메뉴 건너뛰기




Volumn 36, Issue 4, 2006, Pages 718-725

Fuzzy-petri-net-based disassembly planning considering human factors

Author keywords

Disassembly planning; Fuzzy logic; Human factors; Optimization; Petri nets

Indexed keywords

DISASSEMBLY PLANNING; ECONOMIC PRESSURE; HUMAN FACTORS; INDUSTRY SETTINGS;

EID: 33947114793     PISSN: 10834427     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSMCA.2005.853508     Document Type: Article
Times cited : (98)

References (22)
  • 1
    • 0029308285 scopus 로고
    • Task sequence planning using fuzzy Peri nets
    • May
    • T. Cao and A. C. Sanderson, "Task sequence planning using fuzzy Peri nets," IEEE Trans. Syst., Man, Cybern., vol. 25, no. 5, pp. 755-768, May 1995.
    • (1995) IEEE Trans. Syst., Man, Cybern , vol.25 , Issue.5 , pp. 755-768
    • Cao, T.1    Sanderson, A.C.2
  • 3
    • 4844227632 scopus 로고    scopus 로고
    • Intelligent decision making in disassembly process based on fuzzy reasoning Petri nets
    • Oct
    • M. Gao, M. C. Zhou, and Y. Tang, "Intelligent decision making in disassembly process based on fuzzy reasoning Petri nets," IEEE Trans. Syst., Man, Cybern B, vol. 34, no. 5, pp. 2029-2034, Oct. 2004.
    • (2004) IEEE Trans. Syst., Man, Cybern B , vol.34 , Issue.5 , pp. 2029-2034
    • Gao, M.1    Zhou, M.C.2    Tang, Y.3
  • 4
    • 0141750709 scopus 로고    scopus 로고
    • Model-based human-centered task automation: A case study in ACC system design
    • May
    • M. A. Goodrich and E. R. Boer, "Model-based human-centered task automation: A case study in ACC system design," IEEE Trans. Syst., Man, Cybern A, Syst., Humans, vol. 33, no. 3, pp. 325-336, May 2003.
    • (2003) IEEE Trans. Syst., Man, Cybern A, Syst., Humans , vol.33 , Issue.3 , pp. 325-336
    • Goodrich, M.A.1    Boer, E.R.2
  • 5
    • 0344198082 scopus 로고    scopus 로고
    • Multi-criteria decision-making for optimization of product disassembly under multiple situations
    • A. Hula, K. Jalali, K. Hamza, S. J. Skerlos, and K. Saitou, "Multi-criteria decision-making for optimization of product disassembly under multiple situations," Environ. Sc. Technol., vol. 37, no. 23, pp. 5303-5313, 2003.
    • (2003) Environ. Sc. Technol , vol.37 , Issue.23 , pp. 5303-5313
    • Hula, A.1    Jalali, K.2    Hamza, K.3    Skerlos, S.J.4    Saitou, K.5
  • 6
    • 0034808322 scopus 로고    scopus 로고
    • Multivalued fuzzy sets in cost/time estimation of flat plate processing
    • H. Jahan-Shahi, E. Shayan, and S. H. Masood, "Multivalued fuzzy sets in cost/time estimation of flat plate processing," Int. J. Adv. Manuf. Technol., vol. 17, no. 10, pp. 751-759, 2001.
    • (2001) Int. J. Adv. Manuf. Technol , vol.17 , Issue.10 , pp. 751-759
    • Jahan-Shahi, H.1    Shayan, E.2    Masood, S.H.3
  • 7
    • 0036721661 scopus 로고    scopus 로고
    • Determining optimum disassembly sequences in electronic equipment
    • A. J. D. Lambert, "Determining optimum disassembly sequences in electronic equipment," Comput. Ind. Eng., vol. 43, no. 3, pp. 553-575, 2002.
    • (2002) Comput. Ind. Eng , vol.43 , Issue.3 , pp. 553-575
    • Lambert, A.J.D.1
  • 8
    • 0038156629 scopus 로고    scopus 로고
    • Disassembly sequencing: A survey
    • _, "Disassembly sequencing: A survey," Int. J. Prod. Res., vol. 41, no. 16, pp. 3721-3759, 2003.
