메뉴 건너뛰기




Volumn 10, Issue 4, 2013, Pages 1004-1013

A chance constrained programming approach to determine the optimal disassembly sequence

Author keywords

Algorithm; disassembly; disassembly planning; modeling and simulation

Indexed keywords

CHANCE-CONSTRAINED PROGRAMMING; CHANCE-CONSTRAINED PROGRAMMING MODEL; DISASSEMBLY; DISASSEMBLY PLANNING; DISASSEMBLY SEQUENCE; HYBRID INTELLIGENT ALGORITHMS; MODEL AND SIMULATION; STOCHASTIC SIMULATIONS;

EID: 84885444046     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2013.2249663     Document Type: Article
Times cited : (115)

References (55)
  • 1
    • 34548119563 scopus 로고    scopus 로고
    • Learning-embedded disassembly Petri net for process planning
    • Taipei, Taiwan Oct.
    • Y. Tang and M. C. Zhou, "Learning-embedded disassembly Petri net for process planning," in Proc. IEEE Int. Conf. Syst., Man, Cybern., Taipei, Taiwan, Oct. 2006, pp. 80-85.
    • (2006) Proc. IEEE Int. Conf. Syst., Man, Cybern. , pp. 80-85
    • Tang, Y.1    Zhou, M.C.2
  • 2
    • 84860321126 scopus 로고    scopus 로고
    • Measurement method and results of theoretical amount of scrapped household appliances in China
    • Y. L. He, X. H. Liao, and H. Tian, "Measurement method and results of theoretical amount of scrapped household appliances in China," Appl. Technol., vol. 10, pp. 76-77, 2010.
    • (2010) Appl. Technol. , vol.10 , pp. 76-77
    • He, Y.L.1    Liao, X.H.2    Tian, H.3
  • 3
    • 0031247813 scopus 로고    scopus 로고
    • An evaluation methodology for disassembly processes
    • PII S0360835297001046
    • A. Gungor and S. M. Gupta, "An evaluation methodology for disassembly processes," Comput. Ind. Eng., vol. 33, no. 1-2, pp. 329-332, 1997. (Pubitemid 127404380)
    • (1997) Computers and Industrial Engineering , vol.33 , Issue.1-2 , pp. 329-332
    • Gungor, A.1    Gupta, S.M.2
  • 4
    • 0001378506 scopus 로고    scopus 로고
    • Environmentally Conscious Design and Manufacturing: A State-of-the-Art Survey
    • H. C. Zhang, T. C. Kuo, H. Lu, and S. H. Huang, "Environmentally conscious design and manufacturing: A state-of-the-art survey," J. Manuf. Syst., vol. 16, pp. 352-371, 1997. (Pubitemid 127448827)
    • (1997) Journal of Manufacturing Systems , vol.16 , Issue.5 , pp. 352-371
    • Zhang, H.C.1    Kuo, T.C.2    Lu, H.3    Huang, S.H.4
  • 5
    • 24144494525 scopus 로고    scopus 로고
    • An object-oriented intelligent disassembly sequence planner for maintenance
    • DOI 10.1016/j.compind.2005.03.005, PII S0166361505000655
    • J. R. Li, L. P. Khoo, and S. B. Tor, "An object-oriented intelligent disassembly sequence planner for maintenance," Comput. Ind., vol. 56, pp. 699-718, 2005. (Pubitemid 41230990)
    • (2005) Computers in Industry , vol.56 , Issue.7 , pp. 699-718
    • Li, J.R.1    Khoo, L.P.2    Tor, S.B.3
  • 7
    • 0033078088 scopus 로고    scopus 로고
    • A methodology for modeling and adaptive planning of disassembly processes
    • Feb.
    • E. Zussman and M. C. Zhou, "A methodology for modeling and adaptive planning of disassembly processes," IEEE Trans. Robot. Autom., vol. 15, no. 1, pp. 190-194, Feb. 1999.
