메뉴 건너뛰기




Volumn 6, Issue 1, 2011, Pages 30-48

Joint scheduling of jobs and Preventive Maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies

Author keywords

Flowshop; GA; Genetic Algorithm; Joint scheduling; NEH heuristic; PM; Preventive Maintenance; Production; Taboo Search; TS

Indexed keywords

GALLIUM; GENETIC ALGORITHMS; HEURISTIC ALGORITHMS; JOB SHOP SCHEDULING; PRODUCTION; PROMETHIUM; SCHEDULING; SCHEDULING ALGORITHMS; TABU SEARCH;

EID: 78651239754     PISSN: 17500591     EISSN: 17500605     Source Type: Journal    
DOI: 10.1504/IJMR.2011.037912     Document Type: Article
Times cited : (34)

References (31)
  • 1
    • 0242658501 scopus 로고    scopus 로고
    • Minimizing the makespan for the flow shop scheduling problem with availability constraints
    • Aggoune, R. (2004) 'Minimizing the makespan for the flow shop scheduling problem with availability constraints', European Journal of Operational Research, Vol. 153, pp. 534-543.
    • (2004) European Journal of Operational Research , vol.153 , pp. 534-543
    • Aggoune, R.1
  • 2
    • 10444260511 scopus 로고    scopus 로고
    • Integrating simulation and optimization to scheduling a hybrid flow shop with maintenance constraints
    • Allaoui, H. and Artiba, A. (2004) 'Integrating simulation and optimization to scheduling a hybrid flow shop with maintenance constraints', Computers and Industrial Engineering, Vol. 47, pp. 431-450.
    • (2004) Computers and Industrial Engineering , vol.47 , pp. 431-450
    • Allaoui, H.1    Artiba, A.2
  • 3
  • 10
    • 0038813446 scopus 로고    scopus 로고
    • Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    • Cassady, C. R. and Kutanoglu, E. (2003) 'Minimizing job tardiness using integrated preventive maintenance planning and production scheduling', IIE Transactions, Vol. 35, No. 6, pp. 503-513.
    • (2003) IIE Transactions , vol.35 , Issue.6 , pp. 503-513
    • Cassady, C.R.1    Kutanoglu, E.2
  • 11
    • 0000411214 scopus 로고
    • Taboo search: Part I
    • Glover, F. (1989) 'Taboo search: Part I', ORSA Journal of Computing, Vol. 1, pp. 190-206.
    • (1989) ORSA Journal of Computing , vol.1 , pp. 190-206
    • Glover, F.1
  • 13
    • 0032671338 scopus 로고    scopus 로고
    • Scheduling maintenance and semi-resumable jobs on single machine
    • Graves, G. and Lee, C. Y. (1999) 'Scheduling maintenance and semi-resumable jobs on single machine', Naval Research Logistics, Vol. 46, pp. 845-862.
    • (1999) Naval Research Logistics , vol.46 , pp. 845-862
    • Graves, G.1    Lee, C.Y.2
  • 16
    • 77950523379 scopus 로고    scopus 로고
    • Ordonnancement de la production et de la maintenance: Cas d'un atelier de type flow shop à deux machines
    • Kaabi, J., Varnier, C. and Zerhouni, N. (2003) 'Ordonnancement de la production et de la maintenance: cas d'un atelier de type flow shop à deux machines', APII-JESA, Vol. 37, pp. 641-660.
    • (2003) APII-JESA , vol.37 , pp. 641-660
    • Kaabi, J.1    Varnier, C.2    Zerhouni, N.3
  • 17
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • Lee, C. Y. and Chen, Z. L. (2000) 'Scheduling jobs and maintenance activities on parallel machines', Naval Research Logistics, Vol. 47, pp. 145-165.
    • (2000) Naval Research Logistics , vol.47 , pp. 145-165
    • Lee, C.Y.1    Chen, Z.L.2
  • 18
    • 0035900864 scopus 로고    scopus 로고
    • Single-machine scheduling with maintenance and repair rate-modifying activities
    • Lee, C. Y. and Lin, C. S. (2001) 'Single-machine scheduling with maintenance and repair rate-modifying activities', European Journal of Operational Research, Vol. 135, pp. 493-513.
    • (2001) European Journal of Operational Research , vol.135 , pp. 493-513
    • Lee, C.Y.1    Lin, C.S.2
  • 19
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m machine, n job flow shop sequencing problem
    • Nawaz, N., Enscore Jr., E. E. and Ham, I. (1983) 'A heuristic algorithm for the m machine, n job flow shop sequencing problem', OMEGA, Vol. 11, pp. 91-95.
    • (1983) OMEGA , vol.11 , pp. 91-95
    • Nawaz, N.1    Enscore Jr., E.E.2    Ham, I.3
  • 20
    • 0001204823 scopus 로고    scopus 로고
    • A fast tabu search algorithm for the permutation flow-shop problem
    • DOI 10.1016/0377-2217(95)00037-2
    • Nowicki, E. and Smutnicki, C. (1996) 'A fast tabu search algorithm for the permutation flow-shop problem', European Journal of Operational Research, Vol. 91, No. 1, pp. 160-175. (Pubitemid 126369642)
