-
1
-
-
43049084777
-
Complexity of single machine scheduling problems under scenario-based uncertainty
-
M.A. Aloulou, and F.D. Croce Complexity of single machine scheduling problems under scenario-based uncertainty Operations Research Letters 36 2008 338 342
-
(2008)
Operations Research Letters
, vol.36
, pp. 338-342
-
-
Aloulou, M.A.1
Croce, F.D.2
-
3
-
-
84856852768
-
A case-based reasoning approach for providing machine diagnosis from service reports, in case-based reasoning research and development
-
K. Bach, K.D. Althoff, R. Newo, and A. Stahl A case-based reasoning approach for providing machine diagnosis from service reports, in case-based reasoning research and development Lecture Notes in Computer Science 6880 2011 363 377
-
(2011)
Lecture Notes in Computer Science
, vol.6880
, pp. 363-377
-
-
Bach, K.1
Althoff, K.D.2
Newo, R.3
Stahl, A.4
-
4
-
-
35248844941
-
Resolution of joint maintenance/production scheduling by sequential and integrated strategies
-
In 7th international work conference on artificial and natural neural networks IWANN2003, 3-6 June, Spain
-
Benbouzid, F., Varnier, C., & Zerhouni, N. (2003). Resolution of joint maintenance/production scheduling by sequential and integrated strategies. In 7th international work conference on artificial and natural neural networks IWANN2003, 3-6 June, Spain. Proceedings LNCS 2687 (pp. 782-789).
-
(2003)
Proceedings LNCS
, vol.2687
, pp. 782-789
-
-
Benbouzid, F.1
Varnier, C.2
Zerhouni, N.3
-
5
-
-
78651239754
-
Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies
-
F. Benbouzid-Sitayeb, S.A. Guelbi, Y. Bessadi, C. Varnier, and N. Zerhouni Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies International Journal of Management Research (IJMR) 6 1 2011 30 48
-
(2011)
International Journal of Management Research (IJMR)
, vol.6
, Issue.1
, pp. 30-48
-
-
Benbouzid-Sitayeb, F.1
Guelbi, S.A.2
Bessadi, Y.3
Varnier, C.4
Zerhouni, N.5
-
6
-
-
81255210809
-
Simulation-based approach to joint production and preventive maintenance scheduling on a failure-prone machine
-
R. Benmansour, H. Allaoui, A. Artiba, S. Iassinovski, and R. Pellerin Simulation-based approach to joint production and preventive maintenance scheduling on a failure-prone machine Journal of Quality in Maintenance Engineering 17 3 2011 254 267
-
(2011)
Journal of Quality in Maintenance Engineering
, vol.17
, Issue.3
, pp. 254-267
-
-
Benmansour, R.1
Allaoui, H.2
Artiba, A.3
Iassinovski, S.4
Pellerin, R.5
-
7
-
-
62749205978
-
Flexibilité et robustesse en ordonnancement
-
Paris: Hermes Science
-
Billaut, J. C., Moukrim, A., & Sanlaville, E. (2005). Flexibilité et robustesse en ordonnancement. Traité IC2 (pp. 15-34). Paris: Hermes Science.
-
(2005)
Traité IC2
-
-
Billaut, J.C.1
Moukrim, A.2
Sanlaville, E.3
-
8
-
-
84927134275
-
ETOMA: A multi-agent tool for shop scheduling problems. in Advanced approaches to intelligent information and database systems
-
Bouzidi-Hassini, S., Saboun, Y., Bourahla, S., Benbouzid-Sitayeb, F., & Khelifati, S. (2014). ETOMA: A multi-agent tool for shop scheduling problems. In Advanced approaches to intelligent information and database systems. Studies in Computational Intelligence (Vol. 551, pp. 79-88).
