Volumn 59, Issue , 2017, Pages 556-573

A hybridization of genetic algorithms and fuzzy logic for the single-machine scheduling with flexible maintenance problem under human resource constraints

Author keywords

Fuzzy logic; Genetic algorithms; Human resource constraints; Preventive maintenance planning; Scheduling; Single machine problem

Indexed keywords

COMPUTATION THEORY; COMPUTER CIRCUITS; FLOW MEASUREMENT; FUZZY LOGIC; GENETIC ALGORITHMS; MAINTENANCE; OPTIMIZATION; PERSONNEL; PROBLEM SOLVING; SCHEDULING; SCHEDULING ALGORITHMS;

EID: 85021438712     PISSN: 15684946     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.asoc.2017.05.058     Document Type: Article
Times cited : (38)

References (53)
  • 2
    • 43049084777 scopus 로고    scopus 로고
    • Complexity of single machine scheduling problems under scenario-based uncertainty
    • Aloulou, M.A., Croce, F.D., Complexity of single machine scheduling problems under scenario-based uncertainty. Oper. Res. Lett. 36 (2008), 338–342.
    • (2008) Oper. Res. Lett. , vol.36 , pp. 338-342
    • Aloulou, M.A.1    Croce, F.D.2
  • 3
    • 78651239754 scopus 로고    scopus 로고
    • Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: a resolution with sequential and integrated strategies
    • Benbouzid-Sitayeb, F., Guebli, S.-A., Bessadi, Y., Varnier, C., Zerhouni, N., Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: a resolution with sequential and integrated strategies. Int. J. Manuf. Res. 6 (2011), 30–48.
    • (2011) Int. J. Manuf. Res. , vol.6 , pp. 30-48
    • Benbouzid-Sitayeb, F.1    Guebli, S.-A.2    Bessadi, Y.3    Varnier, C.4    Zerhouni, N.5
  • 4
    • 62749205978 scopus 로고    scopus 로고
    • Flexibilit et robustesse en ordonnancement
    • Hermes Science
    • Billaut, J.-C., Moukrim, A., Sanlaville, E., Flexibilit et robustesse en ordonnancement. 2005, Hermes Science.
    • (2005)
    • Billaut, J.-C.1    Moukrim, A.2    Sanlaville, E.3
  • 5
    • 84942428880 scopus 로고    scopus 로고
    • Considering human resource constraints for real joint production and maintenance schedules
    • Bouzidi-Hassini, S., Benbouzid-Sitayeb, F., Marmier, F., Rabahi, M., Considering human resource constraints for real joint production and maintenance schedules. Comput. Ind. Eng. 90 (2015), 197–211.
    • (2015) Comput. Ind. Eng. , vol.90 , pp. 197-211
    • Bouzidi-Hassini, S.1    Benbouzid-Sitayeb, F.2    Marmier, F.3    Rabahi, M.4
  • 6
    • 0030190570 scopus 로고    scopus 로고
    • Production and maintenance integrated planning
    • Brandolese, M., Franci, M., Pozzetti, A., Production and maintenance integrated planning. Int. J. Prod. Res. 34 (1996), 2059–2075.
    • (1996) Int. J. Prod. Res. , vol.34 , pp. 2059-2075
    • Brandolese, M.1    Franci, M.2    Pozzetti, A.3
  • 7
    • 0037410246 scopus 로고    scopus 로고
    • On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
    • Chanas, S., Kasperski, A., On two single machine scheduling problems with fuzzy processing times and fuzzy due dates. Eur. J. Oper. Res. 147 (2003), 281–296.
    • (2003) Eur. J. Oper. Res. , vol.147 , pp. 281-296
    • Chanas, S.1    Kasperski, A.2
  • 8
    • 33745794508 scopus 로고    scopus 로고
    • Single-machine scheduling with flexible and periodic maintenance
    • Chen, J., Single-machine scheduling with flexible and periodic maintenance. J. Oper. Res. Soc. 57 (2006), 703–710.
    • (2006) J. Oper. Res. Soc. , vol.57 , pp. 703-710
    • Chen, J.1
  • 9
    • 41149166270 scopus 로고    scopus 로고
    • Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
    • Chen, J.-S., Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan. Int. J. Adv. Manuf. Technol. 190 (2008), 90–102.
