1
-
-
0012541491
-
Modelling litigation: Mixing qualitative and quantitative approaches
-
F. Ackermann, C. Eden, and T. Williams, "Modelling litigation: Mixing qualitative and quantitative approaches," Interfaces, vol. 27, no. 2, pp. 48-65, 1997.
-
(1997)
Interfaces
, vol.27
, Issue.2
, pp. 48-65
-
-
Ackermann, F.1
Eden, C.2
Williams, T.3
-
2
-
-
84970491541
-
Human error and structural practice
-
D. E.Allen, "Human error and structural practice," J. Build. Phys. vol. 18, no. 4, pp. 313-319, 1995.
-
(1995)
J. Build. Phys
, vol.18
, Issue.4
, pp. 313-319
-
-
Allen, D.E.1
-
3
-
-
0037985358
-
-
Andi and T. Minato, Representing causal mechanism of defective designs: A system approach considering human errors, Constr. Manage. Econ., 21, pp. 297-305, 2003a.
-
Andi and T. Minato, "Representing causal mechanism of defective designs: A system approach considering human errors," Constr. Manage. Econ., vol. 21, pp. 297-305, 2003a.
-
-
-
-
4
-
-
0141988807
-
-
Andi and T. Minato, Design documents in the Japanese construction industry: Factors influencing and impacts on construction process, Int. J. Proj. Manage., 21, pp. 537-546, 2003b.
-
Andi and T. Minato, "Design documents in the Japanese construction industry: Factors influencing and impacts on construction process," Int. J. Proj. Manage., vol. 21, pp. 537-546, 2003b.
-
-
-
-
5
-
-
1842842998
-
-
Andi and T. Minato, Representing causal mechanism of defective designs: Exploration through case studies, Constr. Manage. Econ. 22, pp. 183-192, 2004.
-
Andi and T. Minato, "Representing causal mechanism of defective designs: Exploration through case studies," Constr. Manage. Econ. vol. 22, pp. 183-192, 2004.
-
-
-
-
7
-
-
84993012791
-
The pathology of building defects: A human error approach
-
A. R. Atkinson, "The pathology of building defects: A human error approach," Eng., Constr. Archit. Manage., vol. 9, no. 1, pp. 53-61, 1998a.
-
(1998)
Eng., Constr. Archit. Manage
, vol.9
, Issue.1
, pp. 53-61
-
-
Atkinson, A.R.1
-
8
-
-
0004451631
-
Human error in the management of building projects
-
A. R. Atkinson, "Human error in the management of building projects," Constr. Manage. Econ., vol. 16, pp. 339-349, 1998b.
-
(1998)
Constr. Manage. Econ
, vol.16
, pp. 339-349
-
-
Atkinson, A.R.1
-
9
-
-
84986146497
-
The role of human error in construction defects
-
A. R. Atkinson, "The role of human error in construction defects," Struct. Surv., vol. 17, no. 2, pp. 231-236, 1999.
-
(1999)
Struct. Surv
, vol.17
, Issue.2
, pp. 231-236
-
-
Atkinson, A.R.1
-
10
-
-
0011105805
-
Human error in aviation
-
H. M. Soekkha, Ed. Utrecht, The Netherlands: VSP
-
R. Amalberti and L. Wioland, "Human error in aviation," in Aviation Safety, H. M. Soekkha, Ed. Utrecht, The Netherlands: VSP, 1997, pp. 91-108.
-
(1997)
Aviation Safety
, pp. 91-108
-
-
Amalberti, R.1
Wioland, L.2
-
13
-
-
0026837054
-
Causes of quality deviations in design and construction
-
J. L. Burati, J. J. Farrington, and W. B. Ledbetter, "Causes of quality deviations in design and construction," J. Constr. Eng. Manage., vol. 118, no. 1, pp. 34-49, 1992.
