메뉴 건너뛰기




Volumn 38, Issue 1, 2000, Pages 14-32

Algorithm for multiple shift scheduling of hierarchical workforce on four-day or three-day workweeks

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; OPTIMIZATION;

EID: 0033873325     PISSN: 03155986     EISSN: None     Source Type: None    
DOI: 10.1080/03155986.2000.11732398     Document Type: Article
Times cited : (27)

References (13)
  • 1
    • 0017547182 scopus 로고
    • Workforce Scheduling with Cyclic Demands and Day off Constraints
    • Baker, K.R. and M.J. Magazine. 1977. Workforce Scheduling with Cyclic Demands and Day off Constraints. Mgmt. Sci. 24, 161-167.
    • (1977) Mgmt. Sci. , vol.24 , pp. 161-167
    • Baker, K.R.1    Magazine, M.J.2
  • 2
    • 0018674639 scopus 로고
    • Staff Scheduling with Day-off and Workstretch Constraints
    • Baker, K.R., R.N. Burns and M.W. Carter. 1979. Staff Scheduling with Day-off and Workstretch Constraints. AIIE Trans. 6 11, 286-292.
    • (1979) AIIE Trans. 6 , vol.11 , pp. 286-292
    • Baker, K.R.1    Burns, R.N.2    Carter, M.W.3
  • 3
    • 0016872537 scopus 로고
    • Scheduling of Work Forces Required in Continuous Operations under Alternative Labour Policies
    • Brownell, W.D., and J.M. Lowerre. 1976. Scheduling of Work Forces Required in Continuous Operations under Alternative Labour Policies. Mgmt. Sci. 22, 597-605.
    • (1976) Mgmt. Sci. , vol.22 , pp. 597-605
    • Brownell, W.D.1    Lowerre, J.M.2
  • 4
    • 0000482113 scopus 로고
    • Manpower Scheduling with Variable Demands and Alternate Weekends off
    • Burns, R.N. 1978. Manpower Scheduling with Variable Demands and Alternate Weekends Off. INFOR 16, 101-111.
    • (1978) INFOR , vol.16 , pp. 101-111
    • Burns, R.N.1
  • 6
    • 0022060907 scopus 로고
    • Work Force Size and Schedules with Variable Demands
    • Burns, R.N., and M.W. Carter. 1985. Work Force Size and Schedules with Variable Demands. Mgmt. Sci. 31, 599-607.
    • (1985) Mgmt. Sci. , vol.31 , pp. 599-607
    • Burns, R.N.1    Carter, M.W.2
  • 7
    • 0023171522 scopus 로고
    • A Modular Approach to Optimal Multiple-Shift Manpower Scheduling
    • Burns, R.N., and G.J. Koop. 1987. A Modular Approach to Optimal Multiple-Shift Manpower Scheduling. Opns. Res. 35, 100-110.
    • (1987) Opns. Res. , vol.35 , pp. 100-110
    • Burns, R.N.1    Koop, G.J.2
  • 8
    • 0026163585 scopus 로고
    • Off-Day Scheduling with Hierarchical Worker Categories
    • Emmons, H. and R.N. Burns. 1991. Off-Day Scheduling with Hierarchical Worker Categories. Opns Res. 39, 484-495.
    • (1991) Opns Res. , vol.39 , pp. 484-495
    • Emmons, H.1    Burns, R.N.2
  • 9
    • 0012655189 scopus 로고
    • Single Shift Workforce Scheduling under a Compressed Workweek
    • Hung, R. 1991. Single Shift Workforce Scheduling Under a Compressed Workweek. OMEGA. 19, 494-497.
    • (1991) OMEGA , vol.19 , pp. 494-497
    • Hung, R.1
  • 10
    • 0027544656 scopus 로고
    • A Three-day Workweek Multiple-Shift Scheduling Model
    • Hung, R. 1993. A Three-day Workweek Multiple-Shift Scheduling Model. J. Opl Res. Soc. 44, 141-146.
    • (1993) J. Opl Res. Soc. , vol.44 , pp. 141-146
    • Hung, R.1
  • 11
    • 0000183015 scopus 로고
    • Multiple-Shift Workforce Scheduling under the 3-4 Workweek with Different Weekday and Weekend Labor Requirements
    • Hung, R. 1994a. Multiple-Shift Workforce Scheduling Under the 3-4 Workweek with Different Weekday and Weekend Labor Requirements. Mgmt. Sci. 40, 280-284.
    • (1994) Mgmt. Sci. , vol.40 , pp. 280-284
    • Hung, R.1
  • 12
    • 0028498195 scopus 로고
    • A Multiple-Shift Workforce Scheduling Model under the Four-day Workweek with Weekday and Weekend Labour Demands
    • Hung, R. 1994b. A Multiple-Shift Workforce Scheduling Model under the Four-day Workweek with Weekday and Weekend Labour Demands. J. Opl Res. Soc. 45, 1088-1092.
    • (1994) J. Opl Res. Soc. , vol.45 , pp. 1088-1092
    • Hung, R.1
  • 13
    • 0017495691 scopus 로고
    • Workstretch Properties for the Scheduling of Continuous Operations under Alternative Labour Policies
    • Lowerre, J.M. 1977. Workstretch Properties for the Scheduling of Continuous Operations under Alternative Labour Policies. Mgmt. Sci. 23, 963-971.
    • (1977) Mgmt. Sci. , vol.23 , pp. 963-971
    • Lowerre, J.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.