메뉴 건너뛰기




Volumn 57, Issue 6, 2006, Pages 703-710

Single-machine scheduling with flexible and periodic maintenance

Author keywords

Availability constraints; Heuristics; Integer programming; Maintenance; Scheduling; Single machine

Indexed keywords

HEURISTIC METHODS; INTEGER PROGRAMMING; MAINTENANCE; MATHEMATICAL MODELS; PROBLEM SOLVING; SCHEDULING;

EID: 33745794508     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2602043     Document Type: Article
Times cited : (61)

References (16)
  • 1
    • 0037316821 scopus 로고    scopus 로고
    • Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance
    • Akturk MS, Ghosh JB and Gunes ED (2003). Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance. Naval Res Log 50: 15-30.
    • (2003) Naval Res Log , vol.50 , pp. 15-30
    • Akturk, M.S.1    Ghosh, J.B.2    Gunes, E.D.3
  • 2
    • 2342558624 scopus 로고    scopus 로고
    • Scheduling with tool changes to minimize total completion time: Basic results and SPT performance
    • Akturk MS, Ghosh JB and Gunes ED (2004). Scheduling with tool changes to minimize total completion time: basic results and SPT performance. Eur J Opl Res 157: 784-790.
    • (2004) Eur J Opl Res , vol.157 , pp. 784-790
    • Akturk, M.S.1    Ghosh, J.B.2    Gunes, E.D.3
  • 3
    • 0032671338 scopus 로고    scopus 로고
    • Scheduling maintenance and semiresumable jobs on a single machine
    • Graves GH and Lee CY (1999). Scheduling maintenance and semiresumable jobs on a single machine. Naval Rex Log 46: 845-863.
    • (1999) Naval Rex Log , vol.46 , pp. 845-863
    • Graves, G.H.1    Lee, C.Y.2
  • 4
    • 0000541519 scopus 로고    scopus 로고
    • Machine scheduling with an availability constraint
    • Lee CY (1996). Machine scheduling with an availability constraint. J Global Optim 9: 395-416.
    • (1996) J Global Optim , vol.9 , pp. 395-416
    • Lee, C.Y.1
  • 5
    • 0035200203 scopus 로고    scopus 로고
    • Machine scheduling with a rate-modifying activity
    • Lee CY and Leon J (2001). Machine scheduling with a rate-modifying activity. Eur J Opt Res 128: 119-128.
    • (2001) Eur J Opt Res , vol.128 , pp. 119-128
    • Lee, C.Y.1    Leon, J.2
  • 6
    • 0026897390 scopus 로고
    • Single machine flow-time scheduling with scheduled maintenance
    • Lee CY and Liman SD (1992). Single machine flow-time scheduling with scheduled maintenance. Acta Inform 29: 375-382.
    • (1992) Acta Inform , vol.29 , pp. 375-382
    • Lee, C.Y.1    Liman, S.D.2
  • 7
    • 0035900864 scopus 로고    scopus 로고
    • Single-machine scheduling with maintenance and repair rate-modifying activities
    • Lee CY and Lin CS (2001). Single-machine scheduling with maintenance and repair rate-modifying activities. Eur J Opl Res 135: 493-513.
    • (2001) Eur J Opl Res , vol.135 , pp. 493-513
    • Lee, C.Y.1    Lin, C.S.2
  • 8
    • 0031492360 scopus 로고    scopus 로고
    • Current trend in deterministic scheduling
    • Lee CY, Lei L and Pinedo M (1997). Current trend in deterministic scheduling. Ann Opns Res 70: 1-42.
    • (1997) Ann Opns Res , vol.70 , pp. 1-42
    • Lee, C.Y.1    Lei, L.2    Pinedo, M.3
  • 9
    • 0026818026 scopus 로고
    • On scheduling with ready-times, due-dates and vacations
    • Leon VJ and Wu SD (1992). On scheduling with ready-times, due-dates and vacations. Naval Res Log 39: 53-65.
    • (1992) Naval Res Log , vol.39 , pp. 53-65
    • Leon, V.J.1    Wu, S.D.2
  • 10
    • 0037411886 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance and nonresumable jobs
    • Liao CJ and Chen WJ (2003). Single-machine scheduling with periodic maintenance and nonresumable jobs. Comput Opns Res 30: 1335-1347.
    • (2003) Comput Opns Res , vol.30 , pp. 1335-1347
    • Liao, C.J.1    Chen, W.J.2
  • 12
    • 0033446820 scopus 로고    scopus 로고
    • Scheduling the maintenance on a single machine
    • Qi X, Chen T and Tu F (1999). Scheduling the maintenance on a single machine. J Opl Res Soc 50: 1071-1078.
    • (1999) J Opl Res Soc , vol.50 , pp. 1071-1078
    • Qi, X.1    Chen, T.2    Tu, F.3
  • 14
    • 0032362468 scopus 로고    scopus 로고
    • Machine scheduling with availability constraints
    • Sanlaville E and Schmidt G (1998). Machine scheduling with availability constraints. Acta Inform 35: 795-811.
    • (1998) Acta Inform , vol.35 , pp. 795-811
    • Sanlaville, E.1    Schmidt, G.2
  • 15
    • 0343963100 scopus 로고    scopus 로고
    • Scheduling with limited machine availability
    • Schmidt G (2000). Scheduling with limited machine availability. Eur J Opl Res 121: 1-15.
    • (2000) Eur J Opl Res , vol.121 , pp. 1-15
    • Schmidt, G.1
  • 16
    • 24644510199 scopus 로고    scopus 로고
    • Minimizing the makespan in a single machine scheduling problem with a flexible maintenance
    • Yang DL, Hung CL, Hsu CJ and Chern MS (2002). Minimizing the makespan in a single machine scheduling problem with a flexible maintenance. J Chin Inst Ind Eng 19: 63-66.
    • (2002) J Chin Inst Ind Eng , vol.19 , pp. 63-66
    • Yang, D.L.1    Hung, C.L.2    Hsu, C.J.3    Chern, M.S.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.