메뉴 건너뛰기




Volumn 67, Issue 3, 2000, Pages 205-218

Specialization, teamwork, and production efficiency

Author keywords

[No Author keywords available]

Indexed keywords

INDUSTRIAL RELATIONS; JOB ANALYSIS; MATHEMATICAL MODELS; PROCESS CONTROL; PRODUCTIVITY; REENGINEERING;

EID: 0034633530     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(00)00020-7     Document Type: Article
Times cited : (15)

References (19)
  • 1
    • 0002481047 scopus 로고
    • The new industrial engineering: Information technology and business process redesign
    • Davenport T., Short J. The new industrial engineering: Information technology and business process redesign. Sloan Management Review. 11:1990;11-26.
    • (1990) Sloan Management Review , vol.11 , pp. 11-26
    • Davenport, T.1    Short, J.2
  • 2
    • 0001167750 scopus 로고
    • Reengineering work: Don't automate, obliterate
    • Hammer M. Reengineering work: Don't automate, obliterate. Harvard Business Review. 90(4):1990;104-112.
    • (1990) Harvard Business Review , vol.90 , Issue.4 , pp. 104-112
    • Hammer, M.1
  • 4
    • 0030149933 scopus 로고    scopus 로고
    • Commonalities in reengineered business processes: Models and issues
    • Buzacott J. Commonalities in reengineered business processes: Models and issues. Management Science. 42(5):1996;768-782.
    • (1996) Management Science , vol.42 , Issue.5 , pp. 768-782
    • Buzacott, J.1
  • 9
    • 0023981046 scopus 로고    scopus 로고
    • The role of work-in-process inventory in serial production lines
    • Conway R., Maxwell W., McClain J., Thomas L. The role of work-in-process inventory in serial production lines. Operations Research. 36(2):1998;229-241.
    • (1998) Operations Research , vol.36 , Issue.2 , pp. 229-241
    • Conway, R.1    Maxwell, W.2    McClain, J.3    Thomas, L.4
  • 10
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results
    • Dallery Y., Gershwin S. Manufacturing flow line systems: A review of models and analytical results. Queueing Systems. 12:1992;3-94.
    • (1992) Queueing Systems , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.2
  • 13
    • 0018509376 scopus 로고
    • On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times
    • Hillier F., Boling R. On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times. Management Science. 25:1979;721-728.
    • (1979) Management Science , vol.25 , pp. 721-728
    • Hillier, F.1    Boling, R.2
  • 14
    • 0030134777 scopus 로고    scopus 로고
    • On the simultaneous optimization of server and work allocations in production line systems with variable processing times
    • Hillier F., So K. On the simultaneous optimization of server and work allocations in production line systems with variable processing times. Management Science. 44(3):1996;435-443.
    • (1996) Management Science , vol.44 , Issue.3 , pp. 435-443
    • Hillier, F.1    So, K.2
  • 15
    • 0007029482 scopus 로고
    • An update on analytical models of serial transfer lines
    • Department of Industrial and Systems Engineering, University of Florida, Gainseville, FL
    • E. Muth, An update on analytical models of serial transfer lines, Research Report 87-15, Department of Industrial and Systems Engineering, University of Florida, Gainseville, FL, 1987.
    • (1987) Research Report 87-15
    • E. Muth1
  • 16
    • 0028439140 scopus 로고
    • An empirical investigation of the two-moment approximation for production lines
    • Powell S., Pyke D. An empirical investigation of the two-moment approximation for production lines. International Journal of Production Research. 32(5):1994;1137-1157.
    • (1994) International Journal of Production Research , vol.32 , Issue.5 , pp. 1137-1157
    • Powell, S.1    Pyke, D.2
  • 18
    • 0029735339 scopus 로고    scopus 로고
    • Allocation of buffers to serial production lines with bottlenecks
    • Powell S., Pyke D. Allocation of buffers to serial production lines with bottlenecks. IIE Transactions. 27:1996;18-29.
    • (1996) IIE Transactions , vol.27 , pp. 18-29
    • Powell, S.1    Pyke, D.2
  • 19
    • 0025630286 scopus 로고
    • Dynamics of the output interval distribution in unpaced lines
    • Martin G., Lau H. Dynamics of the output interval distribution in unpaced lines. Computers and Industrial Engineering. 18(3):1990;391-399.
    • (1990) Computers and Industrial Engineering , vol.18 , Issue.3 , pp. 391-399
    • Martin, G.1    Lau, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.