-
1
-
-
0004023295
-
-
Prentice Hall, Englewood Cliffs, NJ
-
Buzacott, J. A., and Shanthikumar, J. G., 1993, Stochastic Models of Manufacturing Systems, Prentice Hall, Englewood Cliffs, NJ.
-
(1993)
Stochastic Models of Manufacturing Systems
-
-
Buzacott, J.A.1
Shanthikumar, J.G.2
-
4
-
-
44449123785
-
-
WingSpan Press, Livermore, CA
-
Li, J., and Meerkov, S. M., 2008, Production Systems Engineering, WingSpan Press, Livermore, CA.
-
(2008)
Production Systems Engineering
-
-
Li, J.1
Meerkov, S.M.2
-
5
-
-
0000797228
-
Metamodels of production line transient behavior for sudden machine breakdowns
-
Lin, L., and Cochran, J. K., 1990, "Metamodels of Production Line Transient Behavior for Sudden Machine Breakdowns," Int. J. Prod . Res., 28(10), pp. 1791-1806.
-
(1990)
Int. J. Prod . Res.
, vol.28
, Issue.10
, pp. 1791-1806
-
-
Lin, L.1
Cochran, J.K.2
-
6
-
-
0001476428
-
A mathematical theory for transient analysis of communication networks
-
Kobayashi, H., and Ren, Q., 1992, "A Mathematical Theory for Transient Analysis of Communication Networks," IEICE Trans. Commun., E75-B(12), pp. 1266-1276.
-
(1992)
IEICE Trans. Commun., E75-B
, vol.12
, pp. 1266-1276
-
-
Kobayashi, H.1
Ren, Q.2
-
7
-
-
0032073404
-
Transient analysis of stochastic fluid models
-
Sericola, B., 1998, "Transient Analysis of Stochastic Fluid Models," Perform. Eval., 32(4), pp. 245-263.
-
(1998)
Perform. Eval.
, vol.32
, Issue.4
, pp. 245-263
-
-
Sericola, B.1
-
8
-
-
1642359114
-
Transient analysis of fluid flow models via stochastic coupling to a queue
-
Ahn, S., and Ramaswami, V., 2004, "Transient Analysis of Fluid Flow Models via Stochastic Coupling to a Queue," Stoch. Models, 20(1), pp. 71-101.
-
(2004)
Stoch. Models
, vol.20
, Issue.1
, pp. 71-101
-
-
Ahn, S.1
Ramaswami, V.2
-
9
-
-
38049075378
-
Transient behavior of serial production lines with bernoulli machines
-
Meerkov, S. M., and Zhang, L., 2008, "Transient Behavior of Serial Production Lines With Bernoulli Machines," IIE Trans., 40(3), pp. 297-312.
-
(2008)
IIE Trans.
, vol.40
, Issue.3
, pp. 297-312
-
-
Meerkov, S.M.1
Zhang, L.2
-
10
-
-
0003398482
-
-
North River Press, Boston, MA
-
Goldratt, E. M., and Cox, J., 2004, The Goal: A Process of Ongoing Improvement, North River Press, Boston, MA.
-
(2004)
The Goal: A Process of Ongoing Improvement
-
-
Goldratt, E.M.1
Cox, J.2
-
11
-
-
0034291972
-
DT-bottlenecks in serial production lines: Theory and application
-
DOI 10.1109/70.880806
-
Chiang, S. Y., Kuo, C. T., and Meerkov, S. M., 2000, "DT-Botlenecks in Serial Production Lines: Theory and Application," IEEE Trans. Rob. Autom., 16(5), pp. 567-580. (Pubitemid 32067026)
-
(2000)
IEEE Transactions on Robotics and Automation
, vol.16
, Issue.5
, pp. 567-580
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Meerkov, S.M.3
-
12
-
-
70449688157
-
Data driven bottleneck detection of manufacturing systems
-
Li, L., Chang, Q., and Ni, J., 2009, "Data Driven Bottleneck Detection of Manufacturing Systems," Int. J. Prod. Res., 47(18), pp. 5019-5036.
-
(2009)
Int. J. Prod. Res.
, vol.47
, Issue.18
, pp. 5019-5036
-
-
Li, L.1
Chang, Q.2
Ni, J.3
-
13
-
-
0009455220
-
Influence of storage bin capacity on the average standstill time of a production line
-
Sevast'yanov, B. A., 1962, "Influence of Storage Bin Capacity on the Average Standstill Time of a Production Line," Theory Probab. Appl., 7(4), pp. 429-438.
-
(1962)
Theory Probab. Appl.
, vol.7
, Issue.4
, pp. 429-438
-
-
Sevast'yanov, B.A.1
-
14
-
-
0018444869
-
Effect of interstage buffer storage on the output of two unreliable production units in series, with different production rates
-
Wijngaard, J., 1979, "The Effect of Inter Stage Buffer Storage on Output of Two Unreliable Production Units in Series With Different Production Rates," AIIE Trans., 11(1), pp. 42-47. (Pubitemid 9444965)
-
(1979)
AIIE Trans
, vol.11
, Issue.1
, pp. 42-47
-
-
Wijngaard Jacob1
-
15
-
-
0010769391
-
Continuous model of an unreliable two-stage material flow system with a finite interstage buffer
-
Technical Report No. 1039
-
Gershwin, S. B., and Schick, I. C., 1980, "Continuous Model of an Unreliable Two-Stage Material Flow System With a Finite Interstage Buffer," Massachusetts Institute of Technology, Technical Report No. 1039.
-
(1980)
Massachusetts Institute of Technology
-
-
Gershwin, S.B.1
Schick, I.C.2
-
16
-
-
0002661275
-
Activity-based systems: Measuring the costs of resource usage
-
Cooper, R., and Kaplan, R. S., 1992, "Activity-Based Systems: Measuring the Costs of Resource Usage," Account. Horiz., 6(3), pp. 1-13.
-
(1992)
Account. Horiz.
, vol.6
, Issue.3
, pp. 1-13
-
-
Cooper, R.1
Kaplan, R.S.2
-
17
-
-
33750321285
-
The case for resource consumption accounting
-
van der Merwe, A., and Keys, D. E., 2002, "The Case for Resource Consumption Accounting," Strategic Finance, 83(10), pp. 30-36.
-
(2002)
Strategic Finance
, vol.83
, Issue.10
, pp. 30-36
-
-
Van Der Merwe, A.1
Keys, D.E.2
-
18
-
-
34547416651
-
Maintenance opportunity planning system
-
DOI 10.1115/1.2716713
-
Chang, Q., Ni, J., Bandyopadhyay, P., Biller, S., and Xiao, G., 2007, "Maintenance Opportunity Planning System," ASME Trans. J. Manuf. Sci. Eng., 129(3), pp. 661-668. (Pubitemid 47170015)
-
(2007)
Journal of Manufacturing Science and Engineering, Transactions of the ASME
, vol.129
, Issue.3
, pp. 661-668
-
-
Chang, Q.1
Ni, J.2
Bandyopadhyay, P.3
Biller, S.4
Xiao, G.5
-
19
-
-
78649985524
-
Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems
-
Chang, Q., Liu, J., Biller, S., and Xiao, G., 2010, "Transient Analysis of Downtimes and Bottleneck Dynamics in Serial Manufacturing Systems," ASME J. Manuf. Sci. Eng., 132(5), 051015.
-
(2010)
ASME J. Manuf. Sci. Eng.
, vol.132
, Issue.5
, pp. 051015
-
-
Chang, Q.1
Liu, J.2
Biller, S.3
Xiao, G.4
|