메뉴 건너뛰기




Volumn 123, Issue 4, 1997, Pages 399-410

Neural network model for estimating construction productivity

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0001362287     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1997)123:4(399)     Document Type: Article
Times cited : (112)

References (21)
  • 1
    • 0028417085 scopus 로고
    • Estimating construction productivity: Neural-network-based approach
    • ASCE
    • Chao, L. C., and Skibniewski, M. J. (1993). "Estimating construction productivity: Neural-network-based approach." J. Computing in Civ. Engrg., ASCE, 8(2), 234-251.
    • (1993) J. Computing in Civ. Engrg. , vol.8 , Issue.2 , pp. 234-251
    • Chao, L.C.1    Skibniewski, M.J.2
  • 3
    • 0002231440 scopus 로고
    • Cost estimation of timber bridges using neural networks
    • Creese, R. C., and Li, L. (1995). "Cost estimation of timber bridges using neural networks." Cost Engrg., 37(5), 17-22.
    • (1995) Cost Engrg. , vol.37 , Issue.5 , pp. 17-22
    • Creese, R.C.1    Li, L.2
  • 4
    • 0346616328 scopus 로고
    • Neural network and their applicability within civil engineering
    • Dallas, Tex.
    • Garrett, J. H. (1992). "Neural network and their applicability within civil engineering." Proc., Computing in Civ. Engrg., 8th Conf., Dallas, Tex. 1155-1162.
    • (1992) Proc., Computing in Civ. Engrg., 8th Conf. , pp. 1155-1162
    • Garrett, J.H.1
  • 7
    • 0006932701 scopus 로고
    • Application of neural networks in earth-moving equipment production estimating
    • Dallas, Tex.
    • Karshenas, S., and Feng, X. (1992). "Application of neural networks in earth-moving equipment production estimating." Proc., Computing in Civ. Engrg., 8th Conf., Dallas, Tex., 841-847.
    • (1992) Proc., Computing in Civ. Engrg., 8th Conf. , pp. 841-847
    • Karshenas, S.1    Feng, X.2
  • 8
    • 0028413247 scopus 로고
    • Neural networks in civil engineering II: Systems and application
    • ASCE
    • Kartam, N., and Hood, I. (1994). "Neural networks in civil engineering II: Systems and application." J. Computing in Civ. Engrg., ASCE, 8(2).
    • (1994) J. Computing in Civ. Engrg. , vol.8 , Issue.2
    • Kartam, N.1    Hood, I.2
  • 9
    • 38449099019 scopus 로고
    • A construction crew evaluation model to improve productivity
    • Kuntz, K. A., and Sanvido, V. E. (1995). "A construction crew evaluation model to improve productivity." Constr. Congr., 201-208.
    • (1995) Constr. Congr. , pp. 201-208
    • Kuntz, K.A.1    Sanvido, V.E.2
  • 10
    • 0026381932 scopus 로고
    • Neural networks as tools in construction
    • ASCE
    • Moselhi, O., Hegazy, T., and Fazio, P. (1990). "Neural networks as tools in construction." J. Constr. Engrg. and Mgmt., ASCE, 117(4), 606-623.
    • (1990) J. Constr. Engrg. and Mgmt. , vol.117 , Issue.4 , pp. 606-623
    • Moselhi, O.1    Hegazy, T.2    Fazio, P.3
  • 11
    • 0028412972 scopus 로고
    • Neuromex: Neural network system for modular construction decision making
    • ASCE
    • Murtaza, M. B., and Fisher, D. J. (1993). "Neuromex: Neural network system for modular construction decision making." J. Computing in Civ. Engrg., ASCE, 8(2), 221-233.
    • (1993) J. Computing in Civ. Engrg. , vol.8 , Issue.2 , pp. 221-233
    • Murtaza, M.B.1    Fisher, D.J.2
  • 13
    • 0004176805 scopus 로고
    • NeuralWare Inc., Pittsburgh, Pa.
    • NeuralWare (1993). Neural computing. NeuralWare Inc., Pittsburgh, Pa.
    • (1993) Neural Computing
  • 15
    • 0004960184 scopus 로고
    • NeuralWare Inc., Pittsburgh, Pa.
    • NeuralWare. (1993). Using NeuralWorks. NeuralWare Inc., Pittsburgh, Pa.
    • (1993) Using NeuralWorks
  • 17
    • 0027608442 scopus 로고
    • Computerized daily site reporting
    • ASCE
    • Russell, A. D. (1993). "Computerized daily site reporting." J. Constr. Engrg. and Mgmt., ASCE, 119(2), 385-401.
    • (1993) J. Constr. Engrg. and Mgmt. , vol.119 , Issue.2 , pp. 385-401
    • Russell, A.D.1
  • 18
    • 85033164409 scopus 로고    scopus 로고
    • Constr. Engrg. and Mgmt. Internal Rep., Univ. of Alberta, Edmonton, Alberta, Canada
    • Salem, O. (1996). Neural network experimentation results. Constr. Engrg. and Mgmt. Internal Rep., Univ. of Alberta, Edmonton, Alberta, Canada.
    • (1996) Neural Network Experimentation Results
    • Salem, O.1
  • 19
    • 0026382438 scopus 로고
    • Factors affecting masonry-labor productivity
    • ASCE
    • Sanders, S. R., and Thomas, H. R. (1991). "Factors affecting masonry-labor productivity." J. Constr. Engrg. and Mgmt., ASCE, 117(4), 626-664.
    • (1991) J. Constr. Engrg. and Mgmt. , vol.117 , Issue.4 , pp. 626-664
    • Sanders, S.R.1    Thomas, H.R.2
  • 20
    • 0026918184 scopus 로고
    • Evaluation of advanced construction technology with AHP method
    • ASCE
    • Skibniewski, M. J., and Choa, L. C. (1992). "Evaluation of advanced construction technology with AHP method." J. Constr. Engrg. and Mgmt., ASCE, 118(3), 577-593.
    • (1992) J. Constr. Engrg. and Mgmt. , vol.118 , Issue.3 , pp. 577-593
    • Skibniewski, M.J.1    Choa, L.C.2
  • 21
    • 85033160356 scopus 로고
    • Factors influencing formwork productivity
    • Vancouver, Canada
    • Smith, G. R, and Hanna, A. S. (1991). "Factors influencing formwork productivity."Proc., 1991 Annu. Conf. of CSCE, Vancouver, Canada, 395-404.
    • (1991) Proc., 1991 Annu. Conf. of CSCE , pp. 395-404
    • Smith, G.R.1    Hanna, A.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.