메뉴 건너뛰기




Volumn 36, Issue 10, 2004, Pages 919-940

Agile workforce evaluation: A framework for cross-training and coordination

Author keywords

[No Author keywords available]

Indexed keywords

MATHEMATICAL MODELS; OPERATIONS RESEARCH; PERSONNEL RATING; PERSONNEL TRAINING; PRODUCTIVITY; STRATEGIC PLANNING;

EID: 4444342794     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1080/07408170490487759     Document Type: Article
Times cited : (241)

References (143)
  • 1
    • 0033332650 scopus 로고    scopus 로고
    • Optimal scheduling of a two-stage tandem queue with parallel servers
    • Ahn, H.-S., Duenyas, I. and Zhang, R.Q. (1999) Optimal scheduling of a two-stage tandem queue with parallel servers. Advances in Applied Probability, 31, 1095-1117.
    • (1999) Advances in Applied Probability , vol.31 , pp. 1095-1117
    • Ahn, H.-S.1    Duenyas, I.2    Zhang, R.Q.3
  • 3
    • 0035261938 scopus 로고    scopus 로고
    • Modeling a phone center: Analysis of a multichannel, multiresource processor shared loss system
    • Aksin, O.Z. and Harker, P.T. (2001) Modeling a phone center: analysis of a multichannel, multiresource processor shared loss system. Management Science, 47, 324-336.
    • (2001) Management Science , vol.47 , pp. 324-336
    • Aksin, O.Z.1    Harker, P.T.2
  • 5
    • 0035494143 scopus 로고    scopus 로고
    • Server assignment policies for maximizing the steady-state throughput of finite queueing systems
    • Andradottir, S., Ayhan, H. and Down, D.G. (2001) Server assignment policies for maximizing the steady-state throughput of finite queueing systems. Management Science, 47(10), 1421-1439.
    • (2001) Management Science , vol.47 , Issue.10 , pp. 1421-1439
    • Andradottir, S.1    Ayhan, H.2    Down, D.G.3
  • 6
    • 0025021555 scopus 로고
    • Learning curves in manufacturing
    • Argote, L. and Epple, D. (1990) Learning curves in manufacturing. Science, 247(4945), 920-924.
    • (1990) Science , vol.247 , Issue.4945 , pp. 920-924
    • Argote, L.1    Epple, D.2
  • 7
    • 0027660881 scopus 로고
    • A comparison of scheduling philosophies for manufacturing cells
    • Askin, R.G. and Iyer, A. (1993) A comparison of scheduling philosophies for manufacturing cells. European Journal of Operational Research, 69, 438-449.
    • (1993) European Journal of Operational Research , vol.69 , pp. 438-449
    • Askin, R.G.1    Iyer, A.2
  • 9
    • 0032000346 scopus 로고    scopus 로고
    • Comparison of manufacturing performance of three team structures in semiconductor plants
    • Bailey, D.E. (1998) Comparison of manufacturing performance of three team structures in semiconductor plants. IEEE Transactions on Engineering Management, 45(1), 20-32.
    • (1998) IEEE Transactions on Engineering Management , vol.45 , Issue.1 , pp. 20-32
    • Bailey, D.E.1
  • 10
    • 0030305477 scopus 로고    scopus 로고
    • Impact of work teams on manufacturing performance: A longitudinal study
    • Banker, R., Field, J., Schroeder, R., and Sinha, K. (1996) Impact of work teams on manufacturing performance: a longitudinal study. Academy of Management Journal, 39(4), 867-890.
    • (1996) Academy of Management Journal , vol.39 , Issue.4 , pp. 867-890
    • Banker, R.1    Field, J.2    Schroeder, R.3    Sinha, K.4
  • 11
    • 0009768363 scopus 로고    scopus 로고
    • Work-team implementation and trajectories of manufacturing quality: A longitudinal study
    • Banker, R., Field, J. and Sinha, K. (2001) Work-team implementation and trajectories of manufacturing quality: a longitudinal study. Manufacturing and Services Operations Management, 3(1), 25-42.
    • (2001) Manufacturing and Services Operations Management , vol.3 , Issue.1 , pp. 25-42
    • Banker, R.1    Field, J.2    Sinha, K.3
  • 12
    • 4444271717 scopus 로고    scopus 로고
    • Staff scheduling in high volume facilities with downgrading
    • Bard, J. (2004) Staff scheduling in high volume facilities with downgrading. IIE Transactions, 36(10), 985-997.
