-
1
-
-
33750732937
-
Fuzzy time series prediction method based on fuzzy recurrent neural network
-
Aliev, R., Fazlollahi, B., Aliev, R., Guirimov, B., Fuzzy time series prediction method based on fuzzy recurrent neural network. International Conference on Neural Information Processing, 2006, 860–869.
-
(2006)
International Conference on Neural Information Processing
, pp. 860-869
-
-
Aliev, R.1
Fazlollahi, B.2
Aliev, R.3
Guirimov, B.4
-
2
-
-
43049084777
-
Complexity of single machine scheduling problems under scenario-based uncertainty
-
Aloulou, M.A., Croce, F.D., Complexity of single machine scheduling problems under scenario-based uncertainty. Oper. Res. Lett. 36 (2008), 338–342.
-
(2008)
Oper. Res. Lett.
, vol.36
, pp. 338-342
-
-
Aloulou, M.A.1
Croce, F.D.2
-
3
-
-
78651239754
-
Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: a resolution with sequential and integrated strategies
-
Benbouzid-Sitayeb, F., Guebli, S.-A., Bessadi, Y., Varnier, C., Zerhouni, N., Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: a resolution with sequential and integrated strategies. Int. J. Manuf. Res. 6 (2011), 30–48.
-
(2011)
Int. J. Manuf. Res.
, vol.6
, pp. 30-48
-
-
Benbouzid-Sitayeb, F.1
Guebli, S.-A.2
Bessadi, Y.3
Varnier, C.4
Zerhouni, N.5
-
4
-
-
62749205978
-
Flexibilit et robustesse en ordonnancement
-
Hermes Science
-
Billaut, J.-C., Moukrim, A., Sanlaville, E., Flexibilit et robustesse en ordonnancement. 2005, Hermes Science.
-
(2005)
-
-
Billaut, J.-C.1
Moukrim, A.2
Sanlaville, E.3
-
5
-
-
84942428880
-
Considering human resource constraints for real joint production and maintenance schedules
-
Bouzidi-Hassini, S., Benbouzid-Sitayeb, F., Marmier, F., Rabahi, M., Considering human resource constraints for real joint production and maintenance schedules. Comput. Ind. Eng. 90 (2015), 197–211.
-
(2015)
Comput. Ind. Eng.
, vol.90
, pp. 197-211
-
-
Bouzidi-Hassini, S.1
Benbouzid-Sitayeb, F.2
Marmier, F.3
Rabahi, M.4
-
6
-
-
0030190570
-
Production and maintenance integrated planning
-
Brandolese, M., Franci, M., Pozzetti, A., Production and maintenance integrated planning. Int. J. Prod. Res. 34 (1996), 2059–2075.
-
(1996)
Int. J. Prod. Res.
, vol.34
, pp. 2059-2075
-
-
Brandolese, M.1
Franci, M.2
Pozzetti, A.3
-
7
-
-
0037410246
-
On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
-
Chanas, S., Kasperski, A., On two single machine scheduling problems with fuzzy processing times and fuzzy due dates. Eur. J. Oper. Res. 147 (2003), 281–296.
-
(2003)
Eur. J. Oper. Res.
, vol.147
, pp. 281-296
-
-
Chanas, S.1
Kasperski, A.2
-
8
-
-
33745794508
-
Single-machine scheduling with flexible and periodic maintenance
-
Chen, J., Single-machine scheduling with flexible and periodic maintenance. J. Oper. Res. Soc. 57 (2006), 703–710.
-
(2006)
J. Oper. Res. Soc.
, vol.57
, pp. 703-710
-
-
Chen, J.1
-
9
-
-
41149166270
-
Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
-
Chen, J.-S., Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan. Int. J. Adv. Manuf. Technol. 190 (2008), 90–102.
-
(2008)
Int. J. Adv. Manuf. Technol.
, vol.190
, pp. 90-102
-
-
Chen, J.-S.1
-
10
-
-
84894639131
-
Artificial chromosomes with genetic algorithm 2 (ACGA2) for single machine scheduling problems with sequence-dependent setup times
-
Chen, S.-H., Chen, M.-C., Liou, Y.-C., Artificial chromosomes with genetic algorithm 2 (ACGA2) for single machine scheduling problems with sequence-dependent setup times. Appl. Soft Comput. 17 (2014), 167–175.
-
(2014)
Appl. Soft Comput.
