-
1
-
-
84888318265
-
A genetic algorithm for mode identity and the resource constrained project scheduling problem
-
Afshar-Nadjafi, B., Rahimi, A., Karimi, H., 2013. A genetic algorithm for mode identity and the resource constrained project scheduling problem. Sci. Iran. 20 (3), 824-831.
-
(2013)
Sci. Iran.
, vol.20
, Issue.3
, pp. 824-831
-
-
Afshar-Nadjafi, B.1
Rahimi, A.2
Karimi, H.3
-
2
-
-
0030121344
-
DAGEN: A generator of testsets for project activity nets
-
Agrawal, M.K., Elmaghraby, S.E., Herroelen, W.S., 1996. DAGEN: a generator of testsets for project activity nets. Eur. J. Oper. Res. 90 (2), 376-382.
-
(1996)
Eur. J. Oper. Res.
, vol.90
, Issue.2
, pp. 376-382
-
-
Agrawal, M.K.1
Elmaghraby, S.E.2
Herroelen, W.S.3
-
3
-
-
0010772302
-
-
University of Osnabruck, Germany, Technical Report
-
Baar, T., Brucker., P., Knust, S., 1997. Tabu-Search Algorithms for the Resource- Constrained Project Scheduling Problem. University of Osnabruck, Germany, Technical Report.
-
(1997)
Tabu-Search Algorithms for the Resource- Constrained Project Scheduling Problem
-
-
Baar Brucker. T, P.1
Knust, S.2
-
5
-
-
0032096810
-
A branch-and-bound algorithm for the resource-constrained project scheduling problem
-
Brucker, P., Knust, S., Schoo, A., Thiele, O., 1998. A branch-and-bound algorithm for the resource-constrained project scheduling problem. Eur. J. Oper. Res. 107 (2), 272-288.
-
(1998)
Eur. J. Oper. Res.
, vol.107
, Issue.2
, pp. 272-288
-
-
Brucker, P.1
Knust, S.2
Schoo, A.3
Thiele, O.4
-
6
-
-
0042286934
-
Genetic algorithms for project management
-
Chang, C.K., Christensen, M.J., Zhang, T., 2001. Genetic algorithms for project management. Ann. Softw. Eng. 11 (1), 107-139.
-
(2001)
Ann. Softw. Eng.
, vol.11
, Issue.1
, pp. 107-139
-
-
Chang, C.K.1
Christensen, M.J.2
Zhang, T.3
-
7
-
-
63549109485
-
A two-phase GA model for resource-constrained project scheduling
-
Chen, P.H., Weng, H.J., 2009. A two-phase GA model for resource-constrained project scheduling. Autom. Constr. 18 (4), 485-498.
-
(2009)
Autom. Constr.
, vol.18
, Issue.4
, pp. 485-498
-
-
Chen, P.H.1
Weng, H.J.2
-
8
-
-
0000150947
-
Applying adaptive algorithms to epistatic domains
-
Davis, L., 1985. Applying adaptive algorithms to epistatic domains. IJCAI 85, 162-164.
-
(1985)
IJCAI
, vol.85
, pp. 162-164
-
-
Davis, L.1
-
9
-
-
0344894852
-
Estimating project and activity duration: A risk management approach using network analysis
-
Dawood, N., 1998. Estimating project and activity duration: a risk management approach using network analysis. Constr. Manag. Econ. 16 (1), 41-48.
-
(1998)
Constr. Manag. Econ.
, vol.16
, Issue.1
, pp. 41-48
-
-
Dawood, N.1
-
10
-
-
3543055794
-
Rangen: A random net-work generator for activity-On-The-Node networks
-
Demeulemeester, E., Vanhoucke, M., Herroelen, W., 2003. Rangen: a random net-work generator for activity-on-the-node networks. J. Sched. 6(1), 17-38.
-
(2003)
J. Sched.
, vol.6
, Issue.1
, pp. 17-38
-
-
Demeulemeester, E.1
Vanhoucke, M.2
Herroelen, W.3
-
11
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
Demeulemeester, E.L., Herroelen, W.S., 1992. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Manag. Sci. 38 (12), 1803-1818.
-
(1992)
Manag. Sci.