    • (2004) IIE Transactions , vol.36 , Issue.10 , pp. 985-997
    • Bard, J.1
  • 13
    • 0032631927 scopus 로고    scopus 로고
    • Dynamics of 2- and 3-worker 'bucket brigade' production lines
    • Bartholdi, J.J., Bunimovich, L.A. and Eisenstein, D.D. (1999) Dynamics of 2- and 3-worker 'bucket brigade' production lines. Operations Research, 47(13), 488-491.
    • (1999) Operations Research , vol.47 , Issue.13 , pp. 488-491
    • Bartholdi, J.J.1    Bunimovich, L.A.2    Eisenstein, D.D.3
  • 14
    • 0002622989 scopus 로고    scopus 로고
    • A production line that balances itself
    • Bartholdi, J.J. and Eisenstein, D.D. (1996) A production line that balances itself. Operations Research, 44(1), 21-34.
    • (1996) Operations Research , vol.44 , Issue.1 , pp. 21-34
    • Bartholdi, J.J.1    Eisenstein, D.D.2
  • 15
    • 0035460936 scopus 로고    scopus 로고
    • Performance of bucket brigades when work is stochastic
    • Bartholdi, J.J., Eisenstein, D.D. and Foley, R.D. (2001) Performance of bucket brigades when work is stochastic. Operations Research, 49(5), 710-719.
    • (2001) Operations Research , vol.49 , Issue.5 , pp. 710-719
    • Bartholdi, J.J.1    Eisenstein, D.D.2    Foley, R.D.3
  • 16
    • 0032118272 scopus 로고    scopus 로고
    • A dynamic programming based algorithm for the crew scheduling problem
    • Beasley, J.E. and Cao, B. (1998) A dynamic programming based algorithm for the crew scheduling problem. Computers & Operations Research, 25(7/8), 567-582.
    • (1998) Computers and Operations Research , vol.25 , Issue.7-8 , pp. 567-582
    • Beasley, J.E.1    Cao, B.2
  • 17
    • 0003373617 scopus 로고    scopus 로고
    • Modeling and analysis of machine sharing in manufacturing systems
    • Benjaafar, S. (1996) Modeling and analysis of machine sharing in manufacturing systems. European Journal of Operations Research, 91, 56-73.
    • (1996) European Journal of Operations Research , vol.91 , pp. 56-73
    • Benjaafar, S.1
  • 18
    • 0032070542 scopus 로고    scopus 로고
    • Scope versus focus: Issues of flexibility, capacity, and number of production facilities
    • Benjaafar, S. and Gupta, D. (1998) Scope versus focus: issues of flexibility, capacity, and number of production facilities. IIE Transactions, 30, 415-425.
    • (1998) IIE Transactions , vol.30 , pp. 415-425
    • Benjaafar, S.1    Gupta, D.2
  • 19
    • 0031070705 scopus 로고    scopus 로고
    • Scheduling workforce and workflow in a high volume factory
    • Berman, O., Larson, R. and Pinker, E. (1997) Scheduling workforce and workflow in a high volume factory. Management Science, 43(2), 158-172.
    • (1997) Management Science , vol.43 , Issue.2 , pp. 158-172
    • Berman, O.1    Larson, R.2    Pinker, E.3
  • 20
    • 38249026923 scopus 로고
    • Islands, archipelagoes and continents: Progress on the road to computer-integrated manufacturing
    • Bessant, J. and Haywood, B. (1988) Islands, archipelagoes and continents: progress on the road to computer-integrated manufacturing. Research Policy, 17, 349-362.
    • (1988) Research Policy , vol.17 , pp. 349-362
    • Bessant, J.1    Haywood, B.2
  • 21
    • 0033116330 scopus 로고    scopus 로고
    • Integer programming to schedule a hierarchical workforce with variable demands
    • Billionnet, A. (1999) Integer programming to schedule a hierarchical workforce with variable demands. European Journal of Operational Research, 114(1), 105-114.
    • (1999) European Journal of Operational Research , vol.114 , Issue.1 , pp. 105-114
    • Billionnet, A.1
  • 22
    • 0030247852 scopus 로고    scopus 로고
    • Performance of a manufacturing module with moving workers
    • Bischak, D.P. (1996) Performance of a manufacturing module with moving workers. IIE Transactions, 28, 723-733.
    • (1996) IIE Transactions , vol.28 , pp. 723-733
    • Bischak, D.P.1
  • 25
    • 0013054392 scopus 로고    scopus 로고
    • Human resource planning in knowledge-intensive operations: A model for learning with stochastic turnover
    • Bordoloi, S.K. and Matsuo, H. (2001) Human resource planning in knowledge-intensive operations: a model for learning with stochastic turnover. European Journal of Operational Research, 130, 169-189.