-
(1992)
J. Constr. Eng. Manage
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati, J.L.1
Farrington, J.J.2
Ledbetter, W.B.3
-
14
-
-
0011112998
-
An assessment of post project reviews
-
J. S. Busby, "An assessment of post project reviews," Proj. Manage. J., vol. 30, no. 3, pp. 23-29, 1999.
-
(1999)
Proj. Manage. J
, vol.30
, Issue.3
, pp. 23-29
-
-
Busby, J.S.1
-
15
-
-
0035341601
-
Error and distributed cognition in design
-
J. S. Busby, "Error and distributed cognition in design," Des. Stud., vol. 22, pp. 233-254, 2001a.
-
(2001)
Des. Stud
, vol.22
, pp. 233-254
-
-
Busby, J.S.1
-
16
-
-
0035182121
-
Adaptation failures that cause error in technical organisations
-
J. S. Busby, "Adaptation failures that cause error in technical organisations," Hum. Syst. Manage., vol. 20, pp. 301-312, 2001b.
-
(2001)
Hum. Syst. Manage
, vol.20
, pp. 301-312
-
-
Busby, J.S.1
-
17
-
-
0141688132
-
The social ascription of obligations to engineers
-
J. S. Busby and M. Coeckelbergh, "The social ascription of obligations to engineers," Sci. Eng. Ethics, vol. 9, pp. 363-376, 2003.
-
(2003)
Sci. Eng. Ethics
, vol.9
, pp. 363-376
-
-
Busby, J.S.1
Coeckelbergh, M.2
-
18
-
-
1942530583
-
Projects, pathogens, and incubation periods
-
J. S. Busby and E. J. Hughes, "Projects, pathogens, and incubation periods," Int. J. Proj. Manage., vol. 22, pp. 425-434, 2004.
-
(2004)
Int. J. Proj. Manage
, vol.22
, pp. 425-434
-
-
Busby, J.S.1
Hughes, E.J.2
-
19
-
-
0032491753
-
Collapse of theRamsgatewalkway
-
J. C. Chapman, "Collapse of theRamsgatewalkway," Struct. Eng., vol. 76, no. 1, pp. 1-10, 1998.
-
(1998)
Struct. Eng
, vol.76
, Issue.1
, pp. 1-10
-
-
Chapman, J.C.1
-
20
-
-
0003486293
-
-
2nd ed. Chichester, U.K, Wiley
-
C. Chapman and S. Ward, Project Risk Management: Processes, Techniques and Insights, 2nd ed. Chichester, U.K.: Wiley, 2003.
-
(2003)
Project Risk Management: Processes, Techniques and Insights
-
-
Chapman, C.1
Ward, S.2
-
21
-
-
84993047731
-
A learning culture for strategic partnering in construction
-
E. W. L. Cheng, H. Li, P. E. D. Love, and Z. Irani, "A learning culture for strategic partnering in construction," Constr. Innov., vol. 4, no. 1, pp. 53-65, 2004.
-
(2004)
Constr. Innov
, vol.4
, Issue.1
, pp. 53-65
-
-
Cheng, E.W.L.1
Li, H.2
Love, P.E.D.3
Irani, Z.4
-
22
-
-
33746627742
-
Are construction disputes inevitable?
-
Aug
-
S. O. Cheung and T.W.Yiu, "Are construction disputes inevitable?" IEEE Trans. Eng. Manage., vol. 53, no. 3, pp. 456-470, Aug. 2006.
-
(2006)
IEEE Trans. Eng. Manage
, vol.53
, Issue.3
, pp. 456-470
-
-
Cheung, S.O.1
Yiu, T.W.2
-
23
-
-
68349093463
-
Measuring Up or Muddling Through: Best Practice in the Australian Non-Residential Construction Industry
-
Construction Industry Development Agency CIDA
-
Construction Industry Development Agency (CIDA), Measuring Up or Muddling Through: Best Practice in the Australian Non-Residential Construction Industry. Sydney, Australia: Construction Industry Development Agency and Masters Builders Australia, 1995.
-
(1995)
Sydney, Australia: Construction Industry Development Agency and Masters Builders Australia
-
-
-
24
-
-
83755202997
-
Naval shipyard production: A claim settled and a framework built
-
K. G. Cooper, "Naval shipyard production: A claim settled and a framework built," Interfaces, vol. 10, no. 6, pp. 30-36, 1980.
-
(1980)
Interfaces
, vol.10
, Issue.6
, pp. 30-36
-
-
Cooper, K.G.1
-
25
-
-
0001906688
-
The rework cycle: Benchmarking for the project manager
-
K. G. Cooper, "The rework cycle: Benchmarking for the project manager," Proj. Manage. J., vol. 24, no. 1, pp. 17-22, 1993.
