메뉴 건너뛰기




Volumn 36, Issue 10, 2004, Pages 985-997

Staff scheduling in high volume service facilities with downgrading

Author keywords

[No Author keywords available]

Indexed keywords

HEURISTIC METHODS; INTEGER PROGRAMMING; LINEAR PROGRAMMING; MATHEMATICAL MODELS; OPERATIONS RESEARCH; POSTAL SERVICES;

EID: 4444271717     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1080/07408170490487812     Document Type: Article
Times cited : (44)

References (18)
  • 1
    • 0032210066 scopus 로고    scopus 로고
    • An efficient two-phase algorithm for cyclic days-off scheduling
    • Alfares, H.K. (1997) An efficient two-phase algorithm for cyclic days-off scheduling. Computers & Operations Research, 25(11), 913-923.
    • (1997) Computers and Operations Research , vol.25 , Issue.11 , pp. 913-923
    • Alfares, H.K.1
  • 2
    • 0030125115 scopus 로고    scopus 로고
    • Optimal shift scheduling with multiple break windows
    • Aykin, T. (1996) Optimal shift scheduling with multiple break windows. Management Science, 42(4), 591-602.
    • (1996) Management Science , vol.42 , Issue.4 , pp. 591-602
    • Aykin, T.1
  • 4
  • 5
    • 0000309722 scopus 로고
    • Implicit modeling of flexible break assignments in optimal shift scheduling
    • Bechtold, S.E. and Jacobs, L.W. (1990) Implicit modeling of flexible break assignments in optimal shift scheduling. Management Science, 36(11), 1339-1351.
    • (1990) Management Science , vol.36 , Issue.11 , pp. 1339-1351
    • Bechtold, S.E.1    Jacobs, L.W.2
  • 6
    • 0033116330 scopus 로고    scopus 로고
    • Integer programming to schedule a hierarchical workforce with variable demands
    • Billionnet, A. (1999) Integer programming to schedule a hierarchical workforce with variable demands. European Journal of Operational Research, 114, 105-114.
    • (1999) European Journal of Operational Research , vol.114 , pp. 105-114
    • Billionnet, A.1
  • 7
    • 0032154832 scopus 로고    scopus 로고
    • Solving personnel tour scheduling problems using the dual all-integer cutting plane
    • Brusco, M.J. (1998) Solving personnel tour scheduling problems using the dual all-integer cutting plane. IIE Transactions on Operations Engineering, 30(9), 835-844.
    • (1998) IIE Transactions on Operations Engineering , vol.30 , Issue.9 , pp. 835-844
    • Brusco, M.J.1
  • 8
    • 0034479946 scopus 로고    scopus 로고
    • Optimal models for meal-break and start-time flexibility in continuous tour scheduling
    • Brusco, M. and Jacobs, L.W. (2000) Optimal models for meal-break and start-time flexibility in continuous tour scheduling. Management Science, 46(12), 1630-1641.
    • (2000) Management Science , vol.46 , Issue.12 , pp. 1630-1641
    • Brusco, M.1    Jacobs, L.W.2
  • 9
    • 0022060907 scopus 로고
    • Work force size and single shift schedules with variable demands
    • Burns, R.N. and Carter, M.W. (1985) Work force size and single shift schedules with variable demands. Management Science, 31(5), 599-607.
    • (1985) Management Science , vol.31 , Issue.5 , pp. 599-607
    • Burns, R.N.1    Carter, M.W.2
  • 12
    • 0026163585 scopus 로고
    • Off-day scheduling with hierarchical worker categories
    • Emmons, H. and Burns, R.N. (1991) Off-day scheduling with hierarchical worker categories. Operations Research, 39(3), 484-495.
    • (1991) Operations Research , vol.39 , Issue.3 , pp. 484-495
    • Emmons, H.1    Burns, R.N.2
  • 13
    • 0028496547 scopus 로고
    • Solving large-scale tour scheduling problems
    • Jarrah, A.I.Z., Bard, J.F. and deSilva, A.H. (1994) Solving large-scale tour scheduling problems. Management Science, 40(9), 1124-1145.
    • (1994) Management Science , vol.40 , Issue.9 , pp. 1124-1145
    • Jarrah, A.I.Z.1    Bard, J.F.2    deSilva, A.H.3
  • 14
    • 0003093902 scopus 로고
    • Scheduling flexibility in the service sector: A postal case study
    • Malhotra, M.K. and Ritzman, L.P. (1994) Scheduling flexibility in the service sector: a postal case study. Production and Operations Management, 3, 100-117.
    • (1994) Production and Operations Management , vol.3 , pp. 100-117
    • Malhotra, M.K.1    Ritzman, L.P.2
  • 16
    • 0020797571 scopus 로고
    • Simple approaches to shift, days-off and tour scheduling problems
    • Morris, J.G. and Showalter, M.J. (1983) Simple approaches to shift, days-off and tour scheduling problems. Management Science, 29(8), 942-950.
    • (1983) Management Science , vol.29 , Issue.8 , pp. 942-950
    • Morris, J.G.1    Showalter, M.J.2
  • 17


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.