메뉴 건너뛰기




Volumn 3, Issue 2, 2009, Pages 342-351

Uncertainty factors in real manufacturing environment

Author keywords

Capacity constraints; Demand; Lead time; Safety stock

Indexed keywords


EID: 65549147686     PISSN: 19918178     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Review
Times cited : (64)

References (98)
  • 1
    • 29344471605 scopus 로고    scopus 로고
    • Managing uncertainty in ERP-controlled manufacturing environments in SMEs
    • Koh, S.C.L. and S.M. Saad, 2006. Managing uncertainty in ERP-controlled manufacturing environments in SMEs. International Journal of Production Economics, 101(1): 109-127.
    • (2006) International Journal of Production Economics , vol.101 , Issue.1 , pp. 109-127
    • Koh, S.C.L.1    Saad, S.M.2
  • 4
    • 0035866458 scopus 로고    scopus 로고
    • MRP performance effects due to lot size and planned lead-time settings
    • Enns, S.T., 2001. MRP performance effects due to lot size and planned lead-time settings. International Journal of Production Research, 39(3): 461-480.
    • (2001) International Journal of Production Research , vol.39 , Issue.3 , pp. 461-480
    • Enns, S.T.1
  • 5
    • 0142217266 scopus 로고    scopus 로고
    • A holistic approach to diagnose uncertainty in ERP-controlled manufacturing shop floor
    • Koh, S.C.L. and S.M. Saad, 2003. A holistic approach to diagnose uncertainty in ERP-controlled manufacturing shop floor. International Journal of Production Planning and Control, 2003. 14(3):. 273-289.
    • (2003) International Journal of Production Planning and Control , vol.14 , Issue.3 , pp. 273-289
    • Koh, S.C.L.1    Saad, S.M.2
  • 6
    • 0024962824 scopus 로고
    • Production scheduling: Practice and Theory
    • Buxey, G., 1989. Production scheduling: Practice and Theory. European Journal of Operational Research, 39(1): 17-31.
    • (1989) European Journal of Operational Research , vol.39 , Issue.1 , pp. 17-31
    • Buxey, G.1
  • 9
    • 33645806554 scopus 로고    scopus 로고
    • A knowledge management approach for managing uncertainty in manufacturing
    • Koh, S.C.L. and A. Gunasekaran, 2006. A knowledge management approach for managing uncertainty in manufacturing. Industrial Management & Data Systems, 106(4): 439-459.
    • (2006) Industrial Management & Data Systems , vol.106 , Issue.4 , pp. 439-459
    • Koh, S.C.L.1    Gunasekaran, A.2
  • 15
    • 0032660194 scopus 로고    scopus 로고
    • A new methodology for the estimation of total uncertainty in computational simulation
    • St. Louis, MO
    • Obercampf, W.L., et al., 1999. A new methodology for the estimation of total uncertainty in computational simulation, in AIAA Non-Deterministic Approaches Forum. St. Louis, MO. 3061-3083.
    • (1999) AIAA Non-Deterministic Approaches Forum , pp. 3061-3083
    • Obercampf, W.L.1
  • 18
    • 8844246368 scopus 로고
    • Action taken to prevent the propagation of disturbances in manufacturing systems
    • Lindau, R.A. and K.R. Lumsden, 1995. Action taken to prevent the propagation of disturbances in manufacturing systems. International Journal of Production Economics, 41(1-3): 241-248.
    • (1995) International Journal of Production Economics , vol.41 , Issue.1-3 , pp. 241-248
    • Lindau, R.A.1    Lumsden, K.R.2
  • 20
    • 0032287441 scopus 로고    scopus 로고
    • Handling internal and external disturbances in responsive manufacturing environments
    • Saad, S.M. and N.N. Gindy, 1998. Handling internal and external disturbances in responsive manufacturing environments. International Journal of Production Planning and Control, 9(8): 760-770.
    • (1998) International Journal of Production Planning and Control , vol.9 , Issue.8 , pp. 760-770
    • Saad, S.M.1    Gindy, N.N.2
  • 21
    • 0024702296 scopus 로고
    • Evaluating the impact of operating environments on MRP system nervousness
    • Ho, C.J., 1989. Evaluating the impact of operating environments on MRP system nervousness. International Journal of Production Research, 27(7): 1115-1135.
