-
1
-
-
42949112952
-
A Path-relinking Approach for a Bi-Criteria Disassembly Sequencing Problem
-
Adenso-Diaz, B., S. Garcia-Carbajal, and S. M. Gupta. 2008. “A Path-relinking Approach for a Bi-Criteria Disassembly Sequencing Problem.” Computers & Operations Research 35 (12): 3989–3997.
-
(2008)
Computers & Operations Research
, vol.35
, Issue.12
, pp. 3989-3997
-
-
Adenso-Diaz, B.1
Garcia-Carbajal, S.2
Gupta, S.M.3
-
2
-
-
84961289222
-
An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times
-
Bentaha, M. L., O. Battaïa, and A. Dolgui. 2015. “An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times.” International Journal of Production Research 53 (6): 1807–1818.
-
(2015)
International Journal of Production Research
, vol.53
, Issue.6
, pp. 1807-1818
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
3
-
-
84940610243
-
Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints
-
Bentaha, M. L., O. Battaïa, A. Dolgui, and S. J. Hu. 2015. “Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints.” European Journal of Operational Research 247 (3): 957–967.
-
(2015)
European Journal of Operational Research
, vol.247
, Issue.3
, pp. 957-967
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
Hu, S.J.4
-
4
-
-
35448963449
-
Design for Disassembly: A Critical Twenty-First Century Discipline
-
Bogue, R. 2007. “Design for Disassembly: A Critical Twenty-First Century Discipline.” Assembly Automation 27 (4): 285–289.
-
(2007)
Assembly Automation
, vol.27
, Issue.4
, pp. 285-289
-
-
Bogue, R.1
-
5
-
-
17944377583
-
An Integrated Approach to Selective-disassembly Sequence Planning
-
Chung, C., and Q. Peng. 2005. “An Integrated Approach to Selective-disassembly Sequence Planning.” Robotics and Computer-Integrated Manufacturing 21 (4–5): 475–485.
-
(2005)
Robotics and Computer-Integrated Manufacturing
, vol.21
, Issue.4-5
, pp. 475-485
-
-
Chung, C.1
Peng, Q.2
-
6
-
-
33748576305
-
A Hybrid Approach to Selective-disassembly Sequence Planning for De-manufacturing and Its Implementation on the Internet
-
Chung, C., and Q. Peng. 2006. “A Hybrid Approach to Selective-disassembly Sequence Planning for De-manufacturing and Its Implementation on the Internet.” The International Journal of Advanced Manufacturing Technology 30 (5–6): 521–529.
-
(2006)
The International Journal of Advanced Manufacturing Technology
, vol.30
, Issue.5-6
, pp. 521-529
-
-
Chung, C.1
Peng, Q.2
-
8
-
-
84937251126
-
Generating Complete Disassembly Sequences by Utilising Two-dimensional Views
-
Giri, R., and M. Kanthababu. 2015. “Generating Complete Disassembly Sequences by Utilising Two-dimensional Views.” International Journal of Production Research 53 (17): 5118–5138.
-
(2015)
International Journal of Production Research
, vol.53
, Issue.17
, pp. 5118-5138
-
-
Giri, R.1
Kanthababu, M.2
-
9
-
-
0031247813
-
An Evaluation Methodology for Disassembly Processes
-
Gungor, A., and S. M. Gupta. 1997. “An Evaluation Methodology for Disassembly Processes.” Computers & Industrial Engineering 33 (1-2): 329–332.
