메뉴 건너뛰기




Volumn 82, Issue 9-12, 2016, Pages 1463-1473

Disassembly leveling and lot sizing for multiple product types: a basic model and its extension

Author keywords

Disassembly leveling; Disassembly lot sizing; Optimal and heuristic algorithms; Parts commonality

Indexed keywords

MATHEMATICAL PROGRAMMING; OPTIMIZATION; POLYNOMIAL APPROXIMATION;

EID: 84956617454     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-012-4570-9     Document Type: Article
Times cited : (27)

References (56)
  • 2
    • 33847365367 scopus 로고    scopus 로고
    • Green supply chain management: a state-of-the-art literature review
    • Srivastava SK (2007) Green supply chain management: a state-of-the-art literature review. Int J Manag Rev 9:53–80
    • (2007) Int J Manag Rev , vol.9 , pp. 53-80
    • Srivastava, S.K.1
  • 3
    • 79960682872 scopus 로고    scopus 로고
    • Reverse logistics: research issues and literature review
    • Lee D-H, Kim H-J, Kim J-S (2008) Reverse logistics: research issues and literature review. J Korean Inst Ind Eng 34:270–288
    • (2008) J Korean Inst Ind Eng , vol.34 , pp. 270-288
    • Lee, D.-H.1    Kim, H.-J.2    Kim, J.-S.3
  • 5
    • 0001378506 scopus 로고    scopus 로고
    • Environmentally conscious design and manufacturing: a state-of-the-art survey
    • Zhang HC, Kuo TC, Lu HT, Huang SH (1997) Environmentally conscious design and manufacturing: a state-of-the-art survey. J Manuf Syst 16:352–371
    • (1997) J Manuf Syst , vol.16 , pp. 352-371
    • Zhang, H.C.1    Kuo, T.C.2    Lu, H.T.3    Huang, S.H.4
  • 6
    • 0033358107 scopus 로고    scopus 로고
    • Issues in environmentally conscious manufacturing and product recovery: a survey
    • Gungor A, Gupta SM (1999) Issues in environmentally conscious manufacturing and product recovery: a survey. Comput Ind Eng 36:811–853
    • (1999) Comput Ind Eng , vol.36 , pp. 811-853
    • Gungor, A.1    Gupta, S.M.2
  • 8
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally conscious manufacturing and product recovery (ECMPRO): a review of the state of the art
    • Ilgin MA, Gupta SM (2010) Environmentally conscious manufacturing and product recovery (ECMPRO): a review of the state of the art. J Environ Manage 91:563–591
    • (2010) J Environ Manage , vol.91 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 9
    • 34548418090 scopus 로고    scopus 로고
    • Disassembly scheduling: literature review and further research directions
    • Kim H-J, Lee D-H, Xirouchakis P (2007) Disassembly scheduling: literature review and further research directions. Int J Prod Res 45:4465–4484
    • (2007) Int J Prod Res , vol.45 , pp. 4465-4484
    • Kim, H.-J.1    Lee, D.-H.2    Xirouchakis, P.3
  • 10
  • 11
    • 0036978701 scopus 로고    scopus 로고
    • Computer aided disassembly planning: state of the art and perspectives
    • Santoch M, Dini G, Failli F (2002) Computer aided disassembly planning: state of the art and perspectives. Ann CIRP 51:507–529
    • (2002) Ann CIRP , vol.51 , pp. 507-529
    • Santoch, M.1    Dini, G.2    Failli, F.3
  • 12
    • 0038156629 scopus 로고    scopus 로고
    • Disassembly sequencing: a survey
    • Lambert AJD (2003) Disassembly sequencing: a survey. Int J Prod Res 41:3721–3759
    • (2003) Int J Prod Res , vol.41 , pp. 3721-3759
    • Lambert, A.J.D.1
  • 13
    • 0030085256 scopus 로고    scopus 로고
    • Determination of a disassembly strategy
    • Penev K, de Ron A (1996) Determination of a disassembly strategy. Int J Prod Res 34:495–506
    • (1996) Int J Prod Res , vol.34 , pp. 495-506
    • Penev, K.1    de Ron, A.2
  • 14
    • 0001754245 scopus 로고    scopus 로고
    • Optimal disassembly configurations for single and multiple products