    • (1999) IEEE Trans. Robot. Autom. , vol.15 , Issue.1 , pp. 190-194
    • Zussman, E.1    Zhou, M.C.2
  • 8
    • 0035707986 scopus 로고    scopus 로고
    • An integrated approach to disassembly planning and demanufacturing operation
    • DOI 10.1109/70.975899, PII S1042296X01109158
    • Y. Tang, M. C. Zhou, and R. J. Caudill, "An integrated approach to disassembly planning and demanufacturing operation," IEEE Trans. Robot. Autom., vol. 17, no. 6, pp. 773-784, Dec. 2001. (Pubitemid 34125076)
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , Issue.6 , pp. 773-784
    • Tang, Y.1    Zhou, M.C.2    Caudill, R.J.3
  • 9
    • 0036967254 scopus 로고    scopus 로고
    • Integration of disassembly leveling and bin assignment for demanufacturing automation
    • Dec.
    • M. Gao, M. C. Zhou, and R. J. Caudill, "Integration of disassembly leveling and bin assignment for demanufacturing automation," IEEE Trans Robot Autom., vol. 18, no. 6, pp. 867-874, Dec. 2002.
    • (2002) IEEE Trans Robot Autom. , vol.18 , Issue.6 , pp. 867-874
    • Gao, M.1    Zhou, M.C.2    Caudill, R.J.3
  • 10
    • 34147196256 scopus 로고    scopus 로고
    • Automatic control sequence generation for a hybrid disassembly system
    • DOI 10.1109/TASE.2006.880538
    • H. J. Kim, R. Harms, and G. Seliger, "Automatic control sequence generation for a hybrid disassembly system," IEEE Trans. Autom. Sci. Eng., vol. 4, no. 2, pp. 194-205, Apr. 2007. (Pubitemid 46578100)
    • (2007) IEEE Transactions on Automation Science and Engineering , vol.4 , Issue.2 , pp. 194-205
    • Kim, H.-J.1    Harms, R.2    Seliger, G.3
  • 12
    • 42949112952 scopus 로고    scopus 로고
    • A path-relinking approach for a bi-criteria disassembly sequencing problem
    • DOI 10.1016/j.cor.2007.06.002, PII S0305054807001256
    • B. Adenso-Diaz, S. Garcia-Carbajal, and S. M. Gupta, "A path-relinking approach for a bi-criteria disassembly sequencing problem," Comput. Oper. Res., vol. 35, pp. 3989-3997, 2008. (Pubitemid 351608452)
    • (2008) Computers and Operations Research , vol.35 , Issue.12 , pp. 3989-3997
    • Adenso-Diaz, B.1    Garcia-Carbajal, S.2    Gupta, S.M.3
  • 13
    • 78650593531 scopus 로고    scopus 로고
    • Rule-based recursive selective disassembly sequence planning for green design
    • S. S. Smith and W. H. Chen, "Rule-based recursive selective disassembly sequence planning for green design," Adv. Eng. Inform., vol. 25, pp. 77-87, 2011.
    • (2011) Adv. Eng. Inform. , vol.25 , pp. 77-87
    • Smith, S.S.1    Chen, W.H.2
  • 14
    • 84867576451 scopus 로고    scopus 로고
    • Disassembly sequence planning approach for product virtual maintenance based on improved max-min ant system
    • X. H. Liu, G. L. Peng, X. M. Liu, and Y. F. Hou, "Disassembly sequence planning approach for product virtual maintenance based on improved max-min ant system," Int. J. Adv. Manuf. Technol., vol. 59, pp. 829-839, 2012.
    • (2012) Int. J. Adv. Manuf. Technol. , vol.59 , pp. 829-839
    • Liu, X.H.1    Peng, G.L.2    Liu, X.M.3    Hou, Y.F.4
  • 15
    • 0032183779 scopus 로고    scopus 로고
    • Disassembly Sequence Planning for Products with Defective Parts in Product Recovery
    • PII S0360835298000473
    • A. Gungor and S.M. Gupta, "Disassembly sequence planning for products with defective parts in product recovery," Comput. Ind. Eng., vol. 35, pp. 161-164, 1998. (Pubitemid 128457110)
    • (1998) Computers and Industrial Engineering , vol.35 , Issue.1-4 , pp. 161-164
    • Gungor, A.1    Gupta, S.M.2
  • 16
    • 79956213143 scopus 로고    scopus 로고
    • Performance improvement potential of sensor embedded products in environmental supply chains
    • M. A. Ilgin and S. M. Gupta, "Performance improvement potential of sensor embedded products in environmental supply chains," Resour., Conserv. Recy., vol. 55, pp. 580-592, 2011.