    • (2001) European Journal of Operational Research , vol.130 , pp. 169-189
    • Bordoloi, S.K.1    Matsuo, H.2
  • 27
    • 0032389620 scopus 로고    scopus 로고
    • Staffng a multiskilled workforce with varying levels of productivity: An analysis of cross-training policies
    • Brusco, M.J. and Johns, T.R. (1998) Staffng a multiskilled workforce with varying levels of productivity: an analysis of cross-training policies. Decision Sciences, 29(2), 499-515.
    • (1998) Decision Sciences , vol.29 , Issue.2 , pp. 499-515
    • Brusco, M.J.1    Johns, T.R.2
  • 28
    • 0036642645 scopus 로고    scopus 로고
    • The impact of worker differences on production system output
    • Buzacott, J.A. (2002) The impact of worker differences on production system output. International Journal of Production Economics, 78, 37-44.
    • (2002) International Journal of Production Economics , vol.78 , pp. 37-44
    • Buzacott, J.A.1
  • 29
    • 4043167183 scopus 로고    scopus 로고
    • Modelling teams and workgroups in manufacturing
    • Buzacott, J.A. Modelling teams and workgroups in manufacturing. Annals of Operations Research 126(1-4), 215-230.
    • Annals of Operations Research , vol.126 , Issue.1-4 , pp. 215-230
    • Buzacott, J.A.1
  • 30
    • 0032656506 scopus 로고    scopus 로고
    • Cross-utilization of workers whose capabilities differ
    • Campbell, G.M. (1999) Cross-utilization of workers whose capabilities differ. Management Science, 45(5), 722-732.
    • (1999) Management Science , vol.45 , Issue.5 , pp. 722-732
    • Campbell, G.M.1
  • 32
    • 0031621882 scopus 로고    scopus 로고
    • A study on the measurement of comprehensive flexibility in manufacturing systems
    • Choi, S.-H. and Kim, J.-S. (1998) A study on the measurement of comprehensive flexibility in manufacturing systems. Computers in Industrial Engineering, 34(1), 103-118.
    • (1998) Computers in Industrial Engineering , vol.34 , Issue.1 , pp. 103-118
    • Choi, S.-H.1    Kim, J.-S.2
  • 34
    • 0032210281 scopus 로고    scopus 로고
    • Crew scheduling of light rail transit in Hong Kong: From modeling to implementation
    • Chu, S. and Chan, E. (1998) Crew scheduling of light rail transit in Hong Kong: from modeling to implementation. Computers & Operations Research, 25(11), 887-894.
    • (1998) Computers and Operations Research , vol.25 , Issue.11 , pp. 887-894
    • Chu, S.1    Chan, E.2
  • 39
    • 0001691215 scopus 로고    scopus 로고
    • Scheduling parallel manufacturing cells with resource flexibility
    • Daniels, R.L., Hoopes, B.J. and Mazzola, J.B. (1996) Scheduling parallel manufacturing cells with resource flexibility. Management Science, 42, 1260-1276.
    • (1996) Management Science , vol.42 , pp. 1260-1276
    • Daniels, R.L.1    Hoopes, B.J.2    Mazzola, J.B.3
  • 40
    • 0028424243 scopus 로고
    • Flow shop scheduling with resource flexibility
    • Daniels, R.L. and Mazzola, J.B. (1994) Flow shop scheduling with resource flexibility. Operations Research, 42, 504-522.
    • (1994) Operations Research , vol.42 , pp. 504-522
    • Daniels, R.L.1    Mazzola, J.B.2
  • 45
    • 0346202532 scopus 로고    scopus 로고
    • From human resource strategy to organizational effectiveness: Lessons from research on organizational agility
    • Wright, P.M., Dyer, L.D., Boudreau, J.W. and Milkovich, G.T. (eds.), JAI Press, Inc., Greenwich, CT
    • Dyer, L. and Shafer, R.A. (1998) From human resource strategy to organizational effectiveness: lessons from research on organizational agility, in Research in Personnel and Human Resource Management. Wright, P.M., Dyer, L.D., Boudreau, J.W. and Milkovich, G.T. (eds.), JAI Press, Inc., Greenwich, CT, pp. 145-174.
    • (1998) Research in Personnel and Human Resource Management , pp. 145-174
    • Dyer, L.1    Shafer, R.A.2
  • 46
    • 0023978708 scopus 로고
    • A discrete time average cost flexible manufacturing and operator scheduling model solved by deconvexification over time
    • Eaves, B.C. and Rothblum, U.G. (1988) A discrete time average cost flexible manufacturing and operator scheduling model solved by deconvexification over time. Operations Research, 36(2), 242-257.
