메뉴 건너뛰기




Volumn 40, Issue 7, 2003, Pages 649-661

A project management quality cost information system for the construction industry

Author keywords

Information system; Project management; Prototype; Quality costs; Rework

Indexed keywords

CONSTRUCTION INDUSTRY; COSTS; PROJECT MANAGEMENT; QUALITY CONTROL;

EID: 0042131539     PISSN: 03787206     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0378-7206(02)00094-0     Document Type: Article
Times cited : (109)

References (35)
  • 4
    • 0004271456 scopus 로고
    • Prentice Hall, Englewood Cliffs, NJ
    • D. Besterfield, Quality Control, Prentice Hall, Englewood Cliffs, NJ, 1979.
    • (1979) Quality Control
    • Besterfield, D.1
  • 5
    • 0041688197 scopus 로고    scopus 로고
    • Bovis-Lend Lease http://www.lendleaseprojects.com/.
  • 9
    • 21644483787 scopus 로고
    • Managing construction quality
    • Construction Industry Development Board, Singapore
    • Construction Industry Development Board (CIDB), Managing Construction Quality, A CIDB Manual on Quality Management Systems for Construction Operations, Construction Industry Development Board, Singapore, 1989.
    • (1989) A CIDB Manual on Quality Management Systems for Construction Operations
  • 13
    • 0042689969 scopus 로고
    • Quality cost management for profit, ASQC annual transaction
    • A. Grimm (Ed.), ASQC Press, Milwaukee, WI
    • R. Dobbins, Quality Cost Management for Profit, ASQC Annual Transaction, in: A. Grimm (Ed.), Quality Costs: Ideas and Applications, ASQC Press, Milwaukee, WI, 1975.
    • (1975) Quality Costs: Ideas and Applications
    • Dobbins, R.1
  • 14
    • 0043191024 scopus 로고
    • Quality costs. II. The economics of quality, ASQC annual transactions
    • J. Campanella (Ed.), ASQC Press, Milwaukee, WI
    • J.T. Hagan, Quality Costs. II. The Economics of Quality, ASQC Annual Transactions, in: J. Campanella (Ed.), Quality Costs: Ideas and Applications, vol. 1, ASQC Press, Milwaukee, WI, 1985, pp. 245-256.
    • (1985) Quality Costs: Ideas and Applications , vol.1 , pp. 245-256
    • Hagan, J.T.1
  • 16
    • 0032593163 scopus 로고    scopus 로고
    • The causes and costs of defects in construction: A study of seven building projects
    • Josephson P.-E., Hammarlund Y. The causes and costs of defects in construction: a study of seven building projects. Automation in Construction. 8(6):1999;642-681.
    • (1999) Automation in Construction , vol.8 , Issue.6 , pp. 642-681
    • Josephson, P.-E.1    Hammarlund, Y.2
  • 21
    • 0043191027 scopus 로고    scopus 로고
    • Engineers Australia, February
    • K. Lomas, Quality Pays, Engineers Australia, February 1996, p. 26.
    • (1996) Quality Pays , pp. 26
    • Lomas, K.1
  • 24
    • 0001187120 scopus 로고    scopus 로고
    • Determining the causal structure of rework in construction projects
    • Love P.E.D., Mandal P., Li H. Determining the causal structure of rework in construction projects. Construction Management and Economics. 17(4):1999;505-517.
    • (1999) Construction Management and Economics , vol.17 , Issue.4 , pp. 505-517
    • Love, P.E.D.1    Mandal, P.2    Li, H.3
  • 25
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • Love P.E.D., Li H. Quantifying the causes and costs of rework in construction. Construction Management and Economics. 18(4):2000;479-490.
    • (2000) Construction Management and Economics , vol.18 , Issue.4 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 27
    • 84993029647 scopus 로고    scopus 로고
    • An empirical analysis of the barriers to implementing e-commerce in small-medium sized contractors in the State of Victoria, Australia
    • Love P.E.D., Irani Z., Li H., Tse R.Y.C., Cheng E.W.L. An empirical analysis of the barriers to implementing e-commerce in small-medium sized contractors in the State of Victoria, Australia. Construction Innovation. 1(1):2001;43-54.
    • (2001) Construction Innovation , vol.1 , Issue.1 , pp. 43-54
    • Love, P.E.D.1    Irani, Z.2    Li, H.3    Tse, R.Y.C.4    Cheng, E.W.L.5
  • 28
    • 0035420949 scopus 로고    scopus 로고
    • Evaluating the costs of IT/IS in construction
    • Love P.E.D., Irani Z. Evaluating the costs of IT/IS in construction. Automation in Construction. 10(6):2001;649-658.
    • (2001) Automation in Construction , vol.10 , Issue.6 , pp. 649-658
    • Love, P.E.D.1    Irani, Z.2
  • 29
    • 84986104505 scopus 로고    scopus 로고
    • Auditing the indirect consequences of rework in construction: A case based approach
    • Love P.E.D. Auditing the indirect consequences of rework in construction: a case based approach. Managerial Auditing Journal. 17(3):2002;138-146.
    • (2002) Managerial Auditing Journal , vol.17 , Issue.3 , pp. 138-146
    • Love, P.E.D.1
  • 30
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • Love P.E.D. Influence of project type and procurement method on rework costs in building construction projects. ASCE Journal of Construction Engineering and Management. 128(1):2002;18-29.
    • (2002) ASCE Journal of Construction Engineering and Management , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1
  • 32
    • 4244208223 scopus 로고    scopus 로고
    • Licentiate Thesis, Division of Construction Management and Economics, Department of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden
    • K.-O. Nylén, Cost of Failure in a Major Civil Engineering Project, Licentiate Thesis, Division of Construction Management and Economics, Department of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden, 1996.
    • (1996) Cost of Failure in a Major Civil Engineering Project
    • Nylén, K.-O.1
  • 33
    • 0024874410 scopus 로고
    • The cost of quality: A management tool
    • R.J. Bard (Ed.), American Society of Civil Engineers
    • L. Patterson, W.B. Ledbetter, The Cost of Quality: A Management Tool, in: R.J. Bard (Ed.), Excellence in the Construction Project, American Society of Civil Engineers, 1989, pp. 100-105.
    • (1989) Excellence in the Construction Project , pp. 100-105
    • Patterson, L.1    Ledbetter, W.B.2
  • 34
  • 35


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.