-
3
-
-
0024673749
-
Assembly line Balancing with parallel workstations and dead time
-
BARD, J. F. 1989. Assembly Line Balancing with Parallel Workstations and Dead Time. Int. J. Production Res. 27, 1005-1018.
-
(1989)
Int. J. Production Res.
, vol.27
, pp. 1005-1018
-
-
Bard, J.F.1
-
4
-
-
0026745702
-
An analytic framework for sequencing mixed model assembly lines
-
BARD, J. F., E. DAR-EL, AND A. SHTUB. 1992. An Analytic Framework for Sequencing Mixed Model Assembly Lines. International J. Production Res. 30, 35-48.
-
(1992)
International J. Production Res.
, vol.30
, pp. 35-48
-
-
Bard, J.F.1
Dar-El, E.2
Shtub, A.3
-
5
-
-
17144370088
-
Balancing 2-sided assembly lines (A case study)
-
BARTHOLDI, J. J. III 1992. Balancing 2-Sided Assembly Lines (A Case Study). Working Paper.
-
(1992)
Working Paper
-
-
Bartholdi III, J.J.1
-
6
-
-
0002622989
-
A production line that balances itself
-
BARTHOLDI, J. J. III AND D. D. EISENSTEIN. 1996. A Production Line That Balances Itself. Opns. Res. 44, 21-34.
-
(1996)
Opns. Res.
, vol.44
, pp. 21-34
-
-
Bartholdi III, J.J.1
Eisenstein, D.D.2
-
7
-
-
0022768294
-
A survey of exact algorithms for the simple assembly line balancing problem
-
BAYBARS, I. 1986. A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem. Mgmt. Sci. 32, 909-932.
-
(1986)
Mgmt. Sci.
, vol.32
, pp. 909-932
-
-
Baybars, I.1
-
8
-
-
0004693037
-
Expected behavior of line balancing heuristics
-
BAYBARS, I. AND A. FRIEZE. 1986. Expected Behavior of Line Balancing Heuristics. IMA J. Math. Mgmt. 10, 304-335.
-
(1986)
IMA J. Math. Mgmt.
, vol.10
, pp. 304-335
-
-
Baybars, I.1
Frieze, A.2
-
9
-
-
0014807274
-
A heuristic algorithm for the n job, m machine sequencing problem
-
CAMPBELL, H. G., R. A. DUDEK, AND M. L. SMITH. 1970. A Heuristic Algorithm for the n Job, m Machine Sequencing Problem. Mgmt. Sci. 16, 630-637.
-
(1970)
Mgmt. Sci.
, vol.16
, pp. 630-637
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
10
-
-
0026107299
-
The impact of flexible manufacturing systems on productivity and quality
-
CHEN, F. F. AND E. E. ADAM, JR. 1991. The Impact of Flexible Manufacturing Systems on Productivity and Quality. IEEE Trans. Engineering Management, 38, 33-45.
-
(1991)
IEEE Trans. Engineering Management
, vol.38
, pp. 33-45
-
-
Chen, F.F.1
Adam Jr., E.E.2
-
11
-
-
0025474221
-
A state-of-the-art review of parallel-machine scheduling research
-
CHENG, T. C. E. AND C. C. S. SIN. 1990. A State-of-the-art Review of Parallel-machine Scheduling Research. Eur. J. Opnl. Res. 47, 271-292.
-
(1990)
Eur. J. Opnl. Res.
, vol.47
, pp. 271-292
-
-
Cheng, T.C.E.1
Sin, C.C.S.2
-
12
-
-
0021476842
-
Permuting elements within columns of a matrix in order to minimize maximum row sum
-
COFFMAN, E. G. AND M. YANNAKAKIS. 1984. Permuting Elements Within Columns of a Matrix in Order to Minimize Maximum Row Sum. Math. O.R. 9, 384-390.
-
(1984)
Math. O.R.
, vol.9
, pp. 384-390
-
-
Coffman, E.G.1
Yannakakis, M.2
-
13
-
-
0002298313
-
Mixed model assembly line sequencing problems
-
DAR-EL, E. M. 1977. Mixed Model Assembly Line Sequencing Problems. OMEGA, 6, 313-323.
-
(1977)
OMEGA
, vol.6
, pp. 313-323
-
-
Dar-El, E.M.1
-
14
-
-
0016554171
-
Assembly line sequencing for model-mix
-
DAR-EL, E. M. AND R. F. COTHER. 1975. Assembly Line Sequencing for Model-Mix. Int. J. Prod. Res. 13, 463-477.
-
(1975)
Int. J. Prod. Res.
, vol.13
, pp. 463-477
-
-
Dar-El, E.M.1
Cother, R.F.2
-
15
-
-
0001571982
-
Cross-training effectiveness and profitability
-
EBELING, A. C. AND C.-Y. LEE. 1994. Cross-training Effectiveness and Profitability. Int. J. Prod. Res. 32, 2843-2859.
-
(1994)
Int. J. Prod. Res.
, vol.32
, pp. 2843-2859
-
-
Ebeling, A.C.1
Lee, C.-Y.2
-
16
-
-
84985773741
-
An experimental comparison of cellular (group technology) layout with process layout
-
FLYNN, B. B. AND R. F. JACOBS. 1987. An Experimental Comparison of Cellular (Group Technology) Layout with Process Layout. Dec. Sci. 18, 562-581.
-
(1987)
Dec. Sci.
, vol.18
, pp. 562-581
-
-
Flynn, B.B.1
Jacobs, R.F.2
-
18
-
-
0023643527
-
A successful implementation of group technology and cell manufacturing
-
FRY, T. D., M. G. WILSON, AND M. BREEN. 1987. A Successful Implementation of Group Technology and Cell Manufacturing. Production and Inventory Management, 28, 4-6.
-
(1987)
Production and Inventory Management
, vol.28
, pp. 4-6
-
-
Fry, T.D.1
Wilson, M.G.2
Breen, M.3
-
20
-
-
0016510894
-
Surrogate constraint duality in mathematical programming
-
GLOVER, F. 1975. Surrogate Constraint Duality in Mathematical Programming. Opns. Res. 23, 434-453.
-
(1975)
Opns. Res.
, vol.23
, pp. 434-453
-
-
Glover, F.1
-
21
-
-
0001360372
-
Level schedules for mixed-model assembly lines in just-in-time production systems
-
MILTENBURG, J. 1989. Level Schedules for Mixed-model Assembly Lines in Just-in-Time Production Systems. Mgmt. Sci. 35, 192-207.
-
(1989)
Mgmt. Sci.
, vol.35
, pp. 192-207
-
-
Miltenburg, J.1
-
22
-
-
0018469357
-
A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor
-
OKAMURA, K. AND H. YAMASHIMA. 1979. A Heuristic Algorithm for the Assembly Line Model-Mix Sequencing Problem to Minimize the Risk of Stopping the Conveyor. Int. J. Prod. Res. 17, 233-247.
-
(1979)
Int. J. Prod. Res.
, vol.17
, pp. 233-247
-
-
Okamura, K.1
Yamashima, H.2
|