메뉴 건너뛰기




Volumn 56, Issue 24, 2018, Pages 7243-7257

Selective disassembly sequencing with random operation times in parallel disassembly environment

Author keywords

disassembly planning; parallel disassembly; random operation times; sample average approximation; selective disassembly sequencing

Indexed keywords

APPROXIMATION ALGORITHMS; INTEGER PROGRAMMING; STOCHASTIC MODELS; STOCHASTIC SYSTEMS;

EID: 85041607199     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2018.1432911     Document Type: Article
Times cited : (45)

References (52)
  • 1
    • 42949112952 scopus 로고    scopus 로고
    • A Path-Relinking Approach for a Bi-Criteria Disassembly Sequencing Problem
    • Adenso-Diaz, B., S., Garcia-Carbajal, and S. M., Gupta. 2008. “A Path-Relinking Approach for a Bi-Criteria Disassembly Sequencing Problem.” Computers & Operations Research 35 (12): 3989–3997.10.1016/j.cor.2007.06.002
    • (2008) Computers & Operations Research , vol.35 , Issue.12 , pp. 3989-3997
    • Adenso-Diaz, B.1    Garcia-Carbajal, S.2    Gupta, S.M.3
  • 2
    • 35448963449 scopus 로고    scopus 로고
    • Design for Disassembly: A Critical Twenty‐First Century Discipline
    • Bogue, R., 2007. “Design for Disassembly: A Critical Twenty‐First Century Discipline.” Assembly Automation 27 (4): 285–289.10.1108/01445150710827069
    • (2007) Assembly Automation , vol.27 , Issue.4 , pp. 285-289
    • Bogue, R.1
  • 3
    • 17944377583 scopus 로고    scopus 로고
    • An Integrated Approach to Selective-Disassembly Sequence Planning
    • Chung, C., and Q., Peng. 2005. “An Integrated Approach to Selective-Disassembly Sequence Planning.” Robotics and Computer-Integrated Manufacturing 21 (4–5): 475–485.10.1016/j.rcim.2004.11.008
    • (2005) Robotics and Computer-Integrated Manufacturing , vol.21 , Issue.4-5 , pp. 475-485
    • Chung, C.1    Peng, Q.2
  • 6
    • 0032183779 scopus 로고    scopus 로고
    • Disassembly Sequence Planning for Products with Defective Parts in Product Recovery
    • Gungor, A., and S. M., Gupta. 1998. “Disassembly Sequence Planning for Products with Defective Parts in Product Recovery.” Computers & Industrial Engineering 35 (1–2): 161–164.10.1016/S0360-8352(98)00047-3
    • (1998) Computers & Industrial Engineering , vol.35 , Issue.1-2 , pp. 161-164
    • Gungor, A.1    Gupta, S.M.2
  • 7
    • 0035866455 scopus 로고    scopus 로고
    • Disassembly Sequence Plan Generation Using a Branch-and-Bound Algorithm
    • Gungor, A., and S. M., Gupta. 2001. “Disassembly Sequence Plan Generation Using a Branch-and-Bound Algorithm.” International Journal of Production Research 39 (3): 481–509.10.1080/00207540010002838
    • (2001) International Journal of Production Research , vol.39 , Issue.3 , pp. 481-509
    • Gungor, A.1    Gupta, S.M.2
  • 8
    • 84882451160 scopus 로고    scopus 로고
    • Mathematical Model and Solution Algorithms for Selective Disassembly Sequencing with Multiple Target Components and Sequence-Dependent Setups
    • Han, H.-J., J.-M., Yu, and D.-H., Lee. 2013. “Mathematical Model and Solution Algorithms for Selective Disassembly Sequencing with Multiple Target Components and Sequence-Dependent Setups.” International Journal of Production Research 51 (16): 4997–5010.10.1080/00207543.2013.788794
    • (2013) International Journal of Production Research , vol.51 , Issue.16 , pp. 4997-5010
    • Han, H.-J.1    Yu, J.-M.2    Lee, D.-H.3
  • 9
    • 56449111330 scopus 로고    scopus 로고
    • A Genetic Algorithm for Product Disassembly Sequence Planning
    • Hui, W., X., Dong, and D., Guanghong. 2008. “A Genetic Algorithm for Product Disassembly Sequence Planning.” Neurocomputing 71 (13–15): 2720–2726.10.1016/j.neucom.2007.11.042
    • (2008) Neurocomputing , vol.71 , Issue.13-15 , pp. 2720-2726
    • Hui, W.1    Dong, X.2    Guanghong, D.3
  • 10
    • 85019101648 scopus 로고    scopus 로고
    • Disassembly Line Balancing Using Linear Physical Programming
    • Ilgin, M. A., H., Akçay, and C., Araz. 2017. “ Disassembly Line Balancing Using Linear Physical Programming.” International Journal of Production Research 55 (20): 6108–6119.