-
(1993)
Proj. Manage. J
, vol.24
, Issue.1
, pp. 17-22
-
-
Cooper, K.G.1
-
26
-
-
84992974815
-
Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling
-
S. Chritamara, S. O. Ogunlana, and N. N. Bach, "Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling," Eng. Constr.Archit. Manage., vol. 8, no. 5/6, pp. 381-392, 2001.
-
(2001)
Eng. Constr.Archit. Manage
, vol.8
, Issue.5-6
, pp. 381-392
-
-
Chritamara, S.1
Ogunlana, S.O.2
Bach, N.N.3
-
27
-
-
84992974814
-
System dynamics modelling of design and build projects
-
S. Chritamara, S. O. Ogunlana, and N. N. Bach, "System dynamics modelling of design and build projects," Constr. Innov., vol. 2, pp. 269-295, 2002.
-
(2002)
Constr. Innov
, vol.2
, pp. 269-295
-
-
Chritamara, S.1
Ogunlana, S.O.2
Bach, N.N.3
-
28
-
-
4143074659
-
Implementation of ISO 9000 in construction
-
presented at the, Gold Coast, Australia, Nov
-
D. Cusack, "Implementation of ISO 9000 in construction," presented at the ISO 9000 Forum Symp., Gold Coast, Australia, Nov. 1992.
-
(1992)
ISO 9000 Forum Symp
-
-
Cusack, D.1
-
29
-
-
0022025262
-
Construction claims: Frequency and severity
-
J. E. Diekmann and J. C. Nelson, "Construction claims: Frequency and severity," ASCE J. Constr. Eng. Manage., vol. 111, no. 1, pp. 74-81, 1985.
-
(1985)
ASCE J. Constr. Eng. Manage
, vol.111
, Issue.1
, pp. 74-81
-
-
Diekmann, J.E.1
Nelson, J.C.2
-
30
-
-
0033888428
-
The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects
-
C. Eden, T. Williams, and S. Howick, "The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects," J. Oper. Res. Soc., vol. 51, no. 3, pp. 291-300, 2000.
-
(2000)
J. Oper. Res. Soc
, vol.51
, Issue.3
, pp. 291-300
-
-
Eden, C.1
Williams, T.2
Howick, S.3
-
31
-
-
0022160067
-
Attributional retaining: A review
-
F. Fösterling, "Attributional retaining: A review," Psychol. Bull., vol. 98, pp. 495-512, 1985.
-
(1985)
Psychol. Bull
, vol.98
, pp. 495-512
-
-
Fösterling, F.1
-
32
-
-
68349102727
-
-
J. Gardiner, Management of design documentation, where dowe go from here? in Construction and Management, Recent Advances, R. R. Wakefield andD.G.Carmichael, Eds. Rotterdam, TheNetherlands: Balkema, 1994, pp. 113-118.
-
J. Gardiner, "Management of design documentation, where dowe go from here?" in Construction and Management, Recent Advances, R. R. Wakefield andD.G.Carmichael, Eds. Rotterdam, TheNetherlands: Balkema, 1994, pp. 113-118.
-
-
-
-
33
-
-
0035406839
-
The application of ethics to engineering and the engineer's moral responsibility: Perspectives for a research agenda
-
A. Grunwald, "The application of ethics to engineering and the engineer's moral responsibility: Perspectives for a research agenda," Sci. Eng. Ethics, vol. 7, pp. 415-428, 2001.
-
(2001)
Sci. Eng. Ethics
, vol.7
, pp. 415-428
-
-
Grunwald, A.1
-
34
-
-
68349107549
-
-
D. Guckert and R. King (2002, Sep./Oct.), Who pays for the architect's mistakes? Facil. Manage. [Online]. Available at: Www.appa.org
-
D. Guckert and R. King (2002, Sep./Oct.), "Who pays for the architect's mistakes?" Facil. Manage. [Online]. Available at: Www.appa.org
-
-
-
-
35
-
-
0019566207
-
Human factors engineering in the US nuclear arena
-
E. Hagan and G. Mays, "Human factors engineering in the US nuclear arena," Nucl. Safety, vol. 22, pp. 337-346, 1981.
-
(1981)
Nucl. Safety
, vol.22
, pp. 337-346
-
-
Hagan, E.1
Mays, G.2
-
36
-
-
0038498075
-
Integrating errors into the training process. The function of error management instructions and the role of goal orientation
-
D. Heimbeck, M. Frese, S. Sonnetag, and N. Keith, "Integrating errors into the training process. The function of error management instructions and the role of goal orientation," Pers. Psychol., vol. 56, pp. 333-361, 2003.
