메뉴 건너뛰기




Volumn 237, Issue 1, 2014, Pages 113-128

Real time disruption management for a two-stage batch production-inventory system with reliability considerations

Author keywords

Batch production system; Genetic algorithm; Pattern search; Process reliability; Production inventory; Real time disruption management

Indexed keywords

GENETIC ALGORITHMS; INVENTORY CONTROL; MATHEMATICAL MODELS; PRODUCTION ENGINEERING;

EID: 84898777219     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2014.02.005     Document Type: Article
Times cited : (90)

References (45)
  • 1
    • 59049100103 scopus 로고    scopus 로고
    • A production inventory model with fuzzy random demand and with flexibility and reliability considerations
    • S. Bag, D. Chakraborty, and A.R. Roy A production inventory model with fuzzy random demand and with flexibility and reliability considerations Computers & Industrial Engineering 56 1 2009 411 416
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.1 , pp. 411-416
    • Bag, S.1    Chakraborty, D.2    Roy, A.R.3
  • 2
    • 0037402011 scopus 로고    scopus 로고
    • A dynamic analysis of the single-item periodic stochastic inventory system with order capacity
    • G.H. Chan, and Y. Song A dynamic analysis of the single-item periodic stochastic inventory system with order capacity European Journal of Operational Research 146 3 2003 529 542
    • (2003) European Journal of Operational Research , vol.146 , Issue.3 , pp. 529-542
    • Chan, G.H.1    Song, Y.2
  • 3
    • 0024622287 scopus 로고
    • An economic production quantity model with flexibility and reliability considerations
    • T.C.E. Cheng An economic production quantity model with flexibility and reliability considerations European Journal of Operational Research 39 2 1989 174 179
    • (1989) European Journal of Operational Research , vol.39 , Issue.2 , pp. 174-179
    • Cheng, T.C.E.1
  • 4
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • S.W. Chiu, S.L. Wang, and Y.S.P. Chiu Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns European Journal of Operational Research 180 2 2007 664 676
    • (2007) European Journal of Operational Research , vol.180 , Issue.2 , pp. 664-676
    • Chiu, S.W.1    Wang, S.L.2    Chiu, Y.S.P.3
  • 5
    • 34547673287 scopus 로고    scopus 로고
    • The importance of decoupling recurrent and disruption risks in a supply chain
    • S. Chopra, G. Reinhardt, and U. Mohan The importance of decoupling recurrent and disruption risks in a supply chain Naval Research Logistics 54 5 2007 544 555
    • (2007) Naval Research Logistics , vol.54 , Issue.5 , pp. 544-555
    • Chopra, S.1    Reinhardt, G.2    Mohan, U.3
  • 6
    • 0024717474 scopus 로고    scopus 로고
    • A deterministic lot-size inventory model with shortages and a linear trend in demand
    • U. Dave A deterministic lot-size inventory model with shortages and a linear trend in demand Naval Research Logistics 36 4 2006 507 514
    • (2006) Naval Research Logistics , vol.36 , Issue.4 , pp. 507-514
    • Dave, U.1
  • 7
    • 44049090561 scopus 로고    scopus 로고
    • Latin hypercube sampling and pattern search in magnetic field optimization problems
    • K.R. Davey Latin hypercube sampling and pattern search in magnetic field optimization problems IEEE Transactions on Magnetics 44 6 2008 974 977
    • (2008) IEEE Transactions on Magnetics , vol.44 , Issue.6 , pp. 974-977
    • Davey, K.R.1
  • 8
    • 25144487120 scopus 로고    scopus 로고
    • Recovering cyclic schedules using dynamic produce-up-to policies
    • D.D. Eisenstein Recovering cyclic schedules using dynamic produce-up-to policies Operations research 53 4 2005 675 688
    • (2005) Operations Research , vol.53 , Issue.4 , pp. 675-688
    • Eisenstein, D.D.1
  • 9
    • 0028407941 scopus 로고
    • When is a base stock policy optimal in recovering disrupted cyclic schedules?
    • G. Gallego When is a base stock policy optimal in recovering disrupted cyclic schedules? Naval Research Logistics 41 3 1994 317 333
    • (1994) Naval Research Logistics , vol.41 , Issue.3 , pp. 317-333
    • Gallego, G.1
  • 10
    • 0009457668 scopus 로고
    • Determination of optimum production quantity for a two-stage production system
    • S.K. Goyal Determination of optimum production quantity for a two-stage production system Operational Research Quarterly 1977 865 870
