메뉴 건너뛰기




Volumn 56, Issue 1, 1997, Pages 79-89

On time-dependent availability and maintenance optimization of standby units under various maintenance policies

Author keywords

[No Author keywords available]

Indexed keywords

MAINTENANCE POLICY; TIME-DEPENDENT AVAILABILITY;

EID: 0031125880     PISSN: 09518320     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0951-8320(96)00132-9     Document Type: Article
Times cited : (105)

References (23)
  • 1
    • 30244453501 scopus 로고
    • Reliability of engineered safety features as a function of testing frequency
    • Jacobs, I. M., Reliability of engineered safety features as a function of testing frequency. Nuclear Safety, 1968, 9, 303-312.
    • (1968) Nuclear Safety , vol.9 , pp. 303-312
    • Jacobs, I.M.1
  • 2
    • 0015019243 scopus 로고
    • Setting test intervals and allowable bypass times as a function of protection system goals
    • Hirsch, H. M., Setting test intervals and allowable bypass times as a function of protection system goals. IEEE Transactions of Nuclear Science, 1971, N-18, 488-494.
    • (1971) IEEE Transactions of Nuclear Science , vol.N-18 , pp. 488-494
    • Hirsch, H.M.1
  • 4
    • 0017544622 scopus 로고
    • Unavailability and failure intensity of components
    • Caldarola, L., Unavailability and failure intensity of components. Nuclear Engineering and Design, 1977, 44, 147-162.
    • (1977) Nuclear Engineering and Design , vol.44 , pp. 147-162
    • Caldarola, L.1
  • 5
    • 0017544594 scopus 로고
    • Time dependent unavailability analysis of nuclear safety systems
    • Vesely, W. E. and Goldberg, F. F., Time dependent unavailability analysis of nuclear safety systems. IEEE Transactions Reliability, 1977, R-26, 257-260.
    • (1977) IEEE Transactions Reliability , vol.R-26 , pp. 257-260
    • Vesely, W.E.1    Goldberg, F.F.2
  • 6
    • 0018541698 scopus 로고
    • Unavailability of components with inspection and repair
    • Vaurio, J. K., Unavailability of components with inspection and repair. Nuclear Engineering and Design, 1979, 54, 309-324.
    • (1979) Nuclear Engineering and Design , vol.54 , pp. 309-324
    • Vaurio, J.K.1
  • 9
    • 0019044774 scopus 로고
    • The unavailability of systems under periodic test and maintenance
    • Apostolakis, G. E. and Chu, B. B., The unavailability of systems under periodic test and maintenance. Nuclear Technology, 1980, 50, 5-15.
    • (1980) Nuclear Technology , vol.50 , pp. 5-15
    • Apostolakis, G.E.1    Chu, B.B.2
  • 10
    • 0019069301 scopus 로고
    • Human error considerations in determining the optimum test interval for periodically inspected standby systems
    • McWilliams, T. P. and Martz, H. F., Human error considerations in determining the optimum test interval for periodically inspected standby systems. IEEE Transactions Reliability, 1980, R-29, 305-310.
    • (1980) IEEE Transactions Reliability , vol.R-29 , pp. 305-310
    • McWilliams, T.P.1    Martz, H.F.2
  • 11
    • 0012703490 scopus 로고
    • Unavailability analysis of periodically tested components of dormant systems
    • Sim, S. H., Unavailability analysis of periodically tested components of dormant systems. IEEE Transactions Reliability, 1985, R-34, 88-91.
    • (1985) IEEE Transactions Reliability , vol.R-34 , pp. 88-91
    • Sim, S.H.1
  • 12
    • 0023330962 scopus 로고
    • Reliability of standby equipment with periodic testing
    • Sim, S. H., Reliability of standby equipment with periodic testing. IEEE Transactions Reliability, 1987, R-36, 117-123.
    • (1987) IEEE Transactions Reliability , vol.R-36 , pp. 117-123
    • Sim, S.H.1
  • 13
    • 0029379007 scopus 로고
    • Unavailability analysis of periodically tested standby components