    • (2017) International Journal of Production Research , vol.55 , Issue.20 , pp. 6108-6119
    • Ilgin, M.A.1    Akçay, H.2    Araz, C.3
  • 11
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): a Review of the State of the Art
    • Ilgin, M. A., and S. M., Gupta. 2010. “Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): a Review of the State of the Art.” Journal of Environmental Management 91 (3): 563–591.10.1016/j.jenvman.2009.09.037
    • (2010) Journal of Environmental Management , vol.91 , Issue.3 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 12
    • 84954069273 scopus 로고    scopus 로고
    • Use of MCDM Techniques in Environmentally Conscious Manufacturing and Product Recovery: State of the Art
    • Ilgin, M. A., S. M., Gupta, and O., Battaïa. 2015. “Use of MCDM Techniques in Environmentally Conscious Manufacturing and Product Recovery: State of the Art.” Journal of Manufacturing Systems 37 (3): 746–758.10.1016/j.jmsy.2015.04.010
    • (2015) Journal of Manufacturing Systems , vol.37 , Issue.3 , pp. 746-758
    • Ilgin, M.A.1    Gupta, S.M.2    Battaïa, O.3
  • 13
    • 84959357726 scopus 로고    scopus 로고
    • Capacitated Disassembly Scheduling with Parts Commonality and Start-up Cost and Its Industrial Application
    • Ji, X., Z., Zhang, S., Huang, and L., Li. 2016. “Capacitated Disassembly Scheduling with Parts Commonality and Start-up Cost and Its Industrial Application.” International Journal of Production Research 54 (4): 1225–1243.10.1080/00207543.2015.1058536
    • (2016) International Journal of Production Research , vol.54 , Issue.4 , pp. 1225-1243
    • Ji, X.1    Zhang, Z.2    Huang, S.3    Li, L.4
  • 14
    • 0032300843 scopus 로고    scopus 로고
    • Economical Evaluation of Disassembly Operations for Recycling, Remanufacturing and Reuse
    • Johnson, M. R., and M. H., Wang. 1998. “Economical Evaluation of Disassembly Operations for Recycling, Remanufacturing and Reuse.” International Journal of Production Research 36 (12): 3227–3252.10.1080/002075498192049
    • (1998) International Journal of Production Research , vol.36 , Issue.12 , pp. 3227-3252
    • Johnson, M.R.1    Wang, M.H.2
  • 16
    • 84956617454 scopus 로고    scopus 로고
    • Disassembly Leveling and Lot Sizing for Multiple Product Types: A Basic Model and Its Extension
    • Kang, K.-W., H.-H., Doh, J.-H., Park, and D.-H., Lee. 2016. “Disassembly Leveling and Lot Sizing for Multiple Product Types: A Basic Model and Its Extension.” International Journal of Advanced Manufacturing Technology 82 (9–12): 1463–1473.10.1007/s00170-012-4570-9
    • (2016) International Journal of Advanced Manufacturing Technology , vol.82 , Issue.9-12 , pp. 1463-1473
    • Kang, K.-W.1    Doh, H.-H.2    Park, J.-H.3    Lee, D.-H.4
  • 17
    • 84881185298 scopus 로고    scopus 로고
    • Artificial Bee Colony Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem
    • Kalayci, C. B., and S. M., Gupta. 2013. “Artificial Bee Colony Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem.” Expert Systems with Applications 40 (18): 7231–7241.10.1016/j.eswa.2013.06.067
