Project pathogens: The anatomy of omission errors in construction and resource engineering project

Author keywords

Error; Error management; Omission; Pathogens; Rework

Indexed keywords

CAUSAL MODEL; COST AND SCHEDULE; ENGINEERING PROJECT; ERROR MANAGEMENT; IN-DEPTH INTERVIEWS; KEY FACTORS; OMISSION; OMISSION ERRORS; PROJECT PARTICIPANTS; REWORK; REWORK COSTS; SIGNIFICANT FACTORS; UNDERLYING DYNAMICS; UNDERLYING FACTORS;

EID: 68349117209     PISSN: 00189391     EISSN: None     Source Type: Journal    
DOI: 10.1109/TEM.2008.927774     Document Type: Article
Times cited : (123)

References (77)
  • 1
    • 0012541491 scopus 로고    scopus 로고
    • Modelling litigation: Mixing qualitative and quantitative approaches
    • F. Ackermann, C. Eden, and T. Williams, "Modelling litigation: Mixing qualitative and quantitative approaches," Interfaces, vol. 27, no. 2, pp. 48-65, 1997.
    • (1997) Interfaces , vol.27 , Issue.2 , pp. 48-65
    • Ackermann, F.1    Eden, C.2    Williams, T.3
  • 2
    • 84970491541 scopus 로고
    • Human error and structural practice
    • D. E.Allen, "Human error and structural practice," J. Build. Phys. vol. 18, no. 4, pp. 313-319, 1995.
    • (1995) J. Build. Phys , vol.18 , Issue.4 , pp. 313-319
    • Allen, D.E.1
  • 3
    • 0037985358 scopus 로고    scopus 로고
    • Andi and T. Minato, Representing causal mechanism of defective designs: A system approach considering human errors, Constr. Manage. Econ., 21, pp. 297-305, 2003a.
    • Andi and T. Minato, "Representing causal mechanism of defective designs: A system approach considering human errors," Constr. Manage. Econ., vol. 21, pp. 297-305, 2003a.
  • 4
    • 0141988807 scopus 로고    scopus 로고
    • Andi and T. Minato, Design documents in the Japanese construction industry: Factors influencing and impacts on construction process, Int. J. Proj. Manage., 21, pp. 537-546, 2003b.
    • Andi and T. Minato, "Design documents in the Japanese construction industry: Factors influencing and impacts on construction process," Int. J. Proj. Manage., vol. 21, pp. 537-546, 2003b.
  • 5
    • 1842842998 scopus 로고    scopus 로고
    • Andi and T. Minato, Representing causal mechanism of defective designs: Exploration through case studies, Constr. Manage. Econ. 22, pp. 183-192, 2004.
    • Andi and T. Minato, "Representing causal mechanism of defective designs: Exploration through case studies," Constr. Manage. Econ. vol. 22, pp. 183-192, 2004.
  • 7
    • 84993012791 scopus 로고    scopus 로고
    • The pathology of building defects: A human error approach
    • A. R. Atkinson, "The pathology of building defects: A human error approach," Eng., Constr. Archit. Manage., vol. 9, no. 1, pp. 53-61, 1998a.
    • (1998) Eng., Constr. Archit. Manage , vol.9 , Issue.1 , pp. 53-61
    • Atkinson, A.R.1
  • 8
    • 0004451631 scopus 로고    scopus 로고
    • Human error in the management of building projects
    • A. R. Atkinson, "Human error in the management of building projects," Constr. Manage. Econ., vol. 16, pp. 339-349, 1998b.
    • (1998) Constr. Manage. Econ , vol.16 , pp. 339-349
    • Atkinson, A.R.1
  • 9
    • 84986146497 scopus 로고    scopus 로고
    • The role of human error in construction defects
    • A. R. Atkinson, "The role of human error in construction defects," Struct. Surv., vol. 17, no. 2, pp. 231-236, 1999.
    • (1999) Struct. Surv , vol.17 , Issue.2 , pp. 231-236
    • Atkinson, A.R.1
  • 10
    • 0011105805 scopus 로고    scopus 로고
    • Human error in aviation
    • H. M. Soekkha, Ed. Utrecht, The Netherlands: VSP
    • R. Amalberti and L. Wioland, "Human error in aviation," in Aviation Safety, H. M. Soekkha, Ed. Utrecht, The Netherlands: VSP, 1997, pp. 91-108.