, vol.38
, Issue.12
, pp. 1803-1818
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
12
-
-
0031272722
-
New benchmark results for the resource-constrained project scheduling problem
-
Demeulemeester, E.L., Herroelen, W.S., 1997. new benchmark results for the resource-constrained project scheduling problem. Manag. Sci. 43 (11), 1485-1492.
-
(1997)
Manag. Sci.
, vol.43
, Issue.11
, pp. 1485-1492
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
13
-
-
84862977024
-
Network theory-based analysis of risk interactions in large engineering projects
-
Fang, C., Marle, F., Zio, E., Bocquet,J.-C., 2012. Network theory-based analysis of risk interactions in large engineering projects. Reliab. Eng. Syst. Saf. 106 (1), 1-10.
-
(2012)
Reliab. Eng. Syst. Saf.
, vol.106
, Issue.1
, pp. 1-10
-
-
Fang, C.1
Marle, F.2
Zio, E.3
Bocquet, J.-C.4
-
14
-
-
0031070492
-
Online control model for network con-struction projects
-
Golenko-Ginzburg, D., Gonik, A., 1997. Online control model for network con-struction projects. J. Oper. Res. Soc. 48 (2), 175-183.
-
(1997)
J. Oper. Res. Soc.
, vol.48
, Issue.2
, pp. 175-183
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
15
-
-
84956985807
-
Upon scheduling and controlling large- scale stochastic network projects
-
Greenberg, D., Golenko-Ginzburg, D., 2010. Upon scheduling and controlling large- scale stochastic network projects. J. Appl. Quant. Methods 5 (3), 370-376.
-
(2010)
J. Appl. Quant. Methods
, vol.5
, Issue.3
, pp. 370-376
-
-
Greenberg, D.1
Golenko-Ginzburg, D.2
-
16
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
Hartmann, S., 1998. A competitive genetic algorithm for resource-constrained project scheduling. Nav. Res. Logist. 45 (7), 733-750.
-
(1998)
Nav. Res. Logist.
, vol.45
, Issue.7
, pp. 733-750
-
-
Hartmann, S.1
-
17
-
-
13944255840
-
Genetic optimization for dynamic project control
-
Hegazy, T., Petzold, K., 2003. Genetic optimization for dynamic project control. J. Constr. Eng. Manag. 129 (4), 396-404.
-
(2003)
J. Constr. Eng. Manag.
, vol.129
, Issue.4
, pp. 396-404
-
-
Hegazy, T.1
Petzold, K.2
-
18
-
-
0015404241
-
Resource-constrained project scheduling - The state of the art
-
Herroelen, W.S., 1972. Resource-constrained project scheduling - the state of the art. Oper. Res. Q. 23, 261-275.
-
(1972)
Oper. Res. Q.
, vol.23
, pp. 261-275
-
-
Herroelen, W.S.1
-
19
-
-
84906950836
-
Schedule uncertainty control: A literature review
-
Jun-yan, L., 2012. Schedule uncertainty control: a literature review. Phys. Procedia 33, 1842-1848.
-
(2012)
Phys. Procedia
, vol.33
, pp. 1842-1848
-
-
Jun-Yan, L.1
-
20
-
-
0019540987
-
On the quantitative definition of risk
-
Kaplan, S., Garrick, B.J., 1981. On the quantitative definition of risk. Risk Anal. 1 (1), 11-27.
-
(1981)
Risk Anal.
, vol.1
, Issue.1
, pp. 11-27
-
-
Kaplan, S.1
Garrick, B.J.2
-
21
-
-
25644451090
-
Project scheduling problem with stochastic activity duration times
-
Ke, H., Liu, B., 2005. Project scheduling problem with stochastic activity duration times. Appl. Math. Comput. 168 (1), 342-353.
-
(2005)
Appl. Math. Comput.
, vol.168
, Issue.1
, pp. 342-353
-
-
Ke, H.1
Liu, B.2
-
22
-
-
38749119736
-
A bi-objective genetic algorithm approach to risk mitigation in project scheduling
-
Kilic, M., Ulusoy, G., Serifoglu, F.S., 2008. A bi-objective genetic algorithm approach to risk mitigation in project scheduling. Int. J. Prod. Econ. 12 (1), 202-216.
-
(2008)
Int. J. Prod. Econ.