    • (2013) Expert Systems with Applications , vol.40 , Issue.18 , pp. 7231-7241
    • Kalayci, C.B.1    Gupta, S.M.2
  • 18
    • 0034963174 scopus 로고    scopus 로고
    • Parallel Disassembly Sequencing with Sequence-Dependent Operation times
    • Kang, J.-G., D.-H., Lee, P., Xirouchakis, and J.-G., Persson. 2001. “Parallel Disassembly Sequencing with Sequence-Dependent Operation times.” Annals of the CIRP 50 (1): 343–346.10.1016/S0007-8506(07)62136-2
    • (2001) Annals of the CIRP , vol.50 , Issue.1 , pp. 343-346
    • Kang, J.-G.1    Lee, D.-H.2    Xirouchakis, P.3    Persson, J.-G.4
  • 19
    • 1942469261 scopus 로고    scopus 로고
    • Optimal Disassembly Sequencing with Sequence Dependent Operation times Based on the Directed Graph of Assembly States
    • Kang, J.-G., D.-H., Lee, P., Xirouchakis, and A. J. D., Lambert. 2002. “Optimal Disassembly Sequencing with Sequence Dependent Operation times Based on the Directed Graph of Assembly States.” Journal of the Korean Institute of Industrial Engineers 28 (3): 264–273.
    • (2002) Journal of the Korean Institute of Industrial Engineers , vol.28 , Issue.3 , pp. 264-273
    • Kang, J.-G.1    Lee, D.-H.2    Xirouchakis, P.3    Lambert, A.J.D.4
  • 22
    • 33750068327 scopus 로고    scopus 로고
    • Selective Disassembly Sequencing: A Methodology for the Disassembly of End-of-Life Products
    • Kara, S., P., Pornprasitpol, and H., Kaebernick. 2006. “Selective Disassembly Sequencing: A Methodology for the Disassembly of End-of-Life Products.” Annals of the CIRP 55 (1): 37–40.10.1016/S0007-8506(07)60361-8
    • (2006) Annals of the CIRP , vol.55 , Issue.1 , pp. 37-40
    • Kara, S.1    Pornprasitpol, P.2    Kaebernick, H.3
  • 24
    • 85021147563 scopus 로고    scopus 로고
    • An Optimal Algorithm for Selective Disassembly Sequencing with Sequence-Dependent Setups in Parallel Disassembly Environment
    • Kim, H.-W., and D.-H., Lee. 2017. “An Optimal Algorithm for Selective Disassembly Sequencing with Sequence-Dependent Setups in Parallel Disassembly Environment.” International Journal of Production Research 55 (24): 7317–7333.
    • (2017) International Journal of Production Research , vol.55 , Issue.24 , pp. 7317-7333
    • Kim, H.-W.1    Lee, D.-H.2
  • 25
    • 34548418090 scopus 로고    scopus 로고
    • Disassembly Scheduling: Literature Review and Further Research Directions
    • Kim, H.-J., D.-H., Lee, and P., Xirouchakis. 2007. “Disassembly Scheduling: Literature Review and Further Research Directions.” International Journal of Production Research 45 (18–19): 4465–4484.10.1080/00207540701440097
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4465-4484
    • Kim, H.-J.1    Lee, D.-H.2    Xirouchakis, P.3
  • 26
    • 0036013019 scopus 로고    scopus 로고
    • The Sample Average Approximation Method for Stochastic Discrete Optimization
    • Kleywegt, A. J., A., Shapiro, and T., Homem-de-Mello. 2001. “The Sample Average Approximation Method for Stochastic Discrete Optimization.” SIAM Journal on Optimization 12 (2): 479–502.