    • (1997) Aviation Safety , pp. 91-108
    • Amalberti, R.1    Wioland, L.2
  • 13
    • 0026837054 scopus 로고
    • Causes of quality deviations in design and construction
    • J. L. Burati, J. J. Farrington, and W. B. Ledbetter, "Causes of quality deviations in design and construction," J. Constr. Eng. Manage., vol. 118, no. 1, pp. 34-49, 1992.
    • (1992) J. Constr. Eng. Manage , vol.118 , Issue.1 , pp. 34-49
    • Burati, J.L.1    Farrington, J.J.2    Ledbetter, W.B.3
  • 14
    • 0011112998 scopus 로고    scopus 로고
    • An assessment of post project reviews
    • J. S. Busby, "An assessment of post project reviews," Proj. Manage. J., vol. 30, no. 3, pp. 23-29, 1999.
    • (1999) Proj. Manage. J , vol.30 , Issue.3 , pp. 23-29
    • Busby, J.S.1
  • 15
    • 0035341601 scopus 로고    scopus 로고
    • Error and distributed cognition in design
    • J. S. Busby, "Error and distributed cognition in design," Des. Stud., vol. 22, pp. 233-254, 2001a.
    • (2001) Des. Stud , vol.22 , pp. 233-254
    • Busby, J.S.1
  • 16
    • 0035182121 scopus 로고    scopus 로고
    • Adaptation failures that cause error in technical organisations
    • J. S. Busby, "Adaptation failures that cause error in technical organisations," Hum. Syst. Manage., vol. 20, pp. 301-312, 2001b.
    • (2001) Hum. Syst. Manage , vol.20 , pp. 301-312
    • Busby, J.S.1
  • 17
    • 0141688132 scopus 로고    scopus 로고
    • The social ascription of obligations to engineers
    • J. S. Busby and M. Coeckelbergh, "The social ascription of obligations to engineers," Sci. Eng. Ethics, vol. 9, pp. 363-376, 2003.
    • (2003) Sci. Eng. Ethics , vol.9 , pp. 363-376
    • Busby, J.S.1    Coeckelbergh, M.2
  • 18
    • 1942530583 scopus 로고    scopus 로고
    • Projects, pathogens, and incubation periods
    • J. S. Busby and E. J. Hughes, "Projects, pathogens, and incubation periods," Int. J. Proj. Manage., vol. 22, pp. 425-434, 2004.
    • (2004) Int. J. Proj. Manage , vol.22 , pp. 425-434
    • Busby, J.S.1    Hughes, E.J.2
  • 19
    • 0032491753 scopus 로고    scopus 로고
    • Collapse of theRamsgatewalkway
    • J. C. Chapman, "Collapse of theRamsgatewalkway," Struct. Eng., vol. 76, no. 1, pp. 1-10, 1998.
    • (1998) Struct. Eng , vol.76 , Issue.1 , pp. 1-10
    • Chapman, J.C.1
  • 21
    • 84993047731 scopus 로고    scopus 로고
    • A learning culture for strategic partnering in construction
    • E. W. L. Cheng, H. Li, P. E. D. Love, and Z. Irani, "A learning culture for strategic partnering in construction," Constr. Innov., vol. 4, no. 1, pp. 53-65, 2004.
    • (2004) Constr. Innov , vol.4 , Issue.1 , pp. 53-65
    • Cheng, E.W.L.1    Li, H.2    Love, P.E.D.3    Irani, Z.4
  • 22
    • 33746627742 scopus 로고    scopus 로고
    • Are construction disputes inevitable?
    • Aug
    • S. O. Cheung and T.W.Yiu, "Are construction disputes inevitable?" IEEE Trans. Eng. Manage., vol. 53, no. 3, pp. 456-470, Aug. 2006.
    • (2006) IEEE Trans. Eng. Manage , vol.53 , Issue.3 , pp. 456-470
    • Cheung, S.O.1    Yiu, T.W.2
  • 23
    • 68349093463 scopus 로고
    • Measuring Up or Muddling Through: Best Practice in the Australian Non-Residential Construction Industry
    • Construction Industry Development Agency CIDA
    • Construction Industry Development Agency (CIDA), Measuring Up or Muddling Through: Best Practice in the Australian Non-Residential Construction Industry. Sydney, Australia: Construction Industry Development Agency and Masters Builders Australia, 1995.
