메뉴 건너뛰기




Volumn 90, Issue , 2015, Pages 197-211

Considering human resource constraints for real joint production and maintenance schedules

Author keywords

Fuzzy estimation; Human resource constraints; Joint production and maintenance scheduling; Multi agent systems; Preventive maintenance (condition based and time based)

Indexed keywords

FLOW MEASUREMENT; MAINTENANCE; MULTI AGENT SYSTEMS; PERSONNEL; SCHEDULING;

EID: 84942428880     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2015.08.013     Document Type: Article
Times cited : (32)

References (48)
  • 1
    • 43049084777 scopus 로고    scopus 로고
    • Complexity of single machine scheduling problems under scenario-based uncertainty
    • M.A. Aloulou, and F.D. Croce Complexity of single machine scheduling problems under scenario-based uncertainty Operations Research Letters 36 2008 338 342
    • (2008) Operations Research Letters , vol.36 , pp. 338-342
    • Aloulou, M.A.1    Croce, F.D.2
  • 3
    • 84856852768 scopus 로고    scopus 로고
    • A case-based reasoning approach for providing machine diagnosis from service reports, in case-based reasoning research and development
    • K. Bach, K.D. Althoff, R. Newo, and A. Stahl A case-based reasoning approach for providing machine diagnosis from service reports, in case-based reasoning research and development Lecture Notes in Computer Science 6880 2011 363 377
    • (2011) Lecture Notes in Computer Science , vol.6880 , pp. 363-377
    • Bach, K.1    Althoff, K.D.2    Newo, R.3    Stahl, A.4
  • 4
    • 35248844941 scopus 로고    scopus 로고
    • Resolution of joint maintenance/production scheduling by sequential and integrated strategies
    • In 7th international work conference on artificial and natural neural networks IWANN2003, 3-6 June, Spain
    • Benbouzid, F., Varnier, C., & Zerhouni, N. (2003). Resolution of joint maintenance/production scheduling by sequential and integrated strategies. In 7th international work conference on artificial and natural neural networks IWANN2003, 3-6 June, Spain. Proceedings LNCS 2687 (pp. 782-789).
    • (2003) Proceedings LNCS , vol.2687 , pp. 782-789
    • Benbouzid, F.1    Varnier, C.2    Zerhouni, N.3
  • 5
    • 78651239754 scopus 로고    scopus 로고
    • Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies
    • F. Benbouzid-Sitayeb, S.A. Guelbi, Y. Bessadi, C. Varnier, and N. Zerhouni Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies International Journal of Management Research (IJMR) 6 1 2011 30 48
    • (2011) International Journal of Management Research (IJMR) , vol.6 , Issue.1 , pp. 30-48
    • Benbouzid-Sitayeb, F.1    Guelbi, S.A.2    Bessadi, Y.3    Varnier, C.4    Zerhouni, N.5
  • 7
    • 62749205978 scopus 로고    scopus 로고
    • Flexibilité et robustesse en ordonnancement
    • Paris: Hermes Science
    • Billaut, J. C., Moukrim, A., & Sanlaville, E. (2005). Flexibilité et robustesse en ordonnancement. Traité IC2 (pp. 15-34). Paris: Hermes Science.
    • (2005) Traité IC2
    • Billaut, J.C.1    Moukrim, A.2    Sanlaville, E.3
  • 8
    • 84927134275 scopus 로고    scopus 로고
    • ETOMA: A multi-agent tool for shop scheduling problems. in Advanced approaches to intelligent information and database systems
    • Bouzidi-Hassini, S., Saboun, Y., Bourahla, S., Benbouzid-Sitayeb, F., & Khelifati, S. (2014). ETOMA: A multi-agent tool for shop scheduling problems. In Advanced approaches to intelligent information and database systems. Studies in Computational Intelligence (Vol. 551, pp. 79-88).
    • (2014) Studies in Computational Intelligence , vol.551 , pp. 79-88
    • Bouzidi-Hassini, S.1    Saboun, Y.2    Bourahla, S.3    Benbouzid-Sitayeb, F.4    Khelifati, S.5
