메뉴 건너뛰기




Volumn 76, Issue , 2014, Pages 333-346

Harmony search algorithm for single-machine scheduling problem with planned maintenance

Author keywords

Earliness tardiness penalties; Harmony search; Metaheuristics; Planned maintenance; Scheduling; Single machine

Indexed keywords

EARLINESS-TARDINESS; HARMONY SEARCH; META HEURISTICS; PLANNED MAINTENANCE; SINGLE- MACHINES;

EID: 84907815094     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2014.08.001     Document Type: Article
Times cited : (52)

References (43)
  • 4
    • 67749116576 scopus 로고    scopus 로고
    • Bi-objective optimization algorithms for joint production and maintenance scheduling: Application to the parallel machine problem
    • A. Berrichi, L. Amodeo, F. Yalaoui, E. Châtelet, and M. Mezghiche Bi-objective optimization algorithms for joint production and maintenance scheduling: Application to the parallel machine problem Journal of Intelligent Manufacturing 20 2009 389 400
    • (2009) Journal of Intelligent Manufacturing , vol.20 , pp. 389-400
    • Berrichi, A.1    Amodeo, L.2    Yalaoui, F.3    Châtelet, E.4    Mezghiche, M.5
  • 5
    • 0038813446 scopus 로고    scopus 로고
    • Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    • C.R. Cassady, and E. Kutanoglu Minimizing job tardiness using integrated preventive maintenance planning and production scheduling IIE Transactions 35 2003 503 513
    • (2003) IIE Transactions , vol.35 , pp. 503-513
    • Cassady, C.R.1    Kutanoglu, E.2
  • 6
    • 0037290972 scopus 로고    scopus 로고
    • Single machine scheduling for minimizing earliness and tardiness penalties by metaheuristic approaches
    • M. Feldmann, and D. Bisckup Single machine scheduling for minimizing earliness and tardiness penalties by metaheuristic approaches Computers and Industrial Engineering 44 2003 307 323
    • (2003) Computers and Industrial Engineering , vol.44 , pp. 307-323
    • Feldmann, M.1    Bisckup, D.2
  • 7
    • 80052162860 scopus 로고    scopus 로고
    • A modified harmony search algorithm for the multi-objective flowshop scheduling problem with due dates
    • M. Frosolini, M. Braglia, and F. Zammori A modified harmony search algorithm for the multi-objective flowshop scheduling problem with due dates International Journal of Production Research 49 2010 5957 5985
    • (2010) International Journal of Production Research , vol.49 , pp. 5957-5985
    • Frosolini, M.1    Braglia, M.2    Zammori, F.3
  • 8
    • 33747682830 scopus 로고    scopus 로고
    • Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm
    • J. Gao, M. Gen, and L. Sun Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm Journal of Intelligent Manufacturing 17 2006 493 507
    • (2006) Journal of Intelligent Manufacturing , vol.17 , pp. 493-507
    • Gao, J.1    Gen, M.2    Sun, L.3
  • 9
    • 0034974417 scopus 로고    scopus 로고
    • A new heuristic optimization algorithm: Harmony search
    • Z.W. Geem, J.H. Kim, and G.V. Loganathan A new heuristic optimization algorithm: Harmony search Simulation 76 2001 60 68
    • (2001) Simulation , vol.76 , pp. 60-68
    • Geem, Z.W.1    Kim, J.H.2    Loganathan, G.V.3
  • 11
    • 26844499583 scopus 로고    scopus 로고
    • Harmony search for generalized orienteering problem: Best touring in China
    • Z.W. Geem, C.-L. Tseng, and Y. Park Harmony search for generalized orienteering problem: Best touring in China Lectures Notes in Computer Sciences 3612 2005 741 750
    • (2005) Lectures Notes in Computer Sciences , vol.3612 , pp. 741-750
    • Geem, Z.W.1    Tseng, C.-L.2    Park, Y.3
  • 12
  • 13
    • 47949100087 scopus 로고
    • Positive definite matrices and Sylvester's criterion
    • G.T. Gilbert Positive definite matrices and Sylvester's criterion The American Mathematical Monthly 98 1991 44 46
    • (1991) The American Mathematical Monthly , vol.98 , pp. 44-46
    • Gilbert, G.T.1
  • 17
    • 79151477996 scopus 로고    scopus 로고
    • A hybridization of simulated annealing and electromagnetism-like mechanism for a periodic job shop scheduling problem
    • A. Jamili, M.A. Shafia, and R. Tavakkoli-Moghaddam A hybridization of simulated annealing and electromagnetism-like mechanism for a periodic job shop scheduling problem Expert Systems with Applications 38 5 2011 5859 5901