    • (2008) Int. J. Adv. Manuf. Technol. , vol.190 , pp. 90-102
    • Chen, J.-S.1
  • 10
    • 84894639131 scopus 로고    scopus 로고
    • Artificial chromosomes with genetic algorithm 2 (ACGA2) for single machine scheduling problems with sequence-dependent setup times
    • Chen, S.-H., Chen, M.-C., Liou, Y.-C., Artificial chromosomes with genetic algorithm 2 (ACGA2) for single machine scheduling problems with sequence-dependent setup times. Appl. Soft Comput. 17 (2014), 167–175.
    • (2014) Appl. Soft Comput. , vol.17 , pp. 167-175
    • Chen, S.-H.1    Chen, M.-C.2    Liou, Y.-C.3
  • 11
    • 58149209248 scopus 로고
    • Fuzzy system reliability analysis using fuzzy number arithmetic operations
    • Chen, S.-M., Fuzzy system reliability analysis using fuzzy number arithmetic operations. Fuzzy Sets Syst., 69, 1995, 231.
    • (1995) Fuzzy Sets Syst. , vol.69 , pp. 231
    • Chen, S.-M.1
  • 12
    • 35248836033 scopus 로고    scopus 로고
    • An efficient algorithm for scheduling jobs on a machine with periodic maintenance
    • Chen, W.-J., An efficient algorithm for scheduling jobs on a machine with periodic maintenance. Int. J. Adv. Manuf. Technol. 34 (2007), 1173–1182.
    • (2007) Int. J. Adv. Manuf. Technol. , vol.34 , pp. 1173-1182
    • Chen, W.-J.1
  • 13
    • 34547838624 scopus 로고    scopus 로고
    • Minimizing total flow time and maximum tardiness with periodic maintenance
    • Chen, W.-J., Minimizing total flow time and maximum tardiness with periodic maintenance. J. Qual. Maint. Eng. 13 (2007), 293–303.
    • (2007) J. Qual. Maint. Eng. , vol.13 , pp. 293-303
    • Chen, W.-J.1
  • 14
    • 50349092766 scopus 로고    scopus 로고
    • Minimizing number of tardy jobs on a single machine subject to periodic maintenance
    • Chen, W.-J., Minimizing number of tardy jobs on a single machine subject to periodic maintenance. Omega 37 (2009), 591–599.
    • (2009) Omega , vol.37 , pp. 591-599
    • Chen, W.-J.1
  • 15
    • 0003671169 scopus 로고
    • Fuzzy Rule-Based Modeling with Applications to Geophysical, Biological, and Engineering Systems
    • CRC Press
    • Duckstein, L., Fuzzy Rule-Based Modeling with Applications to Geophysical, Biological, and Engineering Systems. 1995, CRC Press.
    • (1995)
    • Duckstein, L.1
  • 16
    • 0020142383 scopus 로고
    • Membership functions, some mathematical programming models and production scheduling
    • Dumitru, V., Luban, F., Membership functions, some mathematical programming models and production scheduling. Fuzzy Sets Syst. 8 (1982), 19–33.
    • (1982) Fuzzy Sets Syst. , vol.8 , pp. 19-33
    • Dumitru, V.1    Luban, F.2
  • 17
    • 0003722376 scopus 로고
    • Genetic Algorithms in Search, Optimization and Machine Learning
    • Addison-Wesley MA
    • Goldberg, D.-E., Genetic Algorithms in Search, Optimization and Machine Learning. 1989, Addison-Wesley, MA.
    • (1989)
    • Goldberg, D.-E.1
  • 18
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: a survey
    • Graham, R.-L., Lawler, E.-L., Lenstra, J.-K., Kan, A.-R., Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discrete Math. 5 (1979), 287–326.
    • (1979) Ann. Discrete Math. , vol.5 , pp. 287-326
    • Graham, R.-L.1    Lawler, E.-L.2    Lenstra, J.-K.3    Kan, A.-R.4
  • 19
    • 70349269170 scopus 로고    scopus 로고
    • Cut generation for an integrated employee timetabling and production scheduling problem
    • Guyon, O., Lemaire, P., Pinson, E., Rivreau, D., Cut generation for an integrated employee timetabling and production scheduling problem. Eur. J. Oper. Res. 201 (2010), 557–567.
    • (2010) Eur. J. Oper. Res. , vol.201 , pp. 557-567
    • Guyon, O.1    Lemaire, P.2    Pinson, E.3    Rivreau, D.4
  • 20
    • 0026988817 scopus 로고
    • Genetic algorithms
    • Holland, J.-H., Genetic algorithms. Sci. Am. 267 (1992), 66–72.
    • (1992) Sci. Am. , vol.267 , pp. 66-72
    • Holland, J.-H.1
  • 21
    • 0032673230 scopus 로고    scopus 로고
    • A new triangular fuzzy Johnson algorithm
    • Hong, T.-P., Chuang, T.-N., A new triangular fuzzy Johnson algorithm. Comput. Ind. Eng. 36 (1999), 179–200.