    • (1989) International Journal of Production Research , vol.27 , Issue.7 , pp. 1115-1135
    • Ho, C.J.1
  • 22
    • 0003276672 scopus 로고    scopus 로고
    • Uncertainty modeling in civil engineering with structural and reliability applications
    • CRC Press: Boca Raton, FL
    • Ayyub, B.M. and R.U. Chao, 1997. Uncertainty modeling in civil engineering with structural and reliability applications, in Uncertainty modeling and analysis in civil engineering. CRC Press: Boca Raton, FL. 3-33.
    • (1997) Uncertainty modeling and analysis in civil engineering , pp. 3-33
    • Ayyub, B.M.1    Chao, R.U.2
  • 23
    • 0003785426 scopus 로고    scopus 로고
    • System engineering: An approach to information-based design
    • NJ: Prentice Hall
    • Hazelrigg, G.A., 1996. System engineering: An approach to information-based design., Upper Sahhle River, NJ: Prentice Hall.
    • (1996) Upper Sahhle River
    • Hazelrigg, G.A.1
  • 24
    • 0034250264 scopus 로고    scopus 로고
    • Methodology for managing the effect of uncertainty in simulation based design
    • Du, X. and W. Chen, 2000. Methodology for managing the effect of uncertainty in simulation based design. AIAA Journal, 38(8): 1471-1478.
    • (2000) AIAA Journal , vol.38 , Issue.8 , pp. 1471-1478
    • Du, X.1    Chen, W.2
  • 26
    • 0037056090 scopus 로고    scopus 로고
    • Development of a business model for diagnosing uncertainty in ERP environments
    • Koh, S.C.L. and S.M. Saad, 2002. Development of a business model for diagnosing uncertainty in ERP environments. International Journal of Production Research, 40(13): 3015-3039.
    • (2002) International Journal of Production Research , vol.40 , Issue.13 , pp. 3015-3039
    • Koh, S.C.L.1    Saad, S.M.2
  • 27
    • 2342595914 scopus 로고    scopus 로고
    • MRP-controlled batch-manufacturing environment under uncertainty
    • Koh, S.C.L., 2004. MRP-controlled batch-manufacturing environment under uncertainty. Journal of the Operational Research Society, 55: 219-232.
    • (2004) Journal of the Operational Research Society , vol.55 , pp. 219-232
    • Koh, S.C.L.1
  • 28
    • 33744983498 scopus 로고    scopus 로고
    • Models for production planning under uncertainty: A review
    • Mula, J., et al., 2006. Models for production planning under uncertainty: A review. International Journal of Production Economics, 103: 271-285.
    • (2006) International Journal of Production Economics , vol.103 , pp. 271-285
    • Mula, J.1
  • 29
    • 65549117898 scopus 로고    scopus 로고
    • cited 2008 July 08, Available from
    • Uncertainty, BusinessDictionary.com. 2008 [cited 2008 July 08]; Available from: http://www.businessdictionary.com/definition/ uncertainty.html.
    • (2008) Uncertainty, BusinessDictionary.com
  • 32
    • 65549159624 scopus 로고
    • Applied Systems and Cybernetics
    • Academic Press: New York
    • Sommer, G., 1981. Applied Systems and Cybernetics, in Fuzzy inventory scheduling. Academic Press: New York.
    • (1981) Fuzzy inventory scheduling
    • Sommer, G.1
  • 33
    • 0031553259 scopus 로고    scopus 로고
    • Fuzzy production planning model for fresh tomato packing
    • Miller, W.A., et al., 1997. Fuzzy production planning model for fresh tomato packing. International Journal of Production Economics, 53(3-4): 227-238.
    • (1997) International Journal of Production Economics , vol.53 , Issue.3-4 , pp. 227-238
    • Miller, W.A.1
  • 34
    • 0035314299 scopus 로고    scopus 로고
    • Possibilistic programming in production planning of assemble-to-order environments
    • Hsu, H. and W. Wang, 2001. Possibilistic programming in production planning of assemble-to-order environments. Fuzzy Sets and Systems, 119(1): 59-70.