-
(2003)
Pers. Psychol
, vol.56
, pp. 333-361
-
-
Heimbeck, D.1
Frese, M.2
Sonnetag, S.3
Keith, N.4
-
37
-
-
0034681762
-
On error management: Lessons from aviation
-
R. L. Helmreich, "On error management: Lessons from aviation," Br. Med. J., vol. 320, pp. 781-785, 2000.
-
(2000)
Br. Med. J
, vol.320
, pp. 781-785
-
-
Helmreich, R.L.1
-
40
-
-
68349118707
-
Make No Mistake - An Outcome Based Approach to Mistake Proofing
-
C. M. Hinckley, Make No Mistake - An Outcome Based Approach to Mistake Proofing. New York: Productivity, 2001.
-
(2001)
New York: Productivity
-
-
Hinckley, C.M.1
-
41
-
-
0033685138
-
The learning organisation: A paradigm for mutually beneficial strategic construction alliances
-
G. D. Holt, P. E. D. Love, and H. Li, "The learning organisation: A paradigm for mutually beneficial strategic construction alliances," Int. J. Proj. Manage., vol. 18, no. 6, pp. 415-423, 2000.
-
(2000)
Int. J. Proj. Manage
, vol.18
, Issue.6
, pp. 415-423
-
-
Holt, G.D.1
Love, P.E.D.2
Li, H.3
-
42
-
-
34249904399
-
Overcoming errors: A closer look at the attributional mechanism
-
G. J. Homsma, C. V. Dyck, D. D. Gilder, P. L. Koopman, and T. Elfring, "Overcoming errors: A closer look at the attributional mechanism," J. Bus. Psychol., vol. 21, no. 4, pp. 559-583, 2007.
-
(2007)
J. Bus. Psychol
, vol.21
, Issue.4
, pp. 559-583
-
-
Homsma, G.J.1
Dyck, C.V.2
Gilder, D.D.3
Koopman, P.L.4
Elfring, T.5
-
43
-
-
0026117365
-
A classification scheme for pipework failures to include human and socio-technical errors and their contribution to pipework failure frequencies
-
N. W. Hurst, L. J. Bellamy, T. A. W. Geyer, and J. A. Astley, "A classification scheme for pipework failures to include human and socio-technical errors and their contribution to pipework failure frequencies," J. Hazard. Mater., vol. 26, pp. 159-186, 1991.
-
(1991)
J. Hazard. Mater
, vol.26
, pp. 159-186
-
-
Hurst, N.W.1
Bellamy, L.J.2
Geyer, T.A.W.3
Astley, J.A.4
-
44
-
-
30644462330
-
Managing subcontractor supply chain for quality in construction
-
K. Karim, M. Marosszkey, and S. Davis, "Managing subcontractor supply chain for quality in construction," Eng. Constr. Archit. Manage., vol. 13, no. 1, pp. 27-42, 2006.
-
(2006)
Eng. Constr. Archit. Manage
, vol.13
, Issue.1
, pp. 27-42
-
-
Karim, K.1
Marosszkey, M.2
Davis, S.3
-
47
-
-
0007799737
-
Common categories and causes of construction claims
-
M. M. Kumaraswamy, "Common categories and causes of construction claims," Constr. Law J., vol. 13, no. 1, pp. 21-34, 1997.
-
(1997)
Constr. Law J
, vol.13
, Issue.1
, pp. 21-34
-
-
Kumaraswamy, M.M.1
-
51
-
-
0042689966
-
Influence of project type and procurement method on rework costs in building construction projects
-
P. E. D. Love, "Influence of project type and procurement method on rework costs in building construction projects," ASCE J. Constr. Eng. Manage., vol. 128, no. 1, pp. 18-29, 2002.
