-
1
-
-
0024944070
-
Single machine flow time scheduling with a single breakdown
-
Adiri, I., J. Bruno, E. Frostig, and A. H. G. RinnooyKan. 1989. "Single Machine Flow Time Scheduling with a Single Breakdown." Acta Informatica 26 (7): 679-696. doi:10.1007/BF00288977.
-
(1989)
Acta Informatica
, vol.26
, Issue.7
, pp. 679-696
-
-
Adiri, I.1
Bruno, J.2
Frostig, E.3
RinnooyKan, A.H.G.4
-
2
-
-
60749128979
-
Single machine scheduling with preventive maintenances
-
Batun, S., and M. Azizolu. 2009. "Single Machine Scheduling with Preventive Maintenances." International Journal of Production Research 47 (7): 1753-1771. doi:10.1080/00207540701636348.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.7
, pp. 1753-1771
-
-
Batun, S.1
Azizolu, M.2
-
3
-
-
85027884761
-
Using integer programming to solve the machine scheduling problem with a flexible maintenance activity
-
Chen, J.-S. 2006a. "Using Integer Programming to Solve the Machine Scheduling Problem with a Flexible Maintenance Activity." Journal of Statistics and Management Systems 9 (1): 87-104. doi:10.1080/09720510.2006.10701195.
-
(2006)
Journal of Statistics and Management Systems
, vol.9
, Issue.1
, pp. 87-104
-
-
Chen, J.-S.1
-
4
-
-
30344445140
-
Optimization models for the machine scheduling problem with a single flexible maintenance activity
-
Chen, J.-S. 2006b. "Optimization Models for the Machine Scheduling Problem with a Single Flexible Maintenance Activity." Engineering Optimization 38 (1): 53-71. doi:10.1080/03052150500270594.
-
(2006)
Engineering Optimization
, vol.38
, Issue.1
, pp. 53-71
-
-
Chen, J.-S.1
-
5
-
-
41149166270
-
Scheduling of non-resumable jobs and flexible maintenance activities on a single machine to minimize makespan
-
Chen, J.-S. 2008. "Scheduling of Non-Resumable Jobs and Flexible Maintenance Activities on a Single Machine to Minimize Makespan." European Journal of Operational Research 190 (1): 90-102. doi:10.1016/j.ejor.2007.06.029.
-
(2008)
European Journal of Operational Research
, vol.190
, Issue.1
, pp. 90-102
-
-
Chen, J.-S.1
-
6
-
-
50349092766
-
Minimizing number of tardy jobs on a single machine subject to periodic maintenance
-
Chen, W. J. 2009a. "Minimizing Number of Tardy Jobs on a Single Machine Subject to Periodic Maintenance." Omega 37 (3): 591-599. doi:10.1016/j.omega.2008.01.001.
-
(2009)
Omega
, vol.37
, Issue.3
, pp. 591-599
-
-
Chen, W.J.1
-
7
-
-
69649094253
-
Scheduling with dependent setups and maintenance in a textile company
-
Chen, W. J. 2009b. "Scheduling with Dependent Setups and Maintenance in a Textile Company." Computers and Industrial Engineering 57 (3): 867-873. doi:10.1016/j. cie.2009.03.001.
-
(2009)
Computers and Industrial Engineering
, vol.57
, Issue.3
, pp. 867-873
-
-
Chen, W.J.1
-
8
-
-
35248836033
-
An efficient algorithm for scheduling jobs on a machine with periodic maintenance
-
Chen, W.-J. 2007. "An Efficient Algorithm for Scheduling Jobs on a Machine with Periodic Maintenance." The International Journal of Advanced Manufacturing Technology 34 (11-12): 1173-1182. doi:10.1007/s00170-006-0689-x.
-
(2007)
The International Journal of Advanced Manufacturing Technology
, vol.34
, Issue.11-12
, pp. 1173-1182
-
-
Chen, W.-J.1
-
9
-
-
80055029480
-
Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity
-
Cheng, T. C. E., S.-J. Yang, and D.-L. Yang. 2012. "Common Due-Window Assignment and Scheduling of Linear Time-Dependent Deteriorating Jobs and a Deteriorating Maintenance Activity." International Journal of Production Economics 135 (1): 154-161. doi:10.1016/j.ijpe.2010.10.005.