    • (2003) Int. J. Prod. Res , vol.41 , Issue.16 , pp. 3721-3759
    • Lambert, A.J.D.1
  • 9
    • 0034313609 scopus 로고    scopus 로고
    • Dynamic knowledge inference and learning under adaptive fuzzy Petri net framework
    • Nov
    • X. O. Li, W. Yu, and F. Lara-Rosano, "Dynamic knowledge inference and learning under adaptive fuzzy Petri net framework," IEEE Trans. Syst., Man, Cybern. C, vol. 30, no. 4, pp. 442-450, Nov. 2000.
    • (2000) IEEE Trans. Syst., Man, Cybern. C , vol.30 , Issue.4 , pp. 442-450
    • Li, X.O.1    Yu, W.2    Lara-Rosano, F.3
  • 10
    • 0001754245 scopus 로고    scopus 로고
    • Optimal disassembly configurations for single and multiple products
    • A. Meacham, R. Uzsoy, and U. Venkatadri, "Optimal disassembly configurations for single and multiple products," J. Manuf. Syst., vol. 18, no. 5, pp. 311-322, 1999.
    • (1999) J. Manuf. Syst , vol.18 , Issue.5 , pp. 311-322
    • Meacham, A.1    Uzsoy, R.2    Venkatadri, U.3
  • 11
    • 0035546631 scopus 로고    scopus 로고
    • Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships
    • K. E. Moore, A. Gungor, and S. M. Gupta, "Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships," Eur. J. Oper. Res., vol. 135, no. 2, pp. 428-449, 2001.
    • (2001) Eur. J. Oper. Res , vol.135 , Issue.2 , pp. 428-449
    • Moore, K.E.1    Gungor, A.2    Gupta, S.M.3
  • 12
    • 0342297882 scopus 로고    scopus 로고
    • Towards profitable persistent manufacturing human factors in overcoming disturbances in production systems
    • J. Mikler, H. Hådeby, A. Kjellberg, and G. Sohlenius, "Towards profitable persistent manufacturing human factors in overcoming disturbances in production systems," Int. J. Adv. Manuf. Technol., vol. 15, no. 10, pp. 749-756, 1999.
    • (1999) Int. J. Adv. Manuf. Technol , vol.15 , Issue.10 , pp. 749-756
    • Mikler, J.1    Hådeby, H.2    Kjellberg, A.3    Sohlenius, G.4
  • 13
    • 0024107906 scopus 로고
    • On managing the human factors engineering of hybrid production systems
    • Nov
    • M. Rahimi, P. A. Hancock, and A. Majchrzak, "On managing the human factors engineering of hybrid production systems," IEEE Trans. Eng. Manage., vol. 35. no. 4, pp. 238-249, Nov. 1988.
    • (1988) IEEE Trans. Eng. Manage , vol.35 , Issue.4 , pp. 238-249
    • Rahimi, M.1    Hancock, P.A.2    Majchrzak, A.3
  • 14
    • 33947173434 scopus 로고    scopus 로고
    • S. Reveliotis, Uncertainty management in optimal disassembly planning through learning-based strategies, in Advances in Manufacturing, Logistics and Supply Chain Management, N. R. S. Raghavan et al., Ed. Bangalore, India: IIS, 2003, pp. 135-141.
    • S. Reveliotis, "Uncertainty management in optimal disassembly planning through learning-based strategies," in Advances in Manufacturing, Logistics and Supply Chain Management, N. R. S. Raghavan et al., Ed. Bangalore, India: IIS, 2003, pp. 135-141.
  • 15
    • 0034808349 scopus 로고    scopus 로고
    • Optimal disassembly sequence using genetic algorithms considering economic and environmental aspects
    • K. K. Seo, J. H. Park, and D. S. Jang, "Optimal disassembly sequence using genetic algorithms considering economic and environmental aspects," Int. J. Adv. Manuf. Technol., vol. 18, no. 5, pp. 371-380, 2001.
