. O. Faniran, P. E. D. Love, and H. Li, "Optimal allocation of construction planning resources," [i ASCE J. Construction. Eng. Manage. i], vol. 125 no. 5, pp. 311-319, 1999.
-
(1999)
ASCE J. Construction. Eng. Manage.
, vol.125
, Issue.5
, pp. 311-319
-
-
Faniran, O.O.1
Love, P.E.D.2
Li, H.3
-
23
-
-
4143080221
-
Management of design documentation, where do we go from here?
-
R. R. Wakefield and D. G. Carmichael, Eds. Rotterdam: Balkema
-
J. Gardiner, "Management of design documentation, where do we go from here?," in [i Construction and Management, Recent Advances i], R. R. Wakefield and D. G. Carmichael, Eds. Rotterdam: Balkema, 1994. pp. 113-118.
-
(1994)
Construction and Management, Recent Advances
, pp. 113-118
-
-
Gardiner, J.1
-
24
-
-
0004525871
-
Evaluation of methods for studying environmental errors in building and civil engineering projects
-
Göteborg, Sweden: Chalmers Univ. Technol., Apr. 12-13
-
P. Gluch and P.-E. Josephson, "Evaluation of methods for studying environmental errors in building and civil engineering projects," in [i Proc. Nordic Seminar Construction Economics and Organization i]. Göteborg, Sweden: Chalmers Univ. Technol., Apr. 12-13, 1999, pp. 137-144.
-
(1999)
Proc. Nordic Seminar Construction Economics and Organization
, pp. 137-144
-
-
Gluch, P.1
Josephson, P.-E.2
-
26
-
-
2342638600
-
Survey findings on U.K. construction procurement: Is it achieving lowest cost, or value?
-
G. D. Holt, D. Proverbs, and P. E. D. Love, "Survey findings on U.K. construction procurement: Is it achieving lowest cost, or value?," [i Asia-Pacific Building Construction Manage. J. i], vol 5, no. 2, pp. 13-20, 2000.
-
(2000)
Asia-Pacific Building Construction Manage. J.
, vol.5
, Issue.2
, pp. 13-20
-
-
Holt, G.D.1
Proverbs, D.2
Love, P.E.D.3
-
27
-
-
0032593163
-
The causes and costs of defects in construction. A study of seven building projects
-
P.-E. Josephson and Y. Hammarlund, "The causes and costs of defects in construction. A study of seven building projects," [i Automat. Construction i], vol. 8, no. 6, pp. 642-681, 1999.
-
(1999)
Automat. Construction
, vol.8
, Issue.6
, pp. 642-681
-
-
Josephson, P.-E.1
Hammarlund, Y.2
-
28
-
-
2342652570
-
-
Ph.D. dissertation, Univ. Teeside, Newcastle, U.K
-
J. M. Karma, "Client requirements processing for concurrent life-cycle design and construction," Ph.D. dissertation, Univ. Teeside, Newcastle, U.K., 1999.
-
(1999)
Client Requirements Processing for Concurrent Life-Cycle Design and Construction
-
-
Karma, J.M.1
-
29
-
-
0002178218
-
Developments in the implementation of concurrent engineering in construction
-
J. M. Karma, C. J. Anumba, and N. F. O. Evbuomwan, "Developments in the implementation of concurrent engineering in construction," [i Comput.-Integrated Design and Construction i], vol. 2, no. 1, pp. 68-78, 2000.
-
(2000)
Comput.-Integrated Design and Construction
, vol.2
, Issue.1
, pp. 68-78
-
-
Karma, J.M.1
Anumba, C.J.2
Evbuomwan, N.F.O.3
-
30
-
-
0031642811
-
Visualization of building interior design to reduce rework
-
London, U.K.: School of Oriental and African Studies, Univ. London, July 29-31
-
H. Li and P. E. D. Love, "Visualization of building interior design to reduce rework," in [i Proc. Int. Conf. Information Visualization i]. London, U.K.: School of Oriental and African Studies, Univ. London, July 29-31, 1998, pp. 187-191.