, vol.12
, Issue.1
, pp. 202-216
-
-
Kilic, M.1
Ulusoy, G.2
Serifoglu, F.S.3
-
23
-
-
0043140243
-
Experiences with fine-grained par-allel genetic algorithms
-
Kohlmorgen, U., Schmeck, H., Haase, K., 1999. Experiences with fine-grained par-allel genetic algorithms. Ann. Oper. Res. 90 (0), 203-219.
-
(1999)
Ann. Oper. Res.
, vol.90
, pp. 203-219
-
-
Kohlmorgen, U.1
Schmeck, H.2
Haase, K.3
-
24
-
-
0030788844
-
PSPLIB - A project scheduling problem llibrary
-
Kolisch, R., Sprecher, A., 1997. PSPLIB - a project scheduling problem llibrary. Eur. J. Oper. Res. 96 (1), 205-216.
-
(1997)
Eur. J. Oper. Res.
, vol.96
, Issue.1
, pp. 205-216
-
-
Kolisch, R.1
Sprecher, A.2
-
25
-
-
0000698758
-
Characterization and generation of a gen-eral class of resource-constrained project scheduling problems
-
Kolisch, R., Sprecher, A., Drexl, A., 1995. Characterization and generation of a gen-eral class of resource-constrained project scheduling problems. Manag. Sci. 41 (10), 1693-1703.
-
(1995)
Manag. Sci.
, vol.41
, Issue.10
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
26
-
-
0030151930
-
Search heuristics for resource-constrained project scheduling
-
Lee, J.-K., Kim, Y.-D., 1996. Search heuristics for resource-constrained project scheduling. J. Oper. Res. Soc. 47 (5), 678-689.
-
(1996)
J. Oper. Res. Soc.
, vol.47
, Issue.5
, pp. 678-689
-
-
Lee, J.-K.1
Kim, Y.-D.2
-
27
-
-
33845274958
-
Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
-
Leon, V.J., Ramamoorthy, B., 1995. Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling. Oper. Res. Spectr. 17 (2-3), 173-182.
-
(1995)
Oper. Res. Spectr.
, vol.17
, Issue.2-3
, pp. 173-182
-
-
Leon, V.J.1
Ramamoorthy, B.2
-
28
-
-
38049080631
-
Optimized research of resource constrained project scheduling problem based on genetic algorithms
-
Li, X., Kang, L., Tan, W., 2007. Optimized research of resource constrained project scheduling problem based on genetic algorithms. Advances in Computation and Intelligence. Lecture Notes in Computer Science. 4683, pp. 177-186.
-
(2007)
Advances in Computation and Intelligence. Lecture Notes in Computer Science.
, vol.4683
, pp. 177-186
-
-
Li, X.1
Kang, L.2
Tan, W.3
-
29
-
-
84958538248
-
Application of genetic algo-rithm and fuzzy gantt chart to project scheduling with resource con-straints
-
Liu, Y.-C., Gao, H.-M., Yang, S.-M., Chuang, C.-Y., 2014. Application of genetic algo-rithm and fuzzy gantt chart to project scheduling with resource con-straints. Intelligent Computing Methodologies. Lecture Notes in Computer Science. 8589, pp. 241 -252.
-
(2014)
Intelligent Computing Methodologies. Lecture Notes in Computer Science.
, vol.8589
, pp. 241-252
-
-
Liu, Y.-C.1
Gao, H.-M.2
Yang, S.-M.3
Chuang, C.-Y.4
-
30
-
-
0032070635
-
An exact algorithm for the resource-constrained project scheduling problem based on a new mathe-matical formulation
-
Mingozzi, A., Maniezzo, V., Ricciardelli, S., Bianco, L., 1998. An exact algorithm for the resource-constrained project scheduling problem based on a new mathe-matical formulation. Manag. Sci. 44 (5), 714-729.
-
(1998)
Manag. Sci.
, vol.44
, Issue.5
, pp. 714-729
-
-
Mingozzi, A.1
Maniezzo, V.2
Ricciardelli, S.3
Bianco, L.4
-
31
-
-
77953356476
-
Project scheduling with limited resources using a genetic algorithm
-
Montoya-Torres, J.R., Gutierrez-Franco, E., Pirachican-Mayorga, C., 2010. Project scheduling with limited resources using a genetic algorithm. Int. J. Proj. Manag. 28 (6), 619-628.
