메뉴 건너뛰기




Volumn 170, Issue , 2015, Pages 34-44

Quantifying the risk of project delays with a genetic algorithm

Author keywords

Genetic algorithm; Project network; Risk analysis

Indexed keywords

ALGORITHMS; COMPLEX NETWORKS; GENETIC ALGORITHMS; PROJECT MANAGEMENT; RISK ANALYSIS; RISK ASSESSMENT; STOCHASTIC SYSTEMS;

EID: 84956971293     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2015.09.007     Document Type: Article
Times cited : (31)

References (40)
  • 1
    • 84888318265 scopus 로고    scopus 로고
    • A genetic algorithm for mode identity and the resource constrained project scheduling problem
    • Afshar-Nadjafi, B., Rahimi, A., Karimi, H., 2013. A genetic algorithm for mode identity and the resource constrained project scheduling problem. Sci. Iran. 20 (3), 824-831.
    • (2013) Sci. Iran. , vol.20 , Issue.3 , pp. 824-831
    • Afshar-Nadjafi, B.1    Rahimi, A.2    Karimi, H.3
  • 2
    • 0030121344 scopus 로고    scopus 로고
    • DAGEN: A generator of testsets for project activity nets
    • Agrawal, M.K., Elmaghraby, S.E., Herroelen, W.S., 1996. DAGEN: a generator of testsets for project activity nets. Eur. J. Oper. Res. 90 (2), 376-382.
    • (1996) Eur. J. Oper. Res. , vol.90 , Issue.2 , pp. 376-382
    • Agrawal, M.K.1    Elmaghraby, S.E.2    Herroelen, W.S.3
  • 5
    • 0032096810 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for the resource-constrained project scheduling problem
    • Brucker, P., Knust, S., Schoo, A., Thiele, O., 1998. A branch-and-bound algorithm for the resource-constrained project scheduling problem. Eur. J. Oper. Res. 107 (2), 272-288.
    • (1998) Eur. J. Oper. Res. , vol.107 , Issue.2 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 6
    • 0042286934 scopus 로고    scopus 로고
    • Genetic algorithms for project management
    • Chang, C.K., Christensen, M.J., Zhang, T., 2001. Genetic algorithms for project management. Ann. Softw. Eng. 11 (1), 107-139.
    • (2001) Ann. Softw. Eng. , vol.11 , Issue.1 , pp. 107-139
    • Chang, C.K.1    Christensen, M.J.2    Zhang, T.3
  • 7
    • 63549109485 scopus 로고    scopus 로고
    • A two-phase GA model for resource-constrained project scheduling
    • Chen, P.H., Weng, H.J., 2009. A two-phase GA model for resource-constrained project scheduling. Autom. Constr. 18 (4), 485-498.
    • (2009) Autom. Constr. , vol.18 , Issue.4 , pp. 485-498
    • Chen, P.H.1    Weng, H.J.2
  • 8
    • 0000150947 scopus 로고
    • Applying adaptive algorithms to epistatic domains
    • Davis, L., 1985. Applying adaptive algorithms to epistatic domains. IJCAI 85, 162-164.
    • (1985) IJCAI , vol.85 , pp. 162-164
    • Davis, L.1
  • 9
    • 0344894852 scopus 로고    scopus 로고
    • Estimating project and activity duration: A risk management approach using network analysis
    • Dawood, N., 1998. Estimating project and activity duration: a risk management approach using network analysis. Constr. Manag. Econ. 16 (1), 41-48.
    • (1998) Constr. Manag. Econ. , vol.16 , Issue.1 , pp. 41-48
    • Dawood, N.1
  • 10
    • 3543055794 scopus 로고    scopus 로고
    • Rangen: A random net-work generator for activity-On-The-Node networks
    • Demeulemeester, E., Vanhoucke, M., Herroelen, W., 2003. Rangen: a random net-work generator for activity-on-the-node networks. J. Sched. 6(1), 17-38.
    • (2003) J. Sched. , vol.6 , Issue.1 , pp. 17-38
    • Demeulemeester, E.1    Vanhoucke, M.2    Herroelen, W.3
  • 11
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester, E.L., Herroelen, W.S., 1992. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Manag. Sci. 38 (12), 1803-1818.
    • (1992) Manag. Sci. , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 12
    • 0031272722 scopus 로고    scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • Demeulemeester, E.L., Herroelen, W.S., 1997. new benchmark results for the resource-constrained project scheduling problem. Manag. Sci. 43 (11), 1485-1492.
    • (1997) Manag. Sci. , vol.43 , Issue.11 , pp. 1485-1492
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 13
    • 84862977024 scopus 로고    scopus 로고
    • Network theory-based analysis of risk interactions in large engineering projects
