메뉴 건너뛰기




Volumn 55, Issue 24, 2017, Pages 7317-7333

An optimal algorithm for selective disassembly sequencing with sequence-dependent set-ups in parallel disassembly environment

Author keywords

Branch and bound; Disassembly planning; Parallel disassembly; Selective disassembly sequencing; Sequence dependent set ups

Indexed keywords

BRANCH AND BOUND METHOD; SOFTWARE TESTING;

EID: 85021147563     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2017.1342879     Document Type: Article
Times cited : (34)

References (55)
  • 1
    • 42949112952 scopus 로고    scopus 로고
    • A Path-relinking Approach for a Bi-Criteria Disassembly Sequencing Problem
    • Adenso-Diaz, B., S. Garcia-Carbajal, and S. M. Gupta. 2008. “A Path-relinking Approach for a Bi-Criteria Disassembly Sequencing Problem.” Computers & Operations Research 35 (12): 3989–3997.
    • (2008) Computers & Operations Research , vol.35 , Issue.12 , pp. 3989-3997
    • Adenso-Diaz, B.1    Garcia-Carbajal, S.2    Gupta, S.M.3
  • 2
    • 84961289222 scopus 로고    scopus 로고
    • An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times
    • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2015. “An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times.” International Journal of Production Research 53 (6): 1807–1818.
    • (2015) International Journal of Production Research , vol.53 , Issue.6 , pp. 1807-1818
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 3
    • 84940610243 scopus 로고    scopus 로고
    • Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints
    • Bentaha, M. L., O. Battaïa, A. Dolgui, and S. J. Hu. 2015. “Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints.” European Journal of Operational Research 247 (3): 957–967.
    • (2015) European Journal of Operational Research , vol.247 , Issue.3 , pp. 957-967
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3    Hu, S.J.4
  • 4
    • 35448963449 scopus 로고    scopus 로고
    • Design for Disassembly: A Critical Twenty-First Century Discipline
    • Bogue, R. 2007. “Design for Disassembly: A Critical Twenty-First Century Discipline.” Assembly Automation 27 (4): 285–289.
    • (2007) Assembly Automation , vol.27 , Issue.4 , pp. 285-289
    • Bogue, R.1
  • 5
    • 17944377583 scopus 로고    scopus 로고
    • An Integrated Approach to Selective-disassembly Sequence Planning
    • Chung, C., and Q. Peng. 2005. “An Integrated Approach to Selective-disassembly Sequence Planning.” Robotics and Computer-Integrated Manufacturing 21 (4–5): 475–485.
    • (2005) Robotics and Computer-Integrated Manufacturing , vol.21 , Issue.4-5 , pp. 475-485
    • Chung, C.1    Peng, Q.2
  • 6
    • 33748576305 scopus 로고    scopus 로고
    • A Hybrid Approach to Selective-disassembly Sequence Planning for De-manufacturing and Its Implementation on the Internet
    • Chung, C., and Q. Peng. 2006. “A Hybrid Approach to Selective-disassembly Sequence Planning for De-manufacturing and Its Implementation on the Internet.” The International Journal of Advanced Manufacturing Technology 30 (5–6): 521–529.
    • (2006) The International Journal of Advanced Manufacturing Technology , vol.30 , Issue.5-6 , pp. 521-529
    • Chung, C.1    Peng, Q.2
  • 8
    • 84937251126 scopus 로고    scopus 로고
    • Generating Complete Disassembly Sequences by Utilising Two-dimensional Views
    • Giri, R., and M. Kanthababu. 2015. “Generating Complete Disassembly Sequences by Utilising Two-dimensional Views.” International Journal of Production Research 53 (17): 5118–5138.