  • 10
    • 56549109617 scopus 로고    scopus 로고
    • Development in the application of ICT in condition monitoring and maintenance
    • J. Campos Development in the application of ICT in condition monitoring and maintenance Computers in Industry 60 1 2009 1 20
    • (2009) Computers in Industry , vol.60 , Issue.1 , pp. 1-20
    • Campos, J.1
  • 11
    • 84942454731 scopus 로고    scopus 로고
    • Un algorithme génétique pour l'ordonnancement robuste: Application au problème du flow shop hybride. Thèse de doctorat
    • France
    • Chaabi, T. (2010). Un algorithme génétique pour l'ordonnancement robuste: Application au problème du flow shop hybride. Thèse de doctorat. l'Université de Valenciennes et du Hainaut-Cambrésis. France.
    • (2010) L'Université de Valenciennes et du Hainaut-Cambrésis
    • Chaabi, T.1
  • 12
    • 0035369592 scopus 로고    scopus 로고
    • Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates
    • S. Chanas, and A. Kasperski Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates Engineering Applications of Artificial Intelligence 14 2001 377 386
    • (2001) Engineering Applications of Artificial Intelligence , vol.14 , pp. 377-386
    • Chanas, S.1    Kasperski, A.2
  • 15
    • 79551550042 scopus 로고    scopus 로고
    • Coordination activities of human planners during rescheduling: Case analysis and event handling procedure
    • C. De Snoo, W. Van Wezel, J.C. Wortmann, and G.J.C. Gaalman Coordination activities of human planners during rescheduling: Case analysis and event handling procedure International Journal of Production Research 49 7 2011 2101 2122
    • (2011) International Journal of Production Research , vol.49 , Issue.7 , pp. 2101-2122
    • De Snoo, C.1    Van Wezel, W.2    Wortmann, J.C.3    Gaalman, G.J.C.4
  • 18
    • 0020142383 scopus 로고
    • Membership functions, some mathematical programming models and production scheduling
    • V. Dumitru, and F. Luban Membership functions, some mathematical programming models and production scheduling Fuzzy Sets and Systems 8 1982 19 33
    • (1982) Fuzzy Sets and Systems , vol.8 , pp. 19-33
    • Dumitru, V.1    Luban, F.2
  • 19
    • 33746920304 scopus 로고    scopus 로고
    • Strategically optimum maintenance of monitoring-enabled multi-component systems using continuous-time jump deterioration models
    • A. Gupta, and C. Lawsirirat Strategically optimum maintenance of monitoring-enabled multi-component systems using continuous-time jump deterioration models Journal of Quality in Maintenance Engineering 12 3 2006 306 329
    • (2006) Journal of Quality in Maintenance Engineering , vol.12 , Issue.3 , pp. 306-329
    • Gupta, A.1    Lawsirirat, C.2
  • 20
    • 70349269170 scopus 로고    scopus 로고
    • Cut generation for an integrated employee timetabling and production scheduling problem
    • O. Guyon, P. Lemaire, É. Pinson, and D. Rivreau Cut generation for an integrated employee timetabling and production scheduling problem European Journal of Operational Research 201 2 2010 557 567
    • (2010) European Journal of Operational Research , vol.201 , Issue.2 , pp. 557-567
    • Guyon, O.1    Lemaire, P.2    Pinson, É.3    Rivreau, D.4
  • 23
    • 0005648655 scopus 로고    scopus 로고
    • NISTIR-National Institute of Standards and Technology Gaithersburg, MD, USA < >
    • A. Jones, and L.C. Rabelo Survey of job shop scheduling techniques 1998 NISTIR-National Institute of Standards and Technology Gaithersburg, MD, USA < http://www.mel.nist.gov/msidlibrary/doc/luis.pdf >
    • (1998) Survey of Job Shop Scheduling Techniques
    • Jones, A.1    Rabelo, L.C.2
  • 26
    • 84868219656 scopus 로고    scopus 로고
    • Solving multi-objective production scheduling problems using a new approach
