메뉴 건너뛰기




Volumn 11, Issue 2, 2011, Pages 2094-2101

Incorporating periodic preventive maintenance into flexible flowshop scheduling problems

Author keywords

Artificial immune algorithm; Constructive heuristic; Flexible flowshops; Genetic algorithm; Periodic preventive maintenance; Scheduling

Indexed keywords

ARTIFICIAL IMMUNE ALGORITHMS; ARTIFICIAL IMMUNE SYSTEM; COMPUTATIONAL EXPERIMENT; CONSTRUCTIVE HEURISTIC; FLEXIBLE FLOWSHOP; FLOW-SHOPS; MACHINE SCHEDULING PROBLEM; MAKESPAN; META HEURISTICS; ON-MACHINES; PERIODIC PREVENTIVE MAINTENANCE; PRODUCTION SCHEDULING;

EID: 78751615953     PISSN: 15684946     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.asoc.2010.07.008     Document Type: Conference Paper
Times cited : (47)

References (25)
  • 3
    • 2942674864 scopus 로고    scopus 로고
    • Scheduling flexible flow lines with sequence dependent setup times
    • M.E. Kurz, and R.G. Askin Scheduling flexible flow lines with sequence dependent setup times European Journal of Operational Research 159 1 2004 66 82
    • (2004) European Journal of Operational Research , vol.159 , Issue.1 , pp. 66-82
    • Kurz, M.E.1    Askin, R.G.2
  • 4
    • 0242658501 scopus 로고    scopus 로고
    • Minimizing the makespan for the flow shop scheduling problem with availability constraints
    • R. Aggoune Minimizing the makespan for the flow shop scheduling problem with availability constraints European Journal of Operational Research 153 2004 534 543
    • (2004) European Journal of Operational Research , vol.153 , pp. 534-543
    • Aggoune, R.1
  • 5
    • 26444492122 scopus 로고    scopus 로고
    • Scheduling two-stage hybrid flow shop with availability constraints
    • H. Allaoui, and A. Artiba Scheduling two-stage hybrid flow shop with availability constraints Computers and Operations Research 33 2006 1399 1419
    • (2006) Computers and Operations Research , vol.33 , pp. 1399-1419
    • Allaoui, H.1    Artiba, A.2
  • 6
    • 10444260511 scopus 로고    scopus 로고
    • Integrating simulation and optimization to schedule a hybrid flowshop with maintenance constraints
    • H. Allaoui, and A. Artiba Integrating simulation and optimization to schedule a hybrid flowshop with maintenance constraints Computers and Industrial Engineering 47 2004 431 450
    • (2004) Computers and Industrial Engineering , vol.47 , pp. 431-450
    • Allaoui, H.1    Artiba, A.2
  • 7
    • 3142755746 scopus 로고    scopus 로고
    • A new approach to solve hybrid flow shop scheduling problems by artificial immune system
    • O. Engin, and A. Döyen A new approach to solve hybrid flow shop scheduling problems by artificial immune system Future Generation Computer Systems 20 2004 1083 1095
    • (2004) Future Generation Computer Systems , vol.20 , pp. 1083-1095
    • Engin, O.1    Döyen, A.2
  • 8
    • 0000049036 scopus 로고    scopus 로고
    • Minimizing the makespan in the two-machine flow-shop scheduling problem with an availability constraint
    • C.Y. Lee Minimizing the makespan in the two-machine flow-shop scheduling problem with an availability constraint Operational Research Letters 20 1997 129 139
    • (1997) Operational Research Letters , vol.20 , pp. 129-139
    • Lee, C.Y.1
  • 9
    • 13444291361 scopus 로고    scopus 로고
    • Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
    • N. Sortrakul, H.L. Nachtmann, and C.R. Cassady Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine Computers in Industry 56 2005 161 168
    • (2005) Computers in Industry , vol.56 , pp. 161-168
    • Sortrakul, N.1    Nachtmann, H.L.2    Cassady, C.R.3
  • 10
    • 0038813446 scopus 로고    scopus 로고
    • Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    • C.R. Cassady, and E. Kutanoglu Minimizing job tardiness using integrated preventive maintenance planning and production scheduling IIE Transactions 35 6 2003 503 513