-
(1997)
Computers & Industrial Engineering
, vol.33
, Issue.1-2
, pp. 329-332
-
-
Gungor, A.1
Gupta, S.M.2
-
10
-
-
0035866455
-
Disassembly Sequence Plan Generation Using a Branch-and-Bound Algorithm
-
Gungor, A., and S. M. Gupta. 2001. “Disassembly Sequence Plan Generation Using a Branch-and-Bound Algorithm.” International Journal of Production Research 39 (3): 481–509.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.3
, pp. 481-509
-
-
Gungor, A.1
Gupta, S.M.2
-
11
-
-
84882451160
-
Mathematical Model and Solution Algorithms for Selective Disassembly Sequencing with Multiple Target Components and Sequence-Dependent Setups
-
Han, H.-J., J.-M. Yu, and D.-H. Lee. 2013. “Mathematical Model and Solution Algorithms for Selective Disassembly Sequencing with Multiple Target Components and Sequence-Dependent Setups.” International Journal of Production Research 51 (16): 4997–5010.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.16
, pp. 4997-5010
-
-
Han, H.-J.1
Yu, J.-M.2
Lee, D.-H.3
-
12
-
-
84922251741
-
A Network-based Shortest Route Model for Parallel Disassembly Line Balancing Problem
-
Hezer, S., and Y. Kara. 2015. “A Network-based Shortest Route Model for Parallel Disassembly Line Balancing Problem.” International Journal of Production Research 53 (6): 1849–1865.
-
(2015)
International Journal of Production Research
, vol.53
, Issue.6
, pp. 1849-1865
-
-
Hezer, S.1
Kara, Y.2
-
13
-
-
56449111330
-
A Genetic Algorithm for Product Disassembly Sequence Planning
-
Hui, W., X. Dong, and D. Guanghong. 2008. “A Genetic Algorithm for Product Disassembly Sequence Planning.” Neurocomputing 71 (13–15): 2720–2726.
-
(2008)
Neurocomputing
, vol.71
, Issue.13-15
, pp. 2720-2726
-
-
Hui, W.1
Dong, X.2
Guanghong, D.3
-
14
-
-
72149096791
-
Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art
-
Ilgin, M. A., and S. M. Gupta. 2010. “Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art.” Journal of Environmental Management 91 (3): 563–591.
-
(2010)
Journal of Environmental Management
, vol.91
, Issue.3
, pp. 563-591
-
-
Ilgin, M.A.1
Gupta, S.M.2
-
15
-
-
84954069273
-
Use of MCDM Techniques in Environmentally Conscious Manufacturing and Product Recovery: State of the Art
-
Ilgin, M. A., S. M. Gupta, and O. Battaïa. 2015. “Use of MCDM Techniques in Environmentally Conscious Manufacturing and Product Recovery: State of the Art.” Journal of Manufacturing Systems 37 (3): 746–758.
-
(2015)
Journal of Manufacturing Systems
, vol.37
, Issue.3
, pp. 746-758
-
-
Ilgin, M.A.1
Gupta, S.M.2
Battaïa, O.3
-
17
-
-
84959357726
-
Capacitated Disassembly Scheduling with Parts Commonality and Start-up Cost and Its Industrial Application
-
Ji, X., Z. Zhang, S. Huang, and L. Li. 2016. “Capacitated Disassembly Scheduling with Parts Commonality and Start-up Cost and Its Industrial Application.” International Journal of Production Research 54 (4): 1225–1243.
-
(2016)
International Journal of Production Research
, vol.54
, Issue.4
, pp. 1225-1243
-
-
Ji, X.1
Zhang, Z.2
Huang, S.3
Li, L.4
-
18
-
-
84952519001
-
Planning Product Disassembly for Material Recovery Opportunities
-
Johnson, M. R., and M. H. Wang. 1995. “Planning Product Disassembly for Material Recovery Opportunities.” International Journal of Production Research 33 (11): 3119–3142.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.11
, pp. 3119-3142
-
-
Johnson, M.R.1
Wang, M.H.2
-
19
-
-
0032300843
-
Economical Evaluation of Disassembly Operations for Recycling, Remanufacturing and Reuse
-
Johnson, M. R., and M. H. Wang. 1998. “Economical Evaluation of Disassembly Operations for Recycling, Remanufacturing and Reuse.” International Journal of Production Research 36 (12): 3227–3252.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.12
, pp. 3227-3252
-
-
Johnson, M.R.1
Wang, M.H.2
-
20
-
-
0027836570
-
A Key Issue in Product Life Cycle: Disassembly
-
Jovane, F., L. Alting, A. Armillotta, W. Eversheim, K. Feldmann, G. Seliger, and N. Roth. 1993. “A Key Issue in Product Life Cycle: Disassembly.” Annals of the CIRP 42 (2): 651–658.
