메뉴 건너뛰기




Volumn 10, Issue 2, 2013, Pages 334-342

Energy saving opportunity analysis of automotive serial production systems (March 2012)

Author keywords

Continuous improvement; energy management; energy saving opportunity; energy treasure hunt; multistage manufacturing systems

Indexed keywords

CONTINUOUS IMPROVEMENTS; ENERGY TREASURE HUNT; ENERGY-SAVING STRATEGIES; ENVIRONMENTAL CONCERNS; MANUFACTURING ENVIRONMENTS; MULTI-STAGE MANUFACTURING SYSTEMS; PRODUCTION MANAGEMENT; SERIAL PRODUCTION SYSTEM;

EID: 84876146805     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2012.2210874     Document Type: Article
Times cited : (87)

References (34)
  • 2
    • 31044437924 scopus 로고    scopus 로고
    • An analytical formula for throughput of a production line with identical stations and random failures
    • DOI 10.1155/MPE.2005.293
    • D. E. Blumenfeld and J. Li, "An analytical formula for throughput of a production line with identical stations and random failures," Math. Prob. Eng., vol. 3, pp. 293-308, 2005. (Pubitemid 43120993)
    • (2005) Mathematical Problems in Engineering , vol.2005 , Issue.3 , pp. 293-308
    • Blumenfeld, D.E.1    Jingshan, L.I.2
  • 8
    • 70449688157 scopus 로고    scopus 로고
    • Data driven bottleneck detection of manufacturing systems
    • L. Li, Q. Chang, and J. Ni, "Data driven bottleneck detection of manufacturing systems," Int. J. Prod. Res., vol. 47, no. 18, pp. 5019-5036, 2009.
    • (2009) Int. J. Prod. Res , vol.47 , Issue.18 , pp. 5019-5036
    • Li, L.1    Chang, Q.2    Ni, J.3
  • 9
    • 70449578995 scopus 로고    scopus 로고
    • Real-time production improvement through bottleneck control
    • L. Li, Q. Chang, and J.Ni, "Real-time production improvement through bottleneck control," Int. J. Prod. Res., vol. 47, no. 21, pp. 6145-6158, 2009.
    • (2009) Int. J. Prod. Res , vol.47 , Issue.21 , pp. 6145-6158
    • Li, L.1    Chang, Q.2    Ni, J.3
  • 10
    • 0034291972 scopus 로고    scopus 로고
    • DT-bottlenecks in serial production lines: Theory and application
    • S. Y. Chiang, C. T. Kuo, and S.M.Meerkov, "DT-bottlenecks in serial production lines: Theory and application," IEEE Trans. Robot. Autom., vol. 16, no. 5, pp. 567-580, 2000.
    • (2000) IEEE Trans. Robot. Autom , vol.16 , Issue.5 , pp. 567-580
    • Chiang, S.Y.1    Kuo, C.T.2    Meerkov, S.M.3
  • 11
    • 0029287702 scopus 로고
    • Integration optimization, priority setting, planning and combining of maintenance activities
    • R. Dekker, "Integration optimization, priority setting, planning and combining of maintenance activities," Eur. J. Oper. Res., vol. 82, pp. 225-240, 1995.
    • (1995) Eur. J. Oper. Res , vol.82 , pp. 225-240
    • Dekker, R.1
  • 13
    • 84876122126 scopus 로고    scopus 로고
    • U.S. Environmental Protection Agency (EPA) ch. 3, Energy Assessment Strategies [Online] Available
    • U.S. Environmental Protection Agency (EPA), Lean and Energy Toolkit, ch. 3, Energy Assessment Strategies, 2009. [Online]. Available: http://www.epa.gov/ lean/energytoolkit/ch3.htm
    • (2009) Lean and Energy Toolkit
  • 15
    • 34548395445 scopus 로고    scopus 로고
    • Operational methods for minimization of energy consumption of manufacturing equipment
    • DOI 10.1080/00207540701450013, PII 781770536, Sustainable Design and Manufacture
    • G. Mouzon, M. B. Yildirim, and J. Twomey, "Operational methods forminimization of energy consumption ofmanufacturing equipment," Int. J. Prod. Res., vol. 45, pp. 4247-4271, 2007. (Pubitemid 47351658)
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4247-4271
    • Mouzon, G.1    Yildirim, M.B.2    Twomey, J.3
  • 16
    • 78650636006 scopus 로고    scopus 로고
    • A framework tominimize total energy consumption and total tardiness on a single machine
    • G.Mouzon andM. B. Yildirim, "A framework tominimize total energy consumption and total tardiness on a single machine," Int. J. Sustainable Eng., vol. 1, no. 2, pp. 105-116, 2008.
    • (2008) Int. J. Sustainable Eng , vol.1 , Issue.2 , pp. 105-116
    • Mouzon, G.1    Yildirim, M.B.2
  • 19
    • 70349144098 scopus 로고    scopus 로고
    • Manufacturing execution system-A literature review
    • B. S. de Ugarte, A. Artiba, and R. Pellerin, "Manufacturing execution system-A literature review," Prod. Planning Control, vol. 20, no. 6, pp. 525-539, 2009.
    • (2009) Prod. Planning Control , vol.20 , Issue.6 , pp. 525-539
    • De Ugarte, B.S.1    Artiba, A.2    Pellerin, R.3
  • 20