    • Meacham A, Uzsoy R, Venkatadri U (1999) Optimal disassembly configurations for single and multiple products. J Manuf Syst 18:311–322
    • (1999) J Manuf Syst , vol.18 , pp. 311-322
    • Meacham, A.1    Uzsoy, R.2    Venkatadri, U.3
  • 15
    • 0031247813 scopus 로고    scopus 로고
    • An evaluation methodology for disassembly processes
    • Gungor A, Gupta SM (1997) An evaluation methodology for disassembly processes. Comput Ind Eng 33:329–332
    • (1997) Comput Ind Eng , vol.33 , pp. 329-332
    • Gungor, A.1    Gupta, S.M.2
  • 16
    • 0031233911 scopus 로고    scopus 로고
    • Optimal disassembly of complex products
    • Lambert AJD (1997) Optimal disassembly of complex products. Int J Prod Res 35:2509–2523
    • (1997) Int J Prod Res , vol.35 , pp. 2509-2523
    • Lambert, A.J.D.1
  • 17
    • 19444364138 scopus 로고    scopus 로고
    • A selective disassembly methodology for end-of-life products
    • Kara S, Pornprasitpol P, Kaebernick H (2005) A selective disassembly methodology for end-of-life products. Assem Autom 25:124–134
    • (2005) Assem Autom , vol.25 , pp. 124-134
    • Kara, S.1    Pornprasitpol, P.2    Kaebernick, H.3
  • 18
    • 56449111330 scopus 로고    scopus 로고
    • A genetic algorithm for product disassembly sequence planning
    • Hui W, Dong X, Guanghong D (2008) A genetic algorithm for product disassembly sequence planning. Neurocomputing 71:2720–2726
    • (2008) Neurocomputing , vol.71 , pp. 2720-2726
    • Hui, W.1    Dong, X.2    Guanghong, D.3
  • 19
    • 42949112952 scopus 로고    scopus 로고
    • A path-relinking approach for a bi-criteria disassembly sequencing problem
    • Adenso-Diaz B, Garcia-Carbajal S, Gupta SM (2008) A path-relinking approach for a bi-criteria disassembly sequencing problem. Comput Oper Res 35:3989–3997
    • (2008) Comput Oper Res , vol.35 , pp. 3989-3997
    • Adenso-Diaz, B.1    Garcia-Carbajal, S.2    Gupta, S.M.3
  • 20
    • 0036881842 scopus 로고    scopus 로고
    • Incorporating component reuse, remanufacture, and recycle into product portfolio design
    • Mangun D, Thurston DL (2002) Incorporating component reuse, remanufacture, and recycle into product portfolio design. IEEE Trans Eng Manag 49:479–490
    • (2002) IEEE Trans Eng Manag , vol.49 , pp. 479-490
    • Mangun, D.1    Thurston, D.L.2
  • 21
    • 3142688493 scopus 로고    scopus 로고
    • A multicriteria decision-aid approach for product end of life alternative selection
    • Bufardi A, Gheorghe R, Kiritsis D, Xirouchakis P (2004) A multicriteria decision-aid approach for product end of life alternative selection. Int J Prod Res 42:3139–3157
    • (2004) Int J Prod Res , vol.42 , pp. 3139-3157
    • Bufardi, A.1    Gheorghe, R.2    Kiritsis, D.3    Xirouchakis, P.4
  • 22
    • 27844509079 scopus 로고    scopus 로고
    • Integrated approach for disassembly processes generation and recycling evaluation of an end-of-life product
    • Gerner S, Kobeissi A, David B, Binder Z, Descotes-genon B (2005) Integrated approach for disassembly processes generation and recycling evaluation of an end-of-life product. Int J Prod Res 43:195–222
    • (2005) Int J Prod Res , vol.43 , pp. 195-222
    • Gerner, S.1    Kobeissi, A.2    David, B.3    Binder, Z.4    Descotes-genon, B.5
  • 23
    • 34548405611 scopus 로고    scopus 로고
    • A multi-objective evolutionary algorithm for EOL product recovery optimization: turbocharger case study
    • Jun H-B, Cusin M, Kiritsis D, Xirouchakis P (2007) A multi-objective evolutionary algorithm for EOL product recovery optimization: turbocharger case study. Int J Prod Res 45:4573–4594
    • (2007) Int J Prod Res , vol.45 , pp. 4573-4594
    • Jun, H.-B.1    Cusin, M.2    Kiritsis, D.3    Xirouchakis, P.4
  • 24
    • 84867065803 scopus 로고    scopus 로고