-
(1993)
Annals of the CIRP
, vol.42
, Issue.2
, pp. 651-658
-
-
Jovane, F.1
Alting, L.2
Armillotta, A.3
Eversheim, W.4
Feldmann, K.5
Seliger, G.6
Roth, N.7
-
21
-
-
84881185298
-
Artificial Bee Colony Algorithm for Solving Sequence-dependent Disassembly Line Balancing Problem
-
Kalayci, C. B., and S. M. Gupta. 2013. “Artificial Bee Colony Algorithm for Solving Sequence-dependent Disassembly Line Balancing Problem.” Expert Systems with Applications 40 (18): 7231–7241.
-
(2013)
Expert Systems with Applications
, vol.40
, Issue.18
, pp. 7231-7241
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
22
-
-
0034963174
-
Parallel Disassembly Sequencing with Sequence-dependent Operation times
-
Kang, J.-G., D.-H. Lee, P. Xirouchakis, and J.-G. Persson. 2001. “Parallel Disassembly Sequencing with Sequence-dependent Operation times.” Annals of the CIRP 50 (1): 343–346.
-
(2001)
Annals of the CIRP
, vol.50
, Issue.1
, pp. 343-346
-
-
Kang, J.-G.1
Lee, D.-H.2
Xirouchakis, P.3
Persson, J.-G.4
-
23
-
-
1942469261
-
Optimal Disassembly Sequencing with Sequence Dependent Operation times Based on the Directed Graph of Assembly States
-
Kang, J.-G., D.-H. Lee, P. Xirouchakis, and A. J. D. Lambert. 2002. “Optimal Disassembly Sequencing with Sequence Dependent Operation times Based on the Directed Graph of Assembly States.” Journal of the Korean Institute of Industrial Engineers 28 (3): 264–273.
-
(2002)
Journal of the Korean Institute of Industrial Engineers
, vol.28
, Issue.3
, pp. 264-273
-
-
Kang, J.-G.1
Lee, D.-H.2
Xirouchakis, P.3
Lambert, A.J.D.4
-
24
-
-
84956617454
-
Disassembly Leveling and Lot Sizing for Multiple Product Types: A Basic Model and Its Extension
-
Kang, K.-W., H.-H. Doh, J.-H. Park, and D.-H. Lee. 2016. “Disassembly Leveling and Lot Sizing for Multiple Product Types: A Basic Model and Its Extension.” International Journal of Advanced Manufacturing Technology 82 (9–12): 1463–1473.
-
(2016)
International Journal of Advanced Manufacturing Technology
, vol.82
, Issue.9-12
, pp. 1463-1473
-
-
Kang, K.-W.1
Doh, H.-H.2
Park, J.-H.3
Lee, D.-H.4
-
25
-
-
19444364138
-
A Selective Disassembly Methodology for End‐of‐life Products
-
Kara, S., P. Pornprasitpol, and H. Kaebernick. 2005. “A Selective Disassembly Methodology for End‐of‐life Products.” Assembly Automation 25 (2): 124–134.
-
(2005)
Assembly Automation
, vol.25
, Issue.2
, pp. 124-134
-
-
Kara, S.1
Pornprasitpol, P.2
Kaebernick, H.3
-
26
-
-
33750068327
-
Selective Disassembly Sequencing: A Methodology for the Disassembly of End-of-life Products
-
Kara, S., P. Pornprasitpol, and H. Kaebernick. 2006. “Selective Disassembly Sequencing: A Methodology for the Disassembly of End-of-life Products.” Annals of the CIRP 55 (1): 37–40.
