메뉴 건너뛰기




Volumn 29, Issue 3, 2016, Pages 323-341

Minimising the total completion time in a single machine scheduling problem under bimodal flexible periodic availability constraints

Author keywords

bimodal; branch and bound; flexible periodic availability constraints; single machine scheduling; total completion time

Indexed keywords

BRANCH AND BOUND METHOD; HEURISTIC ALGORITHMS; MACHINERY; SCHEDULING;

EID: 84926059030     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/0951192X.2014.1003413     Document Type: Article
Times cited : (17)

References (33)
  • 1
    • 0024944070 scopus 로고
    • Single machine flow time scheduling with a single breakdown
    • Adiri, I., J. Bruno, E. Frostig, and A. H. G. RinnooyKan. 1989. "Single Machine Flow Time Scheduling with a Single Breakdown." Acta Informatica 26 (7): 679-696. doi:10.1007/BF00288977.
    • (1989) Acta Informatica , vol.26 , Issue.7 , pp. 679-696
    • Adiri, I.1    Bruno, J.2    Frostig, E.3    RinnooyKan, A.H.G.4
  • 2
    • 60749128979 scopus 로고    scopus 로고
    • Single machine scheduling with preventive maintenances
    • Batun, S., and M. Azizolu. 2009. "Single Machine Scheduling with Preventive Maintenances." International Journal of Production Research 47 (7): 1753-1771. doi:10.1080/00207540701636348.
    • (2009) International Journal of Production Research , vol.47 , Issue.7 , pp. 1753-1771
    • Batun, S.1    Azizolu, M.2
  • 3
    • 85027884761 scopus 로고    scopus 로고
    • Using integer programming to solve the machine scheduling problem with a flexible maintenance activity
    • Chen, J.-S. 2006a. "Using Integer Programming to Solve the Machine Scheduling Problem with a Flexible Maintenance Activity." Journal of Statistics and Management Systems 9 (1): 87-104. doi:10.1080/09720510.2006.10701195.
    • (2006) Journal of Statistics and Management Systems , vol.9 , Issue.1 , pp. 87-104
    • Chen, J.-S.1
  • 4
    • 30344445140 scopus 로고    scopus 로고
    • Optimization models for the machine scheduling problem with a single flexible maintenance activity
    • Chen, J.-S. 2006b. "Optimization Models for the Machine Scheduling Problem with a Single Flexible Maintenance Activity." Engineering Optimization 38 (1): 53-71. doi:10.1080/03052150500270594.
    • (2006) Engineering Optimization , vol.38 , Issue.1 , pp. 53-71
    • Chen, J.-S.1
  • 5
    • 41149166270 scopus 로고    scopus 로고
    • Scheduling of non-resumable jobs and flexible maintenance activities on a single machine to minimize makespan
    • Chen, J.-S. 2008. "Scheduling of Non-Resumable Jobs and Flexible Maintenance Activities on a Single Machine to Minimize Makespan." European Journal of Operational Research 190 (1): 90-102. doi:10.1016/j.ejor.2007.06.029.
    • (2008) European Journal of Operational Research , vol.190 , Issue.1 , pp. 90-102
    • Chen, J.-S.1
  • 6
    • 50349092766 scopus 로고    scopus 로고
    • Minimizing number of tardy jobs on a single machine subject to periodic maintenance
    • Chen, W. J. 2009a. "Minimizing Number of Tardy Jobs on a Single Machine Subject to Periodic Maintenance." Omega 37 (3): 591-599. doi:10.1016/j.omega.2008.01.001.
    • (2009) Omega , vol.37 , Issue.3 , pp. 591-599
    • Chen, W.J.1
  • 7
    • 69649094253 scopus 로고    scopus 로고
    • Scheduling with dependent setups and maintenance in a textile company
    • Chen, W. J. 2009b. "Scheduling with Dependent Setups and Maintenance in a Textile Company." Computers and Industrial Engineering 57 (3): 867-873. doi:10.1016/j. cie.2009.03.001.
    • (2009) Computers and Industrial Engineering , vol.57 , Issue.3 , pp. 867-873
    • Chen, W.J.1
  • 8
    • 35248836033 scopus 로고    scopus 로고
    • An efficient algorithm for scheduling jobs on a machine with periodic maintenance
    • Chen, W.-J. 2007. "An Efficient Algorithm for Scheduling Jobs on a Machine with Periodic Maintenance." The International Journal of Advanced Manufacturing Technology 34 (11-12): 1173-1182. doi:10.1007/s00170-006-0689-x.