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 242-257
    • Eaves, B.C.1    Rothblum, U.G.2
  • 47
    • 0026163585 scopus 로고
    • Off-day scheduling with hierarchical worker categories
    • Emmons, H. and Burns, R.N. (1991) Off-day scheduling with hierarchical worker categories. Operations Research, 39, 484-495.
    • (1991) Operations Research , vol.39 , pp. 484-495
    • Emmons, H.1    Burns, R.N.2
  • 49
    • 0027649194 scopus 로고
    • Optimal use of an extra server in a two station tandem queueing network
    • Farrar, T.M. (1993) Optimal use of an extra server in a two station tandem queueing network. IEEE Transactions on Automatic Control, 38, 1296-1299.
    • (1993) IEEE Transactions on Automatic Control , vol.38 , pp. 1296-1299
    • Farrar, T.M.1
  • 50
    • 0026837187 scopus 로고
    • Vehicle crew scheduling to complete specific tasks and bulk-tasks at depots
    • Ferland, J.A. and Taillefer, S. (1992) Vehicle crew scheduling to complete specific tasks and bulk-tasks at depots. European Journal of Operational Research, 57(3), 316-322.
    • (1992) European Journal of Operational Research , vol.57 , Issue.3 , pp. 316-322
    • Ferland, J.A.1    Taillefer, S.2
  • 52
    • 0345250108 scopus 로고
    • The case for employee versatility
    • Foegen, J.H. (1993) The case for employee versatility. Business Economics Review, 39(3), 30-31.
    • (1993) Business Economics Review , vol.39 , Issue.3 , pp. 30-31
    • Foegen, J.H.1
  • 53
  • 55
    • 0036778653 scopus 로고    scopus 로고
    • Factors affecting opportunity of worksharing as a dynamic line balancing mechanism
    • Gel, E.G.S., Hopp, W.J. and Van Oyen, M.P. (2002) Factors affecting opportunity of worksharing as a dynamic line balancing mechanism. IIE Transactions, 34, 847-863.
    • (2002) IIE Transactions , vol.34 , pp. 847-863
    • Gel, E.G.S.1    Hopp, W.J.2    Van Oyen, M.P.3
  • 56
    • 0347463880 scopus 로고    scopus 로고
    • Cross training can be a win-win plan
    • Gill, B. (1997) Cross training can be a win-win plan. American Printer 220(1), 88.
    • (1997) American Printer , vol.220 , Issue.1 , pp. 88
    • Gill, B.1
  • 57
    • 84936823659 scopus 로고
    • Groups in context: A model of task group effectiveness
    • Gladstein, D.L. (1984) Groups in context: a model of task group effectiveness. Administrative Science Quarterly, 29(4), 449-517.
    • (1984) Administrative Science Quarterly , vol.29 , Issue.4 , pp. 449-517
    • Gladstein, D.L.1
  • 59
    • 0042279736 scopus 로고    scopus 로고
    • Queueing theory in manufacturing: A survey
    • Govil, M.K. and Fu, M.C. (1999) Queueing theory in manufacturing: a survey. Journal of Manufacturing Systems, 18(3), 214-240.
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.3 , pp. 214-240
    • Govil, M.K.1    Fu, M.C.2
  • 61
    • 0042266799 scopus 로고    scopus 로고
    • Process flexibility in supply chains
    • Working paper, Massachusetts Institute of Technology, Boston, MA
    • Graves, S.C. and Tomlin, B.T. (2003) Process flexibility in supply chains. Working paper, Massachusetts Institute of Technology, Boston, MA. Management Science, 89(7), 907-919.
    • (2003) Management Science , vol.89 , Issue.7 , pp. 907-919
    • Graves, S.C.1    Tomlin, B.T.2
  • 63
    • 0000657260 scopus 로고
    • Effects of changes in job characteristics on work attitudes and behaviors: A naturally occurring quasi-experiment
    • Hackman, J.R. (1978) Effects of changes in job characteristics on work attitudes and behaviors: a naturally occurring quasi-experiment. Organizational Behavior and Human Performance, 21(3), 289-304.
    • (1978) Organizational Behavior and Human Performance , vol.21 , Issue.3 , pp. 289-304
    • Hackman, J.R.1
  • 66
    • 0016985083 scopus 로고
    • Heuristic methods for telephone operator shift scheduling: An experimental analysis
    • Henderson, W.B. (1976) Heuristic methods for telephone operator shift scheduling: an experimental analysis. Management Science, 22, 1372-1380.