    • G. Kulscar, and M. Kulscarine Forrai Solving multi-objective production scheduling problems using a new approach Production Systems and Information Engineering 5 2009 81 94
    • (2009) Production Systems and Information Engineering , vol.5 , pp. 81-94
    • Kulscar, G.1    Forrai, M.K.2
  • 27
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • C.Y. Lee, and Z.L. Chen Scheduling jobs and maintenance activities on parallel machines Naval Research Logistics 47 2000 145 165
    • (2000) Naval Research Logistics , vol.47 , pp. 145-165
    • Lee, C.Y.1    Chen, Z.L.2
  • 33
    • 68249099005 scopus 로고    scopus 로고
    • A survey of dynamic scheduling in manufacturing systems
    • D. Ouelhadj, and S. Petrovic A survey of dynamic scheduling in manufacturing systems Journal of Scheduling 12 4 2009 417 431
    • (2009) Journal of Scheduling , vol.12 , Issue.4 , pp. 417-431
    • Ouelhadj, D.1    Petrovic, S.2
  • 35
    • 77956339475 scopus 로고    scopus 로고
    • A particle swarm optimization (PSO) approach for non-periodic preventive maintenance scheduling programming
    • C.M.N.A. Pereira, C. Lapa, A.C.A. Mol, and A.F. da Luz A particle swarm optimization (PSO) approach for non-periodic preventive maintenance scheduling programming Progress in Nuclear Energy 52 8 2010 710 714
    • (2010) Progress in Nuclear Energy , vol.52 , Issue.8 , pp. 710-714
    • Pereira, C.M.N.A.1    Lapa, C.2    Mol, A.C.A.3    Da Luz, A.F.4
  • 39
    • 18844387410 scopus 로고    scopus 로고
    • Integer programming approach to production scheduling for make-to-order manufacturing
    • T. Sawik Integer programming approach to production scheduling for make-to-order manufacturing Mathematical and Computer Modelling 41 1 2005 99 118
    • (2005) Mathematical and Computer Modelling , vol.41 , Issue.1 , pp. 99-118
    • Sawik, T.1
  • 41
    • 24144441172 scopus 로고    scopus 로고
    • Pre-emptive scheduling problems with controllable processing times
    • N.V. Shakhlevich, and V.A. Strusevich Pre-emptive scheduling problems with controllable processing times Journal of Scheduling 8 2005 233 253
    • (2005) Journal of Scheduling , vol.8 , pp. 233-253
    • Shakhlevich, N.V.1    Strusevich, V.A.2
  • 44
    • 79955584653 scopus 로고    scopus 로고
    • Remaining useful life estimation - A review on the statistical data driven approaches
    • X.S. Si, W. Wang, C.H. Hu, and D.H. Zhou Remaining useful life estimation - A review on the statistical data driven approaches European Journal of Operational Research 213 2011 1 14
    • (2011) European Journal of Operational Research , vol.213 , pp. 1-14
    • Si, X.S.1    Wang, W.2    Hu, C.H.3    Zhou, D.H.4
  • 45
    • 0008193301 scopus 로고    scopus 로고
    • Combined production and maintenance scheduling for a multiple product, single machine production system
    • T.W. Sloan, and J.G. Shanthikumar Combined production and maintenance scheduling for a multiple product, single machine production system Production and Operation Management 9 4 2000 379 399
    • (2000) Production and Operation Management , vol.9 , Issue.4 , pp. 379-399
    • Sloan, T.W.1    Shanthikumar, J.G.2
  • 48
    • 0031125880 scopus 로고    scopus 로고
    • On time-dependent availability and maintenance optimization of standby units under various maintenance policies
    • J.K. Vaurio On time-dependent availability and maintenance optimization of standby units under various maintenance policies Journal of Reliability Engineering and System Safety 56 1997 79 89
    • (1997) Journal of Reliability Engineering and System Safety , vol.56 , pp. 79-89
    • Vaurio, J.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.