    • (2007) The International Journal of Advanced Manufacturing Technology , vol.34 , Issue.11-12 , pp. 1173-1182
    • Chen, W.-J.1
  • 9
    • 80055029480 scopus 로고    scopus 로고
    • Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity
    • Cheng, T. C. E., S.-J. Yang, and D.-L. Yang. 2012. "Common Due-Window Assignment and Scheduling of Linear Time-Dependent Deteriorating Jobs and a Deteriorating Maintenance Activity." International Journal of Production Economics 135 (1): 154-161. doi:10.1016/j.ijpe.2010.10.005.
    • (2012) International Journal of Production Economics , vol.135 , Issue.1 , pp. 154-161
    • Cheng, T.C.E.1    Yang, S.-J.2    Yang, D.-L.3
  • 11
    • 0032671338 scopus 로고    scopus 로고
    • Scheduling maintenance and semi-resumable jobs on a single machine
    • Graves, G. H., and C. Y. Lee. 1999. "Scheduling Maintenance and Semi-Resumable Jobs on a Single Machine." Naval Research Logistics 46 (7): 845-863. doi:10.1002/(SICI) 1520-6750(199910)46:73.0.CO;2-#.
    • (1999) Naval Research Logistics , vol.46 , Issue.7 , pp. 845-863
    • Graves, G.H.1    Lee, C.Y.2
  • 12
    • 71749107567 scopus 로고    scopus 로고
    • Integrating flexible-interval preventive maintenance planning with production scheduling
    • Jin, Y.-L., Z.-H. Jiang, and W.-R. Hou. 2009. "Integrating Flexible-Interval Preventive Maintenance Planning with Production Scheduling." International Journal of Computer Integrated Manufacturing 22 (12): 1089-1101. doi:10.1080/09511920903207449.
    • (2009) International Journal of Computer Integrated Manufacturing , vol.22 , Issue.12 , pp. 1089-1101
    • Jin, Y.-L.1    Jiang, Z.-H.2    Hou, W.-R.3
  • 13
    • 47749086670 scopus 로고    scopus 로고
    • Minimizing the weighted flow time on a single machine with the resumable availability constraint: Worst case of the wspt heuristic
    • Kacem, I., and C. Chu. 2008. "Minimizing the Weighted Flow Time on a Single Machine with the Resumable Availability Constraint: Worst Case of the WSPT Heuristic." International Journal of Computer Integrated Manufacturing 21 (4): 388-395. doi:10.1080/09511920701575088.
    • (2008) International Journal of Computer Integrated Manufacturing , vol.21 , Issue.4 , pp. 388-395
    • Kacem, I.1    Chu, C.2
  • 14
    • 84855549578 scopus 로고    scopus 로고
    • Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance
    • Lee, J.-Y., and Y.-D. Kim. 2012. "Minimizing the Number of Tardy Jobs in a Single-Machine Scheduling Problem with Periodic Maintenance." Computers and Operations Research 39 (9): 2196-2205. doi:10.1016/j.cor.2011.11.002.
    • (2012) Computers and Operations Research , vol.39 , Issue.9 , pp. 2196-2205
    • Lee, J.-Y.1    Kim, Y.-D.2
  • 15
    • 80053580515 scopus 로고    scopus 로고
    • A modified particle swarm optimization algorithm for a single-machine scheduling problem with periodic maintenance
    • Low, C., C.-J. Hsu, and C.-T. Su. 2010. "A Modified Particle Swarm Optimization Algorithm for a Single-Machine Scheduling Problem with Periodic Maintenance." Expert Systems with Applications 37 (9): 6429-6434. doi:10.1016/j.eswa.2010.02.075.
    • (2010) Expert Systems with Applications , vol.37 , Issue.9 , pp. 6429-6434
    • Low, C.1    Hsu, C.-J.2    Su, C.-T.3
  • 16
    • 70349764553 scopus 로고    scopus 로고
    • Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance
    • Low, C., M. Ji, C.-J. Hsu, and C.-T. Su. 2010. "Minimizing the Makespan in a Single Machine Scheduling Problems with Flexible and Periodic Maintenance." Applied Mathematical Modelling 34 (2): 334-342. doi:10.1016/j.apm.2009.04.014.
    • (2010) Applied Mathematical Modelling , vol.34 , Issue.2 , pp. 334-342
    • Low, C.1    Ji, M.2    Hsu, C.-J.3    Su, C.-T.4
  • 17
    • 76349087153 scopus 로고    scopus 로고
    • A survey of scheduling with deterministic machine availability constraints