    • (1995) Sydney, Australia: Construction Industry Development Agency and Masters Builders Australia
  • 24
    • 83755202997 scopus 로고
    • Naval shipyard production: A claim settled and a framework built
    • K. G. Cooper, "Naval shipyard production: A claim settled and a framework built," Interfaces, vol. 10, no. 6, pp. 30-36, 1980.
    • (1980) Interfaces , vol.10 , Issue.6 , pp. 30-36
    • Cooper, K.G.1
  • 25
    • 0001906688 scopus 로고
    • The rework cycle: Benchmarking for the project manager
    • K. G. Cooper, "The rework cycle: Benchmarking for the project manager," Proj. Manage. J., vol. 24, no. 1, pp. 17-22, 1993.
    • (1993) Proj. Manage. J , vol.24 , Issue.1 , pp. 17-22
    • Cooper, K.G.1
  • 26
    • 84992974815 scopus 로고    scopus 로고
    • Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling
    • S. Chritamara, S. O. Ogunlana, and N. N. Bach, "Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling," Eng. Constr.Archit. Manage., vol. 8, no. 5/6, pp. 381-392, 2001.
    • (2001) Eng. Constr.Archit. Manage , vol.8 , Issue.5-6 , pp. 381-392
    • Chritamara, S.1    Ogunlana, S.O.2    Bach, N.N.3
  • 27
    • 84992974814 scopus 로고    scopus 로고
    • System dynamics modelling of design and build projects
    • S. Chritamara, S. O. Ogunlana, and N. N. Bach, "System dynamics modelling of design and build projects," Constr. Innov., vol. 2, pp. 269-295, 2002.
    • (2002) Constr. Innov , vol.2 , pp. 269-295
    • Chritamara, S.1    Ogunlana, S.O.2    Bach, N.N.3
  • 28
    • 4143074659 scopus 로고
    • Implementation of ISO 9000 in construction
    • presented at the, Gold Coast, Australia, Nov
    • D. Cusack, "Implementation of ISO 9000 in construction," presented at the ISO 9000 Forum Symp., Gold Coast, Australia, Nov. 1992.
    • (1992) ISO 9000 Forum Symp
    • Cusack, D.1
  • 29
    • 0022025262 scopus 로고
    • Construction claims: Frequency and severity
    • J. E. Diekmann and J. C. Nelson, "Construction claims: Frequency and severity," ASCE J. Constr. Eng. Manage., vol. 111, no. 1, pp. 74-81, 1985.
    • (1985) ASCE J. Constr. Eng. Manage , vol.111 , Issue.1 , pp. 74-81
    • Diekmann, J.E.1    Nelson, J.C.2
  • 30
    • 0033888428 scopus 로고    scopus 로고
    • The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects
    • C. Eden, T. Williams, and S. Howick, "The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects," J. Oper. Res. Soc., vol. 51, no. 3, pp. 291-300, 2000.
    • (2000) J. Oper. Res. Soc , vol.51 , Issue.3 , pp. 291-300
    • Eden, C.1    Williams, T.2    Howick, S.3
  • 31
    • 0022160067 scopus 로고
    • Attributional retaining: A review
    • F. Fösterling, "Attributional retaining: A review," Psychol. Bull., vol. 98, pp. 495-512, 1985.
    • (1985) Psychol. Bull , vol.98 , pp. 495-512
    • Fösterling, F.1
  • 32
    • 68349102727 scopus 로고    scopus 로고
    • J. Gardiner, Management of design documentation, where dowe go from here? in Construction and Management, Recent Advances, R. R. Wakefield andD.G.Carmichael, Eds. Rotterdam, TheNetherlands: Balkema, 1994, pp. 113-118.
    • J. Gardiner, "Management of design documentation, where dowe go from here?" in Construction and Management, Recent Advances, R. R. Wakefield andD.G.Carmichael, Eds. Rotterdam, TheNetherlands: Balkema, 1994, pp. 113-118.
  • 33
    • 0035406839 scopus 로고    scopus 로고
    • The application of ethics to engineering and the engineer's moral responsibility: Perspectives for a research agenda
    • A. Grunwald, "The application of ethics to engineering and the engineer's moral responsibility: Perspectives for a research agenda," Sci. Eng. Ethics, vol. 7, pp. 415-428, 2001.
