메뉴 건너뛰기




Volumn 45, Issue 4, 1997, Pages 553-567

Workforce planning in mixed model assembly systems

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY MACHINES; HEURISTIC METHODS; MANUFACTURE; OPERATIONS RESEARCH; SCHEDULING;

EID: 0031193169     PISSN: 0030364X     EISSN: None     Source Type: Journal    
DOI: 10.1287/opre.45.4.553     Document Type: Article
Times cited : (54)

References (23)
  • 3
    • 0024673749 scopus 로고
    • Assembly line Balancing with parallel workstations and dead time
    • BARD, J. F. 1989. Assembly Line Balancing with Parallel Workstations and Dead Time. Int. J. Production Res. 27, 1005-1018.
    • (1989) Int. J. Production Res. , vol.27 , pp. 1005-1018
    • Bard, J.F.1
  • 4
    • 0026745702 scopus 로고
    • An analytic framework for sequencing mixed model assembly lines
    • BARD, J. F., E. DAR-EL, AND A. SHTUB. 1992. An Analytic Framework for Sequencing Mixed Model Assembly Lines. International J. Production Res. 30, 35-48.
    • (1992) International J. Production Res. , vol.30 , pp. 35-48
    • Bard, J.F.1    Dar-El, E.2    Shtub, A.3
  • 5
    • 17144370088 scopus 로고
    • Balancing 2-sided assembly lines (A case study)
    • BARTHOLDI, J. J. III 1992. Balancing 2-Sided Assembly Lines (A Case Study). Working Paper.
    • (1992) Working Paper
    • Bartholdi III, J.J.1
  • 6
    • 0002622989 scopus 로고    scopus 로고
    • A production line that balances itself
    • BARTHOLDI, J. J. III AND D. D. EISENSTEIN. 1996. A Production Line That Balances Itself. Opns. Res. 44, 21-34.
    • (1996) Opns. Res. , vol.44 , pp. 21-34
    • Bartholdi III, J.J.1    Eisenstein, D.D.2
  • 7
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • BAYBARS, I. 1986. A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem. Mgmt. Sci. 32, 909-932.
    • (1986) Mgmt. Sci. , vol.32 , pp. 909-932
    • Baybars, I.1
  • 8
    • 0004693037 scopus 로고
    • Expected behavior of line balancing heuristics
    • BAYBARS, I. AND A. FRIEZE. 1986. Expected Behavior of Line Balancing Heuristics. IMA J. Math. Mgmt. 10, 304-335.
    • (1986) IMA J. Math. Mgmt. , vol.10 , pp. 304-335
    • Baybars, I.1    Frieze, A.2
  • 9
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n job, m machine sequencing problem
    • CAMPBELL, H. G., R. A. DUDEK, AND M. L. SMITH. 1970. A Heuristic Algorithm for the n Job, m Machine Sequencing Problem. Mgmt. Sci. 16, 630-637.
    • (1970) Mgmt. Sci. , vol.16 , pp. 630-637
    • Campbell, H.G.1    Dudek, R.A.2    Smith, M.L.3
  • 10
    • 0026107299 scopus 로고
    • The impact of flexible manufacturing systems on productivity and quality
    • CHEN, F. F. AND E. E. ADAM, JR. 1991. The Impact of Flexible Manufacturing Systems on Productivity and Quality. IEEE Trans. Engineering Management, 38, 33-45.
    • (1991) IEEE Trans. Engineering Management , vol.38 , pp. 33-45
    • Chen, F.F.1    Adam Jr., E.E.2
  • 11
    • 0025474221 scopus 로고
    • A state-of-the-art review of parallel-machine scheduling research
    • CHENG, T. C. E. AND C. C. S. SIN. 1990. A State-of-the-art Review of Parallel-machine Scheduling Research. Eur. J. Opnl. Res. 47, 271-292.
    • (1990) Eur. J. Opnl. Res. , vol.47 , pp. 271-292
    • Cheng, T.C.E.1    Sin, C.C.S.2
  • 12
    • 0021476842 scopus 로고
    • Permuting elements within columns of a matrix in order to minimize maximum row sum
    • COFFMAN, E. G. AND M. YANNAKAKIS. 1984. Permuting Elements Within Columns of a Matrix in Order to Minimize Maximum Row Sum. Math. O.R. 9, 384-390.
    • (1984) Math. O.R. , vol.9 , pp. 384-390
    • Coffman, E.G.1    Yannakakis, M.2
  • 13
    • 0002298313 scopus 로고
    • Mixed model assembly line sequencing problems
    • DAR-EL, E. M. 1977. Mixed Model Assembly Line Sequencing Problems. OMEGA, 6, 313-323.
    • (1977) OMEGA , vol.6 , pp. 313-323
    • Dar-El, E.M.1
  • 14
    • 0016554171 scopus 로고
    • Assembly line sequencing for model-mix
    • DAR-EL, E. M. AND R. F. COTHER. 1975. Assembly Line Sequencing for Model-Mix. Int. J. Prod. Res. 13, 463-477.
    • (1975) Int. J. Prod. Res. , vol.13 , pp. 463-477
    • Dar-El, E.M.1    Cother, R.F.2
  • 15
    • 0001571982 scopus 로고
    • Cross-training effectiveness and profitability
    • EBELING, A. C. AND C.-Y. LEE. 1994. Cross-training Effectiveness and Profitability. Int. J. Prod. Res. 32, 2843-2859.
    • (1994) Int. J. Prod. Res. , vol.32 , pp. 2843-2859
    • Ebeling, A.C.1    Lee, C.-Y.2
  • 16
    • 84985773741 scopus 로고
    • An experimental comparison of cellular (group technology) layout with process layout
    • FLYNN, B. B. AND R. F. JACOBS. 1987. An Experimental Comparison of Cellular (Group Technology) Layout with Process Layout. Dec. Sci. 18, 562-581.
    • (1987) Dec. Sci. , vol.18 , pp. 562-581
    • Flynn, B.B.1    Jacobs, R.F.2
  • 18
    • 0023643527 scopus 로고
    • A successful implementation of group technology and cell manufacturing
    • FRY, T. D., M. G. WILSON, AND M. BREEN. 1987. A Successful Implementation of Group Technology and Cell Manufacturing. Production and Inventory Management, 28, 4-6.
    • (1987) Production and Inventory Management , vol.28 , pp. 4-6
    • Fry, T.D.1    Wilson, M.G.2    Breen, M.3
  • 20
    • 0016510894 scopus 로고
    • Surrogate constraint duality in mathematical programming
    • GLOVER, F. 1975. Surrogate Constraint Duality in Mathematical Programming. Opns. Res. 23, 434-453.
    • (1975) Opns. Res. , vol.23 , pp. 434-453
    • Glover, F.1
  • 21
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • MILTENBURG, J. 1989. Level Schedules for Mixed-model Assembly Lines in Just-in-Time Production Systems. Mgmt. Sci. 35, 192-207.
    • (1989) Mgmt. Sci. , vol.35 , pp. 192-207
    • Miltenburg, J.1
  • 22
    • 0018469357 scopus 로고
    • A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor
    • OKAMURA, K. AND H. YAMASHIMA. 1979. A Heuristic Algorithm for the Assembly Line Model-Mix Sequencing Problem to Minimize the Risk of Stopping the Conveyor. Int. J. Prod. Res. 17, 233-247.
    • (1979) Int. J. Prod. Res. , vol.17 , pp. 233-247
    • Okamura, K.1    Yamashima, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.