-
(2006)
Annals of the CIRP
, vol.55
, Issue.1
, pp. 37-40
-
-
Kara, S.1
Pornprasitpol, P.2
Kaebernick, H.3
-
27
-
-
34548418090
-
Disassembly Scheduling: Literature Review and Further Research Directions
-
Kim, H.-J., D.-H. Lee, and P. Xirouchakis. 2007. “Disassembly Scheduling: Literature Review and Further Research Directions.” International Journal of Production Research 45 (18–19): 4465–4484.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.18-19
, pp. 4465-4484
-
-
Kim, H.-J.1
Lee, D.-H.2
Xirouchakis, P.3
-
30
-
-
31044454520
-
Exact Methods in Optimum Disassembly Sequence Search for Problems Subject to Sequence Dependent Costs
-
Lambert, A. J. D. 2006. “Exact Methods in Optimum Disassembly Sequence Search for Problems Subject to Sequence Dependent Costs.” Omega 34 (6): 538–549.
-
(2006)
Omega
, vol.34
, Issue.6
, pp. 538-549
-
-
Lambert, A.J.D.1
-
33
-
-
84886785066
-
Selective Disassembly Planning for Waste Electrical and Electronic Equipment with Case Studies on Liquid Crystaldisplays
-
Li, W. D., K. Xia, L. Gao, and K.-M. Chao. 2013. “Selective Disassembly Planning for Waste Electrical and Electronic Equipment with Case Studies on Liquid Crystaldisplays.” Robotics and Computer-Integrated Manufacturing 29 (4): 248–260.
-
(2013)
Robotics and Computer-Integrated Manufacturing
, vol.29
, Issue.4
, pp. 248-260
-
-
Li, W.D.1
Xia, K.2
Gao, L.3
Chao, K.-M.4
-
34
-
-
84949895569
-
Integrated Multi-layer Representation and Ant Colony Search for Product Selective Disassembly Planning
-
Luo, Y., Q. Peng, and P. Gu. 2016. “Integrated Multi-layer Representation and Ant Colony Search for Product Selective Disassembly Planning.” Computers in Industry 75: 13–26.
-
(2016)
Computers in Industry
, vol.75
, pp. 13-26
-
-
Luo, Y.1
Peng, Q.2
Gu, P.3
-
35
-
-
84862939665
-
Disassembly Process Planning Algorithms for End-of-life Product Recovery and Environmentally Conscious Disposal
-
Ma, Y.-S., H.-B. Jun, H.-W. Kim, and D.-H. Lee. 2011. “Disassembly Process Planning Algorithms for End-of-life Product Recovery and Environmentally Conscious Disposal.” International Journal of Production Research 49 (23): 7007–7027.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.23
, pp. 7007-7027
-
-
Ma, Y.-S.1
Jun, H.-B.2
Kim, H.-W.3
Lee, D.-H.4
-
36
-
-
79961038399
-
Benchmark Data set for Evaluation of Line Balancing Algorithms
-
McGovern, S. M., and S. M. Gupta. 2007. “Benchmark Data set for Evaluation of Line Balancing Algorithms.” IFAC Proceedings Volumes 40 (2): 48–53.
-
(2007)
IFAC Proceedings Volumes
, vol.40
, Issue.2
, pp. 48-53
-
-
McGovern, S.M.1
Gupta, S.M.2
-
37
-
-
84964514073
-
An Improved Co-evolutionary Algorithm for Green Manufacturing by Integration of Recovery Option Selection and Disassembly Planning for End-of-life Products
-
Meng, K., P. Lou, X. Peng, and V. Prybutok. 2016. “An Improved Co-evolutionary Algorithm for Green Manufacturing by Integration of Recovery Option Selection and Disassembly Planning for End-of-life Products.” International Journal of Production Research 54 (18): 5567–5593.
-
(2016)
International Journal of Production Research
, vol.54
, Issue.18
, pp. 5567-5593
-
-
Meng, K.1
Lou, P.2
Peng, X.3
Prybutok, V.4
-
38
-
-
84939260816
-
Selective Disassembly Sequence Generation Based on Lowest Level Disassembly Graph Method
-
Mitrouchev, P., C. G. Wang, L. X. Lu, and G. Q. Li. 2015. “Selective Disassembly Sequence Generation Based on Lowest Level Disassembly Graph Method.” The International Journal of Advanced Manufacturing Technology 80 (1–4): 141–159.