, vol.17
, pp. 167-175
-
-
Chen, S.-H.1
Chen, M.-C.2
Liou, Y.-C.3
-
11
-
-
58149209248
-
Fuzzy system reliability analysis using fuzzy number arithmetic operations
-
Chen, S.-M., Fuzzy system reliability analysis using fuzzy number arithmetic operations. Fuzzy Sets Syst., 69, 1995, 231.
-
(1995)
Fuzzy Sets Syst.
, vol.69
, pp. 231
-
-
Chen, S.-M.1
-
12
-
-
35248836033
-
An efficient algorithm for scheduling jobs on a machine with periodic maintenance
-
Chen, W.-J., An efficient algorithm for scheduling jobs on a machine with periodic maintenance. Int. J. Adv. Manuf. Technol. 34 (2007), 1173–1182.
-
(2007)
Int. J. Adv. Manuf. Technol.
, vol.34
, pp. 1173-1182
-
-
Chen, W.-J.1
-
13
-
-
34547838624
-
Minimizing total flow time and maximum tardiness with periodic maintenance
-
Chen, W.-J., Minimizing total flow time and maximum tardiness with periodic maintenance. J. Qual. Maint. Eng. 13 (2007), 293–303.
-
(2007)
J. Qual. Maint. Eng.
, vol.13
, pp. 293-303
-
-
Chen, W.-J.1
-
14
-
-
50349092766
-
Minimizing number of tardy jobs on a single machine subject to periodic maintenance
-
Chen, W.-J., Minimizing number of tardy jobs on a single machine subject to periodic maintenance. Omega 37 (2009), 591–599.
-
(2009)
Omega
, vol.37
, pp. 591-599
-
-
Chen, W.-J.1
-
15
-
-
0003671169
-
Fuzzy Rule-Based Modeling with Applications to Geophysical, Biological, and Engineering Systems
-
CRC Press
-
Duckstein, L., Fuzzy Rule-Based Modeling with Applications to Geophysical, Biological, and Engineering Systems. 1995, CRC Press.
-
(1995)
-
-
Duckstein, L.1
-
16
-
-
0020142383
-
Membership functions, some mathematical programming models and production scheduling
-
Dumitru, V., Luban, F., Membership functions, some mathematical programming models and production scheduling. Fuzzy Sets Syst. 8 (1982), 19–33.
-
(1982)
Fuzzy Sets Syst.
, vol.8
, pp. 19-33
-
-
Dumitru, V.1
Luban, F.2
-
17
-
-
0003722376
-
Genetic Algorithms in Search, Optimization and Machine Learning
-
Addison-Wesley MA
-
Goldberg, D.-E., Genetic Algorithms in Search, Optimization and Machine Learning. 1989, Addison-Wesley, MA.
-
(1989)
-
-
Goldberg, D.-E.1
-
18
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: a survey
-
Graham, R.-L., Lawler, E.-L., Lenstra, J.-K., Kan, A.-R., Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discrete Math. 5 (1979), 287–326.
-
(1979)
Ann. Discrete Math.
, vol.5
, pp. 287-326
-
-
Graham, R.-L.1
Lawler, E.-L.2
Lenstra, J.-K.3
Kan, A.-R.4
-
19
-
-
70349269170
-
Cut generation for an integrated employee timetabling and production scheduling problem
-
Guyon, O., Lemaire, P., Pinson, E., Rivreau, D., Cut generation for an integrated employee timetabling and production scheduling problem. Eur. J. Oper. Res. 201 (2010), 557–567.
-
(2010)
Eur. J. Oper. Res.
, vol.201
, pp. 557-567
-
-
Guyon, O.1
Lemaire, P.2
Pinson, E.3
Rivreau, D.4
-
20
-
-
0026988817
-
Genetic algorithms
-
Holland, J.-H., Genetic algorithms. Sci. Am. 267 (1992), 66–72.
-
(1992)
Sci. Am.
, vol.267
, pp. 66-72
-
-
Holland, J.-H.1
-
21
-
-
0032673230
-
A new triangular fuzzy Johnson algorithm
-
Hong, T.-P., Chuang, T.-N., A new triangular fuzzy Johnson algorithm. Comput. Ind. Eng. 36 (1999), 179–200.
-
(1999)
Comput. Ind. Eng.
, vol.36
, pp. 179-200
-
-
Hong, T.-P.1
Chuang, T.-N.2
-
22
-
-
0029638856
-
Single machine scheduling problem with fuzzy precedence relation
-
Ishii, H., Tada, M., Single machine scheduling problem with fuzzy precedence relation. Eur. J. Oper. Res. 87 (1995), 284–288.