    • (1976) Management Science , vol.22 , pp. 1372-1380
    • Henderson, W.B.1
  • 68
    • 0027614308 scopus 로고
    • Solving airline crew scheduling problems by branch-and-cut
    • Hoffman, K.L. and Padberg, M. (1993) Solving airline crew scheduling problems by branch-and-cut. Management Science, 39(6), 657-682.
    • (1993) Management Science , vol.39 , Issue.6 , pp. 657-682
    • Hoffman, K.L.1    Padberg, M.2
  • 69
    • 0001568634 scopus 로고
    • The firm as an incentive system
    • Holstrom, B. and Milgrom, P. (1994) The firm as an incentive system. American Economic Review, 84(4), 972-991.
    • (1994) American Economic Review , vol.84 , Issue.4 , pp. 972-991
    • Holstrom, B.1    Milgrom, P.2
  • 72
    • 1242309349 scopus 로고    scopus 로고
    • Benefits of skill chaining in production lines with cross-trained workers
    • Hopp W.J.,Tekin E.,Van Oyen M.R. in production lines with cross-trained workers. Management Science, 50(1), 83-98.
    • (2004) Management Science , vol.50 , Issue.1 , pp. 83-98
    • Hopp, W.J.1    Tekin, E.2    Van Oyen, M.R.3
  • 74
    • 0002820840 scopus 로고
    • Individual differences in output variability as a function of job complexity
    • Hunter, J.E., Schmidt, F.L. and Judiesch, M.K. (1990) Individual differences in output variability as a function of job complexity. Journal of Applied Psychology, 75(1), 28-42.
    • (1990) Journal of Applied Psychology , vol.75 , Issue.1 , pp. 28-42
    • Hunter, J.E.1    Schmidt, F.L.2    Judiesch, M.K.3
  • 75
    • 0032638987 scopus 로고    scopus 로고
    • The effects of human resource management systems on economic performance: An international comparison of U.S. and Japanese plants
    • Ichniowski, C. and Shaw, K. (1999) The effects of human resource management systems on economic performance: an international comparison of U.S. and Japanese plants. Management Science, 45(5), 704-721.
    • (1999) Management Science , vol.45 , Issue.5 , pp. 704-721
    • Ichniowski, C.1    Shaw, K.2
  • 77
    • 0031314299 scopus 로고    scopus 로고
    • A two-stage tandem queue attended by a moving server with holding and switching costs
    • Iravani, S.M.R., Posner, M.J.M. and Buzacott, J.A. (1997a) A two-stage tandem queue attended by a moving server with holding and switching costs. Queueing Systems, 46, 203-228.
    • (1997) Queueing Systems , vol.46 , pp. 203-228
    • Iravani, S.M.R.1    Posner, M.J.M.2    Buzacott, J.A.3
  • 80
    • 0032361513 scopus 로고    scopus 로고
    • A general framework for operating policies in manufacturing cells
    • Iyer, A. and Askin, R.G. (1998) A general framework for operating policies in manufacturing cells. Annals of Operations Research, 77, 23-50.
    • (1998) Annals of Operations Research , vol.77 , pp. 23-50
    • Iyer, A.1    Askin, R.G.2
  • 81
    • 0029290411 scopus 로고
    • Principles on the benefits of manufacturing process flexibility
    • Jordan, W.C. and Graves, S.C. (1995) Principles on the benefits of manufacturing process flexibility. Management Science, 41(4), 577-594.
    • (1995) Management Science , vol.41 , Issue.4 , pp. 577-594
    • Jordan, W.C.1    Graves, S.C.2
  • 82
    • 4444361696 scopus 로고    scopus 로고
    • Chained cross-training of workers for robust performance
    • Jordan, W., Inman, R. and Blumenfeld, D. (2004) Chained cross-training of workers for robust performance. IIE Transactions, 36.
    • (2004) IIE Transactions , vol.36
    • Jordan, W.1    Inman, R.2    Blumenfeld, D.3
  • 84
    • 0033999129 scopus 로고    scopus 로고
    • Examination of worker assignment and dispatching rules for managing vital customer priorities in dual resource constrained job shop environments
    • Kher, H.V. (2000) Examination of worker assignment and dispatching rules for managing vital customer priorities in dual resource constrained job shop environments. Computers & Operations Research, 27, 525-537.
    • (2000) Computers and Operations Research , vol.27 , pp. 525-537
    • Kher, H.V.1
  • 85
    • 0035633724 scopus 로고    scopus 로고
    • The relationship of team goals, incentives, and efficacy to strategic risk, tactical implementation, and performance
    • Knight, D., Curham, C. and Locke, E.A. (2001) The relationship of team goals, incentives, and efficacy to strategic risk, tactical implementation, and performance. Academy of Management Journal, 44(2), 326-338.