    • (2011) Resour., Conserv. Recy. , vol.55 , pp. 580-592
    • Ilgin, M.A.1    Gupta, S.M.2
  • 17
    • 78649318256 scopus 로고    scopus 로고
    • Recovery of sensor embedded washing machines using a multi kanban controlled disassembly line
    • M. A. Ilgin and S. M. Gupta, "Recovery of sensor embedded washing machines using a multi kanban controlled disassembly line," Rot. Cim- Int. Mauf., vol. 27, pp. 318-334, 2011.
    • (2011) Rot. Cim- Int. Mauf. , vol.27 , pp. 318-334
    • Ilgin, M.A.1    Gupta, S.M.2
  • 18
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
    • M. A. Ilgin and S. M. Gupta, "Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art," J. Environ. Manage., vol. 91, pp. 563-591, 2010.
    • (2010) J. Environ. Manage. , vol.91 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 19
    • 84862118118 scopus 로고    scopus 로고
    • Evaluation model and algorithm of product disassembly process with stochastic feature
    • G. D. Tian, Y. M. Liu, Q. Z. Tian, and J. W. Chu, "Evaluation model and algorithm of product disassembly process with stochastic feature," Clean Techn. Environ. Policy, vol. 14, pp. 345-356, 2012.
    • (2012) Clean Techn. Environ. Policy , vol.14 , pp. 345-356
    • Tian, G.D.1    Liu, Y.M.2    Tian, Q.Z.3    Chu, J.W.4
  • 21
    • 84862794782 scopus 로고    scopus 로고
    • Probability evaluation models of product disassembly cost subject to random removal time and different removal labor cost
    • Apr.
    • G. D. Tian, M. C. Zhou, J. W. Chu, and Y. M. Liu, "Probability evaluation models of product disassembly cost subject to random removal time and different removal labor cost," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 288-295, Apr. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.2 , pp. 288-295
    • Tian, G.D.1    Zhou, M.C.2    Chu, J.W.3    Liu, Y.M.4
  • 22
    • 0033310476 scopus 로고    scopus 로고
    • Model for optimizing the assembly and disassembly of electronic systems
    • DOI 10.1109/6104.778170
    • P. A. Sandborn and C. F. Murphy, "A model for optimizing the assembly and disassembly of electronic systems," IEEE Trans. Electr. Pack. Manuf., vol. 22, no. 2, pp. 105-117, Apr. 1999. (Pubitemid 30559425)
    • (1999) IEEE Transactions on Electronics Packaging Manufacturing , vol.22 , Issue.2 , pp. 105-117
    • Sandborn, P.A.1    Murphy, C.F.2
  • 24
    • 33746432209 scopus 로고    scopus 로고
    • A systematic approach to design and operation of disassembly lines
    • Jul.
    • Y. Tang and M. C. Zhou, "A systematic approach to design and operation of disassembly lines," IEEE Trans. Autom. Sci. Eng., vol. 3, no. 3, pp. 324-329, Jul. 2006.
    • (2006) IEEE Trans. Autom. Sci. Eng. , vol.3 , Issue.3 , pp. 324-329
    • Tang, Y.1    Zhou, M.C.2
  • 25
    • 85008057941 scopus 로고    scopus 로고
    • Learning-based disassembly process planner for uncertainty management
    • Y. Tang, "Learning-based disassembly process planner for uncertainty management," IEEE Trans. Syst. Man. Cybern. A., vol. 39, no. 1, pp. 134-143, 2009.
    • (2009) IEEE Trans. Syst. Man. Cybern. A. , vol.39 , Issue.1 , pp. 134-143
    • Tang, Y.1
  • 26
    • 72149101895 scopus 로고    scopus 로고
    • A machine learning approach for optimal disassembly planning
    • D. E. Grochowski and Y. Tang, "A machine learning approach for optimal disassembly planning," Int. J. Comput. Integ. M., vol. 22, no. 4, pp. 374-383, 2009.
    • (2009) Int. J. Comput. Integ. M. , vol.22 , Issue.4 , pp. 374-383
    • Grochowski, D.E.1    Tang, Y.2
  • 27
    • 33947652668 scopus 로고    scopus 로고
    • Uncertainty management in optimal disassembly planning through learning-based strategies
    • DOI 10.1080/07408170600897536, PII 773635494
    • S. A. Reveliotis, "Uncertainty management in optimal disassembly planning through learning-based strategies," IIE Trans., vol. 30, no. 6, pp. 645-658, 2007. (Pubitemid 46502167)
    • (2007) IIE Transactions (Institute of Industrial Engineers) , vol.39 , Issue.6 , pp. 645-658
    • Reveliotis, S.A.1
  • 28
    • 4844227632 scopus 로고    scopus 로고
    • Intelligent decision making in disassembly process based on fuzzy reasoning Petri nets
    • Oct.