    • (1999) Comput. Ind. Eng. , vol.36 , pp. 179-200
    • Hong, T.-P.1    Chuang, T.-N.2
  • 22
    • 0029638856 scopus 로고
    • Single machine scheduling problem with fuzzy precedence relation
    • Ishii, H., Tada, M., Single machine scheduling problem with fuzzy precedence relation. Eur. J. Oper. Res. 87 (1995), 284–288.
    • (1995) Eur. J. Oper. Res. , vol.87 , pp. 284-288
    • Ishii, H.1    Tada, M.2
  • 23
    • 33749681702 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance to minimize makespan
    • Ji, M., He, Y., Cheng, T.-E., Single-machine scheduling with periodic maintenance to minimize makespan. Comput. Oper. Res. 34 (2007), 1764–1770.
    • (2007) Comput. Oper. Res. , vol.34 , pp. 1764-1770
    • Ji, M.1    He, Y.2    Cheng, T.-E.3
  • 25
    • 2342575956 scopus 로고
    • Machine Scheduling Problems: Classification, Complexity and Computations
    • Springer
    • Kan, A.-R., Machine Scheduling Problems: Classification, Complexity and Computations. 1976, Springer.
    • (1976)
    • Kan, A.-R.1
  • 26
    • 0003555636 scopus 로고
    • Introduction a la theorie des sous-ensembles flous a l'usage des ingenieurs
    • Masson Paris
    • Kaufmann, A., Introduction a la theorie des sous-ensembles flous a l'usage des ingenieurs. 1978, Masson, Paris.
    • (1978)
    • Kaufmann, A.1
  • 27
    • 84888352558 scopus 로고    scopus 로고
    • Application of graph search and genetic algorithms for the single machine scheduling problem with sequence-dependent setup times and quadratic penalty function of completion times
    • Kodaganallur, V., Sen, A.-K., Mitra, S., Application of graph search and genetic algorithms for the single machine scheduling problem with sequence-dependent setup times and quadratic penalty function of completion times. Comput. Ind. Eng. 67 (2014), 10–19.
    • (2014) Comput. Ind. Eng. , vol.67 , pp. 10-19
    • Kodaganallur, V.1    Sen, A.-K.2    Mitra, S.3
  • 28
    • 0030166641 scopus 로고    scopus 로고
    • Fuzzy job shop scheduling
    • Kuroda, M., Wang, Z., Fuzzy job shop scheduling. Int. J. Prod. Econ. 44 (1996), 45–51.
    • (1996) Int. J. Prod. Econ. , vol.44 , pp. 45-51
    • Kuroda, M.1    Wang, Z.2
  • 29
    • 84940480129 scopus 로고    scopus 로고
    • Scheduling preventive maintenance tasks with synchronization constraints for human resources by a CP modeling approach
    • Lange, J., Doleschal, D., Weigert, G., Klemmt, A., Scheduling preventive maintenance tasks with synchronization constraints for human resources by a CP modeling approach. Winter Simulation Conference, 2014, 2454–2465.
    • (2014) Winter Simulation Conference , pp. 2454-2465
    • Lange, J.1    Doleschal, D.2    Weigert, G.3    Klemmt, A.4
  • 30
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • Lee, C.-Y., Chen, Z.-L., Scheduling jobs and maintenance activities on parallel machines. Naval Res. Logist. 47 (2000), 145–165.
    • (2000) Naval Res. Logist. , vol.47 , pp. 145-165
    • Lee, C.-Y.1    Chen, Z.-L.2
  • 31
    • 84855549578 scopus 로고    scopus 로고
    • Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance
    • Lee, J.-Y., Kim, Y.-D., Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance. Comput. Oper. Res. 39 (2012), 2196–2205.
    • (2012) Comput. Oper. Res. , vol.39 , pp. 2196-2205
    • Lee, J.-Y.1    Kim, Y.-D.2
  • 32
    • 85020605324 scopus 로고    scopus 로고
    • Event-triggered control for nonlinear systems under unreliable communication links
    • Li, H., Chen, Z., Wu, L., Lam, H.-K., Event-triggered control for nonlinear systems under unreliable communication links. IEEE Trans. Fuzzy Syst., 2016.
    • (2016) IEEE Trans. Fuzzy Syst.
