-
1
-
-
84989688255
-
Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs
-
Adiri, I., Frostig, E. and Rinnooy, K.A.H.G. (1991), "Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs", Naval Research Logistics, Vol. 38, pp. 261-71.
-
(1991)
Naval Research Logistics
, vol.38
, pp. 261-71
-
-
Adiri, I.1
Frostig, E.2
Rinnooy, K.A.H.G.3
-
2
-
-
0026243299
-
Bicriteria scheduling problem involving total tardiness and total earliness penalties
-
Azizoglu, M., Kondakci, S. and Kirca, O. (1991), "Bicriteria scheduling problem involving total tardiness and total earliness penalties", International Journal of Production Economics, Vol. 23, pp. 17-24.
-
(1991)
International Journal of Production Economics
, vol.23
, pp. 17-24
-
-
Azizoglu, M.1
Kondakci, S.2
Kirca, O.3
-
3
-
-
0016552228
-
One machine sequencing to minimize mean flow time with minimum tardy
-
Emmons, H. (1975), "One machine sequencing to minimize mean flow time with minimum tardy", Naval Research Logistics Quarterly, Vol. 22, pp. 585-92.
-
(1975)
Naval Research Logistics Quarterly
, vol.22
, pp. 585-92
-
-
Emmons, H.1
-
5
-
-
0030244408
-
Note: Bicriteria scheduling for minimizing flow time and maximum tardiness
-
Kondakci, S., Azizoglu, M. and Koksalan, M. (1996), "Note: bicriteria scheduling for minimizing flow time and maximum tardiness", Naval Research Logistics, Vol. 43, pp. 929-36.
-
(1996)
Naval Research Logistics
, vol.43
, pp. 929-36
-
-
Kondakci, S.1
Azizoglu, M.2
Koksalan, M.3
-
6
-
-
0000541519
-
Machine scheduling with an availability constraint
-
Lee, C.Y. (1996), "Machine scheduling with an availability constraint", Journal of Global Optimization, Vol. 9, pp. 395-416.
-
(1996)
Journal of Global Optimization
, vol.9
, pp. 395-416
-
-
Lee, C.Y.1
-
7
-
-
0037411886
-
Single-machine scheduling with periodic maintenance and nonresumable jobs
-
Liao, C.J. and Chen, W.J. (2003), "Single-machine scheduling with periodic maintenance and nonresumable jobs", Computers and Operations Research, Vol. 30, pp. 1335-47.
-
(2003)
Computers and Operations Research
, vol.30
, pp. 1335-47
-
-
Liao, C.J.1
Chen, W.J.2
-
8
-
-
0026896051
-
Use of variable range in solving multiple criteria scheduling problems
-
Liao, C.J., Huang, R.W. and Tseng, S.T. (1992), "Use of variable range in solving multiple criteria scheduling problems", Computers and Operations Research, Vol. 19, pp. 453-60.
-
(1992)
Computers and Operations Research
, vol.19
, pp. 453-60
-
-
Liao, C.J.1
Huang, R.W.2
Tseng, S.T.3
-
9
-
-
0002574777
-
Minimizing the sum of job completion times on capacitated parallel machines
-
Mosheiov, G. (1994), "Minimizing the sum of job completion times on capacitated parallel machines", Mathematical and Computer Modeling, Vol. 20, pp. 91-9.
-
(1994)
Mathematical and Computer Modeling
, vol.20
, pp. 91-9
-
-
Mosheiov, G.1
-
10
-
-
0033446820
-
Scheduling the maintenance on a single machine
-
Qi, X., Chen, T. and Tu, F. (1999), "Scheduling the maintenance on a single machine", Journal of Operational Research Society, Vol. 50, pp. 1071-8.
-
(1999)
Journal of Operational Research Society
, vol.50
, pp. 1071-8
-
-
Qi, X.1
Chen, T.2
Tu, F.3
-
11
-
-
0018924243
-
Solving a bicriterion scheduling problem
-
Van Wassenhove, L.N. and Gelders, L.F. (1980), "Solving a bicriterion scheduling problem", European Journal of Operational Research, Vol. 4, pp. 42-8.
-
(1980)
European Journal of Operational Research
, vol.4
, pp. 42-8
-
-
Van Wassenhove, L.N.1
Gelders, L.F.2
|