    • Ma, Y., C. Chu, and C. Zuo. 2010. "A Survey of Scheduling with Deterministic Machine Availability Constraints." Computers and Industrial Engineering 58 (2): 199-211. doi:10.1016/j. cie.2009.04.014.
    • (2010) Computers and Industrial Engineering , vol.58 , Issue.2 , pp. 199-211
    • Ma, Y.1    Chu, C.2    Zuo, C.3
  • 18
    • 0002054180 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine subject to breakdowns
    • Mehta, S. V. 1999. "Predictable Scheduling of a Single Machine Subject to Breakdowns." International Journal of Computer Integrated Manufacturing 12 (1): 15-38. doi:10.1080/095119299130443.
    • (1999) International Journal of Computer Integrated Manufacturing , vol.12 , Issue.1 , pp. 15-38
    • Mehta, S.V.1
  • 19
    • 80054687798 scopus 로고    scopus 로고
    • Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem with availability constraint
    • Molaee, E., G. Moslehi, and M. Reisi. 2011. "Minimizing Maximum Earliness and Number of Tardy Jobs in the Single Machine Scheduling Problem with Availability Constraint." Computers and Mathematics with Applications 62 (9): 3622-3641. doi:10.1016/j.camwa.2011.09.016.
    • (2011) Computers and Mathematics with Applications , vol.62 , Issue.9 , pp. 3622-3641
    • Molaee, E.1    Moslehi, G.2    Reisi, M.3
  • 20
    • 58349089245 scopus 로고    scopus 로고
    • Scheduling a maintenance activity to minimize total weighted completion time
    • Mosheiov, G., and A. Sarig. 2009. "Scheduling a Maintenance Activity to Minimize Total Weighted Completion Time." Computers and Mathematics with Applications 57 (4): 619-623. doi:10.1016/j.camwa.2008.11.008.
    • (2009) Computers and Mathematics with Applications , vol.57 , Issue.4 , pp. 619-623
    • Mosheiov, G.1    Sarig, A.2
  • 21
    • 79957495235 scopus 로고    scopus 로고
    • Integration of process planning and scheduling: A state-of-the-Art review
    • Phanden, R. K., A. Jain, and R. Verma. 2011. "Integration of Process Planning and Scheduling: A State-of-the-Art Review." International Journal of Computer Integrated Manufacturing 24 (6): 517-534. doi:10.1080/0951192X.2011.562543.
    • (2011) International Journal of Computer Integrated Manufacturing , vol.24 , Issue.6 , pp. 517-534
    • Phanden, R.K.1    Jain, A.2    Verma, R.3
  • 23
    • 0033446820 scopus 로고    scopus 로고
    • Scheduling the maintenance on a single machine
    • Qi, X., T. Chen, and F. Tu. 1999. "Scheduling the Maintenance on a Single Machine." Journal of the Operational Research Society 50 (10): 1071-1078. doi:10.1057/palgrave. jors.2600791.
    • (1999) Journal of the Operational Research Society , vol.50 , Issue.10 , pp. 1071-1078
    • Qi, X.1    Chen, T.2    Tu, F.3
  • 24
    • 55649110055 scopus 로고    scopus 로고
    • Single machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness
    • Sbihi, M., and C. Varnier. 2008. "Single Machine Scheduling with Periodic and Flexible Periodic Maintenance to Minimize Maximum Tardiness." Computers and Industrial Engineering 55 (4): 830-840. doi:10.1016/j.cie.2008.03.005.
    • (2008) Computers and Industrial Engineering , vol.55 , Issue.4 , pp. 830-840
    • Sbihi, M.1    Varnier, C.2
  • 25
    • 84899619970 scopus 로고    scopus 로고
    • Patient scheduling with periodic deteriorating maintenance on single medical device
    • Wu, Y., M. Dong, and Z. H. Zheng. 2014. "Patient Scheduling with Periodic Deteriorating Maintenance on Single Medical Device." Computers & Operations Research 49 (10): 107-116. doi:10.1016/j.cor.2014.04.005.
    • (2014) Computers & Operations Research , vol.49 , Issue.10 , pp. 107-116
    • Wu, Y.1    Dong, M.2    Zheng, Z.H.3
  • 26
    • 77956266095 scopus 로고    scopus 로고
    • Scheduling jobs under increasing linear machine maintenance time
    • Xu, D., Y. Yin, and H. Li. 2010. "Scheduling Jobs under Increasing Linear Machine Maintenance Time." Journal of Scheduling 13 (4): 443-449. doi:10.1007/s10951-010-0182-0.
    • (2010) Journal of Scheduling , vol.13 , Issue.4 , pp. 443-449