    • (1977) Operational Research Quarterly , pp. 865-870
    • Goyal, S.K.1
  • 11
    • 0002455554 scopus 로고    scopus 로고
    • A single-item inventory model for a nonstationary demand process
    • S.C. Graves A single-item inventory model for a nonstationary demand process Manufacturing & Service Operations Management 1 1 1999 50 61
    • (1999) Manufacturing & Service Operations Management , vol.1 , Issue.1 , pp. 50-61
    • Graves, S.C.1
  • 12
    • 0033687350 scopus 로고    scopus 로고
    • On optimal two-stage lot sizing and inventory batching policies
    • R.M. Hill On optimal two-stage lot sizing and inventory batching policies International Journal of Production Economics 66 2 2000 149 158
    • (2000) International Journal of Production Economics , vol.66 , Issue.2 , pp. 149-158
    • Hill, R.M.1
  • 13
    • 84863980920 scopus 로고    scopus 로고
    • A disruption recovery model for a single stage production-inventory system
    • H. Hishamuddin, R.A. Sarker, and D. Essam A disruption recovery model for a single stage production-inventory system European Journal of Operational Research 222 3 2012 464 473
    • (2012) European Journal of Operational Research , vol.222 , Issue.3 , pp. 464-473
    • Hishamuddin, H.1    Sarker, R.A.2    Essam, D.3
  • 14
    • 84872467269 scopus 로고    scopus 로고
    • A recovery model for a two-echelon serial supply chain with consideration of transportation disruption
    • H. Hishamuddin, R.A. Sarker, and D. Essam A recovery model for a two-echelon serial supply chain with consideration of transportation disruption Computers & Industrial Engineering 64 2 2013 552 561
    • (2013) Computers & Industrial Engineering , vol.64 , Issue.2 , pp. 552-561
    • Hishamuddin, H.1    Sarker, R.A.2    Essam, D.3
  • 15
    • 0028413196 scopus 로고
    • Constrained optimization via genetic algorithms
    • A. Homaifar, C.X. Qi, and S.H. Lai Constrained optimization via genetic algorithms Simulation 62 4 1994 242 253
    • (1994) Simulation , vol.62 , Issue.4 , pp. 242-253
    • Homaifar, A.1    Qi, C.X.2    Lai, S.H.3
  • 16
    • 0030171755 scopus 로고    scopus 로고
    • A production ordering system for two-item, two-stage, capacity-constraint production and inventory model
    • K. Ishii, and S. Imori A production ordering system for two-item, two-stage, capacity-constraint production and inventory model International journal of production economics 44 1 1996 119 128
    • (1996) International Journal of Production Economics , vol.44 , Issue.1 , pp. 119-128
    • Ishii, K.1    Imori, S.2
  • 18
    • 0036436111 scopus 로고    scopus 로고
    • A globally convergent augmented Lagrangian pattern search algorithm for optimization with general constraints and simple bounds
    • R.M. Lewis, and V. Torczon A globally convergent augmented Lagrangian pattern search algorithm for optimization with general constraints and simple bounds SIAM Journal on Optimization 12 4 2002 1075 1089
    • (2002) SIAM Journal on Optimization , vol.12 , Issue.4 , pp. 1075-1089
    • Lewis, R.M.1    Torczon, V.2
  • 20
    • 33645033021 scopus 로고    scopus 로고
    • On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time
    • G.C. Lin, and D.C. Gong On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time Mathematical and Computer Modelling 43 7 2006 920 932
    • (2006) Mathematical and Computer Modelling , vol.43 , Issue.7 , pp. 920-932
    • Lin, G.C.1    Gong, D.C.2
  • 21
    • 0038323263 scopus 로고    scopus 로고
    • Supply interruptions in a lost-sales inventory system with random lead time
    • E. Mohebbi Supply interruptions in a lost-sales inventory system with random lead time Computers & Operations Research 30 3 2003 411 426
    • (2003) Computers & Operations Research , vol.30 , Issue.3 , pp. 411-426
    • Mohebbi, E.1
  • 22
    • 0242662638 scopus 로고    scopus 로고
    • A replenishment model for the supply-uncertainty problem
    • E. Mohebbi A replenishment model for the supply-uncertainty problem International Journal of Production Economics 87 1 2004 25 37
    • (2004) International Journal of Production Economics , vol.87 , Issue.1 , pp. 25-37
    • Mohebbi, E.1
  • 23
    • 33748422388 scopus 로고    scopus 로고
    • When supplier's availability affects the replenishment lead time - An extension of the supply-interruption problem
