-
1
-
-
0010848654
-
An examination of routing flexibility for small batch assembly of printed circuit boards
-
Graves R.J., Taylor D. An examination of routing flexibility for small batch assembly of printed circuit boards. International Journal of Production Research. 28(11):1990;2117-2135.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.11
, pp. 2117-2135
-
-
Graves, R.J.1
Taylor, D.2
-
3
-
-
0342987742
-
Event driven dynamic scheduling system in electronic boards assembly
-
London, UK, August
-
F. Croci, M. Perona, A. Pozzetti, Event driven dynamic scheduling system in electronic boards assembly, In: Proceedings of the 12th International Conference on CAD/CAM, Robotics and Factories of the Future, London, UK, August 1996.
-
(1996)
In: Proceedings of the 12th International Conference on CAD/CAM, Robotics and Factories of the Future
-
-
Croci, F.1
Perona, M.2
Pozzetti, A.3
-
4
-
-
0343423299
-
Integration of group technology and scheduling techniques for PCB assembly systems: Proposal and test of a new framework
-
London, UK, August
-
M. Perona, A. Pozzetti, Integration of group technology and scheduling techniques for PCB assembly systems: Proposal and test of a new framework, In: Proceedings of the 6th International Conference on CAD/CAM, Robotics and Factories of the Future, London, UK, August 1991.
-
(1991)
In: Proceedings of the 6th International Conference on CAD/CAM, Robotics and Factories of the Future
-
-
Perona, M.1
Pozzetti, A.2
-
7
-
-
0342553325
-
An algorithm for short term production planning of flexible assembly systems
-
Ann Arbor, MI, USA
-
A. Brandolese, M. Garetti, C. Lanza, A. Pozzetti, An algorithm for short term production planning of flexible assembly systems. In: Proceedings of IIIrd International Conference of Computer-Aided Production Engineering, Ann Arbor, MI, USA, 1988.
-
(1988)
In: Proceedings of IIIrd International Conference of Computer-Aided Production Engineering
-
-
Brandolese, A.1
Garetti, M.2
Lanza, C.3
Pozzetti, A.4
-
8
-
-
0025664294
-
A scheduling strategy in the manufacture of printed circuit boards (PCBs) using surface mount technology (SMT)
-
Y. Chi-Ching, R. Menakshi Sundaram, A scheduling strategy in the manufacture of printed circuit boards (PCBs) using surface mount technology (SMT), Computers & Industrial Engineering, 19 (1) (1990).
-
(1990)
Computers & Industrial Engineering
, vol.19
, Issue.1
-
-
Chi-Ching, Y.1
Menakshi Sundaram, R.2
-
11
-
-
0342553033
-
Scheduling and planning of electronics manufacturing operations: A Case study of the MADEMA approach
-
R. Salonna, Scheduling and planning of electronics manufacturing operations: A Case study of the MADEMA approach, International Journal of Computer Integrated Manufacturing 3 (6) (1990).
-
(1990)
International Journal of Computer Integrated Manufacturing
, vol.3
, Issue.6
-
-
Salonna, R.1
-
14
-
-
0025460538
-
Part assignment to electronic insertion machines: Two machine case
-
Ben-Arieh D., Dror M. Part assignment to electronic insertion machines: Two machine case. International Journal of Production Research. 28(7):1990;1317-1327.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.7
, pp. 1317-1327
-
-
Ben-Arieh, D.1
Dror, M.2
-
15
-
-
0021424669
-
A comparative study of priority dispatching rules in a hybrid assembly/job shop
-
Huang P.Y. A comparative study of priority dispatching rules in a hybrid assembly/job shop. International Journal of Production Research. 22(3):1984;375-388.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.3
, pp. 375-388
-
-
Huang, P.Y.1
-
16
-
-
0027668386
-
Cell formation in PCB assembly based on production quantitative data
-
Luzzato D., Perona M. Cell formation in PCB assembly based on production quantitative data. European Journal of Operational Research. 69(2):1993;312-329.
-
(1993)
European Journal of Operational Research
, vol.69
, Issue.2
, pp. 312-329
-
-
Luzzato, D.1
Perona, M.2
-
17
-
-
0011717162
-
Bottleneck scheduling in PCB assembly
-
Palermo, Italy, June
-
M. Perona, A. Portioli, A. Pozzetti, Bottleneck scheduling in PCB assembly. In: Proceedings of the 10th Conference on Computer-Aided Production Engineering, Palermo, Italy, June 1994.
-
(1994)
In: Proceedings of the 10th Conference on Computer-Aided Production Engineering
-
-
Perona, M.1
Portioli, A.2
Pozzetti, A.3
-
18
-
-
0026173740
-
Balancing assembly lines for teams and work groups
-
Johnson R.V. Balancing assembly lines for teams and work groups. International Journal of Production Research. 29(6):1991;1205-1214.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.6
, pp. 1205-1214
-
-
Johnson, R.V.1
-
20
-
-
0002308570
-
The impact of flexible automation on business strategy and organizational structure
-
R. Parthasarthy, The impact of flexible automation on business strategy and organizational structure, Academy of Management Review 17 (1) (1992).
-
(1992)
Academy of Management Review
, vol.17
, Issue.1
-
-
Parthasarthy, R.1
-
21
-
-
0003799759
-
-
R.D. Irvin, Homewood, IL
-
R.N. Anthony, J. Dearden N.M. Bedford, Management Control System, R.D. Irvin, Homewood, IL.
-
Management Control System
-
-
Anthony, R.N.1
Dearden, J.2
Bedford, N.M.3
-
22
-
-
80054479010
-
The UAW and CAW confront Lean Production at Saturn, CAMI and Japanese Automobile Transplants
-
(Winter)
-
E.Y. Yanarella, W.C. Green, The UAW and CAW confront Lean Production at Saturn, CAMI and Japanese Automobile Transplants. Labor Studies Journal (Winter) 1994.
-
(1994)
Labor Studies Journal
-
-
Yanarella, E.Y.1
Green, W.C.2
|