-
(2015)
The International Journal of Advanced Manufacturing Technology
, vol.80
, Issue.1-4
, pp. 141-159
-
-
Mitrouchev, P.1
Wang, C.G.2
Lu, L.X.3
Li, G.Q.4
-
40
-
-
0000930416
-
State of the Art Literature Survey on Disassembly Planning
-
O’Shea, B., S. S. Grewal, and H. Kaebernick. 1998. “State of the Art Literature Survey on Disassembly Planning.” Concurrent Engineering 6 (4): 345–357.
-
(1998)
Concurrent Engineering
, vol.6
, Issue.4
, pp. 345-357
-
-
O’Shea, B.1
Grewal, S.S.2
Kaebernick, H.3
-
41
-
-
0031123978
-
Evaluating the End-of-life Value of a Product Andimproving it by Redesign
-
Pnueli, Y., and E. Zussman. 1997. “Evaluating the End-of-life Value of a Product Andimproving it by Redesign.” International Journal of Production Research 35 (4): 921–942.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.4
, pp. 921-942
-
-
Pnueli, Y.1
Zussman, E.2
-
42
-
-
0036978701
-
Computer Aided Disassembly Planning: State of the Art and Perspectives
-
Santochi, M., G. Dini, and F. Failli. 2002. “Computer Aided Disassembly Planning: State of the Art and Perspectives.” Annals of the CIRP 51 (2): 507–529.
-
(2002)
Annals of the CIRP
, vol.51
, Issue.2
, pp. 507-529
-
-
Santochi, M.1
Dini, G.2
Failli, F.3
-
43
-
-
78650593531
-
Rule-based Recursive Selective Disassembly Sequence Planning for Green Design
-
Smith, S., and W. H. Chen. 2011. “Rule-based Recursive Selective Disassembly Sequence Planning for Green Design.” Advanced Engineering Informatics 25 (1): 77–87.
-
(2011)
Advanced Engineering Informatics
, vol.25
, Issue.1
, pp. 77-87
-
-
Smith, S.1
Chen, W.H.2
-
44
-
-
84943352434
-
A Novel Selective Parallel Disassembly Planning Method for Green Design
-
Smith, S., and P. Y. Hung. 2015. “A Novel Selective Parallel Disassembly Planning Method for Green Design.” Journal of Engineering Design 26 (10–12): 283–301.
-
(2015)
Journal of Engineering Design
, vol.26
, Issue.10-12
, pp. 283-301
-
-
Smith, S.1
Hung, P.Y.2
-
45
-
-
84859626393
-
Disassembly Sequence Structure Graphs: An Optimal Approach for Multiple-target Selective Disassembly Sequence Planning
-
Smith, S., G. Smith, and W. H. Chen. 2012. “Disassembly Sequence Structure Graphs: An Optimal Approach for Multiple-target Selective Disassembly Sequence Planning.” Advanced Engineering Informatics 26 (2): 306–316.
-
(2012)
Advanced Engineering Informatics
, vol.26
, Issue.2
, pp. 306-316
-
-
Smith, S.1
Smith, G.2
Chen, W.H.3
-
46
-
-
84995467669
-
Partial Disassembly Sequence Planning Based on Cost-benefit Analysis
-
Smith, S., L. Y. Hsu, and G. C. Smith. 2016. “Partial Disassembly Sequence Planning Based on Cost-benefit Analysis.” Journal of Cleaner Production 139: 729–739.
-
(2016)
Journal of Cleaner Production
, vol.139
, pp. 729-739
-
-
Smith, S.1
Hsu, L.Y.2
Smith, G.C.3
-
47
-
-
0000098669
-
A Geometric Algorithm for Single Selective Disassembly Using the Wave Propagation Abstraction
-
Srinivasan, H., and R. Gadh. 1998. “A Geometric Algorithm for Single Selective Disassembly Using the Wave Propagation Abstraction.” Computer Aided Design 30 (8): 603–613.
-
(1998)
Computer Aided Design
, vol.30
, Issue.8
, pp. 603-613
-
-
Srinivasan, H.1
Gadh, R.2
-
48
-
-
0041368822
-
Disassembly Modeling, Planning, and Application
-
Tang, Y., M. C. Zhou, E. Zussman, and R. Caudill. 2002. “Disassembly Modeling, Planning, and Application.” Journal of Manufacturing Systems 21 (3): 200–217.