    • E. Mohebbi, and D. Hao When supplier's availability affects the replenishment lead time - An extension of the supply-interruption problem European Journal of Operational Research 175 2 2006 992 1008
    • (2006) European Journal of Operational Research , vol.175 , Issue.2 , pp. 992-1008
    • Mohebbi, E.1    Hao, D.2
  • 24
    • 46849087546 scopus 로고    scopus 로고
    • An inventory model with non-resuming randomly interruptible lead time
    • E. Mohebbi, and D. Hao An inventory model with non-resuming randomly interruptible lead time International Journal of Production Economics 114 2 2008 755 768
    • (2008) International Journal of Production Economics , vol.114 , Issue.2 , pp. 755-768
    • Mohebbi, E.1    Hao, D.2
  • 25
    • 0031273569 scopus 로고    scopus 로고
    • Analysis of a production/inventory system subject to random disruptions
    • K. Moinzadeh, and P. Aggarwal Analysis of a production/inventory system subject to random disruptions Management Science 43 11 1997 1577 1588
    • (1997) Management Science , vol.43 , Issue.11 , pp. 1577-1588
    • Moinzadeh, K.1    Aggarwal, P.2
  • 26
    • 0042639298 scopus 로고    scopus 로고
    • Inventory models with unreliable suppliersin a random environment
    • S. Özekici, and M. Parlar Inventory models with unreliable suppliersin a random environment Annals of Operations Research 91 1999 123 136
    • (1999) Annals of Operations Research , vol.91 , pp. 123-136
    • Özekici, S.1    Parlar, M.2
  • 27
    • 84989685221 scopus 로고
    • Future supply uncertainty in EOQ models
    • M. Parlar, and D. Berkin Future supply uncertainty in EOQ models Naval Research Logistics 38 1 1991 107 121
    • (1991) Naval Research Logistics , vol.38 , Issue.1 , pp. 107-121
    • Parlar, M.1    Berkin, D.2
  • 28
    • 0000317841 scopus 로고    scopus 로고
    • Inventory models of future supply uncertainty with single and multiple suppliers
    • M. Parlar, and D. Perry Inventory models of future supply uncertainty with single and multiple suppliers Naval Research Logistics 43 2 1996 191 210
    • (1996) Naval Research Logistics , vol.43 , Issue.2 , pp. 191-210
    • Parlar, M.1    Perry, D.2
  • 29
    • 84910010607 scopus 로고    scopus 로고
    • Development of a production inventory model with uncertainty and reliability considerations
    • doi:10.1007/s11081-013-9218 (in press)
    • Paul, S. K.; Azeem, A.; Sarker, R.; Essam, D. (2013). Development of a production inventory model with uncertainty and reliability considerations. Optimization and Engineering 1-24. http://dx.doi.org/10.1007/s11081-013-9218 (in press).
    • (2013) Optimization and Engineering , pp. 1-24
    • Paul, S.K.1    Azeem, A.2    Sarker, R.3    Essam, D.4
  • 30
    • 70350191844 scopus 로고    scopus 로고
    • A continuous-review inventory model with disruptions at both supplier and retailer
    • L. Qi, Z.J.M. Shen, and L.V. Snyder A continuous-review inventory model with disruptions at both supplier and retailer Production and Operations Management 18 5 2009 516 532
    • (2009) Production and Operations Management , vol.18 , Issue.5 , pp. 516-532
    • Qi, L.1    Shen, Z.J.M.2    Snyder, L.V.3
  • 31
    • 1842660094 scopus 로고    scopus 로고
    • Supply chain coordination with demand disruptions
    • X. Qi, J.F. Bard, and G. Yu Supply chain coordination with demand disruptions Omega 32 4 2004 301 312
    • (2004) Omega , vol.32 , Issue.4 , pp. 301-312
    • Qi, X.1    Bard, J.F.2    Yu, G.3
  • 32
  • 33
    • 69249219084 scopus 로고    scopus 로고
    • A production-inventory model in an imperfect production process
    • S.S. Sana A production-inventory model in an imperfect production process European Journal of Operational Research 200 2 2010 451 464
    • (2010) European Journal of Operational Research , vol.200 , Issue.2 , pp. 451-464
    • Sana, S.S.1
  • 34
    • 83555160972 scopus 로고    scopus 로고
    • An inventory model with reliability in an imperfect production process
    • B. Sarker An inventory model with reliability in an imperfect production process Applied Mathematics and Computations 218 9 2012 4881 4891
    • (2012) Applied Mathematics and Computations , vol.218 , Issue.9 , pp. 4881-4891
    • Sarker, B.1
  • 35
    • 0033297229 scopus 로고    scopus 로고
    • An optimal batch size for a production system operating under periodic delivery policy