-
(1995)
Eur. J. Oper. Res.
, vol.87
, pp. 284-288
-
-
Ishii, H.1
Tada, M.2
-
23
-
-
33749681702
-
Single-machine scheduling with periodic maintenance to minimize makespan
-
Ji, M., He, Y., Cheng, T.-E., Single-machine scheduling with periodic maintenance to minimize makespan. Comput. Oper. Res. 34 (2007), 1764–1770.
-
(2007)
Comput. Oper. Res.
, vol.34
, pp. 1764-1770
-
-
Ji, M.1
He, Y.2
Cheng, T.-E.3
-
24
-
-
79957528679
-
Scheduling with machine availability: an integrated approach
-
Kaabi, J., Varnier, C., Zerhouni, N., Scheduling with machine availability: an integrated approach. International Conference on Industrial Engineering and Production, 2003, 26–28.
-
(2003)
International Conference on Industrial Engineering and Production
, pp. 26-28
-
-
Kaabi, J.1
Varnier, C.2
Zerhouni, N.3
-
25
-
-
2342575956
-
Machine Scheduling Problems: Classification, Complexity and Computations
-
Springer
-
Kan, A.-R., Machine Scheduling Problems: Classification, Complexity and Computations. 1976, Springer.
-
(1976)
-
-
Kan, A.-R.1
-
26
-
-
0003555636
-
Introduction a la theorie des sous-ensembles flous a l'usage des ingenieurs
-
Masson Paris
-
Kaufmann, A., Introduction a la theorie des sous-ensembles flous a l'usage des ingenieurs. 1978, Masson, Paris.
-
(1978)
-
-
Kaufmann, A.1
-
27
-
-
84888352558
-
Application of graph search and genetic algorithms for the single machine scheduling problem with sequence-dependent setup times and quadratic penalty function of completion times
-
Kodaganallur, V., Sen, A.-K., Mitra, S., Application of graph search and genetic algorithms for the single machine scheduling problem with sequence-dependent setup times and quadratic penalty function of completion times. Comput. Ind. Eng. 67 (2014), 10–19.
-
(2014)
Comput. Ind. Eng.
, vol.67
, pp. 10-19
-
-
Kodaganallur, V.1
Sen, A.-K.2
Mitra, S.3
-
29
-
-
84940480129
-
Scheduling preventive maintenance tasks with synchronization constraints for human resources by a CP modeling approach
-
Lange, J., Doleschal, D., Weigert, G., Klemmt, A., Scheduling preventive maintenance tasks with synchronization constraints for human resources by a CP modeling approach. Winter Simulation Conference, 2014, 2454–2465.
-
(2014)
Winter Simulation Conference
, pp. 2454-2465
-
-
Lange, J.1
Doleschal, D.2
Weigert, G.3
Klemmt, A.4
-
30
-
-
0034159705
-
Scheduling jobs and maintenance activities on parallel machines
-
Lee, C.-Y., Chen, Z.-L., Scheduling jobs and maintenance activities on parallel machines. Naval Res. Logist. 47 (2000), 145–165.
-
(2000)
Naval Res. Logist.
, vol.47
, pp. 145-165
-
-
Lee, C.-Y.1
Chen, Z.-L.2
-
31
-
-
84855549578
-
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance
-
Lee, J.-Y., Kim, Y.-D., Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance. Comput. Oper. Res. 39 (2012), 2196–2205.
-
(2012)
Comput. Oper. Res.
, vol.39
, pp. 2196-2205
-
-
Lee, J.-Y.1
Kim, Y.-D.2
-
32
-
-
85020605324
-
Event-triggered control for nonlinear systems under unreliable communication links
-
Li, H., Chen, Z., Wu, L., Lam, H.-K., Event-triggered control for nonlinear systems under unreliable communication links. IEEE Trans. Fuzzy Syst., 2016.
-
(2016)
IEEE Trans. Fuzzy Syst.
-
-
Li, H.1
Chen, Z.2
Wu, L.3
Lam, H.-K.4
-
33
-
-
70349764553
-
Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance
-
Low, C., Ji, M., Hsu, C.-J., Su, C.-T., Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance. Appl. Math. Model. 34 (2010), 334–342.
-
(2010)
Appl. Math. Model.