-
(2012)
International Journal of Production Economics
, vol.135
, Issue.1
, pp. 154-161
-
-
Cheng, T.C.E.1
Yang, S.-J.2
Yang, D.-L.3
-
11
-
-
0032671338
-
Scheduling maintenance and semi-resumable jobs on a single machine
-
Graves, G. H., and C. Y. Lee. 1999. "Scheduling Maintenance and Semi-Resumable Jobs on a Single Machine." Naval Research Logistics 46 (7): 845-863. doi:10.1002/(SICI) 1520-6750(199910)46:73.0.CO;2-#.
-
(1999)
Naval Research Logistics
, vol.46
, Issue.7
, pp. 845-863
-
-
Graves, G.H.1
Lee, C.Y.2
-
12
-
-
71749107567
-
Integrating flexible-interval preventive maintenance planning with production scheduling
-
Jin, Y.-L., Z.-H. Jiang, and W.-R. Hou. 2009. "Integrating Flexible-Interval Preventive Maintenance Planning with Production Scheduling." International Journal of Computer Integrated Manufacturing 22 (12): 1089-1101. doi:10.1080/09511920903207449.
-
(2009)
International Journal of Computer Integrated Manufacturing
, vol.22
, Issue.12
, pp. 1089-1101
-
-
Jin, Y.-L.1
Jiang, Z.-H.2
Hou, W.-R.3
-
13
-
-
47749086670
-
Minimizing the weighted flow time on a single machine with the resumable availability constraint: Worst case of the wspt heuristic
-
Kacem, I., and C. Chu. 2008. "Minimizing the Weighted Flow Time on a Single Machine with the Resumable Availability Constraint: Worst Case of the WSPT Heuristic." International Journal of Computer Integrated Manufacturing 21 (4): 388-395. doi:10.1080/09511920701575088.
-
(2008)
International Journal of Computer Integrated Manufacturing
, vol.21
, Issue.4
, pp. 388-395
-
-
Kacem, I.1
Chu, C.2
-
14
-
-
84855549578
-
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance
-
Lee, J.-Y., and Y.-D. Kim. 2012. "Minimizing the Number of Tardy Jobs in a Single-Machine Scheduling Problem with Periodic Maintenance." Computers and Operations Research 39 (9): 2196-2205. doi:10.1016/j.cor.2011.11.002.
-
(2012)
Computers and Operations Research
, vol.39
, Issue.9
, pp. 2196-2205
-
-
Lee, J.-Y.1
Kim, Y.-D.2
-
15
-
-
80053580515
-
A modified particle swarm optimization algorithm for a single-machine scheduling problem with periodic maintenance
-
Low, C., C.-J. Hsu, and C.-T. Su. 2010. "A Modified Particle Swarm Optimization Algorithm for a Single-Machine Scheduling Problem with Periodic Maintenance." Expert Systems with Applications 37 (9): 6429-6434. doi:10.1016/j.eswa.2010.02.075.
-
(2010)
Expert Systems with Applications
, vol.37
, Issue.9
, pp. 6429-6434
-
-
Low, C.1
Hsu, C.-J.2
Su, C.-T.3
-
16
-
-
70349764553
-
Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance
-
Low, C., M. Ji, C.-J. Hsu, and C.-T. Su. 2010. "Minimizing the Makespan in a Single Machine Scheduling Problems with Flexible and Periodic Maintenance." Applied Mathematical Modelling 34 (2): 334-342. doi:10.1016/j.apm.2009.04.014.
-
(2010)
Applied Mathematical Modelling
, vol.34
, Issue.2
, pp. 334-342
-
-
Low, C.1
Ji, M.2
Hsu, C.-J.3
Su, C.-T.4
-
17
-
-
76349087153
-
A survey of scheduling with deterministic machine availability constraints
-
Ma, Y., C. Chu, and C. Zuo. 2010. "A Survey of Scheduling with Deterministic Machine Availability Constraints." Computers and Industrial Engineering 58 (2): 199-211. doi:10.1016/j. cie.2009.04.014.
