-
1
-
-
0026913088
-
Statistical properties of construction duration data
-
AbouRizk, S.M. and Halpin, D.W. (1992), "Statistical properties of construction duration data", Journal of Construction Engineering and Management, ASCE, Vol. 118 No. 3, pp. 525-44.
-
(1992)
Journal of Construction Engineering and Management, ASCE
, vol.118
, Issue.3
, pp. 525-544
-
-
Abourizk, S.M.1
Halpin, D.W.2
-
2
-
-
0346636333
-
Decision-making in a fuzzy environment
-
Bellman, R.E. and Zadeh, L.A. (1970), "Decision-making in a fuzzy environment", Management Science, Vol. 17 No. 4, pp. 141-64.
-
(1970)
Management Science
, vol.17
, Issue.4
, pp. 141-164
-
-
Bellman, R.E.1
Zadeh, L.A.2
-
3
-
-
0022011112
-
A review of some methods for ranking fuzzy subsets
-
Bortolan, G. and Degani, R. (1985), "A review of some methods for ranking fuzzy subsets", Fuzzy Sets and Systems, Vol. 15, pp. 1-19.
-
(1985)
Fuzzy Sets and Systems
, vol.15
, pp. 1-19
-
-
Bortolan, G.1
Degani, R.2
-
4
-
-
0018478270
-
Simulation of construction project duration
-
Carr, R.I. (1979), "Simulation of construction project duration", Journal of Construction Engineering and Management, ASCE, Vol. 105 No. 2, pp. 117-28.
-
(1979)
Journal of Construction Engineering and Management, ASCE
, vol.105
, Issue.2
, pp. 117-128
-
-
Carr, R.I.1
-
5
-
-
0030416296
-
Advanced uses for Micro Saint simulation software
-
IEEE, Piscataway, NJ
-
Catherine, E.D. and Laughery, K.R. (1996), "Advanced uses for Micro Saint simulation software", Proceedings of 1996 Winter Simulation Conference, IEEE, Piscataway, NJ, pp. 510-6.
-
(1996)
Proceedings of 1996 Winter Simulation Conference
, pp. 510-516
-
-
Catherine, E.D.1
Laughery, K.R.2
-
6
-
-
0002146440
-
The use of fuzzy variables in Pert
-
Chanas, S. and Kamburowski, J. (1981), "The use of fuzzy variables in Pert", Fuzzy Sets and Systems, Vol. 5, pp. 11-19.
-
(1981)
Fuzzy Sets and Systems
, vol.5
, pp. 11-19
-
-
Chanas, S.1
Kamburowski, J.2
-
7
-
-
2442429010
-
Ranking fuzzy numbers with maximizing set and minimizing set
-
Chen, S.H. (1985), "Ranking fuzzy numbers with maximizing set and minimizing set", Fuzzy Sets and Systems, Vol. 17, pp. 113-29.
-
(1985)
Fuzzy Sets and Systems
, vol.17
, pp. 113-129
-
-
Chen, S.H.1
-
9
-
-
0020939993
-
Fuzzy simulation of industrial problems
-
Dohnal, M. (1983), "Fuzzy simulation of industrial problems", Computers in Industry, Vol. 4, pp. 347-52.
-
(1983)
Computers in Industry
, vol.4
, pp. 347-352
-
-
Dohnal, M.1
-
10
-
-
0003678399
-
An approach to computerized processing of uncertainty
-
Plenum, New York, NY
-
Duobis, D. and Prade, H. (1988), "An approach to computerized processing of uncertainty", Possibility Theory, Plenum, New York, NY, pp. 62-3.
-
(1988)
Possibility Theory
, pp. 62-63
-
-
Duobis, D.1
Prade, H.2
-
11
-
-
0041545750
-
Defining a probability distribution function for construction simulation
-
Fente, J., Schexnayder, C. and Knutson, K. (2000), "Defining a probability distribution function for construction simulation", Journal of Construction Engineering and Management, ASCE, Vol. 126 No. 3, pp. 234-41.