    • (2001) Academy of Management Journal , vol.44 , Issue.2 , pp. 326-338
    • Knight, D.1    Curham, C.2    Locke, E.A.3
  • 86
    • 0008425434 scopus 로고    scopus 로고
    • The current transition in industrial capitalism
    • Knudsen, D.C. (ed.), Kluwer, Boston, MA
    • Knudsen, D.C. and Boggs, J.S. (1996) The current transition in industrial capitalism, in The Transition to Flexibility, Knudsen, D.C. (ed.), Kluwer, Boston, MA. pp. 1-14.
    • (1996) The Transition to Flexibility , pp. 1-14
    • Knudsen, D.C.1    Boggs, J.S.2
  • 87
    • 4444296392 scopus 로고    scopus 로고
    • Estimating job waiting times in production systems with cross-trained setup crews
    • Kula, U., Duenyas, I. and Iravani, S.M.R. (2004) Estimating job waiting times in production systems with cross-trained setup crews. IIE Transactions, 36.
    • (2004) IIE Transactions , vol.36
    • Kula, U.1    Duenyas, I.2    Iravani, S.M.R.3
  • 88
    • 0000074483 scopus 로고
    • Compensation plans for single and multiproduct salesforces: An application of the Holmstrom-Milgrom model
    • Lal, R. and Srinivasan, V. (1993) Compensation plans for single and multiproduct salesforces: an application of the Holmstrom-Milgrom model. Management Science, 39, 777-793.
    • (1993) Management Science , vol.39 , pp. 777-793
    • Lal, R.1    Srinivasan, V.2
  • 89
    • 0031193169 scopus 로고    scopus 로고
    • Workforce planning in mixed model assembly systems
    • Lee, C.Y. and Vairaktarakis, G.L. (1997) Workforce planning in mixed model assembly systems. Operations Research, 45(4), 553-567.
    • (1997) Operations Research , vol.45 , Issue.4 , pp. 553-567
    • Lee, C.Y.1    Vairaktarakis, G.L.2
  • 90
    • 2942671491 scopus 로고    scopus 로고
    • Technology, competitiveness, and flexibility: Constantly evolving concepts
    • Knudsen, D.C. (ed.), Kluwer, Boston, MA
    • Malecki, E.J. (1996) Technology, competitiveness, and flexibility: constantly evolving concepts, in The Transition to Flexibility, Knudsen, D.C. (ed.), Kluwer, Boston, MA, pp. 15-32.
    • (1996) The Transition to Flexibility , pp. 15-32
    • Malecki, E.J.1
  • 91
  • 95
    • 0035435960 scopus 로고    scopus 로고
    • Contingent labor contracting under demand and supply uncertainty
    • Milner, J. and Pinker, E. (2001) Contingent labor contracting under demand and supply uncertainty. Management Science, 47(8), 1046-1062.
    • (2001) Management Science , vol.47 , Issue.8 , pp. 1046-1062
    • Milner, J.1    Pinker, E.2
  • 96
    • 4444384135 scopus 로고    scopus 로고
    • Salesforce design with experience-based learning
    • Misra, S., Pinker, E. and Shumsky, R. (2004) Salesforce design with experience-based learning. IIE Transactions, 36.
    • (2004) IIE Transactions , vol.36
    • Misra, S.1    Pinker, E.2    Shumsky, R.3
  • 97
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press, Norcross, GA
    • Monden, Y. (1984) Toyota Production System, Industrial Engineering and Management Press, Norcross, GA.
    • (1984) Toyota Production System
    • Monden, Y.1
  • 98
    • 0033873325 scopus 로고    scopus 로고
    • An algorithm for multiple shift scheduling of hierarchical workforce on four-day and three-day workweeks
    • Narasimhan, R. (2000) An algorithm for multiple shift scheduling of hierarchical workforce on four-day and three-day workweeks. INFOR, 38(1), 14-32.
    • (2000) INFOR , vol.38 , Issue.1 , pp. 14-32
    • Narasimhan, R.1
  • 99
    • 0033804923 scopus 로고    scopus 로고
    • The effects of task complexity and experience on learning and forgetting: A field study
    • Nembhard, D.A. (2000) The effects of task complexity and experience on learning and forgetting: a field study. Human Factors, 42, 272-286.
    • (2000) Human Factors , vol.42 , pp. 272-286
    • Nembhard, D.A.1
  • 100
    • 0035878031 scopus 로고    scopus 로고
    • Heuristic approach for assigning workers to tasks based on individual learning rates
    • Nembhard, D.A. (2001) Heuristic approach for assigning workers to tasks based on individual learning rates. International Journal of Production Research, 39(9), 1955-1968.