-
(2010)
Int. J. Proj. Manag.
, vol.28
, Issue.6
, pp. 619-628
-
-
Montoya-Torres, J.R.1
Gutierrez-Franco, E.2
Pirachican-Mayorga, C.3
-
32
-
-
0031192667
-
A genetic algorithm for multi-mode resource con-strained project scheduling problem
-
Mori, M., Tseng, C.C., 1997. A genetic algorithm for multi-mode resource con-strained project scheduling problem. Eur. J. Oper. Res. 100 (1), 134-141.
-
(1997)
Eur. J. Oper. Res.
, vol.100
, Issue.1
, pp. 134-141
-
-
Mori, M.1
Tseng, C.C.2
-
33
-
-
0021460636
-
A comparison of exact approaches for solving the multiple constrained resource project scheduling problem
-
Patterson, J.H., 1984. A comparison of exact approaches for solving the multiple constrained resource project scheduling problem. Manag. Sci. 30 (7), 854-867.
-
(1984)
Manag. Sci.
, vol.30
, Issue.7
, pp. 854-867
-
-
Patterson, J.H.1
-
34
-
-
79951905049
-
A genetic algorithm with neighborhood search for the resource-constrained project scheduling problem
-
Proon, S., Jin, M.Z., 2011. A genetic algorithm with neighborhood search for the resource-constrained project scheduling problem. Nav. Res. Logist. 58 (2), 73-82.
-
(2011)
Nav. Res. Logist.
, vol.58
, Issue.2
, pp. 73-82
-
-
Proon, S.1
Jin, M.Z.2
-
35
-
-
0038188879
-
-
University of Kiel, Germany, Technical Report, Manuskripte aus den Instituten fur Betriebswirtschaftslehre 425
-
Sprecher, A., 1996. Solving the RCPSP Efficiently at Modest Memory Requirements. University of Kiel, Germany, Technical Report, Manuskripte aus den Instituten fur Betriebswirtschaftslehre 425.
-
(1996)
Solving the RCPSP Efficiently at Modest Memory Requirements
-
-
Sprecher, A.1
-
37
-
-
0036680978
-
A comparative morphologic analysis of benchmark sets of project networks
-
Tavares, L.V., Ferreira, J.A., Coelho, J.S., 2002. A comparative morphologic analysis of benchmark sets of project networks. Int. J. Proj. Manag. 20 (6), 475-485.
-
(2002)
Int. J. Proj. Manag.
, vol.20
, Issue.6
, pp. 475-485
-
-
Tavares, L.V.1
Ferreira, J.A.2
Coelho, J.S.3
-
38
-
-
34648837872
-
A hybrid genetic algorithm for the resource-constrained project scheduling problem
-
Valls, V., Ballestin, F., Quintanilla, S., 2008. A hybrid genetic algorithm for the resource-constrained project scheduling problem. Eur. J. Oper. Res. 185 (2), 495-508.
-
(2008)
Eur. J. Oper. Res.
, vol.185
, Issue.2
, pp. 495-508
-
-
Valls, V.1
Ballestin, F.2
Quintanilla, S.3
-
39
-
-
36048990558
-
An evalua-tion of the adequacy of project network generators with systematically sam-pled networks
-
Vanhoucke, M., Coelho, J., Debels, D., Maenhout, B., Tavares, L.V., 2008. An evalua-tion of the adequacy of project network generators with systematically sam-pled networks. Eur. J. Oper. Res. 187 (2), 511-524.
-
(2008)
Eur. J. Oper. Res.
, vol.187
, Issue.2
, pp. 511-524
-
-
Vanhoucke, M.1
Coelho, J.2
Debels, D.3
Maenhout, B.4
Tavares, L.V.5
-
40
-
-
26844557383
-
A genetic algorithm for solving resource-constrained project scheduling problem
-
Wang, H., Lin, D., Li, M., 2005. A genetic algorithm for solving resource-constrained project scheduling problem. Advances in Natural Computation. Lecture Notes in Computer Science. 3612, pp. 185-193.
-
(2005)
Advances in Natural Computation. Lecture Notes in Computer Science.
, vol.3612
, pp. 185-193
-
-
Wang, H.1
Lin, D.2
Li, M.3
|