    • Xu, D.1    Yin, Y.2    Li, H.3
  • 27
    • 24644510199 scopus 로고    scopus 로고
    • Minimizing the makespan in a single machine scheduling problem with a flexible maintenance activity
    • Yang, D.-L., C.-L. Hung, J. Hsu, and M.-S. Chern. 2002. "Minimizing the Makespan in a Single Machine Scheduling Problem with a Flexible Maintenance Activity." Journal of the Chinese Institute of Industrial Engineers 19 (1): 63-66. doi:10.1080/10170660209509183.
    • (2002) Journal of the Chinese Institute of Industrial Engineers , vol.19 , Issue.1 , pp. 63-66
    • Yang, D.-L.1    Hung, C.-L.2    Hsu, J.3    Chern, M.-S.4
  • 28
    • 78049316679 scopus 로고    scopus 로고
    • Single machine scheduling problems with both start-time dependent learning and position dependent aging effects under deteriorating maintenance consideration
    • Yang, S.-J. 2010. "Single Machine Scheduling Problems with Both Start-Time Dependent Learning and Position Dependent Aging Effects under Deteriorating Maintenance Consideration." Applied Mathematics and Computation 217 (7): 3321-3329. doi:10.1016/j.amc.2010.08.064.
    • (2010) Applied Mathematics and Computation , vol.217 , Issue.7 , pp. 3321-3329
    • Yang, S.-J.1
  • 29
    • 77952551347 scopus 로고    scopus 로고
    • Minimizing the makespan on single machine scheduling with aging effect and variable maintenance activities
    • Yang, S.-J., and D.-L. Yang. 2010a. "Minimizing the Makespan on Single Machine Scheduling with Aging Effect and Variable Maintenance Activities." Omega 38 (6): 528-533. doi:10.1016/j.omega.2010.01.003.
    • (2010) Omega , vol.38 , Issue.6 , pp. 528-533
    • Yang, S.-J.1    Yang, D.-L.2
  • 30
    • 77957918240 scopus 로고    scopus 로고
    • Minimizing the total completion time in single machine scheduling with aging/deteriorating effects and deteriorating maintenance activities
    • Yang, S.-J., and D.-L. Yang. 2010b. "Minimizing the Total Completion Time in Single Machine Scheduling with Aging/Deteriorating Effects and Deteriorating Maintenance Activities." Computers and Mathematics with Applications 60 (7): 2161-2169. doi:10.1016/j. camwa.2010.08.003.
    • (2010) Computers and Mathematics with Applications , vol.60 , Issue.7 , pp. 2161-2169
    • Yang, S.-J.1    Yang, D.-L.2
  • 31
    • 73449148313 scopus 로고    scopus 로고
    • Single machine due-window assignment and scheduling with job dependent aging effects and deteriorating maintenance
    • Yang, S.-J., D.-L. Yang, and T. C. E. Cheng. 2010. "Single Machine Due-Window Assignment and Scheduling with Job Dependent Aging Effects and Deteriorating Maintenance." Computers and Operations Research 37 (8): 1510-1514. doi:10.1016/j.cor.2009.11.007.
    • (2010) Computers and Operations Research , vol.37 , Issue.8 , pp. 1510-1514
    • Yang, S.-J.1    Yang, D.-L.2    Cheng, T.C.E.3
  • 32
    • 78049450375 scopus 로고    scopus 로고
    • Minimizing total completion time on a single machine with a flexible maintenance activity
    • Yang, S.-L., Y. Ma, D.-L. Xu, and J.-B. Yang. 2011. "Minimizing Total Completion Time on a Single Machine with a Flexible Maintenance Activity." Computers & Operations Research 38 (4): 755-770. doi:10.1016/j. cor.2010.09.003.
    • (2011) Computers & Operations Research , vol.38 , Issue.4 , pp. 755-770
    • Yang, S.-L.1    Ma, Y.2    Xu, D.-L.3    Yang, J.-B.4
  • 33
    • 70350367239 scopus 로고    scopus 로고
    • Single machine scheduling with general job dependent aging effect and maintenance activities to minimize makespan
    • Zhao, C.-L., and H.-Y. Tang. 2010. "Single Machine Scheduling with General Job Dependent Aging Effect and Maintenance Activities to Minimize Makespan." Applied Mathematical Modelling 34 (3): 837-841. doi:10.1016/j.apm.2009.07.002.
    • (2010) Applied Mathematical Modelling , vol.34 , Issue.3 , pp. 837-841
    • Zhao, C.-L.1    Tang, H.-Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.