    • (2011) Expert Systems with Applications , vol.38 , Issue.5 , pp. 5859-5901
    • Jamili, A.1    Shafia, M.A.2    Tavakkoli-Moghaddam, R.3
  • 18
    • 33749681702 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance to minimize makespan
    • M. Ji, Y. He, and T.C.E. Cheng Single-machine scheduling with periodic maintenance to minimize makespan Computers and Operations Research 34 2007 1764 1770
    • (2007) Computers and Operations Research , vol.34 , pp. 1764-1770
    • Ji, M.1    He, Y.2    Cheng, T.C.E.3
  • 19
    • 34548390510 scopus 로고    scopus 로고
    • Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times
    • I. Kacem, C. Chu, and A. Souissi Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times Computers and Operations Research 35 2008 827 844
    • (2008) Computers and Operations Research , vol.35 , pp. 827-844
    • Kacem, I.1    Chu, C.2    Souissi, A.3
  • 20
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • S. Kirkpatrick, C.D. Gellat Jr., and M.P. Vecchi Optimization by simulated annealing Science 220 1983 671 680
    • (1983) Science , vol.220 , pp. 671-680
    • Kirkpatrick, S.1    Gellat, C.D.2    Vecchi, M.P.3
  • 21
    • 80053362109 scopus 로고    scopus 로고
    • Scheduling rules to minimize total tardiness in parallel machine problem with setup and calendar constraints
    • J. Lamothe, F. Marmier, M. Dupuy, P. Gaborit, and L. Dupont Scheduling rules to minimize total tardiness in parallel machine problem with setup and calendar constraints Journal of Computers and Operations Research 39 6 2012 1236 1244
    • (2012) Journal of Computers and Operations Research , vol.39 , Issue.6 , pp. 1236-1244
    • Lamothe, J.1    Marmier, F.2    Dupuy, M.3    Gaborit, P.4    Dupont, L.5
  • 22
    • 0035900864 scopus 로고    scopus 로고
    • Single-machine scheduling with maintenance and repair rate-modifying activities
    • C.-Y. Lee, and C.-S. Lin Single-machine scheduling with maintenance and repair rate-modifying activities European Journal of Operational Research 135 2001 493 513
    • (2001) European Journal of Operational Research , vol.135 , pp. 493-513
    • Lee, C.-Y.1    Lin, C.-S.2
  • 24
    • 0037411886 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance and nonresumable jobs
    • C.J. Liao, and W.J. Chen Single-machine scheduling with periodic maintenance and nonresumable jobs Computers and Operations Research 30 2003 1335 1347
    • (2003) Computers and Operations Research , vol.30 , pp. 1335-1347
    • Liao, C.J.1    Chen, W.J.2
  • 25
    • 77649189522 scopus 로고    scopus 로고
    • An effective hybrid particle swarm optimization for batch scheduling of polypropylene processes
    • B. Liu, L. Wanga, Y. Liud, B. Qiane, and Y.H. Jin An effective hybrid particle swarm optimization for batch scheduling of polypropylene processes Computers and Chemical Engineering 34 2010 518 528
    • (2010) Computers and Chemical Engineering , vol.34 , pp. 518-528
    • Liu, B.1    Wanga, L.2    Liud, Y.3    Qiane, B.4    Jin, Y.H.5
  • 26
    • 76349087153 scopus 로고    scopus 로고
    • A survey of scheduling with deterministic machine availability constraints
    • Y. Ma, C. Chu, and C. Zuo A survey of scheduling with deterministic machine availability constraints Computers and Industrial Engineering 58 2010 199 211
    • (2010) Computers and Industrial Engineering , vol.58 , pp. 199-211
    • Ma, Y.1    Chu, C.2    Zuo, C.3
  • 27
    • 79951579853 scopus 로고    scopus 로고
    • Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
    • E. Moradi, S.M.T. Fatemi Ghomi, and M. Zandieh Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem Expert Systems With Applications 38 2011 7169 7178
    • (2011) Expert Systems with Applications , vol.38 , pp. 7169-7178
    • Moradi, E.1    Fatemi Ghomi, S.M.T.2    Zandieh, M.3
  • 28
    • 75849165458 scopus 로고    scopus 로고
    • Electromagnetism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardiness and makespan
    • B. Naderi, R. Tavakkoli-Moghaddam, and M. Khalili Electromagnetism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardiness and makespan Knowledge-Based Systems 23 2010 77 85
    • (2010) Knowledge-Based Systems , vol.23 , pp. 77-85
    • Naderi, B.1    Tavakkoli-Moghaddam, R.2    Khalili, M.3
  • 30
    • 84861702584 scopus 로고    scopus 로고