    • (2001) Fuzzy Sets and Systems , vol.119 , Issue.1 , pp. 59-70
    • Hsu, H.1    Wang, W.2
  • 37
    • 20344396080 scopus 로고    scopus 로고
    • The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty
    • Mohebbi, E. and F. Choobineh, 2005. The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty. Omega, The International Journal of Management Science, 33: 472-482.
    • (2005) Omega, The International Journal of Management Science , vol.33 , pp. 472-482
    • Mohebbi, E.1    Choobineh, F.2
  • 38
    • 0027624544 scopus 로고
    • A structured analysis of material requirements planning systems under combined demand and supply uncertainty
    • Brennan, L. and S.M. Gupta, 1993. A structured analysis of material requirements planning systems under combined demand and supply uncertainty. International Journal of Production Research, 31(7): 1689-1707.
    • (1993) International Journal of Production Research , vol.31 , Issue.7 , pp. 1689-1707
    • Brennan, L.1    Gupta, S.M.2
  • 41
    • 70449383987 scopus 로고
    • Uncertainty dampening methods for reducing MRP system nervousness
    • Ho, C.J., W.K. Law, and R. Rampal, 1995. Uncertainty dampening methods for reducing MRP system nervousness. International Journal of Production Research, 33(2): 483-496.
    • (1995) International Journal of Production Research , vol.33 , Issue.2 , pp. 483-496
    • Ho, C.J.1    Law, W.K.2    Rampal, R.3
  • 42
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacityconstrained MRP systems: Review formulation and problem reduction
    • Billington, P.J., J.O. McClain, and L.J. Thomas, 1983. Mathematical programming approaches to capacityconstrained MRP systems: Review formulation and problem reduction. Management Science, 29(10): 1126-1141.
    • (1983) Management Science , vol.29 , Issue.10 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 43
    • 0022161887 scopus 로고
    • Integrating the MRP-based control level and the multistage shop level of a manufacturing system via network simulation
    • Huang, P.Y., L.P. Rees, and B.W. Taylor, 1985. Integrating the MRP-based control level and the multistage shop level of a manufacturing system via network simulation. International Journal of Production Research, 23(6): 1217-1231.
    • (1985) International Journal of Production Research , vol.23 , Issue.6 , pp. 1217-1231
    • Huang, P.Y.1    Rees, L.P.2    Taylor, B.W.3
  • 44
    • 0032320279 scopus 로고    scopus 로고
    • Manufacturing lot-sizing under MRP II environment: An improved analytical model & a heuristic procedure
    • Kim, H.J. and Y.A. Hosni, 1998. Manufacturing lot-sizing under MRP II environment: An improved analytical model & a heuristic procedure. Computers Ind. Engng, 35(3-4): 423-426.
    • (1998) Computers Ind. Engng , vol.35 , Issue.3-4 , pp. 423-426
    • Kim, H.J.1    Hosni, Y.A.2
  • 45
    • 0001267220 scopus 로고
    • The strategic use of capacity slack in the economic lot scheduling problem with random demand
    • Bourland, K.E. and C.A. Yano, 1994. The strategic use of capacity slack in the economic lot scheduling problem with random demand. Management Science, 40(12): 1690-1704.
    • (1994) Management Science , vol.40 , Issue.12 , pp. 1690-1704
    • Bourland, K.E.1    Yano, C.A.2
  • 46
    • 0029734543 scopus 로고    scopus 로고
    • An investigation of alternative dampening procedures to cope with MRP system nervousness
    • Ho, C.J. and P.L. Carter, 1996. An investigation of alternative dampening procedures to cope with MRP system nervousness. International Journal of Production Research, 34(1): 137-156.
    • (1996) International Journal of Production Research , vol.34 , Issue.1 , pp. 137-156
    • Ho, C.J.1    Carter, P.L.2
  • 47
    • 0005461851 scopus 로고
    • MRP modelling via scenarios
    • T.A. Ciriani and R.C. Leachman, Editors, John Wiley and Sons
    • Escudero, L.F. and P.V. Kamesam, 1993. MRP modelling via scenarios, in Optimization in Industry, T.A. Ciriani and R.C. Leachman, Editors. 1993, John Wiley and Sons. 101-111.