    • (2015) International Journal of Production Research , vol.53 , Issue.17 , pp. 5118-5138
    • Giri, R.1    Kanthababu, M.2
  • 9
    • 0031247813 scopus 로고    scopus 로고
    • An Evaluation Methodology for Disassembly Processes
    • Gungor, A., and S. M. Gupta. 1997. “An Evaluation Methodology for Disassembly Processes.” Computers & Industrial Engineering 33 (1-2): 329–332.
    • (1997) Computers & Industrial Engineering , vol.33 , Issue.1-2 , pp. 329-332
    • Gungor, A.1    Gupta, S.M.2
  • 10
    • 0035866455 scopus 로고    scopus 로고
    • Disassembly Sequence Plan Generation Using a Branch-and-Bound Algorithm
    • Gungor, A., and S. M. Gupta. 2001. “Disassembly Sequence Plan Generation Using a Branch-and-Bound Algorithm.” International Journal of Production Research 39 (3): 481–509.
    • (2001) International Journal of Production Research , vol.39 , Issue.3 , pp. 481-509
    • Gungor, A.1    Gupta, S.M.2
  • 11
    • 84882451160 scopus 로고    scopus 로고
    • Mathematical Model and Solution Algorithms for Selective Disassembly Sequencing with Multiple Target Components and Sequence-Dependent Setups
    • Han, H.-J., J.-M. Yu, and D.-H. Lee. 2013. “Mathematical Model and Solution Algorithms for Selective Disassembly Sequencing with Multiple Target Components and Sequence-Dependent Setups.” International Journal of Production Research 51 (16): 4997–5010.
    • (2013) International Journal of Production Research , vol.51 , Issue.16 , pp. 4997-5010
    • Han, H.-J.1    Yu, J.-M.2    Lee, D.-H.3
  • 12
    • 84922251741 scopus 로고    scopus 로고
    • A Network-based Shortest Route Model for Parallel Disassembly Line Balancing Problem
    • Hezer, S., and Y. Kara. 2015. “A Network-based Shortest Route Model for Parallel Disassembly Line Balancing Problem.” International Journal of Production Research 53 (6): 1849–1865.
    • (2015) International Journal of Production Research , vol.53 , Issue.6 , pp. 1849-1865
    • Hezer, S.1    Kara, Y.2
  • 13
    • 56449111330 scopus 로고    scopus 로고
    • A Genetic Algorithm for Product Disassembly Sequence Planning
    • Hui, W., X. Dong, and D. Guanghong. 2008. “A Genetic Algorithm for Product Disassembly Sequence Planning.” Neurocomputing 71 (13–15): 2720–2726.
    • (2008) Neurocomputing , vol.71 , Issue.13-15 , pp. 2720-2726
    • Hui, W.1    Dong, X.2    Guanghong, D.3
  • 14
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art
    • Ilgin, M. A., and S. M. Gupta. 2010. “Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art.” Journal of Environmental Management 91 (3): 563–591.
    • (2010) Journal of Environmental Management , vol.91 , Issue.3 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 15
    • 84954069273 scopus 로고    scopus 로고
    • Use of MCDM Techniques in Environmentally Conscious Manufacturing and Product Recovery: State of the Art
    • Ilgin, M. A., S. M. Gupta, and O. Battaïa. 2015. “Use of MCDM Techniques in Environmentally Conscious Manufacturing and Product Recovery: State of the Art.” Journal of Manufacturing Systems 37 (3): 746–758.
    • (2015) Journal of Manufacturing Systems , vol.37 , Issue.3 , pp. 746-758
    • Ilgin, M.A.1    Gupta, S.M.2    Battaïa, O.3
  • 16
  • 17
    • 84959357726 scopus 로고    scopus 로고
    • Capacitated Disassembly Scheduling with Parts Commonality and Start-up Cost and Its Industrial Application
    • Ji, X., Z. Zhang, S. Huang, and L. Li. 2016. “Capacitated Disassembly Scheduling with Parts Commonality and Start-up Cost and Its Industrial Application.” International Journal of Production Research 54 (4): 1225–1243.