    • Heuristic algorithms for minimizing total recovery cost of end-of-life products under quality constraints
    • Jun H-B, Lee D-H, Kim J-G, Kiritsis D (2012) Heuristic algorithms for minimizing total recovery cost of end-of-life products under quality constraints. Int J Prod Res 50:5330–5347
    • (2012) Int J Prod Res , vol.50 , pp. 5330-5347
    • Jun, H.-B.1    Lee, D.-H.2    Kim, J.-G.3    Kiritsis, D.4
  • 25
    • 84952519001 scopus 로고
    • Planning product disassembly for material recovery opportunities
    • Johnson MR, Wang MH (1995) Planning product disassembly for material recovery opportunities. Int J Prod Res 33:3119–3142
    • (1995) Int J Prod Res , vol.33 , pp. 3119-3142
    • Johnson, M.R.1    Wang, M.H.2
  • 26
    • 0032300843 scopus 로고    scopus 로고
    • Economical evaluation of disassembly operations for recycling. remanufacturing and reuse
    • Johnson MR, Wang MH (1998) Economical evaluation of disassembly operations for recycling. remanufacturing and reuse. Int J Prod Res 36:3227–3252
    • (1998) Int J Prod Res , vol.36 , pp. 3227-3252
    • Johnson, M.R.1    Wang, M.H.2
  • 27
    • 0033358055 scopus 로고    scopus 로고
    • Linear programming in disassembly/clustering sequence generation
    • Lambert AJD (1999) Linear programming in disassembly/clustering sequence generation. Comput Ind Eng 36:723–738
    • (1999) Comput Ind Eng , vol.36 , pp. 723-738
    • Lambert, A.J.D.1
  • 28
    • 0034963174 scopus 로고    scopus 로고
    • Parallel disassembly sequencing with sequence-dependent operation times
    • Kang J-G, Lee D-H, Xirouchakis P, Persson JG (2001) Parallel disassembly sequencing with sequence-dependent operation times. Ann CIRP 50:343–346
    • (2001) Ann CIRP , vol.50 , pp. 343-346
    • Kang, J.-G.1    Lee, D.-H.2    Xirouchakis, P.3    Persson, J.G.4
  • 29
    • 1942469261 scopus 로고    scopus 로고
    • Optimal disassembly sequencing with sequence dependent operation times based on the directed graph of assembly states
    • Kang J-G, Lee D-H, Xirouchakis P, Lambert AJD (2002) Optimal disassembly sequencing with sequence dependent operation times based on the directed graph of assembly states. J Korean Inst Ind Eng 28:264–273
    • (2002) J Korean Inst Ind Eng , vol.28 , pp. 264-273
    • Kang, J.-G.1    Lee, D.-H.2    Xirouchakis, P.3    Lambert, A.J.D.4
  • 30
    • 31044454520 scopus 로고    scopus 로고
    • Exact methods in optimum disassembly sequence search for problems subject to sequence dependent costs
    • Lambert AJD (2006) Exact methods in optimum disassembly sequence search for problems subject to sequence dependent costs. Omega 34:538–549
    • (2006) Omega , vol.34 , pp. 538-549
    • Lambert, A.J.D.1
  • 31
    • 0031123978 scopus 로고    scopus 로고
    • Evaluating the end-of-life value of a product and improving it by redesign
    • Pnueli Y, Zussman E (1997) Evaluating the end-of-life value of a product and improving it by redesign. Int J Prod Res 35:921–942
    • (1997) Int J Prod Res , vol.35 , pp. 921-942
    • Pnueli, Y.1    Zussman, E.2
  • 32
    • 0031651509 scopus 로고    scopus 로고
    • On a medium term product recovery and disposal strategy for durable assembly products
    • Krikke HR, Van Harten A, Schuur PC (1998) On a medium term product recovery and disposal strategy for durable assembly products. Int J Prod Res 36:111–139
    • (1998) Int J Prod Res , vol.36 , pp. 111-139
    • Krikke, H.R.1    Van Harten, A.2    Schuur, P.C.3
  • 33
    • 0035872177 scopus 로고    scopus 로고
    • Modeling and evaluating product end-of-life options
    • Erdos G, Kritsis T, Xirouchakis P (2001) Modeling and evaluating product end-of-life options. Int J Prod Res 39:1203–1220
    • (2001) Int J Prod Res , vol.39 , pp. 1203-1220