    • Li, H.1    Chen, Z.2    Wu, L.3    Lam, H.-K.4
  • 33
    • 70349764553 scopus 로고    scopus 로고
    • Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance
    • Low, C., Ji, M., Hsu, C.-J., Su, C.-T., Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance. Appl. Math. Model. 34 (2010), 334–342.
    • (2010) Appl. Math. Model. , vol.34 , pp. 334-342
    • Low, C.1    Ji, M.2    Hsu, C.-J.3    Su, C.-T.4
  • 34
    • 66149094973 scopus 로고    scopus 로고
    • Proactive, dynamic and multi-criteria scheduling of maintenance activities
    • Marmier, F., Varnier, C., Zerhouni, N., Proactive, dynamic and multi-criteria scheduling of maintenance activities. Int. J. Prod. Res. 47 (2009), 2185–2201.
    • (2009) Int. J. Prod. Res. , vol.47 , pp. 2185-2201
    • Marmier, F.1    Varnier, C.2    Zerhouni, N.3
  • 35
    • 84926059030 scopus 로고    scopus 로고
    • Minimising the total completion time in a single machine scheduling problem under bimodal flexible periodic availability constraints
    • Mashkani, O., Moslehi, G., Minimising the total completion time in a single machine scheduling problem under bimodal flexible periodic availability constraints. Int. J. Comput. Integr. Manuf. 29 (2016), 323–341.
    • (2016) Int. J. Comput. Integr. Manuf. , vol.29 , pp. 323-341
    • Mashkani, O.1    Moslehi, G.2
  • 36
    • 59149095473 scopus 로고    scopus 로고
    • Schedule execution for two-machine flow-shop with interval processing times
    • Matsveichuk, N.-M., Sotskov, Y.-N., Egorova, N.-G., Lai, T.-C., Schedule execution for two-machine flow-shop with interval processing times. Math. Comput. Model. 49 (2009), 991–1011.
    • (2009) Math. Comput. Model. , vol.49 , pp. 991-1011
    • Matsveichuk, N.-M.1    Sotskov, Y.-N.2    Egorova, N.-G.3    Lai, T.-C.4
  • 37
    • 85021455366 scopus 로고    scopus 로고
    • Genetic algorithms + data structures = evolution programs
    • Michalewicz, Z., Hartley, S.-J., Genetic algorithms + data structures = evolution programs. Math. Intell., 18, 1996, 71.
    • (1996) Math. Intell. , vol.18 , pp. 71
    • Michalewicz, Z.1    Hartley, S.-J.2
  • 38
    • 0030241443 scopus 로고    scopus 로고
    • Genetic algorithms for flowshop scheduling problems
    • Murata, T., Ishibuchi, H., Tanaka, H., Genetic algorithms for flowshop scheduling problems. Comput. Ind. Eng. 30 (1996), 1061–1071.
    • (1996) Comput. Ind. Eng. , vol.30 , pp. 1061-1071
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 39
    • 78751615953 scopus 로고    scopus 로고
    • Incorporating periodic preventive maintenance into flexible flowshop scheduling problems
    • Naderi, B., Zandieh, M., Aminnayeri, M., Incorporating periodic preventive maintenance into flexible flowshop scheduling problems. Appl. Soft Comput. 11 (2011), 2094–2101.
    • (2011) Appl. Soft Comput. , vol.11 , pp. 2094-2101
    • Naderi, B.1    Zandieh, M.2    Aminnayeri, M.3
  • 41
    • 84892234592 scopus 로고    scopus 로고
    • Scheduling: Theory, Algorithms, and Systems
    • Springer Science & Business Media
    • Pinedo, M.-L., Scheduling: Theory, Algorithms, and Systems. 2012, Springer Science & Business Media.
    • (2012)
    • Pinedo, M.-L.1
  • 42
    • 30044449841 scopus 로고    scopus 로고
    • Two new robust genetic algorithms for the flowshop scheduling problem
    • Ruiz, R., Maroto, C., Alcaraz, J., Two new robust genetic algorithms for the flowshop scheduling problem. Omega 34 (2006), 461–476.
    • (2006) Omega , vol.34 , pp. 461-476
    • Ruiz, R.1    Maroto, C.2    Alcaraz, J.3
  • 43
    • 70149111254 scopus 로고    scopus 로고
    • A multi-agent-based approach for personnel scheduling in assembly centers
    • Sabar, M., Montreuil, B., Frayret, J.-M., A multi-agent-based approach for personnel scheduling in assembly centers. Eng. Appl. Artif. Intell. 22 (2009), 1080–1088.