    • M. Gao, M. C. Zhou, and Y. Tang, "Intelligent decision making in disassembly process based on fuzzy reasoning Petri nets," IEEE Trans. Syst., Man, Cybern. B. Cybern., vol. 34, no. 5, pp. 2029-2034, Oct. 2004.
    • (2004) IEEE Trans. Syst., Man, Cybern. B. Cybern. , vol.34 , Issue.5 , pp. 2029-2034
    • Gao, M.1    Zhou, M.C.2    Tang, Y.3
  • 29
    • 21844513640 scopus 로고
    • Operations planning issues in an assembly/disassembly environment
    • L. Brennan, S. M. Gupta, and K. N. Taleb, "Operations planning issues in an assembly/disassembly environment," Int. J. Oper. Prod. Manag., vol. 14, no. 9, pp. 57-67, 1994.
    • (1994) Int. J. Oper. Prod. Manag. , vol.14 , Issue.9 , pp. 57-67
    • Brennan, L.1    Gupta, S.M.2    Taleb, K.N.3
  • 32
    • 0041368822 scopus 로고    scopus 로고
    • Disassembly modeling, planning and applications
    • Y. Tang, M. C. Zhou, E. Zussman, and R. J. Caudill, "Disassembly modeling, planning and applications," J. Manuf. Syst., vol. 21, no. 2, pp. 200-217, 2002.
    • (2002) J. Manuf. Syst. , vol.21 , Issue.2 , pp. 200-217
    • Tang, Y.1    Zhou, M.C.2    Zussman, E.3    Caudill, R.J.4
  • 33
    • 67349245995 scopus 로고    scopus 로고
    • A fuzzy shortest path with the highest reliability
    • E. Keshavarz and E. Khorram, "A fuzzy shortest path with the highest reliability," J. Comput. Appl. Math., vol. 230, pp. 204-212, 2009.
    • (2009) J. Comput. Appl. Math. , vol.230 , pp. 204-212
    • Keshavarz, E.1    Khorram, E.2
  • 34
    • 0032093911 scopus 로고    scopus 로고
    • On the robust shortest path problem
    • G. Yu and J. Yang, "On the robust shortest path problem," Comput. Ops. Res., vol. 25, no. 26, pp. 457-468, 1998.
    • (1998) Comput. Ops. Res. , vol.25 , Issue.26 , pp. 457-468
    • Yu, G.1    Yang, J.2
  • 35
    • 80053631728 scopus 로고    scopus 로고
    • Stochastic algorithms for discrete parameter simulation optimization
    • Oct.
    • S. Bhatnagar, V. K. Mishra, and N. Hemachandra, "Stochastic algorithms for discrete parameter simulation optimization," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 4, pp. 780-793, Oct. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.4 , pp. 780-793
    • Bhatnagar, S.1    Mishra, V.K.2    Hemachandra, N.3
  • 36
    • 79960461790 scopus 로고    scopus 로고
    • Chance programmingmodels for time-energy trade-off problem of product disassembly process with multiple stochastic variables
    • G. D. Tian, Y. M. Liu, H. W. Zhang, J. W. Chu, and G. Xu, "Chance programmingmodels for time-energy trade-off problem of product disassembly process with multiple stochastic variables," Adv. Sci. Lett., vol. 4, no. 4-5, 2011.
    • Adv. Sci. Lett. , vol.4 , Issue.4-5 , pp. 2011
    • Tian, G.D.1    Liu, Y.M.2    Zhang, H.W.3    Chu, J.W.4    Xu, G.5
  • 38
    • 78650179955 scopus 로고    scopus 로고
    • Creep feed grinding optimization by an integrated GA-NN system
    • M. Sedighi and D. Afshari, "Creep feed grinding optimization by an integrated GA-NN system," J. Intell. Manuf., vol. 21, pp. 657-663, 2010.
    • (2010) J. Intell. Manuf. , vol.21 , pp. 657-663
    • Sedighi, M.1    Afshari, D.2
  • 39
    • 0035521281 scopus 로고    scopus 로고
    • Model reference robust speed control for induction-motor drive with time delay based on neural network
    • Nov.