, vol.34
, pp. 334-342
-
-
Low, C.1
Ji, M.2
Hsu, C.-J.3
Su, C.-T.4
-
34
-
-
66149094973
-
Proactive, dynamic and multi-criteria scheduling of maintenance activities
-
Marmier, F., Varnier, C., Zerhouni, N., Proactive, dynamic and multi-criteria scheduling of maintenance activities. Int. J. Prod. Res. 47 (2009), 2185–2201.
-
(2009)
Int. J. Prod. Res.
, vol.47
, pp. 2185-2201
-
-
Marmier, F.1
Varnier, C.2
Zerhouni, N.3
-
35
-
-
84926059030
-
Minimising the total completion time in a single machine scheduling problem under bimodal flexible periodic availability constraints
-
Mashkani, O., Moslehi, G., Minimising the total completion time in a single machine scheduling problem under bimodal flexible periodic availability constraints. Int. J. Comput. Integr. Manuf. 29 (2016), 323–341.
-
(2016)
Int. J. Comput. Integr. Manuf.
, vol.29
, pp. 323-341
-
-
Mashkani, O.1
Moslehi, G.2
-
36
-
-
59149095473
-
Schedule execution for two-machine flow-shop with interval processing times
-
Matsveichuk, N.-M., Sotskov, Y.-N., Egorova, N.-G., Lai, T.-C., Schedule execution for two-machine flow-shop with interval processing times. Math. Comput. Model. 49 (2009), 991–1011.
-
(2009)
Math. Comput. Model.
, vol.49
, pp. 991-1011
-
-
Matsveichuk, N.-M.1
Sotskov, Y.-N.2
Egorova, N.-G.3
Lai, T.-C.4
-
37
-
-
85021455366
-
Genetic algorithms + data structures = evolution programs
-
Michalewicz, Z., Hartley, S.-J., Genetic algorithms + data structures = evolution programs. Math. Intell., 18, 1996, 71.
-
(1996)
Math. Intell.
, vol.18
, pp. 71
-
-
Michalewicz, Z.1
Hartley, S.-J.2
-
38
-
-
0030241443
-
Genetic algorithms for flowshop scheduling problems
-
Murata, T., Ishibuchi, H., Tanaka, H., Genetic algorithms for flowshop scheduling problems. Comput. Ind. Eng. 30 (1996), 1061–1071.
-
(1996)
Comput. Ind. Eng.
, vol.30
, pp. 1061-1071
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
39
-
-
78751615953
-
Incorporating periodic preventive maintenance into flexible flowshop scheduling problems
-
Naderi, B., Zandieh, M., Aminnayeri, M., Incorporating periodic preventive maintenance into flexible flowshop scheduling problems. Appl. Soft Comput. 11 (2011), 2094–2101.
-
(2011)
Appl. Soft Comput.
, vol.11
, pp. 2094-2101
-
-
Naderi, B.1
Zandieh, M.2
Aminnayeri, M.3
-
40
-
-
84942434259
-
Fuzzy logic-based production scheduling and rescheduling in the presence of uncertainty
-
Springer
-
Petrovic, S., Petrovic, D., Burke, E., Fuzzy logic-based production scheduling and rescheduling in the presence of uncertainty. Planning Production and Inventories in the Extended Enterprise, 2011, Springer, 531–562.
-
(2011)
Planning Production and Inventories in the Extended Enterprise
, pp. 531-562
-
-
Petrovic, S.1
Petrovic, D.2
Burke, E.3
-
41
-
-
84892234592
-
Scheduling: Theory, Algorithms, and Systems
-
Springer Science & Business Media
-
Pinedo, M.-L., Scheduling: Theory, Algorithms, and Systems. 2012, Springer Science & Business Media.
-
(2012)
-
-
Pinedo, M.-L.1
-
42
-
-
30044449841
-
Two new robust genetic algorithms for the flowshop scheduling problem
-
Ruiz, R., Maroto, C., Alcaraz, J., Two new robust genetic algorithms for the flowshop scheduling problem. Omega 34 (2006), 461–476.
-
(2006)
Omega
, vol.34
, pp. 461-476
-
-
Ruiz, R.1
Maroto, C.2
Alcaraz, J.3
-
43
-
-
70149111254
-
A multi-agent-based approach for personnel scheduling in assembly centers
-
Sabar, M., Montreuil, B., Frayret, J.-M., A multi-agent-based approach for personnel scheduling in assembly centers. Eng. Appl. Artif. Intell. 22 (2009), 1080–1088.
