메뉴 건너뛰기




Volumn 131, Issue 8, 2005, Pages 938-941

Predicting industrial construction labor productivity using fuzzy expert systems

Author keywords

Artificial intelligence; Construction industry; Construction management; Expert systems; Fuzzy sets; Industrial plants; Labor; Productivity

Indexed keywords

CONSTRUCTION MANAGEMENT; FUZZY EXPERT SYSTEMS; FUZZY MEMBERSHIP FUNCTIONS; LABOR PRODUCTIVITY;

EID: 25444440655     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:8(938)     Document Type: Article
Times cited : (84)

References (8)
  • 1
    • 84867726953 scopus 로고    scopus 로고
    • A pilot study to examine the effective integration of apprentices into the industrial construction sector
    • Department of Civil and Environmental Engineering, University of Alberta, Presented to the Workforce Development Coordinating Committee, Construction Owners Association of Alberta, Edmonton, Alta.
    • Fayek, A. R., Shaheen, A., and Oduba, A. (2002). "A pilot study to examine the effective integration of apprentices into the industrial construction sector." Department of Civil and Environmental Engineering, University of Alberta, Presented to the Workforce Development Coordinating Committee, Construction Owners Association of Alberta, Construction Best Practices X Conf., Edmonton, Alta.
    • (2002) Construction Best Practices X Conf.
    • Fayek, A.R.1    Shaheen, A.2    Oduba, A.3
  • 2
    • 34548123428 scopus 로고    scopus 로고
    • A fuzzy expert system for design performance prediction and evaluation
    • Fayek, A. R., and Sun, Z. (2001). "A fuzzy expert system for design performance prediction and evaluation." Can. J. Civ. Eng., 28, 1-25.
    • (2001) Can. J. Civ. Eng. , vol.28 , pp. 1-25
    • Fayek, A.R.1    Sun, Z.2
  • 3
    • 0028393273 scopus 로고
    • Action-response model and loss of productivity in construction
    • Halligan, D. W., Demsetz, L. A., Brown, J. D., and Pace, C. B. (1994). "Action-response model and loss of productivity in construction." J. Constr. Eng. Manage., 120(1), 47-64.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.1 , pp. 47-64
    • Halligan, D.W.1    Demsetz, L.A.2    Brown, J.D.3    Pace, C.B.4
  • 4
    • 0242645443 scopus 로고    scopus 로고
    • Benchmarking productivity indicators for electrical/mechanical projects
    • Hanna, A. S., Peterson, P., and Lee, M. J. (2002). "Benchmarking productivity indicators for electrical/mechanical projects." J. Constr. Eng. Manage., 128(4), 331-337.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.4 , pp. 331-337
    • Hanna, A.S.1    Peterson, P.2    Lee, M.J.3
  • 5
    • 0031437598 scopus 로고    scopus 로고
    • SIGMAR: A fuzzy expert system for critiquing marine forecasts
    • Hansen, B. K. (1997). "SIGMAR: A fuzzy expert system for critiquing marine forecasts." AI Appl., 11(1), 59-68.
    • (1997) AI Appl. , vol.11 , Issue.1 , pp. 59-68
    • Hansen, B.K.1
  • 6
    • 0034298443 scopus 로고    scopus 로고
    • Estimating labor productivity using probability inference neural network
    • Lu, M., AbouRizk, S. M., and Hermann, U. H. (2000). "Estimating labor productivity using probability inference neural network." J. Comput. Civ. Eng., 14(4), 241-248.
    • (2000) J. Comput. Civ. Eng. , vol.14 , Issue.4 , pp. 241-248
    • Lu, M.1    Abourizk, S.M.2    Hermann, U.H.3
  • 7
    • 0025694102 scopus 로고
    • Modeling construction labor productivity
    • Thomas, H. R., et al. (1990). "Modeling construction labor productivity." J. Constr. Eng. Manage., 116(4), 705-726.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.4 , pp. 705-726
    • Thomas, H.R.1
  • 8
    • 34248666540 scopus 로고
    • Fuzzy sets
    • Zadeh, L. A. (1965). "Fuzzy sets." Inf. Control., 8(3), 338-353.
    • (1965) Inf. Control. , vol.8 , Issue.3 , pp. 338-353
    • Zadeh, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.