    • (1993) Optimization in Industry , pp. 101-111
    • Escudero, L.F.1    Kamesam, P.V.2
  • 48
    • 0030086447 scopus 로고    scopus 로고
    • Adapting lot-sizing techniques to stochastic demand through production scheduling policy
    • Vargas, G.A. and R. Metters, 1996. Adapting lot-sizing techniques to stochastic demand through production scheduling policy. IIE Transactions, 28(2): 141-148.
    • (1996) IIE Transactions , vol.28 , Issue.2 , pp. 141-148
    • Vargas, G.A.1    Metters, R.2
  • 49
    • 0031069689 scopus 로고    scopus 로고
    • A stochastic linear programming approach to hierarchical production planning
    • Kira, D., M. Kusy, and I. Rakita, 1997. A stochastic linear programming approach to hierarchical production planning. Journal of Operations Research Society, 48: 07-211.
    • (1997) Journal of Operations Research Society , vol.48 , pp. 07-211
    • Kira, D.1    Kusy, M.2    Rakita, I.3
  • 50
    • 17444389311 scopus 로고    scopus 로고
    • Integration of uncertain and imprecise orders in the MRP method
    • Grabot, B., et al., 2005. Integration of uncertain and imprecise orders in the MRP method. Journal of Intelligent manufacturing, 16: 215-234.
    • (2005) Journal of Intelligent manufacturing , vol.16 , pp. 215-234
    • Grabot, B.1
  • 51
    • 27344448554 scopus 로고    scopus 로고
    • MRP with flexible constraints: A fuzzy mathematical programming approach
    • Mula, J., R. Poler, and J.P. Garcia, 2006. MRP with flexible constraints: A fuzzy mathematical programming approach. Fuzzy Sets and Systems, 157: 74-97.
    • (2006) Fuzzy Sets and Systems , vol.157 , pp. 74-97
    • Mula, J.1    Poler, R.2    Garcia, J.P.3
  • 52
    • 33750466515 scopus 로고    scopus 로고
    • Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions
    • Balakrishnan, J. and C.H. Cheng, 2007. Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions. European Journal of Operational Research, 177(1): 281-309.
    • (2007) European Journal of Operational Research , vol.177 , Issue.1 , pp. 281-309
    • Balakrishnan, J.1    Cheng, C.H.2
  • 53
    • 33846833792 scopus 로고    scopus 로고
    • Material Requirement Planning with fuzzy constraints and fuzzy coefficients
    • Mula, J., R. Poler, and J.P. Garcia-Sabater, 2007. Material Requirement Planning with fuzzy constraints and fuzzy coefficients. Fuzzy Sets and Systems, 158: 783-793.
    • (2007) Fuzzy Sets and Systems , vol.158 , pp. 783-793
    • Mula, J.1    Poler, R.2    Garcia-Sabater, J.P.3
  • 54
    • 49349083072 scopus 로고    scopus 로고
    • An agent based approach for integrating manufacturing operations
    • doi: 10.1016/j.ijpe. 10.013
    • Anosike, A.I. and D.Z. Zhang, 2007. An agent based approach for integrating manufacturing operations. International Journal of Production Economics, doi: 10.1016/j.ijpe. 10.013.
    • (2007) International Journal of Production Economics
    • Anosike, A.I.1    Zhang, D.Z.2
  • 55
    • 38349016573 scopus 로고    scopus 로고
    • Stability and optimality of a multi-product production and storage system under demand uncertainty
    • Arruda, E.F. and J.B.R. do Val, 2008. Stability and optimality of a multi-product production and storage system under demand uncertainty. European Journal of Operational Research, 188(2): 406-427.
    • (2008) European Journal of Operational Research , vol.188 , Issue.2 , pp. 406-427
    • Arruda, E.F.1    do Val, J.B.R.2
  • 56
    • 34548668647 scopus 로고    scopus 로고
    • Integrated inventory and inspection policies for stochastic demand
    • Ben-Daya, M. and S.M. Noman, 2008. Integrated inventory and inspection policies for stochastic demand. European Journal of Operational Research, 185(1): 159-169.