    • T. C. Chen and T. T. Sheu, "Model reference robust speed control for induction-motor drive with time delay based on neural network," IEEE Trans. Syst., Man, Cybern., Part A: Syst. Humans, no. 6, pp. 746-753, Nov. 2001.
    • (2001) IEEE Trans. Syst., Man, Cybern., Part A: Syst. Humans , Issue.6 , pp. 746-753
    • Chen, T.C.1    Sheu, T.T.2
  • 40
    • 80053914177 scopus 로고    scopus 로고
    • Expected energy analysis for industrial process planning problemwith fuzzy time parameters
    • G. D. Tian, J.W. Chu, Y. M. Liu,H.Ke,X. Zhao, andG.Xu, "Expected energy analysis for industrial process planning problemwith fuzzy time parameters," Comput. Chem. Eng., vol. 35, no. 12, pp. 2905-2912, 2011.
    • (2011) Comput. Chem. Eng. , vol.35 , Issue.12 , pp. 2905-2912
    • Tian, G.D.1    Chu, J.W.2    Liu, H.3    Ke, X.4    Zhao, G.5    Xu, Y.M.6
  • 41
    • 0034287621 scopus 로고    scopus 로고
    • Neural network based approach for optimization of industrial chemical processes
    • C. A. O. Nascimento, R. Giudici, and R. Guardani, "Neural network based approach for optimization of industrial chemical processes," Comput. Chem. Eng., vol. 24, pp. 2303-2314, 2000.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 2303-2314
    • Nascimento, C.A.O.1    Giudici, R.2    Guardani, R.3
  • 42
    • 0033726694 scopus 로고    scopus 로고
    • Combining a neural network with a genetic algorithm for process parameter optimization
    • D. F. Cook, C. T. Ragsdale, and R. L. Major, "Combining a neural network with a genetic algorithm for process parameter optimization," Eng. Appl. Artif. Intell., vol. 13, pp. 391-396, 2000.
    • (2000) Eng. Appl. Artif. Intell. , vol.13 , pp. 391-396
    • Cook, D.F.1    Ragsdale, C.T.2    Major, R.L.3
  • 43
    • 78049395804 scopus 로고    scopus 로고
    • Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line
    • M. A. Ilgin and S. M. Gupta, "Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line," Comput. Ind. Eng., vol. 59, pp. 748-763, 2010.
    • (2010) Comput. Ind. Eng. , vol.59 , pp. 748-763
    • Ilgin, M.A.1    Gupta, S.M.2
  • 44
    • 79953029079 scopus 로고    scopus 로고
    • Evaluating the impact of sensor-embedded products on the performance of an air conditioner disassembly line
    • M. A. Ilgin and S. M. Gupta, "Evaluating the impact of sensor-embedded products on the performance of an air conditioner disassembly line," Int. J. Adv. Manuf. Technol., vol. 53, pp. 1199-1216, 2011.
    • (2011) Int. J. Adv. Manuf. Technol. , vol.53 , pp. 1199-1216
    • Ilgin, M.A.1    Gupta, S.M.2
  • 45
    • 79960567534 scopus 로고    scopus 로고
    • Evaluation method and mathematical expression for products disassemblability based on probability theory (in Chinese)
    • G.D.Tian, J.W. Chu, X. H. Jin, T. Z. Zhang, andH.Wang, "Evaluation method and mathematical expression for products disassemblability based on probability theory (in Chinese)," Comput. Integ.M. Syst., vol. 17, no. 6, pp. 1164-1170, 2011.
    • (2011) Comput. Integ.M. Syst. , vol.17 , Issue.6 , pp. 1164-1170
    • Tian, G.D.1    Chu, J.W.2    Jin, X.H.3    Zhang, T.Z.4    Wang, H.5
  • 46
    • 84885463530 scopus 로고    scopus 로고
    • Simulation of disassembly and re-assembly processes with beta-distributed operation times
    • Fischer, P. Stock, and G. Zülch
    • J. Fischer, P. Stock, and G. Zülch, "Simulation of disassembly and re-assembly processes with beta-distributed operation times," IFIP Int. Fed. Inf. Process, vol. 160, pp. 147-156, 2005.