    • (2001) Int. J. Adv. Manuf. Technol , vol.18 , Issue.5 , pp. 371-380
    • Seo, K.K.1    Park, J.H.2    Jang, D.S.3
  • 16
    • 0035707986 scopus 로고    scopus 로고
    • An integrated approach to disassembly planning and demanufacturing operation
    • Dec
    • Y. Tang, M. C. Zhou, and R. Caudill, "An integrated approach to disassembly planning and demanufacturing operation," IEEE Trans. Robot. Autom., vol. 17, no. 6, pp. 773-784, Dec. 2001.
    • (2001) IEEE Trans. Robot. Autom , vol.17 , Issue.6 , pp. 773-784
    • Tang, Y.1    Zhou, M.C.2    Caudill, R.3
  • 17
    • 0041368822 scopus 로고    scopus 로고
    • Disassembly modeling, planning, and application
    • Y. Tang, M. C. Zhou, E. Zussman, and R. Caudill, "Disassembly modeling, planning, and application," J. Manuf. Syst., vol. 21, no. 3, pp. 200-217, 2002.
    • (2002) J. Manuf. Syst , vol.21 , Issue.3 , pp. 200-217
    • Tang, Y.1    Zhou, M.C.2    Zussman, E.3    Caudill, R.4
  • 18
    • 0037139677 scopus 로고    scopus 로고
    • A Petri net based approach to determine the disassembly strategy of a product
    • M. K. Tiwari, S. K. Mukhopadhyay, N. Sinha, S. Kumar, and R. Rai, "A Petri net based approach to determine the disassembly strategy of a product," Int. J. Prod. Res., vol. 40, no. 5, pp. 1113-1129, 2002.
    • (2002) Int. J. Prod. Res , vol.40 , Issue.5 , pp. 1113-1129
    • Tiwari, M.K.1    Mukhopadhyay, S.K.2    Sinha, N.3    Kumar, S.4    Rai, R.5
  • 19
    • 0030719318 scopus 로고    scopus 로고
    • Analysis of computer integrated manufacturing systems by fuzzy human operator behavior
    • L. V. Utkin, S. V. Gurov, and I. B. Shubinsky, "Analysis of computer integrated manufacturing systems by fuzzy human operator behavior," J. Qual. Maint. Eng., vol. 3, no. 3, p. 189, 1997.
    • (1997) J. Qual. Maint. Eng , vol.3 , Issue.3 , pp. 189
    • Utkin, L.V.1    Gurov, S.V.2    Shubinsky, I.B.3
  • 20
    • 0036267457 scopus 로고    scopus 로고
    • Optimal operation planning using fuzzy Petri nets with resource constraints
    • R. R. Wu, L. Ma, J. Mathew, and G. H. Duan, "Optimal operation planning using fuzzy Petri nets with resource constraints," Int. J. Comput. Integr. Manuf., vol. 15, no. 1, pp. 28-36, 2002.
    • (2002) Int. J. Comput. Integr. Manuf , vol.15 , Issue.1 , pp. 28-36
    • Wu, R.R.1    Ma, L.2    Mathew, J.3    Duan, G.H.4
  • 21
    • 0030398423 scopus 로고    scopus 로고
    • Fuzzy Petri net-based optimum scheduling of FMS with human factors
    • Kobe, Japan, Dec
    • J. X. Xu, "Fuzzy Petri net-based optimum scheduling of FMS with human factors," in P roc. 35th Conf. Decision Control, Kobe, Japan, Dec. 1996, pp. 4451-4452.
    • (1996) P roc. 35th Conf. Decision Control , pp. 4451-4452
    • Xu, J.X.1
  • 22
    • 0033721516 scopus 로고    scopus 로고
    • Design and implementation of an adaptive process planner for disassembly processes
    • Apr
    • E. Zussman and M. C. Zhou, "Design and implementation of an adaptive process planner for disassembly processes," IEEE Trans. Robot. Autom., vol. 16, no. 2, pp. 171-179, Apr. 2000.
    • (2000) IEEE Trans. Robot. Autom , vol.16 , Issue.2 , pp. 171-179
    • Zussman, E.1    Zhou, M.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.