    • (2001) Sci. Eng. Ethics , vol.7 , pp. 415-428
    • Grunwald, A.1
  • 34
    • 68349107549 scopus 로고    scopus 로고
    • D. Guckert and R. King (2002, Sep./Oct.), Who pays for the architect's mistakes? Facil. Manage. [Online]. Available at: Www.appa.org
    • D. Guckert and R. King (2002, Sep./Oct.), "Who pays for the architect's mistakes?" Facil. Manage. [Online]. Available at: Www.appa.org
  • 35
    • 0019566207 scopus 로고
    • Human factors engineering in the US nuclear arena
    • E. Hagan and G. Mays, "Human factors engineering in the US nuclear arena," Nucl. Safety, vol. 22, pp. 337-346, 1981.
    • (1981) Nucl. Safety , vol.22 , pp. 337-346
    • Hagan, E.1    Mays, G.2
  • 36
    • 0038498075 scopus 로고    scopus 로고
    • Integrating errors into the training process. The function of error management instructions and the role of goal orientation
    • D. Heimbeck, M. Frese, S. Sonnetag, and N. Keith, "Integrating errors into the training process. The function of error management instructions and the role of goal orientation," Pers. Psychol., vol. 56, pp. 333-361, 2003.
    • (2003) Pers. Psychol , vol.56 , pp. 333-361
    • Heimbeck, D.1    Frese, M.2    Sonnetag, S.3    Keith, N.4
  • 37
    • 0034681762 scopus 로고    scopus 로고
    • On error management: Lessons from aviation
    • R. L. Helmreich, "On error management: Lessons from aviation," Br. Med. J., vol. 320, pp. 781-785, 2000.
    • (2000) Br. Med. J , vol.320 , pp. 781-785
    • Helmreich, R.L.1
  • 40
    • 68349118707 scopus 로고    scopus 로고
    • Make No Mistake - An Outcome Based Approach to Mistake Proofing
    • C. M. Hinckley, Make No Mistake - An Outcome Based Approach to Mistake Proofing. New York: Productivity, 2001.
    • (2001) New York: Productivity
    • Hinckley, C.M.1
  • 41
    • 0033685138 scopus 로고    scopus 로고
    • The learning organisation: A paradigm for mutually beneficial strategic construction alliances
    • G. D. Holt, P. E. D. Love, and H. Li, "The learning organisation: A paradigm for mutually beneficial strategic construction alliances," Int. J. Proj. Manage., vol. 18, no. 6, pp. 415-423, 2000.
    • (2000) Int. J. Proj. Manage , vol.18 , Issue.6 , pp. 415-423
    • Holt, G.D.1    Love, P.E.D.2    Li, H.3
  • 42
    • 34249904399 scopus 로고    scopus 로고
    • Overcoming errors: A closer look at the attributional mechanism
    • G. J. Homsma, C. V. Dyck, D. D. Gilder, P. L. Koopman, and T. Elfring, "Overcoming errors: A closer look at the attributional mechanism," J. Bus. Psychol., vol. 21, no. 4, pp. 559-583, 2007.
    • (2007) J. Bus. Psychol , vol.21 , Issue.4 , pp. 559-583
    • Homsma, G.J.1    Dyck, C.V.2    Gilder, D.D.3    Koopman, P.L.4    Elfring, T.5
  • 43
    • 0026117365 scopus 로고
    • A classification scheme for pipework failures to include human and socio-technical errors and their contribution to pipework failure frequencies
    • N. W. Hurst, L. J. Bellamy, T. A. W. Geyer, and J. A. Astley, "A classification scheme for pipework failures to include human and socio-technical errors and their contribution to pipework failure frequencies," J. Hazard. Mater., vol. 26, pp. 159-186, 1991.
    • (1991) J. Hazard. Mater , vol.26 , pp. 159-186
    • Hurst, N.W.1    Bellamy, L.J.2    Geyer, T.A.W.3    Astley, J.A.4
  • 44
    • 30644462330 scopus 로고    scopus 로고
    • Managing subcontractor supply chain for quality in construction
    • K. Karim, M. Marosszkey, and S. Davis, "Managing subcontractor supply chain for quality in construction," Eng. Constr. Archit. Manage., vol. 13, no. 1, pp. 27-42, 2006.
    • (2006) Eng. Constr. Archit. Manage , vol.13 , Issue.1 , pp. 27-42
    • Karim, K.1    Marosszkey, M.2    Davis, S.3
  • 47
    • 0007799737 scopus 로고    scopus 로고
    • Common categories and causes of construction claims
    • M. M. Kumaraswamy, "Common categories and causes of construction claims," Constr. Law J., vol. 13, no. 1, pp. 21-34, 1997.