-
(1998)
Proc. Int. Conf. Information Visualization
, pp. 187-191
-
-
Li, H.1
Love, P.E.D.2
-
31
-
-
84992996699
-
Partnering research in construction
-
H. Li, E. W. L. Cheng, and P. E. D. Love, "Partnering research in construction" [i Eng. Construction Arch. Manage. i], vol. 7, no. 1, pp. 76-92, 2000.
-
(2000)
Eng. Construction Arch. Manage.
, vol.7
, Issue.1
, pp. 76-92
-
-
Li, H.1
Cheng, E.W.L.2
Love, P.E.D.3
-
32
-
-
0043191027
-
-
Engineers Australia, Feb
-
K. Lomas, [i Quality Pays i]: Engineers Australia, Feb. 1996, p. 26.
-
(1996)
Quality Pays
, pp. 26
-
-
Lomas, K.1
-
33
-
-
0042689966
-
The influence of project type and procurement method on rework costs in building construction projects
-
P. E. D. Love, "The influence of project type and procurement method on rework costs in building construction projects," [i ASCE J. Construction Eng. Manage. i], vol. 128, no. 1, pp. 18-29, 2002.
-
(2002)
ASCE J. Construction Eng. Manage.
, vol.128
, Issue.1
, pp. 18-29
-
-
Love, P.E.D.1
-
34
-
-
84986104505
-
Auditing the indirect consequences of rework in construction: A case based approach
-
P. E. D. Love, "Auditing the indirect consequences of rework in construction: A case based approach," [i Manage. Auditing J. i], vol. 17, no. 3, 2002.
-
(2002)
Manage. Auditing J.
, vol.17
, Issue.3
-
-
Love, P.E.D.1
-
35
-
-
2642539100
-
Bench-marking, bench-action and bench-learning: Rework mitigation in projects
-
P. E. D. Love and J. Smith, "Bench-marking, bench-action and bench-learning: Rework mitigation in projects," [i ASCE J. Manage. Eng. i], vol. 19, no. 4, pp. 147-159, 2003.
-
(2003)
ASCE J. Manage. Eng.
, vol.19
, Issue.4
, pp. 147-159
-
-
Love, P.E.D.1
Smith, J.2
-
36
-
-
0032342510
-
Concurrent engineering: A strategy for procuring construction projects
-
P. E. D. Love, A. Gunasekaran, and H. Li, "Concurrent engineering: A strategy for procuring construction projects," [i Int. J. Proj. Manage. i], vol. 16, no. 6, pp. 375-383, 1998.
-
(1998)
Int. J. Proj. Manage.
, vol.16
, Issue.6
, pp. 375-383
-
-
Love, P.E.D.1
Gunasekaran, A.2
Li, H.3
-
37
-
-
0033096295
-
Rework: A symptom of a dysfunctional supply chain
-
P. E. D. Love, H. Li, and P. Mandal, "Rework: A symptom of a dysfunctional supply chain," [i Eur. J. Purchasing and Supply Manage. i], vol. 5, no. 1, pp. 1-11, 1999.
-
(1999)
Eur. J. Purchasing and Supply Manage.
, vol.5
, Issue.1
, pp. 1-11
-
-
Love, P.E.D.1
Li, H.2
Mandal, P.3
-
38
-
-
2042443603
-
The propagation of rework benchmark metrics for construction
-
P. E. D. Love, J. Smith, and H. Li, "The propagation of rework benchmark metrics for construction," [i Int. J. Qual. Rel. Manage. i], vol. 16, no. 7, pp. 638-658, 1999.
-
(1999)
Int. J. Qual. Rel. Manage.
, vol.16
, Issue.7
, pp. 638-658
-
-
Love, P.E.D.1
Smith, J.2
Li, H.3
-
39
-
-
0001187120
-
Determining the causal structure of rework in construction projects
-
P. E. D. Love, P. Mandal, and H. Li, "Determining the causal structure of rework in construction projects," [i Construction Manage. Econ. i], vol. 17, no. 4, pp. 505-517, 1999.
-
(1999)
Construction Manage. Econ.
, vol.17
, Issue.4
, pp. 505-517
-
-
Love, P.E.D.1
Mandal, P.2
Li, H.3
-
41
-
-
0011269229
-
-
Nat. Economic Development Office
-
Nat. Economic Development Office, Achieving quality on building sites, pp. 18-19, 1987.