    • (2001) SIAM Journal on Optimization , vol.12 , Issue.2 , pp. 479-502
    • Kleywegt, A.J.1    Shapiro, A.2    Homem-de-Mello, T.3
  • 27
    • 0033358055 scopus 로고    scopus 로고
    • Linear Programming in Disassembly/Clustering Sequence Generation
    • Lambert, A. J. D., 1999. “Linear Programming in Disassembly/Clustering Sequence Generation.” Computers & Industrial Engineering 36 (4): 723–738.10.1016/S0360-8352(99)00162-X
    • (1999) Computers & Industrial Engineering , vol.36 , Issue.4 , pp. 723-738
    • Lambert, A.J.D.1
  • 28
    • 0038156629 scopus 로고    scopus 로고
    • Disassembly Sequencing: A Survey
    • Lambert, A. J. D., 2003. “Disassembly Sequencing: A Survey.” International Journal of Production Research 41 (16): 3721–3759.10.1080/0020754031000120078
    • (2003) International Journal of Production Research , vol.41 , Issue.16 , pp. 3721-3759
    • Lambert, A.J.D.1
  • 29
    • 31044454520 scopus 로고    scopus 로고
    • Exact Methods in Optimum Disassembly Sequence Search for Problems Subject to Sequence Dependent Costs
    • Lambert, A. J. D., 2006. “Exact Methods in Optimum Disassembly Sequence Search for Problems Subject to Sequence Dependent Costs.” Omega 34 (6): 538–549.10.1016/j.omega.2005.01.005
    • (2006) Omega , vol.34 , Issue.6 , pp. 538-549
    • Lambert, A.J.D.1
  • 31
    • 84886785066 scopus 로고    scopus 로고
    • Selective Disassembly Planning for Waste Electrical and Electronic Equipment with Case Studies on Liquid Crystal Displays
    • Li, W. D., K., Xia, L., Cao, and K.-M., Chao. 2013. “Selective Disassembly Planning for Waste Electrical and Electronic Equipment with Case Studies on Liquid Crystal Displays.” Robotics and Computer-Integrated Manufacturing 29 (4): 248–260.10.1016/j.rcim.2013.01.006
    • (2013) Robotics and Computer-Integrated Manufacturing , vol.29 , Issue.4 , pp. 248-260
    • Li, W.D.1    Xia, K.2    Cao, L.3    Chao, K.-M.4
  • 33
    • 84949895569 scopus 로고    scopus 로고
    • Integrated Multi-Layer Representation and Ant Colony Search for Product Selective Disassembly Planning
    • Luo, Y., Q., Peng, and P., Gu. 2016. “Integrated Multi-Layer Representation and Ant Colony Search for Product Selective Disassembly Planning.” Computers in Industry 75: 13–26.10.1016/j.compind.2015.10.011
    • (2016) Computers in Industry , vol.75 , pp. 13-26
    • Luo, Y.1    Peng, Q.2    Gu, P.3
  • 34
    • 84862939665 scopus 로고    scopus 로고
    • Disassembly Process Planning Algorithms for End-of-Life Product Recovery and Environmentally Conscious Disposal
    • Ma, Y.-S., H.-B., Jun, H.-W., Kim, and D.-H., Lee. 2011. “Disassembly Process Planning Algorithms for End-of-Life Product Recovery and Environmentally Conscious Disposal.” International Journal of Production Research 49 (23): 7007–7027.10.1080/00207543.2010.495089
    • (2011) International Journal of Production Research , vol.49 , Issue.23 , pp. 7007-7027
    • Ma, Y.-S.1    Jun, H.-B.2    Kim, H.-W.3    Lee, D.-H.4
  • 35
    • 0032632474 scopus 로고    scopus 로고
    • Monte Carlo Bounding Techniques for Determining Solution Quality in Stochastic Programs
    • Mak, W. K., D. P., Morton, and R. K., Wood. 1999. “Monte Carlo Bounding Techniques for Determining Solution Quality in Stochastic Programs.” Operations Research Letters 24 (1–2): 47–56.10.1016/S0167-6377(98)00054-6
    • (1999) Operations Research Letters , vol.24 , Issue.1-2 , pp. 47-56
    • Mak, W.K.1    Morton, D.P.2    Wood, R.K.3
  • 36
    • 84939260816 scopus 로고    scopus 로고
    • Selective Disassembly Sequence Generation Based on Lowest Level Disassembly Graph Method
    • Mitrouchev, P., C. G., Wang, L. X., Lu, and G. Q., Li. 2015. “Selective Disassembly Sequence Generation Based on Lowest Level Disassembly Graph Method.” International Journal of Advanced Manufacturing Technology 80 (1): 141–159.10.1007/s00170-015-6861-4
    • (2015) International Journal of Advanced Manufacturing Technology , vol.80 , Issue.1 , pp. 141-159
    • Mitrouchev, P.1    Wang, C.G.2    Lu, L.X.3    Li, G.Q.4
  • 37
    • 0001454014 scopus 로고    scopus 로고
    • A Branch and Bound Method for Stochastic Global Optimization
    • Norkin, V. I., G. C., Pflug, and A., Ruszczyński. 1998. “A Branch and Bound Method for Stochastic Global Optimization.” Mathematical Programming 83 (1): 425–450.