    • (2008) European Journal of Operational Research , vol.185 , Issue.1 , pp. 159-169
    • Ben-Daya, M.1    Noman, S.M.2
  • 57
    • 0032627275 scopus 로고    scopus 로고
    • A net present value to approach to safety stocks in a multi-level MRP system
    • Grubbstrom, R.W., 1999. A net present value to approach to safety stocks in a multi-level MRP system. International Journal of Production Economics, 59(1-3): 361-375.
    • (1999) International Journal of Production Economics , vol.59 , Issue.1-3 , pp. 361-375
    • Grubbstrom, R.W.1
  • 59
    • 84867954072 scopus 로고    scopus 로고
    • A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion under Uncertainty
    • Ahmed, S., A. KING, and G. PARIJA, 2003. A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion under Uncertainty. Journal of Global Optimization, 26: 3-24.
    • (2003) Journal of Global Optimization , vol.26 , pp. 3-24
    • Ahmed, S.1    KING, A.2    PARIJA, G.3
  • 60
    • 27544508424 scopus 로고    scopus 로고
    • A combinatorial manufacturing resource planning model for long-term CNC machining industry
    • Lan, C.H. and T.S. Lan, 2005. A combinatorial manufacturing resource planning model for long-term CNC machining industry. International Journal of Advanced Manufacturing Technology, 26: 1157-1162.
    • (2005) International Journal of Advanced Manufacturing Technology , vol.26 , pp. 1157-1162
    • Lan, C.H.1    Lan, T.S.2
  • 61
    • 33847296636 scopus 로고    scopus 로고
    • A robust optimization model for multi-site production planning problem in an uncertain environment
    • Leung, S.C.H., et al., 2007. A robust optimization model for multi-site production planning problem in an uncertain environment. European Journal of operational Research, 181: 224-238.
    • (2007) European Journal of operational Research , vol.181 , pp. 224-238
    • Leung, S.C.H.1
  • 63
  • 64
    • 0034175277 scopus 로고    scopus 로고
    • A review of techniques for buffering against uncertainty with MRP systems
    • Guide, V.D.R. and R. Srivastava, 2000. A review of techniques for buffering against uncertainty with MRP systems. Production Planning & Control, 11(3): 223-233.
    • (2000) Production Planning & Control , vol.11 , Issue.3 , pp. 223-233
    • Guide, V.D.R.1    Srivastava, R.2
  • 65
    • 33646384940 scopus 로고    scopus 로고
    • Product line design with component commonality and costreduction effort
    • Heese, H.S. and J.M. Swaminathan, 2006. 'Product line design with component commonality and costreduction effort. Manufacturing & Service Operations Management, 8(2): 206-219.
    • (2006) Manufacturing & Service Operations Management , vol.8 , Issue.2 , pp. 206-219
    • Heese, H.S.1    Swaminathan, J.M.2
  • 66
    • 0031069765 scopus 로고    scopus 로고
    • Heuristics, optimal, static, and dynamic schedules when processing times are uncertain
    • Lawrence, S.R. and E.C. Sewell, 1997. Heuristics, optimal, static, and dynamic schedules when processing times are uncertain. Journal of Operations Management, 15(1): 71-82.
    • (1997) Journal of Operations Management , vol.15 , Issue.1 , pp. 71-82
    • Lawrence, S.R.1    Sewell, E.C.2
  • 67
    • 0023327068 scopus 로고
    • Manufacturing strategy, environmental uncertainty and performance: A path analytic model
    • Swamidass, P.M. and W.T. Newell, 1987. Manufacturing strategy, environmental uncertainty and performance: a path analytic model. Management Science, 33(4): 509-524.
    • (1987) Management Science , vol.33 , Issue.4 , pp. 509-524
    • Swamidass, P.M.1    Newell, W.T.2
  • 68
    • 0031123532 scopus 로고    scopus 로고
    • Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
    • Molinder, A., 1997. Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system. International Journal of Production Research, 35(4): 983-994.