    • Fang, C., Marle, F., Zio, E., Bocquet,J.-C., 2012. Network theory-based analysis of risk interactions in large engineering projects. Reliab. Eng. Syst. Saf. 106 (1), 1-10.
    • (2012) Reliab. Eng. Syst. Saf. , vol.106 , Issue.1 , pp. 1-10
    • Fang, C.1    Marle, F.2    Zio, E.3    Bocquet, J.-C.4
  • 14
    • 0031070492 scopus 로고    scopus 로고
    • Online control model for network con-struction projects
    • Golenko-Ginzburg, D., Gonik, A., 1997. Online control model for network con-struction projects. J. Oper. Res. Soc. 48 (2), 175-183.
    • (1997) J. Oper. Res. Soc. , vol.48 , Issue.2 , pp. 175-183
    • Golenko-Ginzburg, D.1    Gonik, A.2
  • 15
    • 84956985807 scopus 로고    scopus 로고
    • Upon scheduling and controlling large- scale stochastic network projects
    • Greenberg, D., Golenko-Ginzburg, D., 2010. Upon scheduling and controlling large- scale stochastic network projects. J. Appl. Quant. Methods 5 (3), 370-376.
    • (2010) J. Appl. Quant. Methods , vol.5 , Issue.3 , pp. 370-376
    • Greenberg, D.1    Golenko-Ginzburg, D.2
  • 16
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • Hartmann, S., 1998. A competitive genetic algorithm for resource-constrained project scheduling. Nav. Res. Logist. 45 (7), 733-750.
    • (1998) Nav. Res. Logist. , vol.45 , Issue.7 , pp. 733-750
    • Hartmann, S.1
  • 17
    • 13944255840 scopus 로고    scopus 로고
    • Genetic optimization for dynamic project control
    • Hegazy, T., Petzold, K., 2003. Genetic optimization for dynamic project control. J. Constr. Eng. Manag. 129 (4), 396-404.
    • (2003) J. Constr. Eng. Manag. , vol.129 , Issue.4 , pp. 396-404
    • Hegazy, T.1    Petzold, K.2
  • 18
    • 0015404241 scopus 로고
    • Resource-constrained project scheduling - The state of the art
    • Herroelen, W.S., 1972. Resource-constrained project scheduling - the state of the art. Oper. Res. Q. 23, 261-275.
    • (1972) Oper. Res. Q. , vol.23 , pp. 261-275
    • Herroelen, W.S.1
  • 19
    • 84906950836 scopus 로고    scopus 로고
    • Schedule uncertainty control: A literature review
    • Jun-yan, L., 2012. Schedule uncertainty control: a literature review. Phys. Procedia 33, 1842-1848.
    • (2012) Phys. Procedia , vol.33 , pp. 1842-1848
    • Jun-Yan, L.1
  • 20
    • 0019540987 scopus 로고
    • On the quantitative definition of risk
    • Kaplan, S., Garrick, B.J., 1981. On the quantitative definition of risk. Risk Anal. 1 (1), 11-27.
    • (1981) Risk Anal. , vol.1 , Issue.1 , pp. 11-27
    • Kaplan, S.1    Garrick, B.J.2
  • 21
    • 25644451090 scopus 로고    scopus 로고
    • Project scheduling problem with stochastic activity duration times
    • Ke, H., Liu, B., 2005. Project scheduling problem with stochastic activity duration times. Appl. Math. Comput. 168 (1), 342-353.
    • (2005) Appl. Math. Comput. , vol.168 , Issue.1 , pp. 342-353
    • Ke, H.1    Liu, B.2
  • 22
    • 38749119736 scopus 로고    scopus 로고
    • A bi-objective genetic algorithm approach to risk mitigation in project scheduling
    • Kilic, M., Ulusoy, G., Serifoglu, F.S., 2008. A bi-objective genetic algorithm approach to risk mitigation in project scheduling. Int. J. Prod. Econ. 12 (1), 202-216.
    • (2008) Int. J. Prod. Econ. , vol.12 , Issue.1 , pp. 202-216
    • Kilic, M.1    Ulusoy, G.2    Serifoglu, F.S.3
  • 23
    • 0043140243 scopus 로고    scopus 로고
    • Experiences with fine-grained par-allel genetic algorithms
    • Kohlmorgen, U., Schmeck, H., Haase, K., 1999. Experiences with fine-grained par-allel genetic algorithms. Ann. Oper. Res. 90 (0), 203-219.
    • (1999) Ann. Oper. Res. , vol.90 , pp. 203-219
    • Kohlmorgen, U.1    Schmeck, H.2    Haase, K.3
  • 24
    • 0030788844 scopus 로고    scopus 로고
    • PSPLIB - A project scheduling problem llibrary
    • Kolisch, R., Sprecher, A., 1997. PSPLIB - a project scheduling problem llibrary. Eur. J. Oper. Res. 96 (1), 205-216.
    • (1997) Eur. J. Oper. Res. , vol.96 , Issue.1 , pp. 205-216
    • Kolisch, R.1    Sprecher, A.2
  • 25
    • 0000698758 scopus 로고
    • Characterization and generation of a gen-eral class of resource-constrained project scheduling problems
    • Kolisch, R., Sprecher, A., Drexl, A., 1995. Characterization and generation of a gen-eral class of resource-constrained project scheduling problems. Manag. Sci. 41 (10), 1693-1703.
