-
3
-
-
2942674864
-
Scheduling flexible flow lines with sequence dependent setup times
-
M.E. Kurz, and R.G. Askin Scheduling flexible flow lines with sequence dependent setup times European Journal of Operational Research 159 1 2004 66 82
-
(2004)
European Journal of Operational Research
, vol.159
, Issue.1
, pp. 66-82
-
-
Kurz, M.E.1
Askin, R.G.2
-
4
-
-
0242658501
-
Minimizing the makespan for the flow shop scheduling problem with availability constraints
-
R. Aggoune Minimizing the makespan for the flow shop scheduling problem with availability constraints European Journal of Operational Research 153 2004 534 543
-
(2004)
European Journal of Operational Research
, vol.153
, pp. 534-543
-
-
Aggoune, R.1
-
5
-
-
26444492122
-
Scheduling two-stage hybrid flow shop with availability constraints
-
H. Allaoui, and A. Artiba Scheduling two-stage hybrid flow shop with availability constraints Computers and Operations Research 33 2006 1399 1419
-
(2006)
Computers and Operations Research
, vol.33
, pp. 1399-1419
-
-
Allaoui, H.1
Artiba, A.2
-
6
-
-
10444260511
-
Integrating simulation and optimization to schedule a hybrid flowshop with maintenance constraints
-
H. Allaoui, and A. Artiba Integrating simulation and optimization to schedule a hybrid flowshop with maintenance constraints Computers and Industrial Engineering 47 2004 431 450
-
(2004)
Computers and Industrial Engineering
, vol.47
, pp. 431-450
-
-
Allaoui, H.1
Artiba, A.2
-
7
-
-
3142755746
-
A new approach to solve hybrid flow shop scheduling problems by artificial immune system
-
O. Engin, and A. Döyen A new approach to solve hybrid flow shop scheduling problems by artificial immune system Future Generation Computer Systems 20 2004 1083 1095
-
(2004)
Future Generation Computer Systems
, vol.20
, pp. 1083-1095
-
-
Engin, O.1
Döyen, A.2
-
8
-
-
0000049036
-
Minimizing the makespan in the two-machine flow-shop scheduling problem with an availability constraint
-
C.Y. Lee Minimizing the makespan in the two-machine flow-shop scheduling problem with an availability constraint Operational Research Letters 20 1997 129 139
-
(1997)
Operational Research Letters
, vol.20
, pp. 129-139
-
-
Lee, C.Y.1
-
9
-
-
13444291361
-
Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
-
N. Sortrakul, H.L. Nachtmann, and C.R. Cassady Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine Computers in Industry 56 2005 161 168
-
(2005)
Computers in Industry
, vol.56
, pp. 161-168
-
-
Sortrakul, N.1
Nachtmann, H.L.2
Cassady, C.R.3
-
10
-
-
0038813446
-
Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
-
C.R. Cassady, and E. Kutanoglu Minimizing job tardiness using integrated preventive maintenance planning and production scheduling IIE Transactions 35 6 2003 503 513
-
(2003)
IIE Transactions
, vol.35
, Issue.6
, pp. 503-513
-
-
Cassady, C.R.1
Kutanoglu, E.2
-
11
-
-
0000693192
-
Heuristic algorithms for the two-machine flowshop problem with limited machine availability
-
J. Blazewicz, J. Breit, P. Formanowicz, W. Kubiak, and G. Schmidt Heuristic algorithms for the two-machine flowshop problem with limited machine availability Omega 29 2001 599 608
-
(2001)
Omega
, vol.29
, pp. 599-608
-
-
Blazewicz, J.1
Breit, J.2
Formanowicz, P.3
Kubiak, W.4
Schmidt, G.5
-
12
-
-
29144477260
-
A polynomial-time approximation scheme for the two-machine flowshop scheduling problem with an availability constraint
-
J. Breit A polynomial-time approximation scheme for the two-machine flowshop scheduling problem with an availability constraint Computers and Operations Research 33 2006 2143 2153
-
(2006)
Computers and Operations Research
, vol.33
, pp. 2143-2153
-
-
Breit, J.1
-
13
-
-
34047122539
-
Considering scheduling and preventive maintenance in the flowshop sequencing problem
-
R. Ruiz, J.C. García-Díaz, and C. Maroto Considering scheduling and preventive maintenance in the flowshop sequencing problem Computers and Operations Research 34 2007 3314 3330
-
(2007)
Computers and Operations Research
, vol.34
, pp. 3314-3330
-
-
Ruiz, R.1
García-Díaz, J.C.2
Maroto, C.3
-
14
-
-
0029343965
-
Two-stage production scheduling with separated setup times and stochastic breakdowns
-
A. Allahverdi Two-stage production scheduling with separated setup times and stochastic breakdowns Journal of Operational Research Society 46 1995 896 904
-
(1995)
Journal of Operational Research Society
, vol.46
, pp. 896-904
-
-
Allahverdi, A.1
-
15
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flowshop sequencing problem
-
M. Nawaz, E.E. Enscore Jr., and I. Ham A heuristic algorithm for the m-machine, n-job flowshop sequencing problem OMEGA, The International Journal of Management Science 11 1 1983 91 95
-
(1983)
OMEGA, the International Journal of Management Science
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore Jr., E.E.2
Ham, I.3
-
16
-
-
34548454869
-
A two-machine flowshop scheduling problem with a separated maintenance constraint
-
D.L. Yang, C.J. Hsu, and W.H. Kuo A two-machine flowshop scheduling problem with a separated maintenance constraint Computers and Operations Research 35 3 2008 876 883
-
(2008)
Computers and Operations Research
, vol.35
, Issue.3
, pp. 876-883
-
-
Yang, D.L.1
Hsu, C.J.2
Kuo, W.H.3
-
19
-
-
0000700371
-
Maintenance policies for stochastically failing equipment: A survey
-
J.J. McCall Maintenance policies for stochastically failing equipment: a survey Management Science 11 1956 493 524
-
(1956)
Management Science
, vol.11
, pp. 493-524
-
-
McCall, J.J.1
-
20
-
-
0016995779
-
A survey of maintenance models: The control and surveillance of deteriorating systems
-
W.P. Pierskall, and J.A. Voelker A survey of maintenance models: the control and surveillance of deteriorating systems Naval Logistics Research Quarterly 23 1976 353 388
-
(1976)
Naval Logistics Research Quarterly
, vol.23
, pp. 353-388
-
-
Pierskall, W.P.1
Voelker, J.A.2
-
21
-
-
0011594732
-
Optimal maintenance models for systems subject to failure - A review
-
Y.S. Sherif, and M.L. Smith Optimal maintenance models for systems subject to failure - a review Naval Logistics Research Quarterly 23 1976 47 74
-
(1976)
Naval Logistics Research Quarterly
, vol.23
, pp. 47-74
-
-
Sherif, Y.S.1
Smith, M.L.2
-
24
-
-
0033101911
-
A genetic algorithm methodology for complex scheduling problems
-
B.A. Norman, and J.C. Bean A genetic algorithm methodology for complex scheduling problems Naval Research Logistics 46 1999 199 211
-
(1999)
Naval Research Logistics
, vol.46
, pp. 199-211
-
-
Norman, B.A.1
Bean, J.C.2
|