    • (2016) International Journal of Production Research , vol.54 , Issue.4 , pp. 1225-1243
    • Ji, X.1    Zhang, Z.2    Huang, S.3    Li, L.4
  • 18
    • 84952519001 scopus 로고
    • Planning Product Disassembly for Material Recovery Opportunities
    • Johnson, M. R., and M. H. Wang. 1995. “Planning Product Disassembly for Material Recovery Opportunities.” International Journal of Production Research 33 (11): 3119–3142.
    • (1995) International Journal of Production Research , vol.33 , Issue.11 , pp. 3119-3142
    • Johnson, M.R.1    Wang, M.H.2
  • 19
    • 0032300843 scopus 로고    scopus 로고
    • Economical Evaluation of Disassembly Operations for Recycling, Remanufacturing and Reuse
    • Johnson, M. R., and M. H. Wang. 1998. “Economical Evaluation of Disassembly Operations for Recycling, Remanufacturing and Reuse.” International Journal of Production Research 36 (12): 3227–3252.
    • (1998) International Journal of Production Research , vol.36 , Issue.12 , pp. 3227-3252
    • Johnson, M.R.1    Wang, M.H.2
  • 21
    • 84881185298 scopus 로고    scopus 로고
    • Artificial Bee Colony Algorithm for Solving Sequence-dependent Disassembly Line Balancing Problem
    • Kalayci, C. B., and S. M. Gupta. 2013. “Artificial Bee Colony Algorithm for Solving Sequence-dependent Disassembly Line Balancing Problem.” Expert Systems with Applications 40 (18): 7231–7241.
    • (2013) Expert Systems with Applications , vol.40 , Issue.18 , pp. 7231-7241
    • Kalayci, C.B.1    Gupta, S.M.2
  • 22
    • 0034963174 scopus 로고    scopus 로고
    • Parallel Disassembly Sequencing with Sequence-dependent Operation times
    • Kang, J.-G., D.-H. Lee, P. Xirouchakis, and J.-G. Persson. 2001. “Parallel Disassembly Sequencing with Sequence-dependent Operation times.” Annals of the CIRP 50 (1): 343–346.
    • (2001) Annals of the CIRP , vol.50 , Issue.1 , pp. 343-346
    • Kang, J.-G.1    Lee, D.-H.2    Xirouchakis, P.3    Persson, J.-G.4
  • 23
    • 1942469261 scopus 로고    scopus 로고
    • Optimal Disassembly Sequencing with Sequence Dependent Operation times Based on the Directed Graph of Assembly States
    • Kang, J.-G., D.-H. Lee, P. Xirouchakis, and A. J. D. Lambert. 2002. “Optimal Disassembly Sequencing with Sequence Dependent Operation times Based on the Directed Graph of Assembly States.” Journal of the Korean Institute of Industrial Engineers 28 (3): 264–273.
    • (2002) Journal of the Korean Institute of Industrial Engineers , vol.28 , Issue.3 , pp. 264-273
    • Kang, J.-G.1    Lee, D.-H.2    Xirouchakis, P.3    Lambert, A.J.D.4
  • 24
  • 25
    • 19444364138 scopus 로고    scopus 로고
    • A Selective Disassembly Methodology for End‐of‐life Products
    • Kara, S., P. Pornprasitpol, and H. Kaebernick. 2005. “A Selective Disassembly Methodology for End‐of‐life Products.” Assembly Automation 25 (2): 124–134.
    • (2005) Assembly Automation , vol.25 , Issue.2 , pp. 124-134
    • Kara, S.1    Pornprasitpol, P.2    Kaebernick, H.3
  • 26
    • 33750068327 scopus 로고    scopus 로고
    • Selective Disassembly Sequencing: A Methodology for the Disassembly of End-of-life Products
    • Kara, S., P. Pornprasitpol, and H. Kaebernick. 2006. “Selective Disassembly Sequencing: A Methodology for the Disassembly of End-of-life Products.” Annals of the CIRP 55 (1): 37–40.