-
(1987)
Achieving Quality on Building Sites
, pp. 18-19
-
-
-
43
-
-
7944238083
-
-
NWPC and NBCC, Nat. Public Works Conf. Nat. Build. Construction Council Joint Working Party Rep., Canberra, ACT, Australia, May
-
NWPC and NBCC, "No dispute - strategies for improvement in the Australian building and construction industry," Nat. Public Works Conf. Nat. Build. Construction Council Joint Working Party Rep., Canberra, ACT, Australia, May 1990.
-
(1990)
No Dispute - Strategies for Improvement in the Australian Building and Construction Industry
-
-
-
44
-
-
0022413469
-
Impacts of constructability improvement
-
J. T. O'Connor, "Impacts of constructability improvement," [i ASCE J. Construction Eng. Manage. i], vol. 111, no. 4, pp. 404-410 1985.
-
(1985)
ASCE J. Construction Eng. Manage.
, vol.111
, Issue.4
, pp. 404-410
-
-
O'Connor, J.T.1
-
46
-
-
0032048057
-
Quality, waste, and cost consideration in architectural building design management
-
G. Rounce, "Quality, waste, and cost consideration in architectural building design management," [i Int. J. Proj. Manage. i], vol. 16. no. 2, pp. 123-127, 1998.
-
(1998)
Int. J. Proj. Manage.
, vol.16
, Issue.2
, pp. 123-127
-
-
Rounce, G.1
-
47
-
-
7944228529
-
-
M.S. thesis, Virginia Polytech. Inst. State Univ., Blacksburg, VA
-
J. Rudolph, "Quality management and rework in the construcuon industry," M.S. thesis, Virginia Polytech. Inst. State Univ., Blacksburg, VA, 1992.
-
(1992)
Quality Management and Rework in the Construcuon Industry
-
-
Rudolph, J.1
-
49
-
-
84986085484
-
Strategic needs analysis: Its role in brief development
-
J. Smith and N. Jackson, "Strategic needs analysis: Its role in brief development," [i Facilities i], vol. 18, no. 13/14, pp. 502-512, 2000.
-
(2000)
Facilities
, vol.18
, Issue.13-14
, pp. 502-512
-
-
Smith, J.1
Jackson, N.2
-
50
-
-
0019597497
-
The design structure system: A method for managing the design of complex systems
-
D. V. Steward, "The design structure system: A method for managing the design of complex systems," [i IEEE Trans. Eng. Manage. i], vol. TEM-1, pp. 71-74, 1981.
-
(1981)
IEEE Trans. Eng. Manage.
, vol.TEM-1
, pp. 71-74
-
-
Steward, D.V.1
-
52
-
-
0026131327
-
Constructability and constructability programs: While paper
-
Construction Management Committee of the ASCE Construction Division
-
Construction Management Committee of the ASCE Construction Division, "Constructability and constructability programs: While paper," [i ASCE J. Construction Eng. Manage. i], vol. 117, no. 1, pp. 67-89, 1991.
-
(1991)
ASCE J. Construction Eng. Manage.
, vol.117
, Issue.1
, pp. 67-89
-
-
-
53
-
-
0242560802
-
-
The Pennsylvania State Univ., University Park, PA, Rep. Construction Industry Institute, Source Document
-
H. R. Thomas and C. Neapolitan, "The effects of changes on labour productivity: Why and how much?," The Pennsylvania State Univ., University Park, PA, Rep. Construction Industry Institute, Source Document 94, 1994.
-
(1994)
The Effects of Changes on Labour Productivity: Why and How Much?
, pp. 94
-
-
Thomas, H.R.1
Neapolitan, C.2
-
54
-
-
2342559532
-
Prequalification criteria - a survey of U.K. construction practitioners' opinions
-
C. H. Wong, G. D. Holt, and P. T. Harris, "Prequalification criteria - A survey of U.K. construction practitioners' opinions," [i J. Construction Res. i], vol. 2, no. 1, pp. 41-56, 2001.
-
(2001)
J. Construction Res.
, vol.2
, Issue.1
, pp. 41-56
-
-
Wong, C.H.1
Holt, G.D.2
Harris, P.T.3
|