메뉴 건너뛰기




Volumn 135, Issue 5, 2013, Pages

Standalone throughput analysis on the wave propagation of disturbances in production sub-systems

Author keywords

[No Author keywords available]

Indexed keywords

MANUFACTURE; WAVE PROPAGATION;

EID: 84888872880     PISSN: 10871357     EISSN: 15288935     Source Type: Journal    
DOI: 10.1115/1.4024815     Document Type: Article
Times cited : (15)

References (34)
  • 1
    • 0027578808 scopus 로고
    • Estimating throughput in an unbalanced assembly-like flow system
    • Hopp, W. J., and Simon, J. T., 1993, "Estimating Throughput in an Unbalanced Assembly-Like Flow System," Int. J. Prod. Res., 31(4), pp. 4851-4868.
    • (1993) Int. J. Prod. Res. , vol.31 , Issue.4 , pp. 4851-4868
    • Hopp, W.J.1    Simon, J.T.2
  • 2
    • 84888868407 scopus 로고    scopus 로고
    • 2nd ed., McGraw-Hill/Irwin, New York
    • Wallac, H., and Mark, S., 2000, Factory Physics, 2nd ed., McGraw-Hill/Irwin, New York.
    • (2000) Factory Physics
    • Wallac, H.1    Mark, S.2
  • 3
    • 0000009851 scopus 로고
    • Production line and internal storage-A review
    • Koenigsberg, E., 1959, "Production Line and Internal Storage-A Review," Manage. Sci., 5(4), pp. 410-433.
    • (1959) Manage. Sci. , vol.5 , Issue.4 , pp. 410-433
    • Koenigsberg, E.1
  • 4
    • 0015603944 scopus 로고
    • Production flow line systems design-A review
    • Buxey, G. M., Slack, N. D., and Wild, R., 1973, "Production Flow Line Systems Design-A Review," AIIE Trans., 5(1), pp. 37-48.
    • (1973) AIIE Trans. , vol.5 , Issue.1 , pp. 37-48
    • Buxey, G.M.1    Slack, N.D.2    Wild, R.3
  • 5
    • 31044437924 scopus 로고    scopus 로고
    • An analytical formula for throughput of a production line with identical stations and random failures
    • DOI 10.1155/MPE.2005.293
    • Blumenfeld, D. E., and Li, J. S., 2005, "An Analytical Formula for Throughput of A Production Line With Identical Stations and Random Failures," Math. Probl. Eng., 2005(3), pp. 293-308. (Pubitemid 43120993)
    • (2005) Mathematical Problems in Engineering , vol.2005 , Issue.3 , pp. 293-308
    • Blumenfeld, D.E.1    Jingshan, L.I.2
  • 6
    • 84954971480 scopus 로고
    • Models of automatic transfer lines with inventory banks: A review and comparison
    • Buzacott, J. A., and Hanifin, L. E., 1978, "Models of Automatic Transfer Lines With Inventory Banks: A Review and Comparison," AIIE Trans., 10(2), pp. 197-207.
    • (1978) AIIE Trans. , vol.10 , Issue.2 , pp. 197-207
    • Buzacott, J.A.1    Hanifin, L.E.2
  • 7
    • 0042279736 scopus 로고    scopus 로고
    • Queueing theory in manufacturing: A survey
    • Govil, M. C., and Fu, M. C., 1996, "Queueing Theory in Manufacturing: A Survey," J. Manuf. Syst., 18(3), pp. 214-240. (Pubitemid 129559002)
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.3 , pp. 214-240
    • Govil, M.K.1    Fu, M.C.2
  • 10
    • 0034427332 scopus 로고    scopus 로고
    • Mathematical programming models of discrete event system dynamics
    • Schruben, L., 2000, "Mathematical Programming Models of Discrete Event System Dynamics," Proceedings of the 2000 Winter Simulation Conference, Vol. 1, pp. 381-385. (Pubitemid 32873407)
    • (2000) Winter Simulation Conference Proceedings , vol.1 , pp. 381-385
    • Schruben Lee, W.1
  • 11
    • 0345533908 scopus 로고    scopus 로고
    • Simulation in production system life cycle
    • Koturiak, J., and Gregor, M., 1999, "Simulation in Production System Life Cycle," Comput Ind., 38(2), pp. 159-172.
    • (1999) Comput Ind. , vol.38 , Issue.2 , pp. 159-172
    • Koturiak, J.1    Gregor, M.2
  • 12
    • 11844277628 scopus 로고    scopus 로고
    • Grand challenges in modeling and simulation of complex manufacturing systems
    • DOI 10.1177/0037549704044324
    • Fowler, J. W., and Rose, O., 2004, "Grand Challenges in Modeling and Simulation of Complex Manufacturing Systems," Simulation, 80(9), pp. 469-476. (Pubitemid 40085442)
    • (2004) Simulation , vol.80 , Issue.9 , pp. 469-476
    • Fowler, J.W.1    Rose, O.2
  • 13
    • 84985756261 scopus 로고
    • Data driven modeling: An application in scheduling
    • Franz, L. S., 1989, "Data Driven Modeling: An Application in Scheduling," Decision Sci., 20(2), pp. 359-377.
    • (1989) Decision Sci. , vol.20 , Issue.2 , pp. 359-377
    • Franz, L.S.1
  • 16
    • 0034628949 scopus 로고    scopus 로고
    • A conceptual framework for the generation of simulation models from process plans and resource configuration
    • DOI 10.1080/002075400189167