    • A joint model of production scheduling and predictive maintenance for minimizing job tardiness
    • E. Pan, W. Liao, and L. Xi A joint model of production scheduling and predictive maintenance for minimizing job tardiness International Journal of Advanced Manufacturing Technology 60 2012 1049 1061
    • (2012) International Journal of Advanced Manufacturing Technology , vol.60 , pp. 1049-1061
    • Pan, E.1    Liao, W.2    Xi, L.3
  • 33
    • 34848849831 scopus 로고    scopus 로고
    • A comparative study of heuristic algorithms to solve maintenance scheduling problem
    • S.A. Raza, and U.M. Al-Turki A comparative study of heuristic algorithms to solve maintenance scheduling problem Journal of Quality in Maintenance Engineering 13 2007 398 410
    • (2007) Journal of Quality in Maintenance Engineering , vol.13 , pp. 398-410
    • Raza, S.A.1    Al-Turki, U.M.2
  • 34
    • 37049022197 scopus 로고    scopus 로고
    • An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
    • R. Ruiz, and T. Stützle An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives European Journal of Operational Research 187 2008 1143 1159
    • (2008) European Journal of Operational Research , vol.187 , pp. 1143-1159
    • Ruiz, R.1    Stützle, T.2
  • 35
    • 78049530061 scopus 로고    scopus 로고
    • A hybrid method for flowshop scheduling with condition-based maintenance constraint and machines breakdown
    • E. Safari, and S.J. Sadjadi A hybrid method for flowshop scheduling with condition-based maintenance constraint and machines breakdown Expert Systems with Applications 38 3 2011 2020 2029
    • (2011) Expert Systems with Applications , vol.38 , Issue.3 , pp. 2020-2029
    • Safari, E.1    Sadjadi, S.J.2
  • 36
    • 55649110055 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness
    • M. Sbihi, and C. Varnier Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness Computers and Industrial Engineering 55 2008 830 840
    • (2008) Computers and Industrial Engineering , vol.55 , pp. 830-840
    • Sbihi, M.1    Varnier, C.2
  • 39
    • 77951207563 scopus 로고    scopus 로고
    • Two robust meta heuristics for scheduling multiple job classes on a single machine with multiple criteria
    • R. Soltani, F. Jolai, and M. Zandieh Two robust meta heuristics for scheduling multiple job classes on a single machine with multiple criteria Expert Systems with Application 37 2010 5951 5959
    • (2010) Expert Systems with Application , vol.37 , pp. 5951-5959
    • Soltani, R.1    Jolai, F.2    Zandieh, M.3
  • 40
    • 33947227221 scopus 로고    scopus 로고
    • Genetic algorithms for total weighted expected tardiness integrated preventive maintenance planning and production scheduling for a single machine
    • N. Sortrakul, and C.R. Cassady Genetic algorithms for total weighted expected tardiness integrated preventive maintenance planning and production scheduling for a single machine Journal of Quality in Maintenance Engineering 13 1 2007 49 61
    • (2007) Journal of Quality in Maintenance Engineering , vol.13 , Issue.1 , pp. 49-61
    • Sortrakul, N.1    Cassady, C.R.2
  • 41
    • 0034196175 scopus 로고    scopus 로고
    • A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times
    • K.C.T. Tan, R. Narasimhan, R.A. Rubin, and G.L. Ragatz A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times Omega 28 2000 313 326
    • (2000) Omega , vol.28 , pp. 313-326
    • Tan, K.C.T.1    Narasimhan, R.2    Rubin, R.A.3    Ragatz, G.L.4
  • 42
    • 70350113814 scopus 로고    scopus 로고
    • A hybrid immune simulated annealing algorithm for the job shop scheduling problem
    • R. Zhang, and C. Whu A hybrid immune simulated annealing algorithm for the job shop scheduling problem Applied Soft Computing 10 2010 79 89
    • (2010) Applied Soft Computing , vol.10 , pp. 79-89
    • Zhang, R.1    Whu, C.2
  • 43
    • 70350367239 scopus 로고    scopus 로고
    • Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan
    • Zhao, C.-L., and Tang, H. y. (2010). Single machine scheduling with general jobdependent aging effect and maintenance activities to minimize makespan. Applied Mathematical Modeling, 34, 837-841.
    • (2010) Applied Mathematical Modeling , vol.34 , pp. 837-841
    • Zhao, C.-L.1    Tang, H.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.