메뉴 건너뛰기




Volumn 34, Issue 7, 1996, Pages 2059-2075

Production and maintenance integrated planning

Author keywords

[No Author keywords available]

Indexed keywords

COSTS; EXPERT SYSTEMS; INDUSTRIAL MANAGEMENT; MACHINERY; MAINTENANCE; PROCESS CONTROL; PRODUCTION; SCHEDULING;

EID: 0030190570     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549608905013     Document Type: Article
Times cited : (28)

References (17)
  • 1
    • 3342887393 scopus 로고
    • The temporal model of CRONOS-III: A knowledge-based system for production scheduling
    • J. Dorn and K. Froeschl (eds) (New York: Ellis Horwood
    • Canzi, U. and Guida, G., 1993, The temporal model of CRONOS-III: a knowledge-based system for production scheduling. In Scheduling of Production Processes, J. Dorn and K. Froeschl (eds) (New York: Ellis Horwood), pp. 113-129.
    • (1993) Scheduling of Production Processes , pp. 113-129
    • Canzi, U.1    Guida, G.2
  • 2
    • 0022812078 scopus 로고
    • A LISP-based heuristic scheduler for automatic insertion in electronics assembly
    • Cunningham, P. and Browne, J., 1976, A LISP-based heuristic scheduler for automatic insertion in electronics assembly. International Journal of Production Research, 24, 1395-1408.
    • (1976) International Journal of Production Research , vol.24 , pp. 1395-1408
    • Cunningham, P.1    Browne, J.2
  • 3
    • 0020809802 scopus 로고
    • Markovian models for investigating failure and repair characteristics of production systems
    • Foster III, J. W, and Garcia-Diaz, A., 1983, Markovian models for investigating failure and repair characteristics of production systems. HE Transactions, 15, 202-209.
    • (1983) HE Transactions , vol.15 , pp. 202-209
    • Foster, J.W.1    Garcia-Diaz, A.2
  • 4
    • 84982522109 scopus 로고
    • ISIS-a knowledge based system for factory scheduling
    • Fox, M. S, and Smith, S. F., 1984, ISIS-a knowledge based system for factory scheduling. Expert Systems, 1(1), 25-49.
    • (1984) Expert Systems , vol.1 , Issue.1 , pp. 25-49
    • Fox, M.S.1    Smith, S.F.2
  • 6
    • 3342920350 scopus 로고
    • EXS: Un sistema esperto per la programmazione operativa della produzione
    • Gareth, M., Jenna, R., Pecchini, L, and Pozzetti, A., 1990, EXS: un sistema esperto per la programmazione operativa della produzione. Automazione e Strumentazione, 6, 118-123.
    • (1990) Automazione E Strumentazione , vol.6 , pp. 118-123
    • Gareth, M.1    Jenna, R.2    Pecchini, L.3    Pozzetti, A.4
  • 7
    • 0016971681 scopus 로고
    • Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach
    • Geoffrion, A. M. and Graves, G. W., 1976, Scheduling parallel production lines with changeover costs: practical application of a quadratic assignment/LP approach. Operations Research, 24(4), 595-610.
    • (1976) Operations Research , vol.24 , Issue.4 , pp. 595-610
    • Geoffrion, A.M.1    Graves, G.W.2
  • 9
    • 0019637027 scopus 로고
    • Optimal preventive maintenance policies for repairable systems
    • Nguyen, D. G. and Murthy, D. N. P., 1981, Optimal preventive maintenance policies for repairable systems. Operations Research, 29(6), 1181-1194.
    • (1981) Operations Research , vol.29 , Issue.6 , pp. 1181-1194
    • Nguyen, D.G.1    Murthy, D.N.P.2
  • 10
    • 0043013252 scopus 로고
    • Scheduling on parallel machines to minimize two criteria related to job tardiness
    • Nunnikhoven, T. S. and Emmons, H., 1977, Scheduling on parallel machines to minimize two criteria related to job tardiness. AIIE Transactions, 9(3), 288-296.
    • (1977) AIIE Transactions , vol.9 , Issue.3 , pp. 288-296
    • Nunnikhoven, T.S.1    Emmons, H.2
  • 11
    • 0017503170 scopus 로고
    • On the use of vehicle routing algorithm for the parallel processor problem with sequence dependent changeover costs
    • Parker, R. G., Deane, R. H. and Holmes, R. A., 1977, On the use of vehicle routing algorithm for the parallel processor problem with sequence dependent changeover costs. A!IE Transactions, 9(2), 155-160.
    • (1977) A!IE Transactions , vol.9 , Issue.2 , pp. 155-160
    • Parker, R.G.1    Deane, R.H.2    Holmes, R.A.3
  • 12
    • 0022680968 scopus 로고
    • A comparative study of continuous and periodic inspection policies in deteriorating production systems
    • Rosenblatt, M. J. and Lee, H. L., 1986, A comparative study of continuous and periodic inspection policies in deteriorating production systems. HE Transactions, 18(1), 2-9.
    • (1986) HE Transactions , vol.18 , Issue.1 , pp. 2-9
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 13
    • 0009743850 scopus 로고
    • Constructing and maintaining detailed production plans: Investigations into the development of knowledge based factory scheduling systems
    • Fall
    • Smith, S. F., Fox, M. S. and Ow, P. S., 1986, Constructing and maintaining detailed production plans: investigations into the development of knowledge based factory scheduling systems. A! Magazine, Fall, 45-61.
    • (1986) A! Magazine , pp. 45-61
    • Smith, S.F.1    Fox, M.S.2    Ow, P.S.3
  • 14
    • 0019563065 scopus 로고
    • Planning with constraints (MOLGEN part 1)
    • Stefik, M., 1981a, Planning with constraints (MOLGEN part 1). Artificial Intelligence, 16, 111-140.
    • (1981) Artificial Intelligence , vol.16 , pp. 111-140
    • Stefik, M.1
  • 15
    • 0019563690 scopus 로고
    • Planning and meta-planning (MOLGEN part 2)
    • Stefik, M., 1981b, Planning and meta-planning (MOLGEN part 2). Artificial Intelligence, 16, 141-170.
    • (1981) Artificial Intelligence , vol.16 , pp. 141-170
    • Stefik, M.1
  • 16
    • 0021422476 scopus 로고
    • A nearly optimal inspection policy for productive equipment
    • Turco, F, and Paroljni, P., 1983, A nearly optimal inspection policy for productive equipment. International Journal of Production Research, 22(3), 515-528.
    • (1983) International Journal of Production Research , vol.22 , Issue.3 , pp. 515-528
    • Turco, F.1    Paroljni, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.