메뉴 건너뛰기




Volumn 80, Issue , 2017, Pages 200-209

Dynamic production system diagnosis and prognosis using model-based data-driven method

Author keywords

Data driven modeling; Disruption event; Permanent production loss; Production system diagnosis and prognosis

Indexed keywords

DECISION MAKING; MANUFACTURE; PRODUCTION CONTROL; REAL TIME CONTROL; STOCHASTIC MODELS; STOCHASTIC SYSTEMS;

EID: 85015980732     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2017.03.025     Document Type: Article
Times cited : (59)

References (34)
  • 3
    • 0003990308 scopus 로고    scopus 로고
    • Discrete-event system simulation
    • Prentice-Hall Englewood Cliffs, NJ
    • Banks, J., Carson, J.S., Nelson, B.L., Nicol, D.M., Discrete-event system simulation. 2010, Prentice-Hall, Englewood Cliffs, NJ.
    • (2010)
    • Banks, J.1    Carson, J.S.2    Nelson, B.L.3    Nicol, D.M.4
  • 7
    • 78649985524 scopus 로고    scopus 로고
    • Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems
    • Chang, Q., Biller, S., Xiao, G., Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems. Journal of Manufacturing Science and Engineering, 132(5), 2010, 51015.
    • (2010) Journal of Manufacturing Science and Engineering , vol.132 , Issue.5 , pp. 51015
    • Chang, Q.1    Biller, S.2    Xiao, G.3
  • 10
    • 84963823333 scopus 로고    scopus 로고
    • Transient performance analysis of serial production lines with geometric machines
    • Chen, C., Wang, C., Zhang, L., Arinez, J., Xiao, G., Transient performance analysis of serial production lines with geometric machines. IEEE Transactions on Automatic Control 61:4 (2016), 877–891, 10.1109/TAC.2015.2444071.
    • (2016) IEEE Transactions on Automatic Control , vol.61 , Issue.4 , pp. 877-891
    • Chen, C.1    Wang, C.2    Zhang, L.3    Arinez, J.4    Xiao, G.5
  • 13
    • 85016071731 scopus 로고    scopus 로고
    • Environmental Protection Agency (EPA)
    • EPA. (). U.S. Chapter 3: Energy assessment strategies.
    • EPA. (2009). U.S. Environmental Protection Agency (EPA), Lean and Energy Toolkit: Chapter 3: Energy assessment strategies.
    • (2009) Lean and Energy Toolkit
  • 14
    • 11844277628 scopus 로고    scopus 로고
    • Grand challenges in modeling and simulation of complex manufacturing systems
    • Fowler, J.W., Rose, O., Grand challenges in modeling and simulation of complex manufacturing systems. Simulation 80:9 (2004), 469–476.
    • (2004) Simulation , vol.80 , Issue.9 , pp. 469-476
    • Fowler, J.W.1    Rose, O.2
  • 16
    • 0004170276 scopus 로고
    • Manufacturing systems engineering
    • Prentice-Hall Englewood Cliffs, NJ
    • Gershwin, S.B., Manufacturing systems engineering. 1993, Prentice-Hall, Englewood Cliffs, NJ.
    • (1993)
    • Gershwin, S.B.1
  • 17
    • 0042279736 scopus 로고    scopus 로고
    • Queueing theory in manufacturing: A survey
    • Govil, M.C., Fu, M.C., Queueing theory in manufacturing: A survey. Journal of Manufacturing Systems 18:3 (1999), 214–240.
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.3 , pp. 214-240
    • Govil, M.C.1    Fu, M.C.2
  • 18
    • 85016025313 scopus 로고    scopus 로고
    • Finite production run-based serial lines with Bernoulli machines: Performance analysis, bottleneck, and case study
    • Jia, Z., Zhang, L., Arinez, J., Xiao, G., Finite production run-based serial lines with Bernoulli machines: Performance analysis, bottleneck, and case study. IEEE Transactions on Automation Science and Engineering 13:1 (2016), 134–148.
    • (2016) IEEE Transactions on Automation Science and Engineering , vol.13 , Issue.1 , pp. 134-148
    • Jia, Z.1    Zhang, L.2    Arinez, J.3    Xiao, G.4
  • 19
    • 0003691637 scopus 로고
    • Stochastic systems: Estimation, identification, and adaptive control
    • Prentice-Hall Englewood Cliffs, NJ
    • Kumar, P.R., Varaiya, P., Stochastic systems: Estimation, identification, and adaptive control. 1986, Prentice-Hall, Englewood Cliffs, NJ.
    • (1986)
    • Kumar, P.R.1    Varaiya, P.2
  • 21
    • 84892313550 scopus 로고    scopus 로고
    • Production systems engineering
    • Springer New York