    • (1995) Manag. Sci. , vol.41 , Issue.10 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 26
    • 0030151930 scopus 로고    scopus 로고
    • Search heuristics for resource-constrained project scheduling
    • Lee, J.-K., Kim, Y.-D., 1996. Search heuristics for resource-constrained project scheduling. J. Oper. Res. Soc. 47 (5), 678-689.
    • (1996) J. Oper. Res. Soc. , vol.47 , Issue.5 , pp. 678-689
    • Lee, J.-K.1    Kim, Y.-D.2
  • 27
    • 33845274958 scopus 로고
    • Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
    • Leon, V.J., Ramamoorthy, B., 1995. Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling. Oper. Res. Spectr. 17 (2-3), 173-182.
    • (1995) Oper. Res. Spectr. , vol.17 , Issue.2-3 , pp. 173-182
    • Leon, V.J.1    Ramamoorthy, B.2
  • 30
    • 0032070635 scopus 로고    scopus 로고
    • An exact algorithm for the resource-constrained project scheduling problem based on a new mathe-matical formulation
    • Mingozzi, A., Maniezzo, V., Ricciardelli, S., Bianco, L., 1998. An exact algorithm for the resource-constrained project scheduling problem based on a new mathe-matical formulation. Manag. Sci. 44 (5), 714-729.
    • (1998) Manag. Sci. , vol.44 , Issue.5 , pp. 714-729
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 32
    • 0031192667 scopus 로고    scopus 로고
    • A genetic algorithm for multi-mode resource con-strained project scheduling problem
    • Mori, M., Tseng, C.C., 1997. A genetic algorithm for multi-mode resource con-strained project scheduling problem. Eur. J. Oper. Res. 100 (1), 134-141.
    • (1997) Eur. J. Oper. Res. , vol.100 , Issue.1 , pp. 134-141
    • Mori, M.1    Tseng, C.C.2
  • 33
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource project scheduling problem
    • Patterson, J.H., 1984. A comparison of exact approaches for solving the multiple constrained resource project scheduling problem. Manag. Sci. 30 (7), 854-867.
    • (1984) Manag. Sci. , vol.30 , Issue.7 , pp. 854-867
    • Patterson, J.H.1
  • 34
    • 79951905049 scopus 로고    scopus 로고
    • A genetic algorithm with neighborhood search for the resource-constrained project scheduling problem
    • Proon, S., Jin, M.Z., 2011. A genetic algorithm with neighborhood search for the resource-constrained project scheduling problem. Nav. Res. Logist. 58 (2), 73-82.
    • (2011) Nav. Res. Logist. , vol.58 , Issue.2 , pp. 73-82
    • Proon, S.1    Jin, M.Z.2
  • 35
    • 0038188879 scopus 로고    scopus 로고
    • University of Kiel, Germany, Technical Report, Manuskripte aus den Instituten fur Betriebswirtschaftslehre 425
    • Sprecher, A., 1996. Solving the RCPSP Efficiently at Modest Memory Requirements. University of Kiel, Germany, Technical Report, Manuskripte aus den Instituten fur Betriebswirtschaftslehre 425.
    • (1996) Solving the RCPSP Efficiently at Modest Memory Requirements
    • Sprecher, A.1
  • 37
    • 0036680978 scopus 로고    scopus 로고
    • A comparative morphologic analysis of benchmark sets of project networks
    • Tavares, L.V., Ferreira, J.A., Coelho, J.S., 2002. A comparative morphologic analysis of benchmark sets of project networks. Int. J. Proj. Manag. 20 (6), 475-485.
    • (2002) Int. J. Proj. Manag. , vol.20 , Issue.6 , pp. 475-485
    • Tavares, L.V.1    Ferreira, J.A.2    Coelho, J.S.3
  • 38
    • 34648837872 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the resource-constrained project scheduling problem
    • Valls, V., Ballestin, F., Quintanilla, S., 2008. A hybrid genetic algorithm for the resource-constrained project scheduling problem. Eur. J. Oper. Res. 185 (2), 495-508.
    • (2008) Eur. J. Oper. Res. , vol.185 , Issue.2 , pp. 495-508
    • Valls, V.1    Ballestin, F.2    Quintanilla, S.3
  • 39
    • 36048990558 scopus 로고    scopus 로고
    • An evalua-tion of the adequacy of project network generators with systematically sam-pled networks
    • Vanhoucke, M., Coelho, J., Debels, D., Maenhout, B., Tavares, L.V., 2008. An evalua-tion of the adequacy of project network generators with systematically sam-pled networks. Eur. J. Oper. Res. 187 (2), 511-524.
    • (2008) Eur. J. Oper. Res. , vol.187 , Issue.2 , pp. 511-524
    • Vanhoucke, M.1    Coelho, J.2    Debels, D.3    Maenhout, B.4    Tavares, L.V.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.