    • Lee, S., Cho, H., and Jung, M., 2000, "A Conceptual Framework for the Generation of Simulation Models From Process Plans and Resource Configuration," Int. J. Prod. Res., 38(4), pp. 811-828. (Pubitemid 35401806)
    • (2000) International Journal of Production Research , vol.38 , Issue.4 , pp. 811-828
    • Lee, S.1    Cho, H.2    Jung, M.3
  • 17
    • 0033880644 scopus 로고    scopus 로고
    • Adaptive protocols for parallel discrete event simulation
    • Das, S. R., 2000, "Adaptive Protocols for Parallel Discrete Event Simulation," J. Oper. Res. Soc., 51(4), pp. 385-394. (Pubitemid 30589585)
    • (2000) Journal of the Operational Research Society , vol.51 , Issue.4 , pp. 385-394
    • Das, S.R.1
  • 19
    • 70449688145 scopus 로고    scopus 로고
    • Throughput analysis of production systems: Recent advances and future topics
    • Li, J., Blumenfeld, D. E., Huang, N., and Alden, J. M., 2009, "Throughput Analysis of Production Systems: Recent Advances and Future Topics," Int. J. Prod. Res., 47, pp. 3823-3851.
    • (2009) Int. J. Prod. Res. , vol.47 , pp. 3823-3851
    • Li, J.1    Blumenfeld, D.E.2    Huang, N.3    Alden, J.M.4
  • 20
    • 0023366315 scopus 로고
    • A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times
    • Choong, Y. F., and Gershwin, S. B., 1987, "A Decomposition Method for the Approximate Evaluation of Capacitated Transfer Lines With Unreliable Machines and Random Processing Times," IIE Trans., 19, pp. 150-159.
    • (1987) IIE Trans. , vol.19 , pp. 150-159
    • Choong, Y.F.1    Gershwin, S.B.2
  • 21
    • 0023315347 scopus 로고
    • An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
    • Gershwin, S. B., 1987, "An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues With Finite Storage Space and Blocking," Oper. Res., 35, pp. 291-305.
    • (1987) Oper. Res. , vol.35 , pp. 291-305
    • Gershwin, S.B.1
  • 22
    • 0008236264 scopus 로고
    • Representation and analysis of transfer lines with machines that have different processing rates
    • Gershwin, S. B., 1987, "Representation and Analysis of Transfer Lines With Machines That Have Different Processing Rates," Ann. Oper. Res., 9, pp. 511-530.
    • (1987) Ann. Oper. Res. , vol.9 , pp. 511-530
    • Gershwin, S.B.1
  • 23
    • 0029291550 scopus 로고
    • A system-theoretic property of serial production lines: Improvability
    • Jacobs, D. A., and Meerkov, S. M., 1995, "A System-Theoretic Property of Serial Production Lines: Improvability," Int. J. Syst. Sci., 26, pp. 95-137.
    • (1995) Int. J. Syst. Sci. , vol.26 , pp. 95-137
    • Jacobs, D.A.1    Meerkov, S.M.2
  • 24
    • 0009432605 scopus 로고
    • Mathematical theory of improvability for production systems
    • Jacobs, D. A., and Meerkov, S. M., 1995, "Mathematical Theory of Improvability for Production Systems," Math. Probl. Eng., 1, pp. 95-137.
    • (1995) Math. Probl. Eng. , vol.1 , pp. 95-137
    • Jacobs, D.A.1    Meerkov, S.M.2
  • 25
    • 0000034424 scopus 로고
    • System-theoretic analysis of due-time performance in production systems
    • Jacobs, D. A., and Meerkov, S. M., 1995, "System-Theoretic Analysis of Due-Time Performance in Production Systems," Math. Probl. Eng., 1, pp. 225-243.
    • (1995) Math. Probl. Eng. , vol.1 , pp. 225-243
    • Jacobs, D.A.1    Meerkov, S.M.2
  • 28
    • 0009455220 scopus 로고
    • Influence of storage bin capacity on the average standstill time of a production line
    • Sevast'yanov, B. A., 1962, "Influence of Storage Bin Capacity on the Average Standstill Time of a Production Line," Theory Probab. Math. Stat., 7(4), pp. 429-438.
    • (1962) Theory Probab. Math. Stat. , vol.7 , Issue.4 , pp. 429-438
    • Sevast'yanov, B.A.1
  • 29
    • 0018444869 scopus 로고
    • The effect of inter stage buffer storage on output of two unreliable production units in series with different rates
    • Wijingaard, J., 1979, "The Effect of Inter Stage Buffer Storage on Output of Two Unreliable Production Units in Series With Different Rates," AIIE Trans., 11(1), pp. 42-47.
    • (1979) AIIE Trans. , vol.11 , Issue.1 , pp. 42-47
    • Wijingaard, J.1
  • 33
    • 78649985524 scopus 로고    scopus 로고
    • Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems
    • Chang, Q., Biller, S., and Xiao, G., 2010, "Transient Analysis of Downtimes and Bottleneck Dynamics in Serial Manufacturing Systems," ASME J. Manuf. Sci. Eng., 132(5), pp. 132-141.
    • (2010) ASME J. Manuf. Sci. Eng. , vol.132 , Issue.5 , pp. 132-141
    • Chang, Q.1    Biller, S.2    Xiao, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.