    • Erdos, G.1    Kritsis, T.2    Xirouchakis, P.3
  • 34
    • 31044434767 scopus 로고    scopus 로고
    • Determining optimal disassembly and recovery strategies
    • Teunter RH (2006) Determining optimal disassembly and recovery strategies. Omega 34:533–537
    • (2006) Omega , vol.34 , pp. 533-537
    • Teunter, R.H.1
  • 35
    • 77955192654 scopus 로고    scopus 로고
    • Simultaneous selective disassembly and end-of-life decision making for multiple products that share disassembly operations
    • Behdad S, Kwak M-G, Kim H, Thurston D (2010) Simultaneous selective disassembly and end-of-life decision making for multiple products that share disassembly operations. J Mech Des 132:1–9
    • (2010) J Mech Des , vol.132 , pp. 1-9
    • Behdad, S.1    Kwak, M.-G.2    Kim, H.3    Thurston, D.4
  • 36
    • 84862939665 scopus 로고    scopus 로고
    • Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal
    • Ma Y-S, Jun H-B, Kim H-W, Lee D-H (2011) Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal. Int J Prod Res 49:7007–7027
    • (2011) Int J Prod Res , vol.49 , pp. 7007-7027
    • Ma, Y.-S.1    Jun, H.-B.2    Kim, H.-W.3    Lee, D.-H.4
  • 37
    • 84862140141 scopus 로고    scopus 로고
    • Sustainability through disassembly modeling, planning, and leveling: a case study
    • Vinodh S, Nachiappan N, Praveen Kumar R (2012) Sustainability through disassembly modeling, planning, and leveling: a case study. Clean Techn Environ Policy 14:55–67
    • (2012) Clean Techn Environ Policy , vol.14 , pp. 55-67
    • Vinodh, S.1    Nachiappan, N.2    Praveen Kumar, R.3
  • 38
    • 84867097764 scopus 로고    scopus 로고
    • Disassembly modeling, planning, and leveling for a cam-operated rotary switch assembly: a case study
    • Vinodh S, Praveen Kumar R, Nachiappan N (2012) Disassembly modeling, planning, and leveling for a cam-operated rotary switch assembly: a case study. Int J Adv Manuf Technol 62:789–800
    • (2012) Int J Adv Manuf Technol , vol.62 , pp. 789-800
    • Vinodh, S.1    Praveen Kumar, R.2    Nachiappan, N.3
  • 39
  • 40
    • 2342594041 scopus 로고    scopus 로고
    • A two-stage heuristic for disassembly scheduling with assembly product structure
    • Lee D-H, Xirouchakis P (2004) A two-stage heuristic for disassembly scheduling with assembly product structure. J Oper Res Soc 55:287–297
    • (2004) J Oper Res Soc , vol.55 , pp. 287-297
    • Lee, D.-H.1    Xirouchakis, P.2
  • 41
    • 60749122690 scopus 로고    scopus 로고
    • A branch and bound algorithm for disassembly scheduling with assembly product structure
    • Kim H-J, Lee D-H, Xirouchakis P, Kwon O-K (2009) A branch and bound algorithm for disassembly scheduling with assembly product structure. J Oper Res Soc 60:419–430
    • (2009) J Oper Res Soc , vol.60 , pp. 419-430
    • Kim, H.-J.1    Lee, D.-H.2    Xirouchakis, P.3    Kwon, O.-K.4
  • 42
    • 0037501212 scopus 로고    scopus 로고
    • Disassembly scheduling with capacity constraints
    • Lee D-H, Xirouchakis P, Züst R (2002) Disassembly scheduling with capacity constraints. Ann CIRP 51:387–390
    • (2002) Ann CIRP , vol.51 , pp. 387-390
    • Lee, D.-H.1    Xirouchakis, P.2    Züst, R.3
  • 43
    • 60749097706 scopus 로고    scopus 로고
    • A two-stage heuristic for disassembly scheduling with capacity constraints
    • Jeon H-B, Kim J-G, Kim H-J, Lee D-H (2006) A two-stage heuristic for disassembly scheduling with capacity constraints. Int J Manag Sci 12:95–112
    • (2006) Int J Manag Sci , vol.12 , pp. 95-112
    • Jeon, H.-B.1    Kim, J.-G.2    Kim, H.-J.3    Lee, D.-H.4
  • 45
    • 0031119840 scopus 로고    scopus 로고
    • Disassembly of complex product structures with parts and materials commonality