-
(2014)
Studies in Computational Intelligence
, vol.551
, pp. 79-88
-
-
Bouzidi-Hassini, S.1
Saboun, Y.2
Bourahla, S.3
Benbouzid-Sitayeb, F.4
Khelifati, S.5
-
10
-
-
56549109617
-
Development in the application of ICT in condition monitoring and maintenance
-
J. Campos Development in the application of ICT in condition monitoring and maintenance Computers in Industry 60 1 2009 1 20
-
(2009)
Computers in Industry
, vol.60
, Issue.1
, pp. 1-20
-
-
Campos, J.1
-
11
-
-
84942454731
-
Un algorithme génétique pour l'ordonnancement robuste: Application au problème du flow shop hybride. Thèse de doctorat
-
France
-
Chaabi, T. (2010). Un algorithme génétique pour l'ordonnancement robuste: Application au problème du flow shop hybride. Thèse de doctorat. l'Université de Valenciennes et du Hainaut-Cambrésis. France.
-
(2010)
L'Université de Valenciennes et du Hainaut-Cambrésis
-
-
Chaabi, T.1
-
12
-
-
0035369592
-
Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates
-
S. Chanas, and A. Kasperski Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates Engineering Applications of Artificial Intelligence 14 2001 377 386
-
(2001)
Engineering Applications of Artificial Intelligence
, vol.14
, pp. 377-386
-
-
Chanas, S.1
Kasperski, A.2
-
15
-
-
79551550042
-
Coordination activities of human planners during rescheduling: Case analysis and event handling procedure
-
C. De Snoo, W. Van Wezel, J.C. Wortmann, and G.J.C. Gaalman Coordination activities of human planners during rescheduling: Case analysis and event handling procedure International Journal of Production Research 49 7 2011 2101 2122
-
(2011)
International Journal of Production Research
, vol.49
, Issue.7
, pp. 2101-2122
-
-
De Snoo, C.1
Van Wezel, W.2
Wortmann, J.C.3
Gaalman, G.J.C.4
-
18
-
-
0020142383
-
Membership functions, some mathematical programming models and production scheduling
-
V. Dumitru, and F. Luban Membership functions, some mathematical programming models and production scheduling Fuzzy Sets and Systems 8 1982 19 33
-
(1982)
Fuzzy Sets and Systems
, vol.8
, pp. 19-33
-
-
Dumitru, V.1
Luban, F.2
-
19
-
-
33746920304
-
Strategically optimum maintenance of monitoring-enabled multi-component systems using continuous-time jump deterioration models
-
A. Gupta, and C. Lawsirirat Strategically optimum maintenance of monitoring-enabled multi-component systems using continuous-time jump deterioration models Journal of Quality in Maintenance Engineering 12 3 2006 306 329
-
(2006)
Journal of Quality in Maintenance Engineering
, vol.12
, Issue.3
, pp. 306-329
-
-
Gupta, A.1
Lawsirirat, C.2
-
20
-
-
70349269170
-
Cut generation for an integrated employee timetabling and production scheduling problem
-
O. Guyon, P. Lemaire, É. Pinson, and D. Rivreau Cut generation for an integrated employee timetabling and production scheduling problem European Journal of Operational Research 201 2 2010 557 567
-
(2010)
European Journal of Operational Research
, vol.201
, Issue.2
, pp. 557-567
-
-
Guyon, O.1
Lemaire, P.2
Pinson, É.3
Rivreau, D.4
-
22
-
-
84942454734
-
Using condition-based maintenance and reliability-centered maintenance to improve maintenance in nuclear power plants
-
Springer Japan
-
