메뉴 건너뛰기




Volumn 2, Issue 1, 2000, Pages 49-67

Management of worksharing systems

Author keywords

Bucket Brigade; Cross Training; Serial Production Lines; Worksharing

Indexed keywords


EID: 0002929809     PISSN: 15234614     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (43)

References (21)
  • 1
    • 0002622989 scopus 로고    scopus 로고
    • A production line that balances itself
    • Bartholdi, John J. III, Donald D. Eisenstein. 1996. A production line that balances itself. Oper. Res. 44 (1) 21-34.
    • (1996) Oper. Res. , vol.44 , Issue.1 , pp. 21-34
    • Bartholdi III, J.J.1    Eisenstein, D.D.2
  • 2
    • 26944459501 scopus 로고
    • Design of bucket brigade production lines
    • University of Chicago, Chicago, IL.
    • _, _, Charlotte Jacobs-Blecha, H. Donald Ratliff. 1995. Design of bucket brigade production lines. Working Paper. University of Chicago, Chicago, IL.
    • (1995) Working Paper
    • Charlotte, J.-B.1    Donald Ratliff, H.2
  • 3
    • 0000529899 scopus 로고    scopus 로고
    • The performance effects of modular production in the apparel industry
    • Berg, P., E. Appelbaum, T. Bailey, A. L. Kalleberg. 1996. The performance effects of modular production in the apparel industry. Indust. Relations 35(3) 356-373.
    • (1996) Indust. Relations , vol.35 , Issue.3 , pp. 356-373
    • Berg, P.1    Appelbaum, E.2    Bailey, T.3    Kalleberg, A.L.4
  • 4
    • 0030247852 scopus 로고    scopus 로고
    • Performance of a manufacturing module with moving workers
    • Bischak, Diane P. 1996. Performance of a manufacturing module with moving workers. IIE Trans. 28(9) 723-733.
    • (1996) IIE Trans. , vol.28 , Issue.9 , pp. 723-733
    • Bischak, D.P.1
  • 5
    • 85016181182 scopus 로고
    • Relations between work group characteristics and effectiveness: Implications for designing effective work groups
    • Campion, Michael A., Gina J. Medsker, A. Catherine Higgs. 1993. Relations between work group characteristics and effectiveness: implications for designing effective work groups. Personnel Psych. 46(4) 823-850.
    • (1993) Personnel Psych. , vol.46 , Issue.4 , pp. 823-850
    • Campion, M.A.1    Medsker, G.J.2    Catherine Higgs, A.3
  • 6
  • 8
    • 0000691121 scopus 로고
    • Group performance and intergroup relations in organizations
    • M. D. Dunnette, L. M. Hough, eds. Consulting Psychologists Press, Palo Alto, CA.
    • Guzzo, R. A., G. P. Shea. 1992. Group performance and intergroup relations in organizations. M. D. Dunnette, L. M. Hough, eds. Handbook of Industrial and Organizational Psychology, Volume 3, Consulting Psychologists Press, Palo Alto, CA. 269-313.
    • (1992) Handbook of Industrial and Organizational Psychology , vol.3 , pp. 269-313
    • Guzzo, R.A.1    Shea, G.P.2
  • 9
    • 0000644040 scopus 로고
    • The design of work teams
    • J. W. Lorsch, ed. Prentice Hall, Englewood Cliffs, NJ.
    • Hackman, J. R. 1987. The design of work teams. J. W. Lorsch, ed. Handbook of Organizational Behavior. Prentice Hall, Englewood Cliffs, NJ. 315-342.
    • (1987) Handbook of Organizational Behavior , pp. 315-342
    • Hackman, J.R.1
  • 10
    • 0027680941 scopus 로고
    • The output process of serial production lines of general machines with finite buffers
    • Hendricks, Kevin B., John O. McClain. 1993. The output process of serial production lines of general machines with finite buffers. Management Sci. 39 (10) 1194-1201.
    • (1993) Management Sci. , vol.39 , Issue.10 , pp. 1194-1201
    • Hendricks, K.B.1    John, O.M.2
  • 11
    • 26944465275 scopus 로고    scopus 로고
    • Personality and performance in serial worksharing systems
    • Johnson Graduate School of Management, Cornell University, Ithaca, NY.
    • Juran, David C., Kenneth L. Schultz, John O. McClain, Tove H. Hammer, Lee W. Schruben. 1997. Personality and performance in serial worksharing systems. Working Paper 96-04. Johnson Graduate School of Management, Cornell University, Ithaca, NY.
    • (1997) Working Paper , vol.96 , Issue.4
    • Juran, D.C.1    Kenneth, L.S.2    John, O.M.3    Tove, H.H.4    Lee, W.S.5
  • 12
    • 0023311310 scopus 로고
    • A study of work-time distributions on unpaced tasks
    • Knott, Kenneth, Roy J. Sury. 1987. A study of work-time distributions on unpaced tasks. IIE Trans. 19(1) 50-55.
    • (1987) IIE Trans. , vol.19 , Issue.1 , pp. 50-55
    • Knott, K.1    Roy, J.S.2
  • 14
    • 26944435094 scopus 로고
    • K-products walks fine line of modular production
    • January
    • Moore, Lila. 1995. K-products walks fine line of modular production. Apparel Indust. Magazine January.
    • (1995) Apparel Indust. Magazine
    • Moore, L.1
  • 15
    • 0015614422 scopus 로고
    • The production rate of a series of work stations with variable service times
    • Muth, E. J. 1973. The production rate of a series of work stations with variable service times. Internat. J. Production Res. 11(2) 155-169.
    • (1973) Internat. J. Production Res. , vol.11 , Issue.2 , pp. 155-169
    • Muth, E.J.1
  • 16
    • 0003094666 scopus 로고
    • The use of dynamic (state-dependent) assembly-line balancing to improve through-put
    • Ostolaza, J., J. O. McClain, L. J. Thomas. 1990. The use of dynamic (state-dependent) assembly-line balancing to improve through-put. J. Manufacturing and Oper. Management 3 105-133.
    • (1990) J. Manufacturing and Oper. Management , vol.3 , pp. 105-133
    • Ostolaza, J.1    McClain, J.O.2    Thomas, L.J.3
  • 17
    • 1842653190 scopus 로고
    • Cupid hits bull's eye with modular system
    • September
    • Proper, Carl, Rebecca Plattus. 1993. Cupid hits bull's eye with modular system. Apparel Indust. Magazine September.
    • (1993) Apparel Indust. Magazine
    • Proper, C.1    Plattus, R.2
  • 20
    • 0000977704 scopus 로고
    • Identifiability as a deterrent to social loafing: Two cheering experiments
    • Williams, K., Harkins, S., Latane, B. 1981. Identifiability as a deterrent to social loafing: Two cheering experiments. J. Personality and Social Psych. 40 303-311.
    • (1981) J. Personality and Social Psych. , vol.40 , pp. 303-311
    • Williams, K.1    Harkins, S.2    Latane, B.3
  • 21
    • 0000906215 scopus 로고    scopus 로고
    • Self buffering, self balancing, self flushing production lines
    • Zavadlav, E., J. O. McClain, L. J. Thomas. 1996. Self buffering, self balancing, self flushing production lines. Management Sci. 42(8) 1151-1164.
    • (1996) Management Sci. , vol.42 , Issue.8 , pp. 1151-1164
    • Zavadlav, E.1    McClain, J.O.2    Thomas, L.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.