메뉴 건너뛰기




Volumn 77, Issue , 1998, Pages 23-50

A general framework for comparing operating policies in manufacturing cells

Author keywords

Cellular manufacturing; Labor allocation rules; Operating protocols; Scheduling

Indexed keywords


EID: 0032361513     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1023/a:1018929512306     Document Type: Article
Times cited : (6)

References (28)
  • 1
    • 0027660881 scopus 로고
    • A comparison of scheduling philosophies for manufacturing cells
    • R.G. Askin and A. Iyer, A comparison of scheduling philosophies for manufacturing cells, European Journal of Operationsal Research 69(1993)438-449.
    • (1993) European Journal of Operationsal Research , vol.69 , pp. 438-449
    • Askin, R.G.1    Iyer, A.2
  • 5
    • 0039567088 scopus 로고
    • Technical Report, Georgia Institute of Technology, School of Industrial and Systems Engineering
    • J.J. Bartholdi III and D.D. Eisenstein, A production line that balances itself, Technical Report, Georgia Institute of Technology, School of Industrial and Systems Engineering, 1993.
    • (1993) A Production Line That Balances Itself
    • Bartholdi J.J. III1    Eisenstein, D.D.2
  • 6
    • 77957054549 scopus 로고
    • Machine sharing in cellular manufacturing systems
    • A.K. Kamrani, H.R. Parsaei and D.H. Liles, eds., Elsevier Science
    • S. Benjaafar, Machine sharing in cellular manufacturing systems, in: Planning, Design and Analysis of Cellular Manufacturing Systems, A.K. Kamrani, H.R. Parsaei and D.H. Liles, eds., Elsevier Science, 1995, pp. 203-228.
    • (1995) Planning, Design and Analysis of Cellular Manufacturing Systems , pp. 203-228
    • Benjaafar, S.1
  • 10
    • 0016520260 scopus 로고
    • GERTS QR: A model for multi-resource constrained queueing systems: Part I
    • G.L. Hogg, D.T. Phillips, M.J. Maggard and W.O. Lesso, GERTS QR: A model for multi-resource constrained queueing systems: Part I, AIIE Transactions 7(1975)89-99.
    • (1975) AIIE Transactions , vol.7 , pp. 89-99
    • Hogg, G.L.1    Phillips, D.T.2    Maggard, M.J.3    Lesso, W.O.4
  • 11
    • 0016522285 scopus 로고
    • GERTS QR: A model for multi-resource constrained queueing systems: Part II: An analysis of parallel-channel dual-resource constrained queueing systems with homogeneous resources
    • G.L. Hogg, D.T. Phillips, M.J. Maggard and W.O. Lesso, GERTS QR: A model for multi-resource constrained queueing systems: Part II: An analysis of parallel-channel dual-resource constrained queueing systems with homogeneous resources, AIIE Transactions 7(1975)100-109.
    • (1975) AIIE Transactions , vol.7 , pp. 100-109
    • Hogg, G.L.1    Phillips, D.T.2    Maggard, M.J.3    Lesso, W.O.4
  • 12
    • 0021170438 scopus 로고
    • Workload versus scheduling policies in a dual resource constrained job shop
    • P.Y. Huang, L.J. Moore and R.S. Russell, Workload versus scheduling policies in a dual resource constrained job shop, Computers and Operations Research 11(1984)37-48.
    • (1984) Computers and Operations Research , vol.11 , pp. 37-48
    • Huang, P.Y.1    Moore, L.J.2    Russell, R.S.3
  • 14
    • 0018991743 scopus 로고
    • Machine component grouping in production flow analysis: An approach using a rank ordering clustering algorithm
    • J.R. King, Machine component grouping in production flow analysis: An approach using a rank ordering clustering algorithm, International Journal of Production Research 18(1980)213-232.
    • (1980) International Journal of Production Research , vol.18 , pp. 213-232
    • King, J.R.1
  • 15
    • 0026220052 scopus 로고
    • A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell
    • F. Mahmoodi and K.J. Dooley, A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell, International Journal of Production Research 29(1991)1923-1939.