    • (2006) Annals of the CIRP , vol.55 , Issue.1 , pp. 37-40
    • Kara, S.1    Pornprasitpol, P.2    Kaebernick, H.3
  • 27
    • 34548418090 scopus 로고    scopus 로고
    • Disassembly Scheduling: Literature Review and Further Research Directions
    • Kim, H.-J., D.-H. Lee, and P. Xirouchakis. 2007. “Disassembly Scheduling: Literature Review and Further Research Directions.” International Journal of Production Research 45 (18–19): 4465–4484.
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4465-4484
    • Kim, H.-J.1    Lee, D.-H.2    Xirouchakis, P.3
  • 30
    • 31044454520 scopus 로고    scopus 로고
    • Exact Methods in Optimum Disassembly Sequence Search for Problems Subject to Sequence Dependent Costs
    • Lambert, A. J. D. 2006. “Exact Methods in Optimum Disassembly Sequence Search for Problems Subject to Sequence Dependent Costs.” Omega 34 (6): 538–549.
    • (2006) Omega , vol.34 , Issue.6 , pp. 538-549
    • Lambert, A.J.D.1
  • 33
    • 84886785066 scopus 로고    scopus 로고
    • Selective Disassembly Planning for Waste Electrical and Electronic Equipment with Case Studies on Liquid Crystaldisplays
    • Li, W. D., K. Xia, L. Gao, and K.-M. Chao. 2013. “Selective Disassembly Planning for Waste Electrical and Electronic Equipment with Case Studies on Liquid Crystaldisplays.” Robotics and Computer-Integrated Manufacturing 29 (4): 248–260.
    • (2013) Robotics and Computer-Integrated Manufacturing , vol.29 , Issue.4 , pp. 248-260
    • Li, W.D.1    Xia, K.2    Gao, L.3    Chao, K.-M.4
  • 34
    • 84949895569 scopus 로고    scopus 로고
    • Integrated Multi-layer Representation and Ant Colony Search for Product Selective Disassembly Planning
    • Luo, Y., Q. Peng, and P. Gu. 2016. “Integrated Multi-layer Representation and Ant Colony Search for Product Selective Disassembly Planning.” Computers in Industry 75: 13–26.
    • (2016) Computers in Industry , vol.75 , pp. 13-26
    • Luo, Y.1    Peng, Q.2    Gu, P.3
  • 35
    • 84862939665 scopus 로고    scopus 로고
    • Disassembly Process Planning Algorithms for End-of-life Product Recovery and Environmentally Conscious Disposal
    • Ma, Y.-S., H.-B. Jun, H.-W. Kim, and D.-H. Lee. 2011. “Disassembly Process Planning Algorithms for End-of-life Product Recovery and Environmentally Conscious Disposal.” International Journal of Production Research 49 (23): 7007–7027.
    • (2011) International Journal of Production Research , vol.49 , Issue.23 , pp. 7007-7027
    • Ma, Y.-S.1    Jun, H.-B.2    Kim, H.-W.3    Lee, D.-H.4
  • 36
    • 79961038399 scopus 로고    scopus 로고
    • Benchmark Data set for Evaluation of Line Balancing Algorithms
    • McGovern, S. M., and S. M. Gupta. 2007. “Benchmark Data set for Evaluation of Line Balancing Algorithms.” IFAC Proceedings Volumes 40 (2): 48–53.
    • (2007) IFAC Proceedings Volumes , vol.40 , Issue.2 , pp. 48-53
    • McGovern, S.M.1    Gupta, S.M.2
  • 37
    • 84964514073 scopus 로고    scopus 로고
    • An Improved Co-evolutionary Algorithm for Green Manufacturing by Integration of Recovery Option Selection and Disassembly Planning for End-of-life Products
    • Meng, K., P. Lou, X. Peng, and V. Prybutok. 2016. “An Improved Co-evolutionary Algorithm for Green Manufacturing by Integration of Recovery Option Selection and Disassembly Planning for End-of-life Products.” International Journal of Production Research 54 (18): 5567–5593.