    • Vaurio, J. K., Unavailability analysis of periodically tested standby components. IEEE Transactions Reliability, 1995, 44, 512-517.
    • (1995) IEEE Transactions Reliability , vol.44 , pp. 512-517
    • Vaurio, J.K.1
  • 14
    • 0016947504 scopus 로고
    • Availability of a renewable, checked system
    • Platz, O., Availability of a renewable, checked system. IEEE Transactions Reliability, 1976, R-25, 56-68.
    • (1976) IEEE Transactions Reliability , vol.R-25 , pp. 56-68
    • Platz, O.1
  • 15
    • 0029229754 scopus 로고
    • Time-dependent unavailability of aging standby components based on nuclear plant data
    • Hilsmeier, T. A., Aldemir, T. and Vesely, W. E., Time-dependent unavailability of aging standby components based on nuclear plant data. Reliability Engineering and System Safety, 1995, 47, 199-205.
    • (1995) Reliability Engineering and System Safety , vol.47 , pp. 199-205
    • Hilsmeier, T.A.1    Aldemir, T.2    Vesely, W.E.3
  • 16
    • 0027242557 scopus 로고
    • Time-dependent unavailability analysis of standby components incorporating arbitraty failure distributions and three inspection/maintenance policies
    • Dialynas, E. N. and Michos, D. G., Time-dependent unavailability analysis of standby components incorporating arbitraty failure distributions and three inspection/maintenance policies. Reliability Engineering and System Safety, 1993, 39, 35-54.
    • (1993) Reliability Engineering and System Safety , vol.39 , pp. 35-54
    • Dialynas, E.N.1    Michos, D.G.2
  • 17
    • 30244467583 scopus 로고
    • FRANTIC II - A computer code for time dependent unavailability analysis
    • Brookhaven National Laboratory
    • Vesely, W. E., Goldberg, F. F., Powers, J. T., Dickey, J. M., Smith, J. M. and Hall, R. E., FRANTIC II - A Computer code for time dependent unavailability analysis. NUREG/CR-1924, Brookhaven National Laboratory, 1981.
    • (1981) NUREG/CR-1924
    • Vesely, W.E.1    Goldberg, F.F.2    Powers, J.T.3    Dickey, J.M.4    Smith, J.M.5    Hall, R.E.6
  • 20
    • 0029287702 scopus 로고
    • Integrating optimisation, priority setting, planning and combining of maintenance activities
    • Dekker, R., Integrating optimisation, priority setting, planning and combining of maintenance activities. European Journal of Operations Research, 1995, 82, 225-240.
    • (1995) European Journal of Operations Research , vol.82 , pp. 225-240
    • Dekker, R.1
  • 21
    • 0002669020 scopus 로고
    • A summary of periodic replacement with minimal repair at failure
    • Nakagawa, T., A summary of periodic replacement with minimal repair at failure. Journal of the Operations Research Society of Japan, 1981, 24, 213-227.
    • (1981) Journal of the Operations Research Society of Japan , vol.24 , pp. 213-227
    • Nakagawa, T.1
  • 22
    • 0029237571 scopus 로고
    • Optimization of test and maintenance intervals based on risk and cost
    • Vaurio, J. K., Optimization of test and maintenance intervals based on risk and cost. Reliability Engineering and System Safety, 1995, 49, 23-36.
    • (1995) Reliability Engineering and System Safety , vol.49 , pp. 23-36
    • Vaurio, J.K.1
  • 23
    • 30244474900 scopus 로고    scopus 로고
    • The cost function for periodically tested standby units with age-replacement maintenance
    • Lisbon, 17-20 June
    • Vaurio, J. K., The cost function for periodically tested standby units with age-replacement maintenance. In ESREL '97, International Conference on Safety and Reliability, Lisbon, 17-20 June 1997.
    • (1997) ESREL '97, International Conference on Safety and Reliability
    • Vaurio, J.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.