-
(2002)
ASCE J. Constr. Eng. Manage
, vol.128
, Issue.1
, pp. 18-29
-
-
Love, P.E.D.1
-
52
-
-
7944219517
-
A rework reduction model for construction
-
Nov
-
P. E. D. Love, D. J. Edwards, and Z. Irani, "A rework reduction model for construction," IEEE Trans. Eng. Manage., vol. 51, no. 4, pp. 426-440, Nov. 2005.
-
(2005)
IEEE Trans. Eng. Manage
, vol.51
, Issue.4
, pp. 426-440
-
-
Love, P.E.D.1
Edwards, D.J.2
Irani, Z.3
-
53
-
-
43749116883
-
Forensic project management: An exploratory examination of the causal behaviour of design induced rework
-
P. E. D. Love, D. J. Edwards, and Z. Irani, "Forensic project management: An exploratory examination of the causal behaviour of design induced rework," IEEE Trans. Eng. Manage., vol. 55, no. 2, pp. 234-247, 2008.
-
(2008)
IEEE Trans. Eng. Manage
, vol.55
, Issue.2
, pp. 234-247
-
-
Love, P.E.D.1
Edwards, D.J.2
Irani, Z.3
-
54
-
-
68349118706
-
-
D. Marx, Maintenance Error Causation. Washington, DC: Federal Aviation Authority, Office of Aviation Medicine, 1999.
-
D. Marx, Maintenance Error Causation. Washington, DC: Federal Aviation Authority, Office of Aviation Medicine, 1999.
-
-
-
-
55
-
-
0035400029
-
Productivity orientated analysis of design revisions
-
M. R. Manavazhi and Z. Xunzhi, "Productivity orientated analysis of design revisions," Constr. Manage. Econ., vol. 19, no. 4, pp. 379-391, 2001.
-
(2001)
Constr. Manage. Econ
, vol.19
, Issue.4
, pp. 379-391
-
-
Manavazhi, M.R.1
Xunzhi, Z.2
-
56
-
-
1142281830
-
Assessment of the propensity for revisions in design projects through the dichotomous characterisation of designer effort
-
M. R. Manavazhi, "Assessment of the propensity for revisions in design projects through the dichotomous characterisation of designer effort," Constr. Manage. Econ., vol. 22, no. 1, pp. 47-54, 2004.
-
(2004)
Constr. Manage. Econ
, vol.22
, Issue.1
, pp. 47-54
-
-
Manavazhi, M.R.1
-
57
-
-
0024702772
-
Human error in structural design tasks
-
R. E. Melchers, "Human error in structural design tasks," ASCE J. Struct. Eng., vol. 115, no. 7, pp. 1795-1807, 1989.
-
(1989)
ASCE J. Struct. Eng
, vol.115
, Issue.7
, pp. 1795-1807
-
-
Melchers, R.E.1
-
58
-
-
0032375751
-
To err is human': An examination of the effectiveness of error management training,"
-
C. R. Nordstrom, D. Wendland, and K. B. Williams, "'To err is human': An examination of the effectiveness of error management training," J. Bus. Psychol., vol. 12, pp. 269-282, 1998.
-
(1998)
J. Bus. Psychol
, vol.12
, pp. 269-282
-
-
Nordstrom, C.R.1
Wendland, D.2
Williams, K.B.3
-
60
-
-
0022673947
-
Errors and omissions: Fertile ground for high costs
-
D. Orndoff, "Errors and omissions: Fertile ground for high costs," Mil. Eng., vol. 506, pp. 107-109, 1986.
-
(1986)
Mil. Eng
, vol.506
, pp. 107-109
-
-
Orndoff, D.1
-
61
-
-
0004223940
-
-
Cambridge, U.K, Cambridge Univ. Press
-
J. Reason, Human Error. Cambridge, U.K.: Cambridge Univ. Press, 1990.
-
(1990)
Human Error
-
-
Reason, J.1
-
62
-
-
0028949258
-
Safety in the operating theatre - Part 2: Human error and organisational failure
-
J. Reason, "Safety in the operating theatre - Part 2: Human error and organisational failure," Anaesth. Crit. Care, vol. 6, pp. 121-126, 1995.