-
(2010)
Computers and Industrial Engineering
, vol.58
, Issue.2
, pp. 199-211
-
-
Ma, Y.1
Chu, C.2
Zuo, C.3
-
18
-
-
0002054180
-
Predictable scheduling of a single machine subject to breakdowns
-
Mehta, S. V. 1999. "Predictable Scheduling of a Single Machine Subject to Breakdowns." International Journal of Computer Integrated Manufacturing 12 (1): 15-38. doi:10.1080/095119299130443.
-
(1999)
International Journal of Computer Integrated Manufacturing
, vol.12
, Issue.1
, pp. 15-38
-
-
Mehta, S.V.1
-
19
-
-
80054687798
-
Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem with availability constraint
-
Molaee, E., G. Moslehi, and M. Reisi. 2011. "Minimizing Maximum Earliness and Number of Tardy Jobs in the Single Machine Scheduling Problem with Availability Constraint." Computers and Mathematics with Applications 62 (9): 3622-3641. doi:10.1016/j.camwa.2011.09.016.
-
(2011)
Computers and Mathematics with Applications
, vol.62
, Issue.9
, pp. 3622-3641
-
-
Molaee, E.1
Moslehi, G.2
Reisi, M.3
-
20
-
-
58349089245
-
Scheduling a maintenance activity to minimize total weighted completion time
-
Mosheiov, G., and A. Sarig. 2009. "Scheduling a Maintenance Activity to Minimize Total Weighted Completion Time." Computers and Mathematics with Applications 57 (4): 619-623. doi:10.1016/j.camwa.2008.11.008.
-
(2009)
Computers and Mathematics with Applications
, vol.57
, Issue.4
, pp. 619-623
-
-
Mosheiov, G.1
Sarig, A.2
-
23
-
-
0033446820
-
Scheduling the maintenance on a single machine
-
Qi, X., T. Chen, and F. Tu. 1999. "Scheduling the Maintenance on a Single Machine." Journal of the Operational Research Society 50 (10): 1071-1078. doi:10.1057/palgrave. jors.2600791.
-
(1999)
Journal of the Operational Research Society
, vol.50
, Issue.10
, pp. 1071-1078
-
-
Qi, X.1
Chen, T.2
Tu, F.3
-
24
-
-
55649110055
-
Single machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness
-
Sbihi, M., and C. Varnier. 2008. "Single Machine Scheduling with Periodic and Flexible Periodic Maintenance to Minimize Maximum Tardiness." Computers and Industrial Engineering 55 (4): 830-840. doi:10.1016/j.cie.2008.03.005.
-
(2008)
Computers and Industrial Engineering
, vol.55
, Issue.4
, pp. 830-840
-
-
Sbihi, M.1
Varnier, C.2
-
25
-
-
84899619970
-
Patient scheduling with periodic deteriorating maintenance on single medical device
-
Wu, Y., M. Dong, and Z. H. Zheng. 2014. "Patient Scheduling with Periodic Deteriorating Maintenance on Single Medical Device." Computers & Operations Research 49 (10): 107-116. doi:10.1016/j.cor.2014.04.005.
-
(2014)
Computers & Operations Research
, vol.49
, Issue.10
, pp. 107-116
-
-
Wu, Y.1
Dong, M.2
Zheng, Z.H.3
-
26
-
-
77956266095
-
Scheduling jobs under increasing linear machine maintenance time
-
Xu, D., Y. Yin, and H. Li. 2010. "Scheduling Jobs under Increasing Linear Machine Maintenance Time." Journal of Scheduling 13 (4): 443-449. doi:10.1007/s10951-010-0182-0.
-
(2010)
Journal of Scheduling
, vol.13
, Issue.4
, pp. 443-449
-
-
Xu, D.1
Yin, Y.2
Li, H.3
-
27
-
-
24644510199
-
Minimizing the makespan in a single machine scheduling problem with a flexible maintenance activity
-
Yang, D.-L., C.-L. Hung, J. Hsu, and M.-S. Chern. 2002. "Minimizing the Makespan in a Single Machine Scheduling Problem with a Flexible Maintenance Activity." Journal of the Chinese Institute of Industrial Engineers 19 (1): 63-66. doi:10.1080/10170660209509183.