-
(2009)
Eng. Appl. Artif. Intell.
, vol.22
, pp. 1080-1088
-
-
Sabar, M.1
Montreuil, B.2
Frayret, J.-M.3
-
44
-
-
0033881797
-
Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms
-
Sakawa, M., Kubota, R., Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms. Eur. J. Oper. Res. 120 (2000), 393–407.
-
(2000)
Eur. J. Oper. Res.
, vol.120
, pp. 393-407
-
-
Sakawa, M.1
Kubota, R.2
-
45
-
-
55649110055
-
Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness
-
Sbihi, M., Varnier, C., Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness. Comput. Ind. Eng. 55 (2008), 830–840.
-
(2008)
Comput. Ind. Eng.
, vol.55
, pp. 830-840
-
-
Sbihi, M.1
Varnier, C.2
-
46
-
-
85021402392
-
On Fuzziness: A Homage to Lotfi A. Zadeh
-
Springer
-
Seising, R., Trillas, E., Moraga, C., Termini, S., On Fuzziness: A Homage to Lotfi A. Zadeh. 2012, Springer.
-
(2012)
-
-
Seising, R.1
Trillas, E.2
Moraga, C.3
Termini, S.4
-
47
-
-
24144441172
-
Pre-emptive scheduling problems with controllable processing times
-
Shakhlevich, N.-V., Strusevich, V.-A., Pre-emptive scheduling problems with controllable processing times. J. Sched. 8 (2005), 233–253.
-
(2005)
J. Sched.
, vol.8
, pp. 233-253
-
-
Shakhlevich, N.-V.1
Strusevich, V.-A.2
-
48
-
-
85021443995
-
Combined production and maintenance scheduling for a multiple-product, single-machine production system
-
Sloan, T.-W., Shanthikumar, J.-G., Combined production and maintenance scheduling for a multiple-product, single-machine production system. Prod. Oper. Manag. 11 (2011), 2094–2101.
-
(2011)
Prod. Oper. Manag.
, vol.11
, pp. 2094-2101
-
-
Sloan, T.-W.1
Shanthikumar, J.-G.2
-
49
-
-
0031125880
-
On time-dependent availability and maintenance optimization of standby units under various maintenance policies
-
Vaurio, J., On time-dependent availability and maintenance optimization of standby units under various maintenance policies. Reliab. Eng. Syst. Saf. 56 (1997), 79–89.
-
(1997)
Reliab. Eng. Syst. Saf.
, vol.56
, pp. 79-89
-
-
Vaurio, J.1
-
50
-
-
56549103610
-
A note on makespan minimization for two parallel machines scheduling with a periodic availability constraint
-
Xu, D., Cheng, Z., Yin, Y., Li, H., A note on makespan minimization for two parallel machines scheduling with a periodic availability constraint. Comput. Oper. Res. 36 (2009), 1809–1812.
-
(2009)
Comput. Oper. Res.
, vol.36
, pp. 1809-1812
-
-
Xu, D.1
Cheng, Z.2
Yin, Y.3
Li, H.4
-
51
-
-
60649111057
-
A note on scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
-
Xu, D., Yin, Y., Li, H., A note on scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan. Eur. J. Oper. Res. 197 (2009), 825–827.
-
(2009)
Eur. J. Oper. Res.
, vol.197
, pp. 825-827
-
-
Xu, D.1
Yin, Y.2
Li, H.3
-
52
-
-
84907815094
-
Harmony search algorithm for single-machine scheduling problem with planned maintenance
-
Zammori, F., Braglia, M., Castellano, D., Harmony search algorithm for single-machine scheduling problem with planned maintenance. Comput. Ind. Eng. 76 (2014), 333–346.
-
(2014)
Comput. Ind. Eng.
, vol.76
, pp. 333-346
-
-
Zammori, F.1
Braglia, M.2
Castellano, D.3
-
53
-
-
85027695567
-
Adaptive fuzzy control for nonstrict-feedback systems with input saturation and output constraint
-
Zhou, Q., Wang, L., Wu, C., Li, H., Du, H., Adaptive fuzzy control for nonstrict-feedback systems with input saturation and output constraint. IEEE Trans. Syst., Man, Cybern.: Syst. 47 (2016), 1–12.
-
(2016)
IEEE Trans. Syst., Man, Cybern.: Syst.
, vol.47
, pp. 1-12
-
-
Zhou, Q.1
Wang, L.2
Wu, C.3
Li, H.4
Du, H.5
|