    • (1997) International Journal of Production Research , vol.35 , Issue.4 , pp. 983-994
    • Molinder, A.1
  • 69
    • 0002575987 scopus 로고    scopus 로고
    • Measuring uncertainties in MRP environments. Logistics Information Management
    • Koh, S.C.L., et al., 2000. Measuring uncertainties in MRP environments. Logistics Information Management: An International Journal, 13(3): 177-183.
    • (2000) An International Journal , vol.13 , Issue.3 , pp. 177-183
    • Koh, S.C.L.1
  • 70
    • 0000470092 scopus 로고
    • The impact of safety stock on schedule instability, cost and service
    • Sridharan, V. and R.L. LaForge, 1989. The impact of safety stock on schedule instability, cost and service. Journal of Operations Management, 8: 327-347.
    • (1989) Journal of Operations Management , vol.8 , pp. 327-347
    • Sridharan, V.1    LaForge, R.L.2
  • 71
    • 0028756018 scopus 로고
    • Safety stock versus safety lead-time in MRP controlled production systems
    • Buzacott, J.A. and J.G. Shanthikumar, 1994. Safety stock versus safety lead-time in MRP controlled production systems. Management Science, 40: 1678-1689.
    • (1994) Management Science , vol.40 , pp. 1678-1689
    • Buzacott, J.A.1    Shanthikumar, J.G.2
  • 74
    • 0033101952 scopus 로고    scopus 로고
    • A multiple-method study of environmental uncertainty and manufacturing flexibility
    • Pagell, M. and D.R. Krause, 1999. A multiple-method study of environmental uncertainty and manufacturing flexibility. Journal of Operations Management, 17(3): 307-325.
    • (1999) Journal of Operations Management , vol.17 , Issue.3 , pp. 307-325
    • Pagell, M.1    Krause, D.R.2
  • 75
    • 0036532654 scopus 로고    scopus 로고
    • MRP performance effects due to forecast bias and demand uncertainty
    • Enns, S.T., 2002. MRP performance effects due to forecast bias and demand uncertainty. European Journal of Operational Research, 138(1): 87-102.
    • (2002) European Journal of Operational Research , vol.138 , Issue.1 , pp. 87-102
    • Enns, S.T.1
  • 76
  • 77
    • 0004293209 scopus 로고    scopus 로고
    • Englewood Cliffs, NJ: Prentice hall
    • Moore, R.E., 1996. Interval Analysis. Englewood Cliffs, NJ: Prentice hall.
    • (1996) Interval Analysis
    • Moore, R.E.1
  • 80
    • 0031098319 scopus 로고    scopus 로고
    • Generalizing Interval Matrix Operations for Design
    • Chen, R. and A.C. Ward, 1997. Generalizing Interval Matrix Operations for Design. Journal of Mechanical Design, 119(1): 65-72.
    • (1997) Journal of Mechanical Design , vol.119 , Issue.1 , pp. 65-72
    • Chen, R.1    Ward, A.C.2
  • 81
    • 0345918863 scopus 로고    scopus 로고
    • Uncertainty model of the gradient constraint and quantitative reliability measures of optical flow
    • Kubota, S. and O. Hori, 1999. Uncertainty model of the gradient constraint and quantitative reliability measures of optical flow. Systems and Computers in Japan, 30(7): 9-19.
    • (1999) Systems and Computers in Japan , vol.30 , Issue.7 , pp. 9-19
    • Kubota, S.1    Hori, O.2
  • 82
    • 0036563578 scopus 로고    scopus 로고
    • Efficient Estimation of Structural Reliability for Problems with Uncertain Intervals
    • Penmetsa, R.C. and R.V. Grandhi, 2002. Efficient Estimation of Structural Reliability for Problems with Uncertain Intervals. Computers and Structures, 80(12): 1103-1112.
    • (2002) Computers and Structures , vol.80 , Issue.12 , pp. 1103-1112
    • Penmetsa, R.C.1    Grandhi, R.V.2
  • 83
    • 0026981981 scopus 로고
    • Convex Models for uncertain imperfection control in multimode dynamic buckling
    • Lindberg, H.E., 1992. Convex Models for uncertain imperfection control in multimode dynamic buckling. Journal of Applied Mechanics, 59(4): 937-945.