    • R.A. Sarker, and L.R. Khan An optimal batch size for a production system operating under periodic delivery policy Computers & Industrial Engineering 37 4 1999 711 730
    • (1999) Computers & Industrial Engineering , vol.37 , Issue.4 , pp. 711-730
    • Sarker, R.A.1    Khan, L.R.2
  • 36
    • 0035469843 scopus 로고    scopus 로고
    • An optimal batch size under a periodic delivery policy
    • R.A. Sarker, and L.R. Khan An optimal batch size under a periodic delivery policy International Journal of Systems Science 32 9 2001 1089 1099
    • (2001) International Journal of Systems Science , vol.32 , Issue.9 , pp. 1089-1099
    • Sarker, R.A.1    Khan, L.R.2
  • 37
    • 80051783300 scopus 로고    scopus 로고
    • Infinite-horizon models for inventory control under yield uncertainty and disruptions
    • A.J. Schmitt, and L.V. Snyder Infinite-horizon models for inventory control under yield uncertainty and disruptions Computers & Operations Research 39 4 2012 850 862
    • (2012) Computers & Operations Research , vol.39 , Issue.4 , pp. 850-862
    • Schmitt, A.J.1    Snyder, L.V.2
  • 38
    • 77950368643 scopus 로고    scopus 로고
    • Inventory systems with stochastic demand and supply: Properties and approximations
    • A.J. Schmitt, L.V. Snyder, and Z.J.M. Shen Inventory systems with stochastic demand and supply: Properties and approximations European Journal of Operational Research 206 2 2010 313 328
    • (2010) European Journal of Operational Research , vol.206 , Issue.2 , pp. 313-328
    • Schmitt, A.J.1    Snyder, L.V.2    Shen, Z.J.M.3
  • 39
    • 0027592812 scopus 로고
    • Two-stage, multi-product production/inventory systems
    • G.A. Shiue, and T. Altiok Two-stage, multi-product production/inventory systems Performance Evaluation 17 3 1993 225 232
    • (1993) Performance Evaluation , vol.17 , Issue.3 , pp. 225-232
    • Shiue, G.A.1    Altiok, T.2
  • 40
    • 33646342992 scopus 로고    scopus 로고
    • On the value of mitigation and contingency strategies for managing supply chain disruption risks
    • B. Tomlin On the value of mitigation and contingency strategies for managing supply chain disruption risks Management Science 52 5 2006 639 657
    • (2006) Management Science , vol.52 , Issue.5 , pp. 639-657
    • Tomlin, B.1
  • 41
    • 79953172529 scopus 로고    scopus 로고
    • Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time
    • G.A. Widyadana, and H.M. Wee Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time Applied Mathematical Modelling 35 7 2011 3495 3508
    • (2011) Applied Mathematical Modelling , vol.35 , Issue.7 , pp. 3495-3508
    • Widyadana, G.A.1    Wee, H.M.2
  • 42
    • 1642502335 scopus 로고    scopus 로고
    • Real-time disruption management in a two-stage production and inventory system
    • Y. Xia, M.-H. Yang, B. Golany, S.M. Gilbert, and G. Yu Real-time disruption management in a two-stage production and inventory system IIE Transactions 36 2 2004 111 125
    • (2004) IIE Transactions , vol.36 , Issue.2 , pp. 111-125
    • Xia, Y.1    Yang, M.-H.2    Golany, B.3    Gilbert, S.M.4    Yu, G.5
  • 43
    • 33646515786 scopus 로고    scopus 로고
    • Supply chain disruption management and evolutionarily stable strategies of retailers in the quantity-setting duopoly situation with homogeneous goods
    • T. Xiao, and G. Yu Supply chain disruption management and evolutionarily stable strategies of retailers in the quantity-setting duopoly situation with homogeneous goods European Journal of Operational Research 173 2 2006 648 668
    • (2006) European Journal of Operational Research , vol.173 , Issue.2 , pp. 648-668
    • Xiao, T.1    Yu, G.2
  • 44
    • 24144493803 scopus 로고    scopus 로고
    • Disruption management in production planning
    • J. Yang, X. Qi, and G. Yu Disruption management in production planning Naval Research Logistics 52 5 2005 420 442
    • (2005) Naval Research Logistics , vol.52 , Issue.5 , pp. 420-442
    • Yang, J.1    Qi, X.2    Yu, G.3
  • 45
    • 84856619786 scopus 로고    scopus 로고
    • Analysis of a two-party supply chain with random disruptions
    • F. Zeynep Sargut, and L. Qi Analysis of a two-party supply chain with random disruptions Operations Research Letters 40 2 2012 114 122
    • (2012) Operations Research Letters , vol.40 , Issue.2 , pp. 114-122
    • Zeynep Sargut, F.1    Qi, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.