    • (1997) Constr. Law J , vol.13 , Issue.1 , pp. 21-34
    • Kumaraswamy, M.M.1
  • 51
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • P. E. D. Love, "Influence of project type and procurement method on rework costs in building construction projects," ASCE J. Constr. Eng. Manage., vol. 128, no. 1, pp. 18-29, 2002.
    • (2002) ASCE J. Constr. Eng. Manage , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1
  • 52
    • 7944219517 scopus 로고    scopus 로고
    • A rework reduction model for construction
    • Nov
    • P. E. D. Love, D. J. Edwards, and Z. Irani, "A rework reduction model for construction," IEEE Trans. Eng. Manage., vol. 51, no. 4, pp. 426-440, Nov. 2005.
    • (2005) IEEE Trans. Eng. Manage , vol.51 , Issue.4 , pp. 426-440
    • Love, P.E.D.1    Edwards, D.J.2    Irani, Z.3
  • 53
    • 43749116883 scopus 로고    scopus 로고
    • Forensic project management: An exploratory examination of the causal behaviour of design induced rework
    • P. E. D. Love, D. J. Edwards, and Z. Irani, "Forensic project management: An exploratory examination of the causal behaviour of design induced rework," IEEE Trans. Eng. Manage., vol. 55, no. 2, pp. 234-247, 2008.
    • (2008) IEEE Trans. Eng. Manage , vol.55 , Issue.2 , pp. 234-247
    • Love, P.E.D.1    Edwards, D.J.2    Irani, Z.3
  • 54
    • 68349118706 scopus 로고    scopus 로고
    • D. Marx, Maintenance Error Causation. Washington, DC: Federal Aviation Authority, Office of Aviation Medicine, 1999.
    • D. Marx, Maintenance Error Causation. Washington, DC: Federal Aviation Authority, Office of Aviation Medicine, 1999.
  • 55
    • 0035400029 scopus 로고    scopus 로고
    • Productivity orientated analysis of design revisions
    • M. R. Manavazhi and Z. Xunzhi, "Productivity orientated analysis of design revisions," Constr. Manage. Econ., vol. 19, no. 4, pp. 379-391, 2001.
    • (2001) Constr. Manage. Econ , vol.19 , Issue.4 , pp. 379-391
    • Manavazhi, M.R.1    Xunzhi, Z.2
  • 56
    • 1142281830 scopus 로고    scopus 로고
    • Assessment of the propensity for revisions in design projects through the dichotomous characterisation of designer effort
    • M. R. Manavazhi, "Assessment of the propensity for revisions in design projects through the dichotomous characterisation of designer effort," Constr. Manage. Econ., vol. 22, no. 1, pp. 47-54, 2004.
    • (2004) Constr. Manage. Econ , vol.22 , Issue.1 , pp. 47-54
    • Manavazhi, M.R.1
  • 57
    • 0024702772 scopus 로고
    • Human error in structural design tasks
    • R. E. Melchers, "Human error in structural design tasks," ASCE J. Struct. Eng., vol. 115, no. 7, pp. 1795-1807, 1989.
    • (1989) ASCE J. Struct. Eng , vol.115 , Issue.7 , pp. 1795-1807
    • Melchers, R.E.1
  • 58
    • 0032375751 scopus 로고    scopus 로고
    • To err is human': An examination of the effectiveness of error management training,"
    • C. R. Nordstrom, D. Wendland, and K. B. Williams, "'To err is human': An examination of the effectiveness of error management training," J. Bus. Psychol., vol. 12, pp. 269-282, 1998.
    • (1998) J. Bus. Psychol , vol.12 , pp. 269-282
    • Nordstrom, C.R.1    Wendland, D.2    Williams, K.B.3
  • 60
    • 0022673947 scopus 로고
    • Errors and omissions: Fertile ground for high costs
    • D. Orndoff, "Errors and omissions: Fertile ground for high costs," Mil. Eng., vol. 506, pp. 107-109, 1986.
    • (1986) Mil. Eng , vol.506 , pp. 107-109
    • Orndoff, D.1
  • 61
    • 0004223940 scopus 로고
    • Cambridge, U.K, Cambridge Univ. Press
    • J. Reason, Human Error. Cambridge, U.K.: Cambridge Univ. Press, 1990.
