메뉴 건너뛰기




Volumn 55, Issue 2, 2010, Pages 453-458

Transient behavior of two-machine geometric production lines

Author keywords

Effects of up and downtime; Geometric reliability model; Production lines; Production rate; Transient behavior

Indexed keywords

MARKOV CHAIN; PRODUCTION LINE; PRODUCTION RATES; PRODUCTION SYSTEM; RELIABILITY MODEL; SECOND LARGEST EIGENVALUE; SERIAL PRODUCTION LINE; STEADY STATE; TECHNICAL NOTES; TRANSIENT BEHAVIOR; TRANSITION MATRICES; TWO-MACHINE SYSTEMS;

EID: 76949085283     PISSN: 00189286     EISSN: None     Source Type: Journal    
DOI: 10.1109/TAC.2009.2036328     Document Type: Article
Times cited : (52)

References (9)
  • 1
    • 0028417115 scopus 로고
    • Transient analysis of manufacturing systems performance
    • Apr
    • Y. Narahari and N. Viswanadham, "Transient analysis of manufacturing systems performance," IEEE Trans. Robot. Autom., vol.10, no.2, pp. 230-244, Apr. 1994.
    • (1994) IEEE Trans. Robot. Autom , vol.10 , Issue.2 , pp. 230-244
    • Narahari, Y.1    Viswanadham, N.2
  • 2
    • 76949106734 scopus 로고    scopus 로고
    • Numerical algorithms for transient analysis of fluid queues
    • Zakynthos, Greece
    • S. Mocanu, "Numerical algorithms for transient analysis of fluid queues," in Proc. 5th Int. Conf. Anal. Manufact. Syst., Zakynthos, Greece, 2005, pp. 15-20.
    • (2005) Proc. 5th Int. Conf. Anal. Manufact. Syst , pp. 15-20
    • Mocanu, S.1
  • 3
    • 38049075378 scopus 로고    scopus 로고
    • Transient behavior of serial production lines with Bernoulli machines
    • S. M. Meerkov and L. Zhang, "Transient behavior of serial production lines with Bernoulli machines," IIE Trans., vol.40, no.3, pp. 297-312, 2008.
    • (2008) IIE Trans , vol.40 , Issue.3 , pp. 297-312
    • Meerkov, S.M.1    Zhang, L.2
  • 9
    • 4043098920 scopus 로고    scopus 로고
    • Due-time performance in production systems with markovian machines
    • S. B. Gershwin, Y. Dallery, C. T. Papadopolous, and J. Smith, Eds. Boston, MA: Kluwer Academic ch
    • J. Li and S. M. Meerkov, "Due-time performance in production systems with markovian machines," in Analysis and Modeling of Manufacturing Systems, S. B. Gershwin, Y. Dallery, C. T. Papadopolous, and J. Smith, Eds. Boston, MA: Kluwer Academic, 2003, ch. 10, pp. 221-253.
    • (2003) Analysis and Modeling of Manufacturing Systems , vol.10 , pp. 221-253
    • Li, J.1    Meerkov, S.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.