    • (2016) International Journal of Production Research , vol.54 , Issue.18 , pp. 5567-5593
    • Meng, K.1    Lou, P.2    Peng, X.3    Prybutok, V.4
  • 40
    • 0000930416 scopus 로고    scopus 로고
    • State of the Art Literature Survey on Disassembly Planning
    • O’Shea, B., S. S. Grewal, and H. Kaebernick. 1998. “State of the Art Literature Survey on Disassembly Planning.” Concurrent Engineering 6 (4): 345–357.
    • (1998) Concurrent Engineering , vol.6 , Issue.4 , pp. 345-357
    • O’Shea, B.1    Grewal, S.S.2    Kaebernick, H.3
  • 41
    • 0031123978 scopus 로고    scopus 로고
    • Evaluating the End-of-life Value of a Product Andimproving it by Redesign
    • Pnueli, Y., and E. Zussman. 1997. “Evaluating the End-of-life Value of a Product Andimproving it by Redesign.” International Journal of Production Research 35 (4): 921–942.
    • (1997) International Journal of Production Research , vol.35 , Issue.4 , pp. 921-942
    • Pnueli, Y.1    Zussman, E.2
  • 42
    • 0036978701 scopus 로고    scopus 로고
    • Computer Aided Disassembly Planning: State of the Art and Perspectives
    • Santochi, M., G. Dini, and F. Failli. 2002. “Computer Aided Disassembly Planning: State of the Art and Perspectives.” Annals of the CIRP 51 (2): 507–529.
    • (2002) Annals of the CIRP , vol.51 , Issue.2 , pp. 507-529
    • Santochi, M.1    Dini, G.2    Failli, F.3
  • 43
    • 78650593531 scopus 로고    scopus 로고
    • Rule-based Recursive Selective Disassembly Sequence Planning for Green Design
    • Smith, S., and W. H. Chen. 2011. “Rule-based Recursive Selective Disassembly Sequence Planning for Green Design.” Advanced Engineering Informatics 25 (1): 77–87.
    • (2011) Advanced Engineering Informatics , vol.25 , Issue.1 , pp. 77-87
    • Smith, S.1    Chen, W.H.2
  • 44
    • 84943352434 scopus 로고    scopus 로고
    • A Novel Selective Parallel Disassembly Planning Method for Green Design
    • Smith, S., and P. Y. Hung. 2015. “A Novel Selective Parallel Disassembly Planning Method for Green Design.” Journal of Engineering Design 26 (10–12): 283–301.
    • (2015) Journal of Engineering Design , vol.26 , Issue.10-12 , pp. 283-301
    • Smith, S.1    Hung, P.Y.2
  • 45
    • 84859626393 scopus 로고    scopus 로고
    • Disassembly Sequence Structure Graphs: An Optimal Approach for Multiple-target Selective Disassembly Sequence Planning
    • Smith, S., G. Smith, and W. H. Chen. 2012. “Disassembly Sequence Structure Graphs: An Optimal Approach for Multiple-target Selective Disassembly Sequence Planning.” Advanced Engineering Informatics 26 (2): 306–316.
    • (2012) Advanced Engineering Informatics , vol.26 , Issue.2 , pp. 306-316
    • Smith, S.1    Smith, G.2    Chen, W.H.3
  • 46
    • 84995467669 scopus 로고    scopus 로고
    • Partial Disassembly Sequence Planning Based on Cost-benefit Analysis
    • Smith, S., L. Y. Hsu, and G. C. Smith. 2016. “Partial Disassembly Sequence Planning Based on Cost-benefit Analysis.” Journal of Cleaner Production 139: 729–739.
