-
1
-
-
3342887393
-
The temporal model of CRONOS-III: A knowledge-based system for production scheduling
-
J. Dorn and K. Froeschl (eds) (New York: Ellis Horwood
-
Canzi, U. and Guida, G., 1993, The temporal model of CRONOS-III: a knowledge-based system for production scheduling. In Scheduling of Production Processes, J. Dorn and K. Froeschl (eds) (New York: Ellis Horwood), pp. 113-129.
-
(1993)
Scheduling of Production Processes
, pp. 113-129
-
-
Canzi, U.1
Guida, G.2
-
2
-
-
0022812078
-
A LISP-based heuristic scheduler for automatic insertion in electronics assembly
-
Cunningham, P. and Browne, J., 1976, A LISP-based heuristic scheduler for automatic insertion in electronics assembly. International Journal of Production Research, 24, 1395-1408.
-
(1976)
International Journal of Production Research
, vol.24
, pp. 1395-1408
-
-
Cunningham, P.1
Browne, J.2
-
3
-
-
0020809802
-
Markovian models for investigating failure and repair characteristics of production systems
-
Foster III, J. W, and Garcia-Diaz, A., 1983, Markovian models for investigating failure and repair characteristics of production systems. HE Transactions, 15, 202-209.
-
(1983)
HE Transactions
, vol.15
, pp. 202-209
-
-
Foster, J.W.1
Garcia-Diaz, A.2
-
4
-
-
84982522109
-
ISIS-a knowledge based system for factory scheduling
-
Fox, M. S, and Smith, S. F., 1984, ISIS-a knowledge based system for factory scheduling. Expert Systems, 1(1), 25-49.
-
(1984)
Expert Systems
, vol.1
, Issue.1
, pp. 25-49
-
-
Fox, M.S.1
Smith, S.F.2
-
5
-
-
0002296563
-
Constrained heuristic search
-
August, Detroit, Michigan, USA
-
Fox, M. S., Sadeh, N. and Baykan, C. 1988, Constrained heuristic search. Proceedings of the Eleventh International Joint Conference on Artificial Intelligence, 20-25 August, Detroit, Michigan, USA.
-
(1988)
Proceedings of the Eleventh International Joint Conference on Artificial Intelligence
, pp. 20-25
-
-
Fox, M.S.1
Sadeh, N.2
Baykan, C.3
-
6
-
-
3342920350
-
EXS: Un sistema esperto per la programmazione operativa della produzione
-
Gareth, M., Jenna, R., Pecchini, L, and Pozzetti, A., 1990, EXS: un sistema esperto per la programmazione operativa della produzione. Automazione e Strumentazione, 6, 118-123.
-
(1990)
Automazione E Strumentazione
, vol.6
, pp. 118-123
-
-
Gareth, M.1
Jenna, R.2
Pecchini, L.3
Pozzetti, A.4
-
7
-
-
0016971681
-
Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach
-
Geoffrion, A. M. and Graves, G. W., 1976, Scheduling parallel production lines with changeover costs: practical application of a quadratic assignment/LP approach. Operations Research, 24(4), 595-610.
-
(1976)
Operations Research
, vol.24
, Issue.4
, pp. 595-610
-
-
Geoffrion, A.M.1
Graves, G.W.2
-
8
-
-
0004151665
-
-
Reading, MA: Addison-Wesley)
-
Hayes-Roth, F., Waterman, D. A. and Lenat, D. B., 1983, Building Expert Systems (Reading, MA: Addison-Wesley).
-
(1983)
Building Expert Systems
-
-
Hayes-Roth, F.1
Waterman, D.A.2
Lenat, D.B.3
-
9
-
-
0019637027
-
Optimal preventive maintenance policies for repairable systems
-
Nguyen, D. G. and Murthy, D. N. P., 1981, Optimal preventive maintenance policies for repairable systems. Operations Research, 29(6), 1181-1194.
-
(1981)
Operations Research
, vol.29
, Issue.6
, pp. 1181-1194
-
-
Nguyen, D.G.1
Murthy, D.N.P.2
-
10
-
-
0043013252
-
Scheduling on parallel machines to minimize two criteria related to job tardiness
-
Nunnikhoven, T. S. and Emmons, H., 1977, Scheduling on parallel machines to minimize two criteria related to job tardiness. AIIE Transactions, 9(3), 288-296.
-
(1977)
AIIE Transactions
, vol.9
, Issue.3
, pp. 288-296
-
-
Nunnikhoven, T.S.1
Emmons, H.2
-
11
-
-
0017503170
-
On the use of vehicle routing algorithm for the parallel processor problem with sequence dependent changeover costs
-
Parker, R. G., Deane, R. H. and Holmes, R. A., 1977, On the use of vehicle routing algorithm for the parallel processor problem with sequence dependent changeover costs. A!IE Transactions, 9(2), 155-160.
-
(1977)
A!IE Transactions
, vol.9
, Issue.2
, pp. 155-160
-
-
Parker, R.G.1
Deane, R.H.2
Holmes, R.A.3
-
12
-
-
0022680968
-
A comparative study of continuous and periodic inspection policies in deteriorating production systems
-
Rosenblatt, M. J. and Lee, H. L., 1986, A comparative study of continuous and periodic inspection policies in deteriorating production systems. HE Transactions, 18(1), 2-9.
-
(1986)
HE Transactions
, vol.18
, Issue.1
, pp. 2-9
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
13
-
-
0009743850
-
Constructing and maintaining detailed production plans: Investigations into the development of knowledge based factory scheduling systems
-
Fall
-
Smith, S. F., Fox, M. S. and Ow, P. S., 1986, Constructing and maintaining detailed production plans: investigations into the development of knowledge based factory scheduling systems. A! Magazine, Fall, 45-61.
-
(1986)
A! Magazine
, pp. 45-61
-
-
Smith, S.F.1
Fox, M.S.2
Ow, P.S.3
-
14
-
-
0019563065
-
Planning with constraints (MOLGEN part 1)
-
Stefik, M., 1981a, Planning with constraints (MOLGEN part 1). Artificial Intelligence, 16, 111-140.
-
(1981)
Artificial Intelligence
, vol.16
, pp. 111-140
-
-
Stefik, M.1
-
15
-
-
0019563690
-
Planning and meta-planning (MOLGEN part 2)
-
Stefik, M., 1981b, Planning and meta-planning (MOLGEN part 2). Artificial Intelligence, 16, 141-170.
-
(1981)
Artificial Intelligence
, vol.16
, pp. 141-170
-
-
Stefik, M.1
-
16
-
-
0021422476
-
A nearly optimal inspection policy for productive equipment
-
Turco, F, and Paroljni, P., 1983, A nearly optimal inspection policy for productive equipment. International Journal of Production Research, 22(3), 515-528.
-
(1983)
International Journal of Production Research
, vol.22
, Issue.3
, pp. 515-528
-
-
Turco, F.1
Paroljni, P.2
|