-
(2002)
Journal of Manufacturing Systems
, vol.21
, Issue.3
, pp. 200-217
-
-
Tang, Y.1
Zhou, M.C.2
Zussman, E.3
Caudill, R.4
-
49
-
-
31044434767
-
Determining Optimal Disassembly and Recovery Strategies
-
Teunter, R. H. 2006. “Determining Optimal Disassembly and Recovery Strategies.” Omega 34 (6): 533–537.
-
(2006)
Omega
, vol.34
, Issue.6
, pp. 533-537
-
-
Teunter, R.H.1
-
50
-
-
4043173472
-
Intelligent Selective Disassembly Using the Ant Colony Algorithm
-
Wang, J. F., J. H. Liu, S. Q. Li, and Y. F. Zhong. 2003. “Intelligent Selective Disassembly Using the Ant Colony Algorithm.” Artificial Intelligence for Engineering Design, Analysis and Manufacturing 17 (4): 325–333.
-
(2003)
Artificial Intelligence for Engineering Design, Analysis and Manufacturing
, vol.17
, Issue.4
, pp. 325-333
-
-
Wang, J.F.1
Liu, J.H.2
Li, S.Q.3
Zhong, Y.F.4
-
51
-
-
34547282845
-
Selective Disassembly Planning for Product Green Manufacturing
-
Wang, J. F., S. Q. Li, and J. H. Liu. 2007. “Selective Disassembly Planning for Product Green Manufacturing.” Computer Integrated Manufacturing Systems 13 (6): 1097–1102.
-
(2007)
Computer Integrated Manufacturing Systems
, vol.13
, Issue.6
, pp. 1097-1102
-
-
Wang, J.F.1
Li, S.Q.2
Liu, J.H.3
-
52
-
-
84874295596
-
Intelligent Disassembly Planning: A Review on Its Fundamental Methodology
-
Wang, H., D. Xiang, Y. Rong, and L. Zhang. 2013. “Intelligent Disassembly Planning: A Review on Its Fundamental Methodology.” Assembly Automation 33 (1): 78–85.
-
(2013)
Assembly Automation
, vol.33
, Issue.1
, pp. 78-85
-
-
Wang, H.1
Xiang, D.2
Rong, Y.3
Zhang, L.4
-
53
-
-
0026157024
-
Automatic Disassembly and Total Ordering in Three Dimensions
-
Woo, T. C., and D. Dutta. 1991. “Automatic Disassembly and Total Ordering in Three Dimensions.” Journal of Engineering for Industry 113 (2): 207–213.
-
(1991)
Journal of Engineering for Industry
, vol.113
, Issue.2
, pp. 207-213
-
-
Woo, T.C.1
Dutta, D.2
-
54
-
-
34347242859
-
Planning of Selective Disassembly Sequence Based on Ant Colony Optimization Algorithm
-
Xue, J. F., C. H. Qiu, and D. Xiang. 2007. “Planning of Selective Disassembly Sequence Based on Ant Colony Optimization Algorithm.” Journal of Computer Aided Design & Computer Graphics 1119 (16): 742–747.
-
(2007)
Journal of Computer Aided Design & Computer Graphics
, vol.1119
, Issue.16
, pp. 742-747
-
-
Xue, J.F.1
Qiu, C.H.2
Xiang, D.3
-
55
-
-
0001378506
-
Environmentally Conscious Design and Manufacturing: A State-of-the-Art Survey
-
Zhang, H. C., T. C. Kuo, H. T. Lu, and S. H. Huang. 1997. “Environmentally Conscious Design and Manufacturing: A State-of-the-Art Survey.” Journal of Manufacturing Systems 16 (5): 352–371.
-
(1997)
Journal of Manufacturing Systems
, vol.16
, Issue.5
, pp. 352-371
-
-
Zhang, H.C.1
Kuo, T.C.2
Lu, H.T.3
Huang, S.H.4
|