-
(2002)
Journal of the Chinese Institute of Industrial Engineers
, vol.19
, Issue.1
, pp. 63-66
-
-
Yang, D.-L.1
Hung, C.-L.2
Hsu, J.3
Chern, M.-S.4
-
28
-
-
78049316679
-
Single machine scheduling problems with both start-time dependent learning and position dependent aging effects under deteriorating maintenance consideration
-
Yang, S.-J. 2010. "Single Machine Scheduling Problems with Both Start-Time Dependent Learning and Position Dependent Aging Effects under Deteriorating Maintenance Consideration." Applied Mathematics and Computation 217 (7): 3321-3329. doi:10.1016/j.amc.2010.08.064.
-
(2010)
Applied Mathematics and Computation
, vol.217
, Issue.7
, pp. 3321-3329
-
-
Yang, S.-J.1
-
29
-
-
77952551347
-
Minimizing the makespan on single machine scheduling with aging effect and variable maintenance activities
-
Yang, S.-J., and D.-L. Yang. 2010a. "Minimizing the Makespan on Single Machine Scheduling with Aging Effect and Variable Maintenance Activities." Omega 38 (6): 528-533. doi:10.1016/j.omega.2010.01.003.
-
(2010)
Omega
, vol.38
, Issue.6
, pp. 528-533
-
-
Yang, S.-J.1
Yang, D.-L.2
-
30
-
-
77957918240
-
Minimizing the total completion time in single machine scheduling with aging/deteriorating effects and deteriorating maintenance activities
-
Yang, S.-J., and D.-L. Yang. 2010b. "Minimizing the Total Completion Time in Single Machine Scheduling with Aging/Deteriorating Effects and Deteriorating Maintenance Activities." Computers and Mathematics with Applications 60 (7): 2161-2169. doi:10.1016/j. camwa.2010.08.003.
-
(2010)
Computers and Mathematics with Applications
, vol.60
, Issue.7
, pp. 2161-2169
-
-
Yang, S.-J.1
Yang, D.-L.2
-
31
-
-
73449148313
-
Single machine due-window assignment and scheduling with job dependent aging effects and deteriorating maintenance
-
Yang, S.-J., D.-L. Yang, and T. C. E. Cheng. 2010. "Single Machine Due-Window Assignment and Scheduling with Job Dependent Aging Effects and Deteriorating Maintenance." Computers and Operations Research 37 (8): 1510-1514. doi:10.1016/j.cor.2009.11.007.
-
(2010)
Computers and Operations Research
, vol.37
, Issue.8
, pp. 1510-1514
-
-
Yang, S.-J.1
Yang, D.-L.2
Cheng, T.C.E.3
-
32
-
-
78049450375
-
Minimizing total completion time on a single machine with a flexible maintenance activity
-
Yang, S.-L., Y. Ma, D.-L. Xu, and J.-B. Yang. 2011. "Minimizing Total Completion Time on a Single Machine with a Flexible Maintenance Activity." Computers & Operations Research 38 (4): 755-770. doi:10.1016/j. cor.2010.09.003.
-
(2011)
Computers & Operations Research
, vol.38
, Issue.4
, pp. 755-770
-
-
Yang, S.-L.1
Ma, Y.2
Xu, D.-L.3
Yang, J.-B.4
-
33
-
-
70350367239
-
Single machine scheduling with general job dependent aging effect and maintenance activities to minimize makespan
-
Zhao, C.-L., and H.-Y. Tang. 2010. "Single Machine Scheduling with General Job Dependent Aging Effect and Maintenance Activities to Minimize Makespan." Applied Mathematical Modelling 34 (3): 837-841. doi:10.1016/j.apm.2009.07.002.
-
(2010)
Applied Mathematical Modelling
, vol.34
, Issue.3
, pp. 837-841
-
-
Zhao, C.-L.1
Tang, H.-Y.2
|