-
(2000)
Journal of Construction Engineering and Management, ASCE
, vol.126
, Issue.3
, pp. 234-241
-
-
Fente, J.1
Schexnayder, C.2
Knutson, K.3
-
12
-
-
0001009199
-
Fuzzy simulation: Specifying and identifying qualitative models
-
Fishwick, P.A. (1991), "Fuzzy simulation: specifying and identifying qualitative models", International Journal of General Systems, Vol. 19, pp. 295-316.
-
(1991)
International Journal of General Systems
, vol.19
, pp. 295-316
-
-
Fishwick, P.A.1
-
13
-
-
9144271287
-
Bounds for the expected duration of a stochastic project planning model
-
Gaul, W. (1981), "Bounds for the expected duration of a stochastic project planning model", Journal of Information and Optimization Sciences, Vol. 2, pp. 45-63.
-
(1981)
Journal of Information and Optimization Sciences
, vol.2
, pp. 45-63
-
-
Gaul, W.1
-
14
-
-
0017539255
-
CYCLONE - A method for modeling job site processes
-
Halpin, D.W. (1976), "CYCLONE - a method for modeling job site processes", Journal of Construction Division, ASCE, Vol. 103 No. 3, pp. 489-99.
-
(1976)
Journal of Construction Division, ASCE
, vol.103
, Issue.3
, pp. 489-499
-
-
Halpin, D.W.1
-
15
-
-
0345413017
-
-
P.E. Group, Egham
-
Hills, P.R. (1971), HOCUS, P.E. Group, Egham.
-
(1971)
HOCUS
-
-
Hills, P.R.1
-
16
-
-
0022698724
-
Robustness against dependence in Pert: An application of duality and distributions with known marginals
-
Klein, H.W.K. (1986), "Robustness against dependence in Pert: an application of duality and distributions with known marginals", Mathematical Programming Study, Vol. 27, pp. 153-82.
-
(1986)
Mathematical Programming Study
, vol.27
, pp. 153-182
-
-
Klein, H.W.K.1
-
17
-
-
0347703800
-
Selecting and generating variates for modeling service times
-
Purdue University, West Lafayette, IN
-
Klein, R.W. and Baris, P.M. (1990), "Selecting and generating variates for modeling service times", Res. Memorandum No. 90-2, Purdue University, West Lafayette, IN.
-
(1990)
Res. Memorandum No. 90-2
, vol.90
, Issue.2
-
-
Klein, R.W.1
Baris, P.M.2
-
18
-
-
0004312378
-
-
McGraw-Hill, New York, NY
-
Law, A.M. and Kelton, W.D. (1991), Simulation Modeling and Analysis, McGraw-Hill, New York, NY.
-
(1991)
Simulation Modeling and Analysis
-
-
Law, A.M.1
Kelton, W.D.2
-
19
-
-
0036499562
-
A genetic algorithm-based optimal resource-constrained scheduling simulation model
-
Leu, S.S. and Hung, T.H. (2002), "A genetic algorithm-based optimal resource-constrained scheduling simulation model", Construction Management and Economics, Vol. 20, pp. 131-41.
-
(2002)
Construction Management and Economics
, vol.20
, pp. 131-141
-
-
Leu, S.S.1
Hung, T.H.2
-
21
-
-
9144263820
-
Simplified enhancing project evaluation and review technique simulation through artificial neural network-based input modeling
-
Lu, M. (2002), "Simplified enhancing project evaluation and review technique simulation through artificial neural network-based input modeling", Journal of Construction Engineering and Management ASCE, Vol. 128 No. 5, pp. 438-45.
-
(2002)
Journal of Construction Engineering and Management ASCE
, vol.128
, Issue.5
, pp. 438-445
-
-
Lu, M.1
-
22
-
-
0034225611
-
Probability distribution function for construction simulation
-
Maio, C., Schexnayder, C., Knutson, K. and Weber, S. (2000), "Probability distribution function for construction simulation", Journal of Construction Engineering and Management ASCE, Vol. 126 No. 4, pp. 285-92.
-
(2000)
Journal of Construction Engineering and Management ASCE
, vol.126
, Issue.4
, pp. 285-292
-
-
Maio, C.1
Schexnayder, C.2
Knutson, K.3
Weber, S.4
-
23
-
-
0032677122
-
General-purpose system for effective construction simulation
-
Martinez, J. and Ioannou, P.G. (1999), "General-purpose system for effective construction simulation", Journal of Construction Engineering and Management ASCE, Vol. 125 No. 4, pp. 265-76.