    • (2016) Journal of Cleaner Production , vol.139 , pp. 729-739
    • Smith, S.1    Hsu, L.Y.2    Smith, G.C.3
  • 47
    • 0000098669 scopus 로고    scopus 로고
    • A Geometric Algorithm for Single Selective Disassembly Using the Wave Propagation Abstraction
    • Srinivasan, H., and R. Gadh. 1998. “A Geometric Algorithm for Single Selective Disassembly Using the Wave Propagation Abstraction.” Computer Aided Design 30 (8): 603–613.
    • (1998) Computer Aided Design , vol.30 , Issue.8 , pp. 603-613
    • Srinivasan, H.1    Gadh, R.2
  • 49
    • 31044434767 scopus 로고    scopus 로고
    • Determining Optimal Disassembly and Recovery Strategies
    • Teunter, R. H. 2006. “Determining Optimal Disassembly and Recovery Strategies.” Omega 34 (6): 533–537.
    • (2006) Omega , vol.34 , Issue.6 , pp. 533-537
    • Teunter, R.H.1
  • 51
    • 34547282845 scopus 로고    scopus 로고
    • Selective Disassembly Planning for Product Green Manufacturing
    • Wang, J. F., S. Q. Li, and J. H. Liu. 2007. “Selective Disassembly Planning for Product Green Manufacturing.” Computer Integrated Manufacturing Systems 13 (6): 1097–1102.
    • (2007) Computer Integrated Manufacturing Systems , vol.13 , Issue.6 , pp. 1097-1102
    • Wang, J.F.1    Li, S.Q.2    Liu, J.H.3
  • 52
    • 84874295596 scopus 로고    scopus 로고
    • Intelligent Disassembly Planning: A Review on Its Fundamental Methodology
    • Wang, H., D. Xiang, Y. Rong, and L. Zhang. 2013. “Intelligent Disassembly Planning: A Review on Its Fundamental Methodology.” Assembly Automation 33 (1): 78–85.
    • (2013) Assembly Automation , vol.33 , Issue.1 , pp. 78-85
    • Wang, H.1    Xiang, D.2    Rong, Y.3    Zhang, L.4
  • 53
    • 0026157024 scopus 로고
    • Automatic Disassembly and Total Ordering in Three Dimensions
    • Woo, T. C., and D. Dutta. 1991. “Automatic Disassembly and Total Ordering in Three Dimensions.” Journal of Engineering for Industry 113 (2): 207–213.
    • (1991) Journal of Engineering for Industry , vol.113 , Issue.2 , pp. 207-213
    • Woo, T.C.1    Dutta, D.2
  • 54
    • 34347242859 scopus 로고    scopus 로고
    • Planning of Selective Disassembly Sequence Based on Ant Colony Optimization Algorithm
    • Xue, J. F., C. H. Qiu, and D. Xiang. 2007. “Planning of Selective Disassembly Sequence Based on Ant Colony Optimization Algorithm.” Journal of Computer Aided Design & Computer Graphics 1119 (16): 742–747.
    • (2007) Journal of Computer Aided Design & Computer Graphics , vol.1119 , Issue.16 , pp. 742-747
    • Xue, J.F.1    Qiu, C.H.2    Xiang, D.3
  • 55
    • 0001378506 scopus 로고    scopus 로고
    • Environmentally Conscious Design and Manufacturing: A State-of-the-Art Survey
    • Zhang, H. C., T. C. Kuo, H. T. Lu, and S. H. Huang. 1997. “Environmentally Conscious Design and Manufacturing: A State-of-the-Art Survey.” Journal of Manufacturing Systems 16 (5): 352–371.
    • (1997) Journal of Manufacturing Systems , vol.16 , Issue.5 , pp. 352-371
    • Zhang, H.C.1    Kuo, T.C.2    Lu, H.T.3    Huang, S.H.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.