L.J. Huang, H. Jiang, Y. Chen, and S.J. Chen Using condition-based maintenance and reliability-centered maintenance to improve maintenance in nuclear power plants Progress of nuclear safety for symbiosis and sustainability: Advanced digital instrumentation, control and information systems for nuclear power plants Vol. 177 2014 Springer Japan
-
(2014)
Progress of Nuclear Safety for Symbiosis and Sustainability: Advanced Digital Instrumentation, Control and Information Systems for Nuclear Power Plants
, vol.177
-
-
Huang, L.J.1
Jiang, H.2
Chen, Y.3
Chen, S.J.4
-
23
-
-
0005648655
-
-
NISTIR-National Institute of Standards and Technology Gaithersburg, MD, USA < >
-
A. Jones, and L.C. Rabelo Survey of job shop scheduling techniques 1998 NISTIR-National Institute of Standards and Technology Gaithersburg, MD, USA < http://www.mel.nist.gov/msidlibrary/doc/luis.pdf >
-
(1998)
Survey of Job Shop Scheduling Techniques
-
-
Jones, A.1
Rabelo, L.C.2
-
26
-
-
84868219656
-
Solving multi-objective production scheduling problems using a new approach
-
G. Kulscar, and M. Kulscarine Forrai Solving multi-objective production scheduling problems using a new approach Production Systems and Information Engineering 5 2009 81 94
-
(2009)
Production Systems and Information Engineering
, vol.5
, pp. 81-94
-
-
Kulscar, G.1
Forrai, M.K.2
-
27
-
-
0034159705
-
Scheduling jobs and maintenance activities on parallel machines
-
C.Y. Lee, and Z.L. Chen Scheduling jobs and maintenance activities on parallel machines Naval Research Logistics 47 2000 145 165
-
(2000)
Naval Research Logistics
, vol.47
, pp. 145-165
-
-
Lee, C.Y.1
Chen, Z.L.2
-
29
-
-
71749109550
-
An agent-based approach for integrated process planning and scheduling
-
X. Li, C. Zhang, L. Gao, W. Li, and X. Shao An agent-based approach for integrated process planning and scheduling Journal of Expert Systems with Applications 37 2010 1256 1264
-
(2010)
Journal of Expert Systems with Applications
, vol.37
, pp. 1256-1264
-
-
Li, X.1
Zhang, C.2
Gao, L.3
Li, W.4
Shao, X.5
-
30
-
-
66149094973
-
Proactive, dynamic and multi-criteria scheduling of maintenance activities
-
F. Marmier, C. Varnier, and N. Zerhouni Proactive, dynamic and multi-criteria scheduling of maintenance activities International Journal of Production Research 47 8 2009 2185 2220
-
(2009)
International Journal of Production Research
, vol.47
, Issue.8
, pp. 2185-2220
-
-
Marmier, F.1
Varnier, C.2
Zerhouni, N.3
-
32
-
-
59149095473
-
Schedule execution for two-machine flow-shop with interval processing times
-
N.M. Matsveichuk, Yu N. Sotskov, N.M. Egorova, and T. Lai Schedule execution for two-machine flow-shop with interval processing times Mathematical and Computer Modelling 49 5-6 2009 991 1011
-
(2009)
Mathematical and Computer Modelling
, vol.49
, Issue.5-6
, pp. 991-1011
-
-
Matsveichuk, N.M.1
Sotskov, Y.N.2
Egorova, N.M.3
Lai, T.4
-
33
-
-
68249099005
-
A survey of dynamic scheduling in manufacturing systems
-
D. Ouelhadj, and S. Petrovic A survey of dynamic scheduling in manufacturing systems Journal of Scheduling 12 4 2009 417 431
-
(2009)
Journal of Scheduling
, vol.12
, Issue.4
, pp. 417-431
-
-
Ouelhadj, D.1
Petrovic, S.2
-
34
-
-
77956590951
-
-
Agents-based interaction protocols and topologies in manufacturing task allocation
-
Owliya, M., Saadat, M., Goharian, M., & Anane, R. (2010). Agents-based interaction protocols and topologies in manufacturing task allocation. In Proceeding of the 5th international conference on system of systems engineering.