-
(1999)
Journal of Construction Engineering and Management ASCE
, vol.125
, Issue.4
, pp. 265-276
-
-
Martinez, J.1
Ioannou, P.G.2
-
24
-
-
9144232541
-
Techniques and applications of fuzzy theory to critical path method
-
Nasution, S.H. (1999), "Techniques and applications of fuzzy theory to critical path method", Fuzzy Theory Systems: Techniques and Applications, Vol. 4, pp. 1561-97.
-
(1999)
Fuzzy Theory Systems: Techniques and Applications
, vol.4
, pp. 1561-1597
-
-
Nasution, S.H.1
-
25
-
-
0002671218
-
Analysis and simulation of fuzzy queues
-
Negi, D.S. and Lee, E.S. (1992), "Analysis and simulation of fuzzy queues", fuzzy Sets and Systems, Vol. 46, pp. 321-30.
-
(1992)
Fuzzy Sets and Systems
, vol.46
, pp. 321-330
-
-
Negi, D.S.1
Lee, E.S.2
-
26
-
-
0032168266
-
Modeling and simulation of a supply chain in an uncertain environment
-
Petroivc, D., Roy, R. and Petroivc, R. (1998), "Modeling and simulation of a supply chain in an uncertain environment", European Journal of Operational Research, Vol. 109, pp. 299-309.
-
(1998)
European Journal of Operational Research
, vol.109
, pp. 299-309
-
-
Petroivc, D.1
Roy, R.2
Petroivc, R.3
-
27
-
-
0003791247
-
-
Wiley, Chichester, New York, NY
-
Pidd, M. (1998), Computer Simulation in Management Science, Wiley, Chichester, New York, NY.
-
(1998)
Computer Simulation in Management Science
-
-
Pidd, M.1
-
28
-
-
0029499774
-
HSM-simulation-based planning method for construction projects
-
Sawhney, A. and Abourizk, S.M. (1995), "HSM-simulation-based planning method for construction projects", Journal of Construction Engineering and Management ASCE, Vol. 121 No. 3, pp. 297-303.
-
(1995)
Journal of Construction Engineering and Management ASCE
, vol.121
, Issue.3
, pp. 297-303
-
-
Sawhney, A.1
Abourizk, S.M.2
-
29
-
-
0011718182
-
Investigation using simulation models into manufacturing/distribution chain relationships
-
Southall, J.T. and Wyatt, M.D. (1988), "Investigation using simulation models into manufacturing/distribution chain relationships", BPICS Control, Vols 4/5, pp. 29-34.
-
(1988)
BPICS Control
, vol.4-5
, pp. 29-34
-
-
Southall, J.T.1
Wyatt, M.D.2
-
30
-
-
0002090096
-
Input data analysis
-
Banks, J. (Ed.), Wiley, New York, NY
-
Stephen, E.C. (1998), "Input data analysis", in Banks, J. (Ed.), Handbook of Simulation: Principles, Methodology, Advances, Applications, and Practice, Wiley, New York, NY, pp. 55-91.
-
(1998)
Handbook of Simulation: Principles, Methodology, Advances, Applications, and Practice
, pp. 55-91
-
-
Stephen, E.C.1
-
31
-
-
0033325133
-
Steps to implement Bayesian input distribution selection
-
IEEE, Piscataway, NJ
-
Stephen, E.C. (1999), "Steps to implement Bayesian input distribution selection", Proceedings of 1999 Winter Simulation Conference, IEEE, Piscataway, NJ, pp. 317-24.
-
(1999)
Proceedings of 1999 Winter Simulation Conference
, pp. 317-324
-
-
Stephen, E.C.1
-
32
-
-
0031451940
-
Probabilistic model for tunneling project using Markov chain
-
Touran, A. (1997), "Probabilistic model for tunneling project using Markov chain", Journal of Construction Engineering and Management, ASCE, Vol. 123 No. 1, pp. 444-9.