    • (2001) International Journal of Production Research , vol.39 , Issue.9 , pp. 1955-1968
    • Nembhard, D.A.1
  • 105
  • 106
    • 4444312908 scopus 로고
    • Transit crew scheduling on a personal workstation (MS/DOS)
    • Paixao, J. (1991) Transit crew scheduling on a personal workstation (MS/DOS). Operational Research '90, 18(6), 421-432.
    • (1991) Operational Research '90 , vol.18 , Issue.6 , pp. 421-432
    • Paixao, J.1
  • 108
    • 0008824985 scopus 로고
    • Stochastic shop scheduling: A survey
    • Dempster, M. et al. (eds.), Reidel, Dordrecht, Holland
    • Pinedo, M. and Schrage, L. (1982) Stochastic shop scheduling: a survey, in Deterministic and Stochastic Scheduling, Dempster, M. et al. (eds.), Reidel, Dordrecht, Holland.
    • (1982) Deterministic and Stochastic Scheduling
    • Pinedo, M.1    Schrage, L.2
  • 113
    • 0001168340 scopus 로고
    • Compensating heterogeneous salesforces - Some explicit solutions
    • Rao, R. (1990) Compensating heterogeneous salesforces - some explicit solutions. Marketing Science, 9(4), 319-341.
    • (1990) Marketing Science , vol.9 , Issue.4 , pp. 319-341
    • Rao, R.1
  • 115
    • 84985417836 scopus 로고
    • Volvo human-centred work organization - The end of the road?
    • Sandberg, A. (1993) Volvo human-centred work organization - the end of the road? New Technology, Work, and Employment, 8(2), 83-87.
    • (1993) New Technology, Work, and Employment , vol.8 , Issue.2 , pp. 83-87
    • Sandberg, A.1
  • 120
    • 0035704628 scopus 로고    scopus 로고
    • The effects of worker learning, forgetting, and heterogeneity on assembly line productivity
    • Shafer, S.M., Nembhard, D.A. and Uzumeri, M.V. (2001) The effects of worker learning, forgetting, and heterogeneity on assembly line productivity. Management Science, 47(12), 1639-1653.
    • (2001) Management Science , vol.47 , Issue.12 , pp. 1639-1653
    • Shafer, S.M.1    Nembhard, D.A.2    Uzumeri, M.V.3
  • 122
    • 0026904878 scopus 로고
    • Workforce staffing and scheduling: Hospital nursing specific models
    • Siferd, S.R and Benton, W.C. (1992) Workforce staffing and scheduling: hospital nursing specific models. European Journal of Operational Research, 60(3), 233-246.
    • (1992) European Journal of Operational Research , vol.60 , Issue.3 , pp. 233-246
    • Siferd, S.R.1    Benton, W.C.2
  • 123
    • 0023791063 scopus 로고
    • A bus crew scheduling system using a set covering formulation
    • Smith, B.M. and Wren, A. (1988) A bus crew scheduling system using a set covering formulation. Transportation Research, 22A(2), 97-108.
    • (1988) Transportation Research , vol.22 A , Issue.2 , pp. 97-108
    • Smith, B.M.1    Wren, A.2
  • 124
    • 0019438118 scopus 로고
    • Resource sharing for efficiency in traffic systems
    • Smith, D.R. and Whitt, W. (1981) Resource sharing for efficiency in traffic systems. Bell System Technical JournaL 60(1), 39-55.
    • (1981) Bell System Technical Journal , vol.60 , Issue.1 , pp. 39-55
    • Smith, D.R.1    Whitt, W.2
  • 125
    • 0023348319 scopus 로고
    • The impact of worker forgetting on production scheduling
    • Smunt, T.L. (1987) The impact of worker forgetting on production scheduling. International Journal of Production Research, 25, 689-701.
    • (1987) International Journal of Production Research , vol.25 , pp. 689-701
    • Smunt, T.L.1
  • 126
    • 0002623534 scopus 로고    scopus 로고
    • Decoding the DNA of the Toyota production system
    • September-October
    • Spear, S. and Bowen, K. (1999) Decoding the DNA of the Toyota production system. Harvard Business Review, September-October, 77(5), 96-106.
    • (1999) Harvard Business Review , vol.77 , Issue.5 , pp. 96-106
    • Spear, S.1    Bowen, K.2
  • 127
    • 34250111322 scopus 로고
    • Design, planning, scheduling, and control problems of flexible manufacturing systems
    • Stecke, K.E. (1985) Design, planning, scheduling, and control problems of flexible manufacturing systems. Annals of Operations Research, 3, 1-13.
