메뉴 건너뛰기




Volumn 130, Issue 1, 2004, Pages 114-123

Where do we stand with fuzzy project scheduling?

Author keywords

Fuzzy sets; Project management; Scheduling

Indexed keywords

COMPUTER SIMULATION; DECISION MAKING; FUZZY CONTROL; MATHEMATICAL MODELS; MONTE CARLO METHODS; PROBABILITY; UNCERTAIN SYSTEMS;

EID: 13944250291     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:1(114)     Document Type: Article
Times cited : (49)

References (39)
  • 1
    • 0001849846 scopus 로고
    • Heuristic algorithms for resource-constrained project scheduling: A review of an empirical analysis
    • R. Słoviński and J. Wȩglarz, eds., Elsevier Science, Amsterdam
    • Alvares-Valdés Olaguíbel, R., and Tamarit Goerlich, J. M. (1989). "Heuristic algorithms for resource-constrained project scheduling: A review of an empirical analysis." Advances in project scheduling, R. Słoviński and J. Wȩglarz, eds., Elsevier Science, Amsterdam, 113-134.
    • (1989) Advances in Project Scheduling , pp. 113-134
    • Alvares-Valdés Olaguíbel, R.1    Tamarit Goerlich, J.M.2
  • 2
    • 0002146440 scopus 로고
    • The use of fuzzy variables in PERT
    • Chanas, S., and Kamburowski, J. (1981). "The use of fuzzy variables in PERT." Fuzzy Sets Syst., 5, 11-19.
    • (1981) Fuzzy Sets Syst. , vol.5 , pp. 11-19
    • Chanas, S.1    Kamburowski, J.2
  • 3
    • 0035885517 scopus 로고    scopus 로고
    • Critical path analysis in a network with fuzzy activity times
    • Chanas, S., and Zieliński, P. (2001). "Critical path analysis in a network with fuzzy activity times." Fuzzy Sets Syst., 122(2), 195-204.
    • (2001) Fuzzy Sets Syst. , vol.122 , Issue.2 , pp. 195-204
    • Chanas, S.1    Zieliński, P.2
  • 4
    • 0036466460 scopus 로고    scopus 로고
    • The computational complexity of the interval critical path method
    • Chanas, S., and Zieliński, P. (2002). "The computational complexity of the interval critical path method." Eur. J. Oper. Res., 136(3), 541-550.
    • (2002) Eur. J. Oper. Res. , vol.136 , Issue.3 , pp. 541-550
    • Chanas, S.1    Zieliński, P.2
  • 5
    • 0015725454 scopus 로고
    • Project scheduling under resource constraints: Historical review and categorization procedure
    • Davis, E. W. (1973). "Project scheduling under resource constraints: Historical review and categorization procedure." AIIE Trans., 5(4), 297-313.
    • (1973) AIIE Trans. , vol.5 , Issue.4 , pp. 297-313
    • Davis, E.W.1
  • 6
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimal solutions in resource constraint project scheduling
    • Davis, E. W., and Patterson, J. H. (1973). "A comparison of heuristic and optimal solutions in resource constraint project scheduling." Manage. Sci., 20(1), 944-955.
    • (1973) Manage. Sci. , vol.20 , Issue.1 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 7
    • 13944257848 scopus 로고    scopus 로고
    • Ordonnancement sous contraintes flexibles et données incertaines: L'approche floue
    • P. Lopez, and F. Roubellot, Hermès, Paris, (in French)
    • Dubois, D., Fargier, H., and Fortemps, P. (2000). "Ordonnancement sous contraintes flexibles et données incertaines: L'approche floue." Ordonnacement de la production, P. Lopez, and F. Roubellot, Hermès, Paris, 361-391 (in French).
    • (2000) Ordonnacement de la Production , pp. 361-391