    • (2005) IFIP Int. Fed. Inf. Process , vol.160 , pp. 147-156
  • 47
    • 0031652021 scopus 로고    scopus 로고
    • Disassembly petri net approach to modeling and planning disassembly processes of electronic products
    • Oak Brook, IL, USA May 4-6
    • E. Zussman, M. C. Zhou, and R. J. Caudill, "Disassembly petri net approach to modeling and planning disassembly processes of electronic products," in Proc. IEEE Int. Symp. Electron. Environ., Oak Brook, IL, USA, May 4-6, 1998, pp. 331-336.
    • (1998) Proc. IEEE Int. Symp. Electron. Environ. , pp. 331-336
    • Zussman, E.1    Zhou, M.C.2    Caudill, R.J.3
  • 48
    • 84885446757 scopus 로고    scopus 로고
    • Disassembly sequence generation and evaluation of environmentally conscious product designs
    • Troy,NY, USA Oct. 7-9 Paper No. 50, CD-ROM
    • M. C. Ahmed and R. J. Caudill, "Disassembly sequence generation and evaluation of environmentally conscious product designs," in Rensselaer's Conf. Agile, Intell. Comput.-Integr.Manuf., Troy,NY, USA, Oct. 7-9, 1998, Paper No. 50, CD-ROM.
    • (1998) Rensselaer's Conf. Agile, Intell. Comput.-Integr.Manuf.
    • Ahmed, M.C.1    Caudill, R.J.2
  • 49
    • 0033720221 scopus 로고    scopus 로고
    • Disassemblymodeling, planning, and application: A review
    • San Francisco, CA,USA Apr.
    • Y.Tang,M.C.Zhou,E. Zussman, and R. J. Caudill, "Disassemblymodeling, planning, and application: A review," in Proc. IEEE Int. Conf. Robot. Autom., San Francisco, CA,USA,Apr. 2000, pp. 2197-3002.
    • (2000) Proc. IEEE Int. Conf. Robot. Autom. , pp. 2197-3002
    • Tang, Y.1    Zhou, M.C.2    Zussman, E.3    Caudill, R.J.4
  • 51
    • 0033721516 scopus 로고    scopus 로고
    • Design and implementation of an adaptive planner for disassembly processes
    • Apr.
    • E. Zussman and M. C. Zhou, "Design and implementation of an adaptive planner for disassembly processes," IEEE Trans. Robot. utom., vol. 16, no. 2, pp. 171-179, Apr. 2000.
    • (2000) IEEE Trans. Robot. Utom. , vol.16 , Issue.2 , pp. 171-179
    • Zussman, E.1    Zhou, M.C.2
  • 52
    • 33947114793 scopus 로고    scopus 로고
    • Fuzzy-petri-net based disassembly planning considering human factors
    • Jul.
    • Y. Tang,M. C. Zhou, and M. Gao, "Fuzzy-petri-net based disassembly planning considering human factors," IEEE Trans. Syst. Man, Cybern. Part A: Syst. Humans, vol. 36, no. 4, pp. 718-726, Jul. 2006.
    • (2006) IEEE Trans. Syst. Man, Cybern. Part A: Syst. Humans , vol.36 , Issue.4 , pp. 718-726
    • Tangm. C Zhou, Y.1    Gao, M.2
  • 54
    • 84655163249 scopus 로고    scopus 로고
    • Optimization of the disassembly sequencing problem on the basis of self-adaptive simplified swarm optimization
    • Jan.
    • W.-C. Yeh, "Optimization of the disassembly sequencing problem on the basis of self-adaptive simplified swarm optimization," EEE Trans. Syst. Man, Cybern. Part A: Syst. Humans, vol. 42, no. 1, pp. 250-261, Jan. 2012.
    • (2012) EEE Trans. Syst. Man, Cybern. Part A: Syst. Humans , vol.42 , Issue.1 , pp. 250-261
    • Yeh, W.-C.1
  • 55
    • 84871794972 scopus 로고    scopus 로고
    • A modeling approach to analyze variability of remanufacturing process routing
    • Jan.
    • C. Li, Y. Tang, C. Li, and L. Li, "A modeling approach to analyze variability of remanufacturing process routing," Trans. Autom. Sci. Eng., vol. 10, no. 1, pp. 86-98, Jan. 2013.
    • (2013) Trans. Autom. Sci. Eng. , vol.10 , Issue.1 , pp. 86-98
    • Li, C.1    Tang, Y.2    Li, C.3    Li, L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.