    • (1998) Mathematical Programming , vol.83 , Issue.1 , pp. 425-450
    • Norkin, V.I.1    Pflug, G.C.2    Ruszczyński, A.3
  • 39
    • 0031123978 scopus 로고    scopus 로고
    • Evaluating the End-of-Life Value of a Product Andimproving It by Redesign
    • Pnueli, Y., and E., Zussman. 1997. “Evaluating the End-of-Life Value of a Product Andimproving It by Redesign.” International Journal of Production Research 35 (4): 921–942.10.1080/002075497195452
    • (1997) International Journal of Production Research , vol.35 , Issue.4 , pp. 921-942
    • Pnueli, Y.1    Zussman, E.2
  • 40
    • 0036978701 scopus 로고    scopus 로고
    • Computer Aided Disassembly Planning: State of the Art and Perspectives
    • Santoch, M., G., Dini, and F., Failli. 2002. “Computer Aided Disassembly Planning: State of the Art and Perspectives.” Annals of the CIRP 51 (2): 507–529.10.1016/S0007-8506(07)61698-9
    • (2002) Annals of the CIRP , vol.51 , Issue.2 , pp. 507-529
    • Santoch, M.1    Dini, G.2    Failli, F.3
  • 41
    • 78650593531 scopus 로고    scopus 로고
    • Rule-Based Recursive Selective Disassembly Sequence Planning for Green Design
    • Smith, S., and W. H., Chen. 2011. “Rule-Based Recursive Selective Disassembly Sequence Planning for Green Design.” Advanced Engineering Informatics 25 (1): 77–87.10.1016/j.aei.2010.03.002
    • (2011) Advanced Engineering Informatics , vol.25 , Issue.1 , pp. 77-87
    • Smith, S.1    Chen, W.H.2
  • 42
    • 84995467669 scopus 로고    scopus 로고
    • Partial Disassembly Sequence Planning Based on Cost-Benefit Analysis
    • Smith, S., L. Y., Hsu, and G. C., Smith. 2016. “Partial Disassembly Sequence Planning Based on Cost-Benefit Analysis.” Journal of Cleaner Production 139: 729–739.10.1016/j.jclepro.2016.08.095
    • (2016) Journal of Cleaner Production , vol.139 , pp. 729-739
    • Smith, S.1    Hsu, L.Y.2    Smith, G.C.3
  • 43
    • 84859626393 scopus 로고    scopus 로고
    • Disassembly Sequence Structure Graphs: An Optimal Approach for Multiple-Target Selective Disassembly Sequence Planning
    • Smith, S., G., Smith, and W. H., Chen. 2012. “Disassembly Sequence Structure Graphs: An Optimal Approach for Multiple-Target Selective Disassembly Sequence Planning.” Advanced Engineering Informatics 26 (2): 306–316.10.1016/j.aei.2011.11.003
    • (2012) Advanced Engineering Informatics , vol.26 , Issue.2 , pp. 306-316
    • Smith, S.1    Smith, G.2    Chen, W.H.3
  • 44
    • 0000098669 scopus 로고    scopus 로고
    • A Geometric Algorithm for Single Selective Disassembly Using the Wave Propagation Abstraction
    • Srinivasan, H., and R., Gadh. 1998. “A Geometric Algorithm for Single Selective Disassembly Using the Wave Propagation Abstraction.” Computer Aided Design 30 (8): 603–613.10.1016/S0010-4485(98)00009-8
    • (1998) Computer Aided Design , vol.30 , Issue.8 , pp. 603-613
    • Srinivasan, H.1    Gadh, R.2
  • 46
    • 84862118118 scopus 로고    scopus 로고
    • Evaluation Model and Algorithm of Product Disassembly Process with Stochastic Feature
    • Tian, G., Y., Liu, Q., Tian, and J., Chu. 2012. “Evaluation Model and Algorithm of Product Disassembly Process with Stochastic Feature.” Clean Technologies and Environmental Policy 14 (2): 345–356.10.1007/s10098-011-0406-9