    • Dubois, D.1    Fargier, H.2    Fortemps, P.3
  • 8
    • 0345028632 scopus 로고
    • Algorithmes de plus courts chemins pour traiter de données floues
    • in French
    • Dubois, D., and Prade, H. (1978). "Algorithmes de plus courts chemins pour traiter de données floues." RAIRO: Anal. Numer., 12(2), 213-227 (in French).
    • (1978) RAIRO: Anal. Numer. , vol.12 , Issue.2 , pp. 213-227
    • Dubois, D.1    Prade, H.2
  • 10
    • 0001320360 scopus 로고
    • A generalized network approach to the planning and scheduling of a research program
    • Eisner, H. (1962). "A generalized network approach to the planning and scheduling of a research program." J. Oper. Res. Soc., 10(1), 115-125.
    • (1962) J. Oper. Res. Soc. , vol.10 , Issue.1 , pp. 115-125
    • Eisner, H.1
  • 11
    • 0001273577 scopus 로고
    • An algebra for the analysis of generalized activity networks
    • Elmaghraby, S. E. (1964). "An algebra for the analysis of generalized activity networks." Manage. Sci., 10(3), 494-515.
    • (1964) Manage. Sci. , vol.10 , Issue.3 , pp. 494-515
    • Elmaghraby, S.E.1
  • 12
    • 13944261672 scopus 로고
    • On generalized activity networks
    • Elmaghraby, S. E. (1966). "On generalized activity networks." J. Ind. Eng., 17(11), 621-631.
    • (1966) J. Ind. Eng. , vol.17 , Issue.11 , pp. 621-631
    • Elmaghraby, S.E.1
  • 16
    • 0020798185 scopus 로고
    • Fuzzy network planning
    • Gazdik, I. (1983). "Fuzzy network planning." IEEE Trans. Reliability R32, 304-313.
    • (1983) IEEE Trans. Reliability , vol.R32 , pp. 304-313
    • Gazdik, I.1
  • 17
    • 13944263684 scopus 로고
    • PhD thesis, Univ. Karslruhe, Institut für Wirtschaftstheorie und Operations Research, Karslruhe, Germany (in German)
    • Geidel, J. (1988). "Zeitplanung von Projeckten mit unsharfen Daten." PhD thesis, Univ. Karslruhe, Institut für Wirtschaftstheorie und Operations Research, Karslruhe, Germany (in German).
    • (1988) Zeitplanung von Projeckten mit Unsharfen Daten
    • Geidel, J.1
  • 18
    • 13944249994 scopus 로고
    • Project scheduling with fuzzy data
    • Geidel, J. (1989). "Project scheduling with fuzzy data." Meth. Op. Res., 62, 339-347.
    • (1989) Meth. Op. Res. , vol.62 , pp. 339-347
    • Geidel, J.1
  • 20
    • 0028524436 scopus 로고
    • Fuzzy project scheduling system for software development
    • Hapke, M., Jaszkiewicz, A., and Stoviński, R. (1994). "Fuzzy project scheduling system for software development." Fuzzy Sets Syst., 67(1), 101-117.
    • (1994) Fuzzy Sets Syst. , vol.67 , Issue.1 , pp. 101-117
    • Hapke, M.1    Jaszkiewicz, A.2    Stoviński, R.3
  • 23
    • 0032095408 scopus 로고    scopus 로고
    • Interactive analysis of multiple-criteria project scheduling problems
    • Hapke, M., Jaszkiewicz, A., and Słoviński, R. (1998). "Interactive analysis of multiple-criteria project scheduling problems." Eur. J. Oper. Res., 107, 315-324.
    • (1998) Eur. J. Oper. Res. , vol.107 , pp. 315-324
    • Hapke, M.1    Jaszkiewicz, A.2    Słoviński, R.3
  • 24
    • 84953063276 scopus 로고
    • A DSS for resource-constrained project scheduling under uncertainty
    • Hapke, M., and Słoviński, R. (1993). "A DSS for resource-constrained project scheduling under uncertainty." J. Decision Syst., 2(2), 111-128.