    • 84876143617 scopus 로고    scopus 로고
    • Trends in manufacturing execution systems
    • O. Sauer, "Trends in manufacturing execution systems," in Proc. DET'09, AISC 66, 2010, pp. 685-693.
    • (2010) Proc. DET'09, AISC , vol.66 , pp. 685-693
    • Sauer, O.1
  • 25
    • 80053511710 scopus 로고    scopus 로고
    • Production system design to achieve energy savings in an automotive paint shop
    • C. A. Guerrero, J. Wang, J. Li, J. Arinez, S. Biller, N. Huang, and G. Xiao, "Production system design to achieve energy savings in an automotive paint shop," Int. J. Prod. Res., vol. 49, no. 22, pp. 6769-6785, 2011.
    • (2011) Int. J. Prod. Res , vol.49 , Issue.22 , pp. 6769-6785
    • Guerrero, C.A.1    Wang, J.2    Li, J.3    Arinez, J.4    Biller, S.5    Huang, N.6    Xiao, G.7
  • 26
    • 82455166861 scopus 로고    scopus 로고
    • Energy consumption reduction for sustainable manufacturing systems consideringmachines withmultiple-power states
    • Corvallis, OR
    • Z. Sun, S. Biller, F. Gu, and L. Li, "Energy consumption reduction for sustainable manufacturing systems consideringmachines withmultiple-power states," in Proc. 6th Annu. ASME Int. Manuf. Sci. Eng. Conf., Corvallis, OR, 2011.
    • (2011) Proc. 6th Annu. ASME Int. Manuf. Sci. Eng. Conf.
    • Sun, Z.1    Biller, S.2    Gu, F.3    Li, L.4
  • 27
    • 80054680608 scopus 로고    scopus 로고
    • A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
    • K. Fang, N. Uhan, F. Zhao, and J. W. Sutherland, "A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction," J. Manuf. Syst., vol. 30, no. 4, pp. 234-240, 2011.
    • (2011) J. Manuf. Syst , vol.30 , Issue.4 , pp. 234-240
    • Fang, K.1    Uhan, N.2    Zhao, F.3    Sutherland, J.W.4
  • 28
    • 0009455220 scopus 로고
    • Influence of storage bin capacity on the average standstill time of a production line
    • B. A. Sevast'yanov, "Influence of storage bin capacity on the average standstill time of a production line," Theory of Probability and its Applications, vol. 7, no. 4, pp. 429-438, 1962.
    • (1962) Theory of Probability and Its Applications , vol.7 , Issue.4 , pp. 429-438
    • Sevast'Yanov, B.A.1
  • 29
    • 0018444869 scopus 로고
    • Effect of interstage buffer storage on the output of two unreliable production units in series, with different production rates
    • J.Wijngaard, "The effect of inter stage buffer storage on output of two unreliable production units in series with different production rates," AIIE Trans., vol. 11, no. 1, pp. 42-47, 1979. (Pubitemid 9444965)
    • (1979) AIIE Trans , vol.11 , Issue.1 , pp. 42-47
    • Wijngaard, J.1
  • 30
    • 0010769391 scopus 로고
    • Continuous model of an unreliable two-stage material flow system with a finite inter-stage buffer
    • Cambridge, MA, Tech. Rep.1039
    • S. B. Gershwin and I. Schick, "Continuous model of an unreliable two-stage material flow system with a finite inter-stage buffer," Massachusetts Inst. Technol., Cambridge, MA, Tech. Rep.1039, 1980.
    • (1980) Massachusetts Inst. Technol.
    • Gershwin, S.B.1    Schick, I.2
  • 31
    • 80455163297 scopus 로고    scopus 로고
    • Feature level energy assessments for discrete partmanufacturing
    • Corvallis, OR
    • A. Deshpande, J. Snyder, and D. Scherrer, "Feature level energy assessments for discrete partmanufacturing," in Proc. NAMRI/SME, Corvallis, OR, 2011, vol. 39, pp. 4712-1-47128.
    • (2011) Proc. NAMRI/SME , vol.39 , pp. 47121-47128
    • Deshpande, A.1    Snyder, J.2    Scherrer, D.3
  • 33
    • 78649985524 scopus 로고    scopus 로고
    • Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems
    • Oct.
    • Q. Chang, S. Biller, G. Xiao, and J. Liu, "Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems," ASME Trans., J. Manuf. Sci. Eng., vol. 132, no. 5, p. 051015, Oct. 2010.
    • (2010) ASME Trans., J. Manuf. Sci. Eng , vol.132 , Issue.5 , pp. 051015
    • Chang, Q.1    Biller, S.2    Xiao, G.3    Liu, J.4
  • 34
    • 84859920255 scopus 로고    scopus 로고
    • The costs of downtime incidents in serial multi-stage manufacturing systems
    • Apr.
    • J. Liu, Q. Chang, G. Xiao, and S. Biller, "The costs of downtime incidents in serial multi-stage manufacturing systems," ASME Transaction, J. Manuf. Sci. Eng., vol. 134, no. 2, p. 021016, Apr. 2012.
    • (2012) ASME Transaction, J. Manuf. Sci. Eng , vol.134 , Issue.2 , pp. 021016
    • Liu, J.1    Chang, Q.2    Xiao, G.3    Biller, S.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.