-
(1997)
Journal of Construction Engineering and Management, ASCE
, vol.123
, Issue.1
, pp. 444-449
-
-
Touran, A.1
-
33
-
-
0037119853
-
Comparison of fuzzy numbers using a fuzzy distance measure
-
Tran, L. and Duzkstein, L. (2002), "Comparison of fuzzy numbers using a fuzzy distance measure", Fuzzy Sets and Systems, Vol. 130, pp. 331-41.
-
(2002)
Fuzzy Sets and Systems
, vol.130
, pp. 331-341
-
-
Tran, L.1
Duzkstein, L.2
-
34
-
-
0001160660
-
Reasonable properties for the ordering of fuzzy quantities (I)
-
Wang, X. and Kere, E.E. (2001 a), "Reasonable properties for the ordering of fuzzy quantities (I)", Fuzzy Sets and Systems, Vol. 118, pp. 375-85.
-
(2001)
Fuzzy Sets and Systems
, vol.118
, pp. 375-385
-
-
Wang, X.1
Kere, E.E.2
-
35
-
-
0041073915
-
Reasonable properties for the ordering of fuzzy quantities (II)
-
Wang, X. and Kere, E.E. (2001 b), "Reasonable properties for the ordering of fuzzy quantities (II)", Fuzzy Sets and Systems, Vol. 118, pp. 385-405.
-
(2001)
Fuzzy Sets and Systems
, vol.118
, pp. 385-405
-
-
Wang, X.1
Kere, E.E.2
-
36
-
-
0000949404
-
The use of the incomplete beta functions for prior distributions in binomial sampling
-
Weiler, H. (1965), "The use of the incomplete beta functions for prior distributions in binomial sampling", Technometrics, Vol. 7 No. 3, pp. 335-47.
-
(1965)
Technometrics
, vol.7
, Issue.3
, pp. 335-347
-
-
Weiler, H.1
-
37
-
-
0020140440
-
Analysis of space shuttle ground operations
-
Wilson, J.R., Vaughan, D.K., Naylor, E. and Voss, R.G. (1982), "Analysis of space shuttle ground operations", Simulation, Vol. 38 No. 6, pp. 187-203.
-
(1982)
Simulation
, vol.38
, Issue.6
, pp. 187-203
-
-
Wilson, J.R.1
Vaughan, D.K.2
Naylor, E.3
Voss, R.G.4
-
38
-
-
0000575860
-
Criteria for evaluating fuzzy ranking methods
-
Yufei, Y. (1991), "Criteria for evaluating fuzzy ranking methods", Fuzzy Sets and Systems, Vol. 44, pp. 139-57.
-
(1991)
Fuzzy Sets and Systems
, vol.44
, pp. 139-157
-
-
Yufei, Y.1
-
40
-
-
0036028116
-
Visual modeling and simulation for construction operations
-
Zhang, H., Tam, C.M. and Shi, J. (2001), "Visual modeling and simulation for construction operations", Automation in Construction, Vol. 11 No. 1, pp. 47-57.
-
(2001)
Automation in Construction
, vol.11
, Issue.1
, pp. 47-57
-
-
Zhang, H.1
Tam, C.M.2
Shi, J.3
-
41
-
-
1642432959
-
Simulation-based methodology for project scheduling
-
Zhang, H., Tam, C.M. and Shi, J. (2002), "Simulation-based methodology for project scheduling", Construction Management and Economics, Vol. 20 No. 8, pp. 667-78.
-
(2002)
Construction Management and Economics
, vol.20
, Issue.8
, pp. 667-678
-
-
Zhang, H.1
Tam, C.M.2
Shi, J.3
-
42
-
-
1642598653
-
Application of fuzzy logic to simulation for construction operations
-
Zhang, H., Tam, C.M. and Shi, J. (2003), "Application of fuzzy logic to simulation for construction operations", Journal of Computing in Civil Engineering, ASCE, Vol. 17 No. 1, pp. 38-45.
-
(2003)
Journal of Computing in Civil Engineering, ASCE
, vol.17
, Issue.1
, pp. 38-45
-
-
Zhang, H.1
Tam, C.M.2
Shi, J.3
|