    • (2012) Clean Technologies and Environmental Policy , vol.14 , Issue.2 , pp. 345-356
    • Tian, G.1    Liu, Y.2    Tian, Q.3    Chu, J.4
  • 47
    • 84862794782 scopus 로고    scopus 로고
    • Probability Evaluation Models of Product Disassembly Cost Subject to Random Removal Time and Different Removal Labor Cost
    • Tian, G., M., Zhou, J., Chu, and Y., Liu. 2012. “Probability Evaluation Models of Product Disassembly Cost Subject to Random Removal Time and Different Removal Labor Cost.” IEEE Transactions on Automation Science and Engineering 9 (2): 288–295.10.1109/TASE.2011.2176489
    • (2012) IEEE Transactions on Automation Science and Engineering , vol.9 , Issue.2 , pp. 288-295
    • Tian, G.1    Zhou, M.2    Chu, J.3    Liu, Y.4
  • 48
    • 84885444046 scopus 로고    scopus 로고
    • A Chance Constrained Programming Approach to Determine the Optimal Disassembly Sequence
    • Tian, G., M., Zhou, and J., Chu. 2013. “A Chance Constrained Programming Approach to Determine the Optimal Disassembly Sequence.” IEEE Transactions on Automation Science and Engineering 10 (4): 1004–1013.10.1109/TASE.2013.2249663
    • (2013) IEEE Transactions on Automation Science and Engineering , vol.10 , Issue.4 , pp. 1004-1013
    • Tian, G.1    Zhou, M.2    Chu, J.3
  • 49
    • 34547282845 scopus 로고    scopus 로고
    • Selective Disassembly Planning for Product Green Manufacturing
    • Wang, J. F., S. Q., Li, and J. H., Liu. 2007. “Selective Disassembly Planning for Product Green Manufacturing.” Computer Integrated Manufacturing Systems 13 (6): 1097–1102.
    • (2007) Computer Integrated Manufacturing Systems , vol.13 , Issue.6 , pp. 1097-1102
    • Wang, J.F.1    Li, S.Q.2    Liu, J.H.3
  • 50
    • 84874295596 scopus 로고    scopus 로고
    • Intelligent Disassembly Planning: A Review on Its Fundamental Methodology
    • Wang, H., D., Xiang, Y., Rong, and L., Zhang. 2013. “Intelligent Disassembly Planning: A Review on Its Fundamental Methodology.” Assembly Automation 33 (1): 78–85.10.1108/01445151311294801
    • (2013) Assembly Automation , vol.33 , Issue.1 , pp. 78-85
    • Wang, H.1    Xiang, D.2    Rong, Y.3    Zhang, L.4
  • 51
    • 0026157024 scopus 로고
    • Automatic Disassembly and Total Ordering in Three Dimensions
    • Woo, T. C., and D., Dutta. 1991. “Automatic Disassembly and Total Ordering in Three Dimensions.” Journal of Engineering for Industry 113 (2): 207–213.10.1115/1.2899679
    • (1991) Journal of Engineering for Industry , vol.113 , Issue.2 , pp. 207-213
    • Woo, T.C.1    Dutta, D.2
  • 52
    • 0001378506 scopus 로고    scopus 로고
    • Environmentally Conscious Design and Manufacturing: A State-of-the-Art Survey
    • Zhang, H. C., T. C., Kuo, H. T., Lu, and S. H., Huang. 1997. “Environmentally Conscious Design and Manufacturing: A State-of-the-Art Survey.” Journal of Manufacturing Systems 16 (5): 352–371.10.1016/S0278-6125(97)88465-8
    • (1997) Journal of Manufacturing Systems , vol.16 , Issue.5 , pp. 352-371
    • Zhang, H.C.1    Kuo, T.C.2    Lu, H.T.3    Huang, S.H.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.