    • (1990) Human Error
    • Reason, J.1
  • 62
    • 0028949258 scopus 로고
    • Safety in the operating theatre - Part 2: Human error and organisational failure
    • J. Reason, "Safety in the operating theatre - Part 2: Human error and organisational failure," Anaesth. Crit. Care, vol. 6, pp. 121-126, 1995.
    • (1995) Anaesth. Crit. Care , vol.6 , pp. 121-126
    • Reason, J.1
  • 63
    • 0011107473 scopus 로고    scopus 로고
    • How necessary steps in a process get omitted: Revising old ideas to combat a persistent problem
    • J. Reason, "How necessary steps in a process get omitted: Revising old ideas to combat a persistent problem," Cogn. Technol., vol. 3, pp. 24-32, 1998.
    • (1998) Cogn. Technol , vol.3 , pp. 24-32
    • Reason, J.1
  • 64
    • 0034681819 scopus 로고    scopus 로고
    • Human error: Models andmanagement
    • J. Reason, "Human error: Models andmanagement," Br. Med. J., vol. 320, pp. 768-770, 2000.
    • (2000) Br. Med. J , vol.320 , pp. 768-770
    • Reason, J.1
  • 65
    • 0036489344 scopus 로고    scopus 로고
    • Combating omission errors through task analysis and good reminder
    • J. Reason, "Combating omission errors through task analysis and good reminder," Qual. Saf. Health Care, vol. 11, pp. 40-44, 2002.
    • (2002) Qual. Saf. Health Care , vol.11 , pp. 40-44
    • Reason, J.1
  • 67
    • 0030211890 scopus 로고    scopus 로고
    • The role of system dynamics in project management
    • A. Rodrigues and J. Bowers, "The role of system dynamics in project management," Int. J. Proj. Manage., vol. 14, no. 4, pp. 213-220, 1996.
    • (1996) Int. J. Proj. Manage , vol.14 , Issue.4 , pp. 213-220
    • Rodrigues, A.1    Bowers, J.2
  • 68
    • 0031672864 scopus 로고    scopus 로고
    • System dynamics in project management: Assessing the impacts of client behaviour on project performance
    • A. Rodrigues and T. M. Williams, "System dynamics in project management: Assessing the impacts of client behaviour on project performance," J. Oper. Res. Soc., vol. 49, pp. 2-15, 1998.
    • (1998) J. Oper. Res. Soc , vol.49 , pp. 2-15
    • Rodrigues, A.1    Williams, T.M.2
  • 69
    • 68349085309 scopus 로고    scopus 로고
    • D. F. Rogge, C. Cogliser,H.Alaman, and S. McCormack, An Investigation of Field Rework in Industrial Construction (RR153-11). Austin, TX: Construction Industry Institute, 2001.
    • D. F. Rogge, C. Cogliser,H.Alaman, and S. McCormack, An Investigation of Field Rework in Industrial Construction (RR153-11). Austin, TX: Construction Industry Institute, 2001.
  • 70
    • 0032048057 scopus 로고    scopus 로고
    • Quality, waste, and cost consideration in architectural building designmanagement
    • G. Rounce, "Quality, waste, and cost consideration in architectural building designmanagement," Int. J. Proj.Manage., vol. 16, no. 2, pp. 123-127, 1998.
    • (1998) Int. J. Proj.Manage , vol.16 , Issue.2 , pp. 123-127
    • Rounce, G.1
  • 75
    • 84993009940 scopus 로고    scopus 로고
    • D.Wantanakorn, M. J.Mawdesley, andW.H.Askew, Management errors in construction, Eng. Constr. Archit. Manage., 6, no. 2, pp. 112-120, 1999.
    • D.Wantanakorn, M. J.Mawdesley, andW.H.Askew, "Management errors in construction," Eng. Constr. Archit. Manage., vol. 6, no. 2, pp. 112-120, 1999.
  • 77
    • 0042188854 scopus 로고    scopus 로고
    • A quality performance management system for industrial and construction engineering projects
    • T.H. Wills and W.D. Willis, "A quality performance management system for industrial and construction engineering projects," Int. J. Qual. Rel. Manage., vol. 13, no. 9, pp. 38-48, 1996.
    • (1996) Int. J. Qual. Rel. Manage , vol.13 , Issue.9 , pp. 38-48
    • Wills, T.H.1    Willis, W.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.