    • (1991) International Journal of Production Research , vol.29 , pp. 1923-1939
    • Mahmoodi, F.1    Dooley, K.J.2
  • 16
    • 0028439164 scopus 로고
    • A comparison of worker assignment policies for dual resource constrained shops
    • M.K. Malhotra and H.V. Kher, A comparison of worker assignment policies for dual resource constrained shops, International Journal of Production Research 32(1994)1087-1103.
    • (1994) International Journal of Production Research , vol.32 , pp. 1087-1103
    • Malhotra, M.K.1    Kher, H.V.2
  • 17
    • 0000560047 scopus 로고
    • A comparison of cell loading practices in Group Technology
    • J.S. Morris and R.J. Tersine, A comparison of cell loading practices in Group Technology, Journal of Operations Management 2(1989)299-313.
    • (1989) Journal of Operations Management , vol.2 , pp. 299-313
    • Morris, J.S.1    Tersine, R.J.2
  • 19
    • 0010773239 scopus 로고
    • Labor and machine limited production systems
    • R.T. Nelson, Labor and machine limited production systems, Management Science 13(1967)648-671.
    • (1967) Management Science , vol.13 , pp. 648-671
    • Nelson, R.T.1
  • 20
    • 0014855493 scopus 로고
    • A simulation of labor efficiency and centralized assignment in a production model
    • R.T. Nelson, A simulation of labor efficiency and centralized assignment in a production model, Management Science 17(1970)B97-B106.
    • (1970) Management Science , vol.17
    • Nelson, R.T.1
  • 21
    • 84985788526 scopus 로고
    • A study of labor allocation strategies in cellular manufacturing
    • R.S. Russell, P.Y. Huang and Y. Leu, A study of labor allocation strategies in cellular manufacturing, Decision Sciences 22(1991)594-610.
    • (1991) Decision Sciences , vol.22 , pp. 594-610
    • Russell, R.S.1    Huang, P.Y.2    Leu, Y.3
  • 23
    • 0024106261 scopus 로고
    • An approximation for mean waiting times in cyclic server systems with non-exhaustive service
    • M.M. Srinivasan, An approximation for mean waiting times in cyclic server systems with non-exhaustive service, Performance Evaluation 9(1988)17-33.
    • (1988) Performance Evaluation , vol.9 , pp. 17-33
    • Srinivasan, M.M.1
  • 24
    • 0020914418 scopus 로고
    • Some scheduling rules for a Group Technology manufacturing system
    • Ackerman, ed.
    • R.M. Sundaram, Some scheduling rules for a Group Technology manufacturing system, in: Computer Applications in Production and Engineering, Ackerman, ed., 1983, pp. 765-772.
    • (1983) Computer Applications in Production and Engineering , pp. 765-772
    • Sundaram, R.M.1
  • 25
    • 0002912162 scopus 로고
    • Queueing analysis of polling models: An update
    • H. Takagi, ed., Elsevier Science/North-Holland
    • H. Takagi, Queueing analysis of polling models: An update, in: Stochastic Analysis of Computer and Communication Systems, H. Takagi, ed., Elsevier Science/North-Holland, 1990, pp. 267-318.
    • (1990) Stochastic Analysis of Computer and Communication Systems , pp. 267-318
    • Takagi, H.1
  • 27
    • 0025399180 scopus 로고
    • Designing a cellular manufacturing system: A materials flow approach based on operation sequences
    • A. Vakharia and U. Wemmerlöv, Designing a cellular manufacturing system: A materials flow approach based on operation sequences, IIE Transactions 22(1990)84-96.
    • (1990) IIE Transactions , vol.22 , pp. 84-96
    • Vakharia, A.1    Wemmerlöv, U.2
  • 28
    • 0016984996 scopus 로고
    • A simulation study of operating policies in a hypothetical dual-constrained job shop
    • J.K. Weeks and J.S. Fryer, A simulation study of operating policies in a hypothetical dual-constrained job shop, Management Science 22(1976)1362-1371.
    • (1976) Management Science , vol.22 , pp. 1362-1371
    • Weeks, J.K.1    Fryer, J.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.