    • (2003) IIE Transactions , vol.35 , Issue.6 , pp. 503-513
    • Cassady, C.R.1    Kutanoglu, E.2
  • 11
    • 0000693192 scopus 로고    scopus 로고
    • Heuristic algorithms for the two-machine flowshop problem with limited machine availability
    • J. Blazewicz, J. Breit, P. Formanowicz, W. Kubiak, and G. Schmidt Heuristic algorithms for the two-machine flowshop problem with limited machine availability Omega 29 2001 599 608
    • (2001) Omega , vol.29 , pp. 599-608
    • Blazewicz, J.1    Breit, J.2    Formanowicz, P.3    Kubiak, W.4    Schmidt, G.5
  • 12
    • 29144477260 scopus 로고    scopus 로고
    • A polynomial-time approximation scheme for the two-machine flowshop scheduling problem with an availability constraint
    • J. Breit A polynomial-time approximation scheme for the two-machine flowshop scheduling problem with an availability constraint Computers and Operations Research 33 2006 2143 2153
    • (2006) Computers and Operations Research , vol.33 , pp. 2143-2153
    • Breit, J.1
  • 13
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • R. Ruiz, J.C. García-Díaz, and C. Maroto Considering scheduling and preventive maintenance in the flowshop sequencing problem Computers and Operations Research 34 2007 3314 3330
    • (2007) Computers and Operations Research , vol.34 , pp. 3314-3330
    • Ruiz, R.1    García-Díaz, J.C.2    Maroto, C.3
  • 14
    • 0029343965 scopus 로고
    • Two-stage production scheduling with separated setup times and stochastic breakdowns
    • A. Allahverdi Two-stage production scheduling with separated setup times and stochastic breakdowns Journal of Operational Research Society 46 1995 896 904
    • (1995) Journal of Operational Research Society , vol.46 , pp. 896-904
    • Allahverdi, A.1
  • 16
    • 34548454869 scopus 로고    scopus 로고
    • A two-machine flowshop scheduling problem with a separated maintenance constraint
    • D.L. Yang, C.J. Hsu, and W.H. Kuo A two-machine flowshop scheduling problem with a separated maintenance constraint Computers and Operations Research 35 3 2008 876 883
    • (2008) Computers and Operations Research , vol.35 , Issue.3 , pp. 876-883
    • Yang, D.L.1    Hsu, C.J.2    Kuo, W.H.3
  • 19
    • 0000700371 scopus 로고
    • Maintenance policies for stochastically failing equipment: A survey
    • J.J. McCall Maintenance policies for stochastically failing equipment: a survey Management Science 11 1956 493 524
    • (1956) Management Science , vol.11 , pp. 493-524
    • McCall, J.J.1
  • 20
    • 0016995779 scopus 로고
    • A survey of maintenance models: The control and surveillance of deteriorating systems
    • W.P. Pierskall, and J.A. Voelker A survey of maintenance models: the control and surveillance of deteriorating systems Naval Logistics Research Quarterly 23 1976 353 388
    • (1976) Naval Logistics Research Quarterly , vol.23 , pp. 353-388
    • Pierskall, W.P.1    Voelker, J.A.2
  • 21
    • 0011594732 scopus 로고
    • Optimal maintenance models for systems subject to failure - A review
    • Y.S. Sherif, and M.L. Smith Optimal maintenance models for systems subject to failure - a review Naval Logistics Research Quarterly 23 1976 47 74
    • (1976) Naval Logistics Research Quarterly , vol.23 , pp. 47-74
    • Sherif, Y.S.1    Smith, M.L.2
  • 24
    • 0033101911 scopus 로고    scopus 로고
    • A genetic algorithm methodology for complex scheduling problems
    • B.A. Norman, and J.C. Bean A genetic algorithm methodology for complex scheduling problems Naval Research Logistics 46 1999 199 211
    • (1999) Naval Research Logistics , vol.46 , pp. 199-211
    • Norman, B.A.1    Bean, J.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.