메뉴 건너뛰기




Volumn 18, Issue 3, 2007, Pages 351-360

Maintenance staffing management

Author keywords

Bottleneck identification; Dynamic simulation; Labor estimation; Maintenance management; Opportunistic maintenance; Resource dispatching

Indexed keywords

COMPUTER SIMULATION; FEEDBACK CONTROL; MAINTENANCE; PLANNING; PROBABILITY; PROBLEM SOLVING;

EID: 34547689494     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-007-0027-7     Document Type: Article
Times cited : (24)

References (6)
  • 4
    • 0033352188 scopus 로고    scopus 로고
    • Klungle, R. (1999). Simulation of a claims call center: A success and a failure. In P. A. Farrington, H. B. Nembhard, D. T. Sturrock, & G. W. Evans (Eds.), Proceedings of the 1999 winter simulation conference.
    • Klungle, R. (1999). Simulation of a claims call center: A success and a failure. In P. A. Farrington, H. B. Nembhard, D. T. Sturrock, & G. W. Evans (Eds.), Proceedings of the 1999 winter simulation conference.
  • 5
    • 0033307585 scopus 로고    scopus 로고
    • Parker, R. S., & Marriott, A. J. (1999). Personnel forecasting strategic workforce planning' A proposed simulation cost modeling methodology. In P. A. Farrington, H. B. Nembhard, D. T. Sturrock, & G. W. Evans (Eds.), Proceedings of the 1999 winter simulation conference.
    • Parker, R. S., & Marriott, A. J. (1999). "Personnel forecasting strategic workforce planning' A proposed simulation cost modeling methodology. In P. A. Farrington, H. B. Nembhard, D. T. Sturrock, & G. W. Evans (Eds.), Proceedings of the 1999 winter simulation conference.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.