    • (1996) European Journal of Operational Research , vol.91 , Issue.1 , pp. 160-175
    • Nowicki, E.1    Smutnicki, C.2
  • 21
    • 0035384296 scopus 로고    scopus 로고
    • Constructive and improvement flow shop scheduling: An extensive evaluation
    • Ponnambalam, S. G., Aravindan, P. and Chandrasekaran, S. (2001) 'Constructive and improvement flow shop scheduling: an extensive evaluation', Production Planning and Control, Vol. 12, No. 4, pp. 335-344.
    • (2001) Production Planning and Control , vol.12 , Issue.4 , pp. 335-344
    • Ponnambalam, S.G.1    Aravindan, P.2    Chandrasekaran, S.3
  • 22
    • 0002343068 scopus 로고    scopus 로고
    • Genetic algorithms and scheduling: A state of art and some propositions
    • Belgium
    • Portmann, M. C. (1996) 'Genetic algorithms and scheduling: a state of art and some propositions', Workshop on Production Planning and Control, Vol. I-XIV, Belgium.
    • (1996) Workshop on Production Planning and Control , vol.1-14
    • Portmann, M.C.1
  • 23
    • 0033446820 scopus 로고    scopus 로고
    • Scheduling the maintenance on single machine
    • Qi, X., Chen, T. and Tu, F. (1999) 'Scheduling the maintenance on single machine', Journal of the Operational Research Society, Vol. 50, No. 10, pp. 1071-1078.
    • (1999) Journal of the Operational Research Society , vol.50 , Issue.10 , pp. 1071-1078
    • Qi, X.1    Chen, T.2    Tu, F.3
  • 24
    • 34848879386 scopus 로고    scopus 로고
    • Early-tardy minimization for joint scheduling of jobs and maintenance operations on a single machine
    • Raza, S. A., Al-Turki, U. M. and Selim, S. Z. (2007) 'Early-tardy minimization for joint scheduling of jobs and maintenance operations on a single machine', International Journal of Operations Research, Vol. 4, No. 1, pp. 32-41.
    • (2007) International Journal of Operations Research , vol.4 , Issue.1 , pp. 32-41
    • Raza, S.A.1    Al-Turki, U.M.2    Selim, S.Z.3
  • 26
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • Ruiz, R., García-Díaz, J. C. and Maroto, C. (2007) 'Considering scheduling and preventive maintenance in the flowshop sequencing problem', Computers and Operations Research, Vol. 34, pp. 3314-3330.
    • (2007) Computers and Operations Research , vol.34 , pp. 3314-3330
    • Ruiz, R.1    García-Díaz, J.C.2    Maroto, C.3
  • 27
    • 0031193217 scopus 로고    scopus 로고
    • Batch production and preventive maintenance scheduling under equipment failure uncertainty
    • Sanmarti, E., Espuna, A. and Puigjaner, L. (1997) 'Batch production and preventive maintenance scheduling under equipment failure uncertainty', Computer Chemical Engineering, Vol. 21, No. 10, pp. 1157-1168.
    • (1997) Computer Chemical Engineering , vol.21 , Issue.10 , pp. 1157-1168
    • Sanmarti, E.1    Espuna, A.2    Puigjaner, L.3
  • 28
    • 0008193301 scopus 로고    scopus 로고
    • Combined production and maintenance scheduling for a multiple product, single machine production system
    • Sloan, T. W. and Shanthikumar, J. G. (2000) 'Combined production and maintenance scheduling for a multiple product, single machine production system', Production and Operation Management, Vol. 9, No. 4, pp. 379-399.
    • (2000) Production and Operation Management , vol.9 , Issue.4 , pp. 379-399
    • Sloan, T.W.1    Shanthikumar, J.G.2
  • 29
    • 13444291361 scopus 로고    scopus 로고
    • Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
    • Sortrakul, N., Nachtmann, H. and Cassady, C. R. (2005) 'Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine', Computers in Industry, Vol. 56, pp. 161-168.
    • (2005) Computers in Industry , vol.56 , pp. 161-168
    • Sortrakul, N.1    Nachtmann, H.2    Cassady, C.R.3
  • 30
    • 0025700701 scopus 로고
    • Some efficient heuristic methods for the flow shop sequencing problem
    • Taillard, E. (1990) 'Some efficient heuristic methods for the flow shop sequencing problem', European Journal of Operational Research, Vol. 47, pp. 65-74.
    • (1990) European Journal of Operational Research , vol.47 , pp. 65-74
    • Taillard, E.1
  • 31
    • 0027201278 scopus 로고
    • Benchmarks for basic scheduling problems
    • Available from
    • Taillard, E. (1993) 'Benchmarks for basic scheduling problems', European Journal of Operational Research, Vol. 64, pp. 278-285, Available from: http://ina.eivd.ch/Collaborateurs/etd/default.htm
    • (1993) European Journal of Operational Research , vol.64 , pp. 278-285
    • Taillard, E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.