    • (2009) Eng. Appl. Artif. Intell. , vol.22 , pp. 1080-1088
    • Sabar, M.1    Montreuil, B.2    Frayret, J.-M.3
  • 44
    • 0033881797 scopus 로고    scopus 로고
    • Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms
    • Sakawa, M., Kubota, R., Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms. Eur. J. Oper. Res. 120 (2000), 393–407.
    • (2000) Eur. J. Oper. Res. , vol.120 , pp. 393-407
    • Sakawa, M.1    Kubota, R.2
  • 45
    • 55649110055 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness
    • Sbihi, M., Varnier, C., Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness. Comput. Ind. Eng. 55 (2008), 830–840.
    • (2008) Comput. Ind. Eng. , vol.55 , pp. 830-840
    • Sbihi, M.1    Varnier, C.2
  • 46
    • 85021402392 scopus 로고    scopus 로고
    • On Fuzziness: A Homage to Lotfi A. Zadeh
    • Springer
    • Seising, R., Trillas, E., Moraga, C., Termini, S., On Fuzziness: A Homage to Lotfi A. Zadeh. 2012, Springer.
    • (2012)
    • Seising, R.1    Trillas, E.2    Moraga, C.3    Termini, S.4
  • 47
    • 24144441172 scopus 로고    scopus 로고
    • Pre-emptive scheduling problems with controllable processing times
    • Shakhlevich, N.-V., Strusevich, V.-A., Pre-emptive scheduling problems with controllable processing times. J. Sched. 8 (2005), 233–253.
    • (2005) J. Sched. , vol.8 , pp. 233-253
    • Shakhlevich, N.-V.1    Strusevich, V.-A.2
  • 48
    • 85021443995 scopus 로고    scopus 로고
    • Combined production and maintenance scheduling for a multiple-product, single-machine production system
    • Sloan, T.-W., Shanthikumar, J.-G., Combined production and maintenance scheduling for a multiple-product, single-machine production system. Prod. Oper. Manag. 11 (2011), 2094–2101.
    • (2011) Prod. Oper. Manag. , vol.11 , pp. 2094-2101
    • Sloan, T.-W.1    Shanthikumar, J.-G.2
  • 49
    • 0031125880 scopus 로고    scopus 로고
    • On time-dependent availability and maintenance optimization of standby units under various maintenance policies
    • Vaurio, J., On time-dependent availability and maintenance optimization of standby units under various maintenance policies. Reliab. Eng. Syst. Saf. 56 (1997), 79–89.
    • (1997) Reliab. Eng. Syst. Saf. , vol.56 , pp. 79-89
    • Vaurio, J.1
  • 50
    • 56549103610 scopus 로고    scopus 로고
    • A note on makespan minimization for two parallel machines scheduling with a periodic availability constraint
    • Xu, D., Cheng, Z., Yin, Y., Li, H., A note on makespan minimization for two parallel machines scheduling with a periodic availability constraint. Comput. Oper. Res. 36 (2009), 1809–1812.
    • (2009) Comput. Oper. Res. , vol.36 , pp. 1809-1812
    • Xu, D.1    Cheng, Z.2    Yin, Y.3    Li, H.4
  • 51
    • 60649111057 scopus 로고    scopus 로고
    • A note on scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
    • Xu, D., Yin, Y., Li, H., A note on scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan. Eur. J. Oper. Res. 197 (2009), 825–827.
    • (2009) Eur. J. Oper. Res. , vol.197 , pp. 825-827
    • Xu, D.1    Yin, Y.2    Li, H.3
  • 52
    • 84907815094 scopus 로고    scopus 로고
    • Harmony search algorithm for single-machine scheduling problem with planned maintenance
    • Zammori, F., Braglia, M., Castellano, D., Harmony search algorithm for single-machine scheduling problem with planned maintenance. Comput. Ind. Eng. 76 (2014), 333–346.
    • (2014) Comput. Ind. Eng. , vol.76 , pp. 333-346
    • Zammori, F.1    Braglia, M.2    Castellano, D.3
  • 53
    • 85027695567 scopus 로고    scopus 로고
    • Adaptive fuzzy control for nonstrict-feedback systems with input saturation and output constraint
    • Zhou, Q., Wang, L., Wu, C., Li, H., Du, H., Adaptive fuzzy control for nonstrict-feedback systems with input saturation and output constraint. IEEE Trans. Syst., Man, Cybern.: Syst. 47 (2016), 1–12.
    • (2016) IEEE Trans. Syst., Man, Cybern.: Syst. , vol.47 , pp. 1-12
    • Zhou, Q.1    Wang, L.2    Wu, C.3    Li, H.4    Du, H.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.