-
(1995)
Anaesth. Crit. Care
, vol.6
, pp. 121-126
-
-
Reason, J.1
-
63
-
-
0011107473
-
How necessary steps in a process get omitted: Revising old ideas to combat a persistent problem
-
J. Reason, "How necessary steps in a process get omitted: Revising old ideas to combat a persistent problem," Cogn. Technol., vol. 3, pp. 24-32, 1998.
-
(1998)
Cogn. Technol
, vol.3
, pp. 24-32
-
-
Reason, J.1
-
64
-
-
0034681819
-
Human error: Models andmanagement
-
J. Reason, "Human error: Models andmanagement," Br. Med. J., vol. 320, pp. 768-770, 2000.
-
(2000)
Br. Med. J
, vol.320
, pp. 768-770
-
-
Reason, J.1
-
65
-
-
0036489344
-
Combating omission errors through task analysis and good reminder
-
J. Reason, "Combating omission errors through task analysis and good reminder," Qual. Saf. Health Care, vol. 11, pp. 40-44, 2002.
-
(2002)
Qual. Saf. Health Care
, vol.11
, pp. 40-44
-
-
Reason, J.1
-
66
-
-
4544250875
-
-
AB, Canada: Department of Civil and Environmental Engineering, Construction Owners Association of Alberta, AB, Canada
-
A. Robinson-Fayek, M. M. Dissanayake, and O. Campero, Measuring and Classifying Construction Rework: A Pilot Study, AB, Canada: Department of Civil and Environmental Engineering, Construction Owners Association of Alberta, AB, Canada, 2003.
-
(2003)
Measuring and Classifying Construction Rework: A Pilot Study
-
-
Robinson-Fayek, A.1
Dissanayake, M.M.2
Campero, O.3
-
67
-
-
0030211890
-
The role of system dynamics in project management
-
A. Rodrigues and J. Bowers, "The role of system dynamics in project management," Int. J. Proj. Manage., vol. 14, no. 4, pp. 213-220, 1996.
-
(1996)
Int. J. Proj. Manage
, vol.14
, Issue.4
, pp. 213-220
-
-
Rodrigues, A.1
Bowers, J.2
-
68
-
-
0031672864
-
System dynamics in project management: Assessing the impacts of client behaviour on project performance
-
A. Rodrigues and T. M. Williams, "System dynamics in project management: Assessing the impacts of client behaviour on project performance," J. Oper. Res. Soc., vol. 49, pp. 2-15, 1998.
-
(1998)
J. Oper. Res. Soc
, vol.49
, pp. 2-15
-
-
Rodrigues, A.1
Williams, T.M.2
-
69
-
-
68349085309
-
-
D. F. Rogge, C. Cogliser,H.Alaman, and S. McCormack, An Investigation of Field Rework in Industrial Construction (RR153-11). Austin, TX: Construction Industry Institute, 2001.
-
D. F. Rogge, C. Cogliser,H.Alaman, and S. McCormack, An Investigation of Field Rework in Industrial Construction (RR153-11). Austin, TX: Construction Industry Institute, 2001.
-
-
-
-
70
-
-
0032048057
-
Quality, waste, and cost consideration in architectural building designmanagement
-
G. Rounce, "Quality, waste, and cost consideration in architectural building designmanagement," Int. J. Proj.Manage., vol. 16, no. 2, pp. 123-127, 1998.
-
(1998)
Int. J. Proj.Manage
, vol.16
, Issue.2
, pp. 123-127
-
-
Rounce, G.1
-
75
-
-
84993009940
-
-
D.Wantanakorn, M. J.Mawdesley, andW.H.Askew, Management errors in construction, Eng. Constr. Archit. Manage., 6, no. 2, pp. 112-120, 1999.
-
D.Wantanakorn, M. J.Mawdesley, andW.H.Askew, "Management errors in construction," Eng. Constr. Archit. Manage., vol. 6, no. 2, pp. 112-120, 1999.
-
-
-
-
77
-
-
0042188854
-
A quality performance management system for industrial and construction engineering projects
-
T.H. Wills and W.D. Willis, "A quality performance management system for industrial and construction engineering projects," Int. J. Qual. Rel. Manage., vol. 13, no. 9, pp. 38-48, 1996.
-
(1996)
Int. J. Qual. Rel. Manage
, vol.13
, Issue.9
, pp. 38-48
-
-
Wills, T.H.1
Willis, W.D.2
|