    • Li, J., Meerkov, S.M., Production systems engineering. 2009, Springer, New York.
    • (2009)
    • Li, J.1    Meerkov, S.M.2
  • 23
    • 84888872880 scopus 로고    scopus 로고
    • Standalone throughput analysis on the wave propagation of disturbances in production sub-systems
    • Li, Y., Chang, Q., Brundage, M., Xiao, G., Biller, S., Standalone throughput analysis on the wave propagation of disturbances in production sub-systems. Journal of Manufacturing Science and Engineering, 135(5), 2013, 51001.
    • (2013) Journal of Manufacturing Science and Engineering , vol.135 , Issue.5 , pp. 51001
    • Li, Y.1    Chang, Q.2    Brundage, M.3    Xiao, G.4    Biller, S.5
  • 25
    • 84860475379 scopus 로고    scopus 로고
    • Re-entrant lines with unreliable asynchronous machines and finite buffers: performance approximation and bottleneck identification
    • Liu, Y., Li, J., Chiang, S.Y., Re-entrant lines with unreliable asynchronous machines and finite buffers: performance approximation and bottleneck identification. International Journal of Production Research 50:4 (2012), 977–990.
    • (2012) International Journal of Production Research , vol.50 , Issue.4 , pp. 977-990
    • Liu, Y.1    Li, J.2    Chiang, S.Y.3
  • 27
    • 33746878223 scopus 로고    scopus 로고
    • Maintenance performance measurement (MPM): Issues and challenges
    • Parida, A., Kumar, U., Maintenance performance measurement (MPM): Issues and challenges. Journal of Quality in Maintenance Engineering 12:3 (2006), 239–251.
    • (2006) Journal of Quality in Maintenance Engineering , vol.12 , Issue.3 , pp. 239-251
    • Parida, A.1    Kumar, U.2
  • 28
    • 84898777219 scopus 로고    scopus 로고
    • Real time disruption management for a two-stage batch production–inventory system with reliability considerations
    • Paul, S.K., Sarker, R., Essam, D., Real time disruption management for a two-stage batch production–inventory system with reliability considerations. European Journal of Operational Research 237:1 (2014), 113–128.
    • (2014) European Journal of Operational Research , vol.237 , Issue.1 , pp. 113-128
    • Paul, S.K.1    Sarker, R.2    Essam, D.3
  • 29
    • 84939968801 scopus 로고    scopus 로고
    • Managing disruption in an imperfect production–inventory system
    • Paul, S.K., Sarker, R., Essam, D., Managing disruption in an imperfect production–inventory system. Computers & Industrial Engineering 84 (2015), 101–112.
    • (2015) Computers & Industrial Engineering , vol.84 , pp. 101-112
    • Paul, S.K.1    Sarker, R.2    Essam, D.3
  • 30
    • 84863223841 scopus 로고    scopus 로고
    • A quantitative analysis of disruption risk in a multi-echelon supply chain
    • Schmitt, A.J., Singh, M., A quantitative analysis of disruption risk in a multi-echelon supply chain. International Journal of Production Economics 139:1 (2012), 22–32.
    • (2012) International Journal of Production Economics , vol.139 , Issue.1 , pp. 22-32
    • Schmitt, A.J.1    Singh, M.2
  • 32
    • 84871277885 scopus 로고    scopus 로고
    • An efficient analytical method for performance evaluation of transfer lines with unreliable machines and finite transfer-delay buffers
    • Xia, B., Xi, L., Zhou, B., Du, S., An efficient analytical method for performance evaluation of transfer lines with unreliable machines and finite transfer-delay buffers. International Journal of Production Research 51:6 (2013), 1799–1819.
    • (2013) International Journal of Production Research , vol.51 , Issue.6 , pp. 1799-1819
    • Xia, B.1    Xi, L.2    Zhou, B.3    Du, S.4
  • 33
    • 84981294333 scopus 로고    scopus 로고
    • Opportunity window for energy saving and maintenance in stochastic production systems
    • Zou, Jing, Arinez, Jorge, Chang, Qing, Lei, Yong, Opportunity window for energy saving and maintenance in stochastic production systems. Journal of Manufacturing Science and Engineering, 138(12), 2016, 121009.
    • (2016) Journal of Manufacturing Science and Engineering , vol.138 , Issue.12
    • Zou, J.1    Arinez, J.2    Chang, Q.3    Lei, Y.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.