-
(2010)
Proceeding of the 5th International Conference on System of Systems Engineering
-
-
Owliya, M.1
Saadat, M.2
Goharian, M.3
Anane, R.4
-
35
-
-
77956339475
-
A particle swarm optimization (PSO) approach for non-periodic preventive maintenance scheduling programming
-
C.M.N.A. Pereira, C. Lapa, A.C.A. Mol, and A.F. da Luz A particle swarm optimization (PSO) approach for non-periodic preventive maintenance scheduling programming Progress in Nuclear Energy 52 8 2010 710 714
-
(2010)
Progress in Nuclear Energy
, vol.52
, Issue.8
, pp. 710-714
-
-
Pereira, C.M.N.A.1
Lapa, C.2
Mol, A.C.A.3
Da Luz, A.F.4
-
39
-
-
18844387410
-
Integer programming approach to production scheduling for make-to-order manufacturing
-
T. Sawik Integer programming approach to production scheduling for make-to-order manufacturing Mathematical and Computer Modelling 41 1 2005 99 118
-
(2005)
Mathematical and Computer Modelling
, vol.41
, Issue.1
, pp. 99-118
-
-
Sawik, T.1
-
41
-
-
24144441172
-
Pre-emptive scheduling problems with controllable processing times
-
N.V. Shakhlevich, and V.A. Strusevich Pre-emptive scheduling problems with controllable processing times Journal of Scheduling 8 2005 233 253
-
(2005)
Journal of Scheduling
, vol.8
, pp. 233-253
-
-
Shakhlevich, N.V.1
Strusevich, V.A.2
-
42
-
-
80052993037
-
Agent-based distributed manufacturing process planning and scheduling: A State-Of-The-Art survey
-
W. Shen, L. Wang, and Q. Hao Agent-based distributed manufacturing process planning and scheduling: A state-of-the-art survey IEEE Transactions on Systems, Man, and Cybernetics - Part C: Applications and Reviews 36 4 2006 563 577
-
(2006)
IEEE Transactions on Systems, Man, and Cybernetics - Part C: Applications and Reviews
, vol.36
, Issue.4
, pp. 563-577
-
-
Shen, W.1
Wang, L.2
Hao, Q.3
-
44
-
-
79955584653
-
Remaining useful life estimation - A review on the statistical data driven approaches
-
X.S. Si, W. Wang, C.H. Hu, and D.H. Zhou Remaining useful life estimation - A review on the statistical data driven approaches European Journal of Operational Research 213 2011 1 14
-
(2011)
European Journal of Operational Research
, vol.213
, pp. 1-14
-
-
Si, X.S.1
Wang, W.2
Hu, C.H.3
Zhou, D.H.4
-
45
-
-
0008193301
-
Combined production and maintenance scheduling for a multiple product, single machine production system
-
T.W. Sloan, and J.G. Shanthikumar Combined production and maintenance scheduling for a multiple product, single machine production system Production and Operation Management 9 4 2000 379 399
-
(2000)
Production and Operation Management
, vol.9
, Issue.4
, pp. 379-399
-
-
Sloan, T.W.1
Shanthikumar, J.G.2
-
47
-
-
79960910445
-
Hidden Markov models for failure diagnostic and prognostic
-
PHM11. Shenzhen, China
-
Tobon-Mejia, D., Medjaher, K., Zerhouni, N., & Tripot, G. (2011). Hidden Markov models for failure diagnostic and prognostic. In Prognostics and system health management conference, PHM11. Shenzhen, China.
-
(2011)
Prognostics and System Health Management Conference
-
-
Tobon-Mejia, D.1
Medjaher, K.2
Zerhouni, N.3
Tripot, G.4
-
48
-
-
0031125880
-
On time-dependent availability and maintenance optimization of standby units under various maintenance policies
-
J.K. Vaurio On time-dependent availability and maintenance optimization of standby units under various maintenance policies Journal of Reliability Engineering and System Safety 56 1997 79 89
-
(1997)
Journal of Reliability Engineering and System Safety
, vol.56
, pp. 79-89
-
-
Vaurio, J.K.1
|