    • Taleb KN, Gupta SM, Brennan L (1997) Disassembly of complex product structures with parts and materials commonality. Prod Plan Control 8:255–269
    • (1997) Prod Plan Control , vol.8 , pp. 255-269
    • Taleb, K.N.1    Gupta, S.M.2    Brennan, L.3
  • 46
    • 0031219811 scopus 로고    scopus 로고
    • Disassembly of multiple products structure
    • Taleb KN, Gupta SM (1997) Disassembly of multiple products structure. Comput Ind Eng 32:949–961
    • (1997) Comput Ind Eng , vol.32 , pp. 949-961
    • Taleb, K.N.1    Gupta, S.M.2
  • 47
    • 0036612491 scopus 로고    scopus 로고
    • Demand-driven disassembly optimization for electronic products
    • Lambert AJD, Gupta SM (2002) Demand-driven disassembly optimization for electronic products. J Electron Manuf 11:121–135
    • (2002) J Electron Manuf , vol.11 , pp. 121-135
    • Lambert, A.J.D.1    Gupta, S.M.2
  • 48
    • 0041341872 scopus 로고    scopus 로고
    • Disassembly scheduling with multiple product types
    • Kim H-J, Lee D-H, Xirouchakis P, Züst R (2003) Disassembly scheduling with multiple product types. Ann CIRP 52:403–406
    • (2003) Ann CIRP , vol.52 , pp. 403-406
    • Kim, H.-J.1    Lee, D.-H.2    Xirouchakis, P.3    Züst, R.4
  • 49
    • 33746947335 scopus 로고    scopus 로고
    • Heuristics for demand-driven disassembly planning
    • Langella IM (2007) Heuristics for demand-driven disassembly planning. Comput Ind Eng 34:552–577
    • (2007) Comput Ind Eng , vol.34 , pp. 552-577
    • Langella, I.M.1
  • 50
    • 29344457880 scopus 로고    scopus 로고
    • Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality
    • Kim H-J, Lee D-H, Xirouchakis P (2006) Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality. Int J Prod Res 44:195–212
    • (2006) Int J Prod Res , vol.44 , pp. 195-212
    • Kim, H.-J.1    Lee, D.-H.2    Xirouchakis, P.3
  • 51
    • 8344257395 scopus 로고    scopus 로고
    • Disassembly scheduling: integer programming models. Proceedings of the Institution of Mechanical Engineers; Part B
    • Lee D-H, Kim H-J, Choi G, Xirouchakis P (2004) Disassembly scheduling: integer programming models. Proceedings of the Institution of Mechanical Engineers; Part B. J Eng Manuf 218:1357–1372
    • (2004) J Eng Manuf , vol.218 , pp. 1357-1372
    • Lee, D.-H.1    Kim, H.-J.2    Choi, G.3    Xirouchakis, P.4
  • 52
    • 0032284905 scopus 로고    scopus 로고
    • Optimal analysis of lot size balancing for multi-products selective disassembly
    • Veerakamolmal P, Gupta SM (1998) Optimal analysis of lot size balancing for multi-products selective disassembly. Int J Flex Autom Integr Manuf 6:245–269
    • (1998) Int J Flex Autom Integr Manuf , vol.6 , pp. 245-269
    • Veerakamolmal, P.1    Gupta, S.M.2
  • 54
    • 31044432230 scopus 로고    scopus 로고
    • A disassembly to order system under uncertainty
    • Kongar E, Gupta SM (2006) A disassembly to order system under uncertainty. Omega 34:550–561
    • (2006) Omega , vol.34 , pp. 550-561
    • Kongar, E.1    Gupta, S.M.2
  • 55
    • 61549119442 scopus 로고    scopus 로고
    • On the optimal design of the disassembly and recovery processes
    • Xanthopoulos A, Iakovou E (2009) On the optimal design of the disassembly and recovery processes. Waste Manage 29:1702–1711
    • (2009) Waste Manage , vol.29 , pp. 1702-1711
    • Xanthopoulos, A.1    Iakovou, E.2
  • 56
    • 84857514759 scopus 로고    scopus 로고
    • On the complexity of disassembly scheduling. Technical Report, Graduate School of Logistics
    • Incheon, Republic of Kore
    • Kim H-J (2005) On the complexity of disassembly scheduling. Technical Report, Graduate School of Logistics, Inha University, Incheon, Republic of Korea
    • (2005) Inha University
    • Kim, H.-J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.