    • (1992) Journal of Applied Mechanics , vol.59 , Issue.4 , pp. 937-945
    • Lindberg, H.E.1
  • 84
    • 0028167365 scopus 로고
    • Non-probabilistic concept of reliability
    • Ben-Haim, Y., 1994. Non-probabilistic concept of reliability. Structural Safety, 14(4): 227-245.
    • (1994) Structural Safety , vol.14 , Issue.4 , pp. 227-245
    • Ben-Haim, Y.1
  • 86
    • 0006212175 scopus 로고    scopus 로고
    • Robust reliability of structures
    • Ben-Haim, Y., 1997. Robust reliability of structures. Advances in Applied Mechanics, 33(1): 1-40.
    • (1997) Advances in Applied Mechanics , vol.33 , Issue.1 , pp. 1-40
    • Ben-Haim, Y.1
  • 87
    • 0036495367 scopus 로고    scopus 로고
    • Uncertainty analysis in structural number determination in flexible pavement design- A convex model approach
    • Attoh-Okine, N.O., 2002. Uncertainty analysis in structural number determination in flexible pavement design- A convex model approach. Construction and Building Materials, 16(2): 67-71.
    • (2002) Construction and Building Materials , vol.16 , Issue.2 , pp. 67-71
    • Attoh-Okine, N.O.1
  • 91
    • 0002137289 scopus 로고
    • Engineering design calculations with fuzzy parameters
    • Wood, K.L., K.N. Otto, and E.K. Antonsson, 1992. Engineering design calculations with fuzzy parameters. Fuzzy Sets and Systems, 52(1): 1-20.
    • (1992) Fuzzy Sets and Systems , vol.52 , Issue.1 , pp. 1-20
    • Wood, K.L.1    Otto, K.N.2    Antonsson, E.K.3
  • 92
    • 0001829246 scopus 로고
    • Introduction to grey system theory
    • Deng, J., 1989. Introduction to grey system theory. Journal of Grey System, 1(1): 1-24.
    • (1989) Journal of Grey System , vol.1 , Issue.1 , pp. 1-24
    • Deng, J.1
  • 94
    • 0001044028 scopus 로고
    • Planning horizons for master production scheduling
    • Chung, C.H. and L.J. Krajewski, 1984. Planning horizons for master production scheduling. Journal of Operations Management, 4(4): 389-406.
    • (1984) Journal of Operations Management , vol.4 , Issue.4 , pp. 389-406
    • Chung, C.H.1    Krajewski, L.J.2
  • 95
    • 0035410522 scopus 로고    scopus 로고
    • Modelling practical lot-sizing problems as mixed integer programs
    • Belvaux, G. and L.A. Wolsey, 2001. Modelling practical lot-sizing problems as mixed integer programs. Management Science, 47(7): 993-1007.
    • (2001) Management Science , vol.47 , Issue.7 , pp. 993-1007
    • Belvaux, G.1    Wolsey, L.A.2
  • 96
    • 0036681925 scopus 로고    scopus 로고
    • A matrix formulation for integrating assembly trees and manufacturing resource planning with capacity constraints
    • Harris, B., F. Lewis, and D.J. Cook, 2002. A matrix formulation for integrating assembly trees and manufacturing resource planning with capacity constraints. Journal of Intelligent Manufacturing, 13: 239-252.
    • (2002) Journal of Intelligent Manufacturing , vol.13 , pp. 239-252
    • Harris, B.1    Lewis, F.2    Cook, D.J.3
  • 97
    • 3242739177 scopus 로고    scopus 로고
    • Multi-product capacity-constrained lot sizing with economic objectives
    • Choi, S. and S.T. Enns, 2004. Multi-product capacity-constrained lot sizing with economic objectives. International Journal of Production Economics, 91(1): 47-62.
    • (2004) International Journal of Production Economics , vol.91 , Issue.1 , pp. 47-62
    • Choi, S.1    Enns, S.T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.