    • (1993) J. Decision Syst. , vol.2 , Issue.2 , pp. 111-128
    • Hapke, M.1    Słoviński, R.2
  • 25
    • 0030286425 scopus 로고    scopus 로고
    • Fuzzy priority heuristics for project scheduling
    • Hapke, M., and Słoviński, R. (1996a). "Fuzzy priority heuristics for project scheduling." Fuzzy Sets Syst., 83, 291-299.
    • (1996) Fuzzy Sets Syst. , vol.83 , pp. 291-299
    • Hapke, M.1    Słoviński, R.2
  • 27
    • 13944263331 scopus 로고
    • PhD thesis, Dept. of Industrial Engineering, Univ. of Missouri at Columbia, Columbia, Mo.
    • Klein, C. M. (1988). "Fuzzy shortest path." PhD thesis, Dept. of Industrial Engineering, Univ. of Missouri at Columbia, Columbia, Mo.
    • (1988) Fuzzy Shortest Path
    • Klein, C.M.1
  • 29
    • 0015667795 scopus 로고
    • Another look at the PERT assumption
    • Kotiah, T. C. T., and Wallace, B. D. (1973). "Another look at the PERT assumption." Manage. Sci., 20(1), 44-49.
    • (1973) Manage. Sci. , vol.20 , Issue.1 , pp. 44-49
    • Kotiah, T.C.T.1    Wallace, B.D.2
  • 30
    • 0344584768 scopus 로고
    • Netz-plantechnik mit unscharfen Methoden
    • in German
    • Lessmann, H., Mühlögger, J., and Oberguggenberger, M. (1994). "Netz-plantechnik mit unscharfen Methoden." Bauingenieur, 69, 469-478 (in German).
    • (1994) Bauingenieur , vol.69 , pp. 469-478
    • Lessmann, H.1    Mühlögger, J.2    Oberguggenberger, M.3
  • 31
    • 0024770103 scopus 로고
    • Stochastic and fuzzy PERT
    • Lootsma, F. A. (1989). "Stochastic and fuzzy PERT." Eur. J. Oper. Res., 43, 174-183.
    • (1989) Eur. J. Oper. Res. , vol.43 , pp. 174-183
    • Lootsma, F.A.1
  • 32
    • 0001501655 scopus 로고
    • Application of a technique for R&D program evaluation (PERT)
    • Malcolm, D. G., Rosenbloom, J. H., Clark, C. E., and Fazer, W. (1959). "Application of a technique for R&D program evaluation (PERT)." Oper. Res., 7(5), 646-669.
    • (1959) Oper. Res. , vol.7 , Issue.5 , pp. 646-669
    • Malcolm, D.G.1    Rosenbloom, J.H.2    Clark, C.E.3    Fazer, W.4
  • 33
    • 0002641538 scopus 로고
    • An analytical study of the PERT assumption
    • McCrimmon, K. R., and Rayvec, A. (1964). "An analytical study of the PERT assumption." Oper. Res., 12(1), 16-37.
    • (1964) Oper. Res. , vol.12 , Issue.1 , pp. 16-37
    • McCrimmon, K.R.1    Rayvec, A.2
  • 35
  • 36
    • 11144304606 scopus 로고
    • The use of the compound Poisson in PERT
    • Parks, W. H., and Ramsing, K. D. (1969). "The use of the compound Poisson in PERT." Manage. Sci., 15(8), B397-B402.
    • (1969) Manage. Sci. , vol.15 , Issue.8
    • Parks, W.H.1    Ramsing, K.D.2
  • 38
    • 0000738834 scopus 로고
    • Monte-Carlo method and the PERT problem
    • Van Slyke, R. M. (1963). "Monte-Carlo method and the PERT problem." Oper. Res., 11(5), 839-860.
    • (1963) Oper. Res. , vol.11 , Issue.5 , pp. 839-860
    • Van Slyke, R.M.1
  • 39
    • 0033283751 scopus 로고    scopus 로고
    • A fuzzy set approach to activity scheduling for product development
    • Wang, J. R. (1999). "A fuzzy set approach to activity scheduling for product development." J. Oper. Res. Soc., 50(12), 1217-1228.
    • (1999) J. Oper. Res. Soc. , vol.50 , Issue.12 , pp. 1217-1228
    • Wang, J.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.