    • (1985) Annals of Operations Research , vol.3 , pp. 1-13
    • Stecke, K.E.1
  • 128
    • 0039824512 scopus 로고    scopus 로고
    • Making call-center voices smile: A business case for better training
    • April
    • Stuller, J. (1999) Making call-center voices smile: a business case for better training. Training, April, 26-32.
    • (1999) Training , pp. 26-32
    • Stuller, J.1
  • 129
    • 4444219653 scopus 로고    scopus 로고
    • Workforce agility through employee involvement
    • Sumukadas, N. and Sawhney, R. (2002) Workforce agility through employee involvement. IIE Transations, 36(10), 1011-1021.
    • (2002) IIE Transations , vol.36 , Issue.10 , pp. 1011-1021
    • Sumukadas, N.1    Sawhney, R.2
  • 131
    • 0024731874 scopus 로고
    • A review of the dual resource constrained system research
    • Treleven, M. (1989) A review of the dual resource constrained system research. IIE Transactions, 21(3), 279-287.
    • (1989) IIE Transactions , vol.21 , Issue.3 , pp. 279-287
    • Treleven, M.1
  • 132
    • 0016951543 scopus 로고
    • A branch and bound algorithm for optimum allocation of float nurses
    • Trivedi, V.M. and Warner, D.M. (1976) A branch and bound algorithm for optimum allocation of float nurses. Management Science, 22(9), 972-981.
    • (1976) Management Science , vol.22 , Issue.9 , pp. 972-981
    • Trivedi, V.M.1    Warner, D.M.2
  • 133
    • 84968118669 scopus 로고
    • The management of manufacturing flexibility
    • Upton, D.M. (1994) The management of manufacturing flexibility. California Management Review, 36(2), 72-89.
    • (1994) California Management Review , vol.36 , Issue.2 , pp. 72-89
    • Upton, D.M.1
  • 134
    • 0002875223 scopus 로고
    • What really makes factories flexible?
    • Jul.-Aug
    • Upton, D.M. (1995) What really makes factories flexible? Harvard Business Review, Jul.-Aug., 73(4), 74-84.
    • (1995) Harvard Business Review , vol.73 , Issue.4 , pp. 74-84
    • Upton, D.M.1
  • 136
    • 0032136536 scopus 로고    scopus 로고
    • Investment strategies for flexible resources
    • Van Mieghem, J.A. (1998) Investment strategies for flexible resources. Management Science, 44(8), 1071-1078.
    • (1998) Management Science , vol.44 , Issue.8 , pp. 1071-1078
    • Van Mieghem, J.A.1
  • 137
    • 0035452548 scopus 로고    scopus 로고
    • Performance opportunity for workforce agility in collaborative and non-collaborative work systems
    • Van Oyen, M.P., Gel, E.G.S. and Hopp, W.J. (2001) Performance opportunity for workforce agility in collaborative and non-collaborative work systems. IIE Transactions, 33(9), 761-777.
    • (2001) IIE Transactions , vol.33 , Issue.9 , pp. 761-777
    • Van Oyen, M.P.1    Gel, E.G.S.2    Hopp, W.J.3
  • 139
    • 0031081949 scopus 로고    scopus 로고
    • Incentives and cooperation: The joint effects of task and reward interdependence on group performance
    • Wageman, R. and Baker, G. (1997) Incentives and cooperation: the joint effects of task and reward interdependence on group performance. Journal of Organizational Behavior, 18(2), 139-158.
    • (1997) Journal of Organizational Behavior , vol.18 , Issue.2 , pp. 139-158
    • Wageman, R.1    Baker, G.2
  • 140
    • 0008861641 scopus 로고
    • Multiserver stochastic scheduling
    • M. Dempster et al. (eds.), Reidel, Dordrecht, Holland
    • Weiss, G. (1982) Multiserver stochastic scheduling, in M. Dempster et al. (eds.), Deterministic and Stochastic Scheduling, Reidel, Dordrecht, Holland, 157-177.
    • (1982) Deterministic and Stochastic Scheduling , pp. 157-177
    • Weiss, G.1
  • 143
    • 0000906215 scopus 로고    scopus 로고
    • Self-buffering, self-balancing, self-flushing production lines
    • Zavadlav, E., McClain, J.O. and Thomas, L.J. (1996) Self-buffering, self-balancing, self-flushing production lines. Management Science, 42(8), 1151-1164.
    • (1996) Management Science , vol.42 , Issue.8 , pp. 1151-1164
    • Zavadlav, E.1    McClain, J.O.2    Thomas, L.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.