메뉴 건너뛰기




Volumn 3612, Issue PART III, 2005, Pages 185-193

A genetic algorithm for solving resource-constrained project scheduling problem

Author keywords

[No Author keywords available]

Indexed keywords

DECODING; GENES; OPTIMIZATION; PROBLEM SOLVING; SCHEDULING;

EID: 26844557383     PISSN: 03029743     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1007/11539902_22     Document Type: Conference Paper
Times cited : (6)

References (14)
  • 3
    • 0042287689 scopus 로고    scopus 로고
    • A robust genetic algorithm for resource allocation in project scheduling
    • Alcaraz, J., Maroto, C.: A Robust Genetic Algorithm for Resource Allocation in Project Scheduling. Annals of Operations Research, Vol. 102 (2001) 83-109
    • (2001) Annals of Operations Research , vol.102 , pp. 83-109
    • Alcaraz, J.1    Maroto, C.2
  • 4
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • Hartmann, S.: A Competitive Genetic Algorithm for Resource-Constrained Project Scheduling. Naval Research Logistics, Vol. 45 (1998) 733-750
    • (1998) Naval Research Logistics , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 5
    • 0036684673 scopus 로고    scopus 로고
    • A self-adapting genetic algorithm for project scheduling under resource constraints
    • Hartmann, S.: A Self-Adapting Genetic Algorithm for Project Scheduling under Resource Constraints. Naval Research Logistics, Vol. 49 (2002) 433-448
    • (2002) Naval Research Logistics , vol.49 , pp. 433-448
    • Hartmann, S.1
  • 6
    • 0030151930 scopus 로고    scopus 로고
    • Search heuristics for resource constrained project scheduling
    • Lee, J.-K., Kim, Y.-D.: Search Heuristics for Resource Constrained Project Scheduling. Journal of the Operational Research Society, Vol. 47 (1996) 678-689
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 678-689
    • Lee, J.-K.1    Kim, Y.-D.2
  • 7
    • 0030216966 scopus 로고    scopus 로고
    • Resource-constrained project scheduling by simulated annealing
    • Boctor, F. F.: Resource-Constrained Project Scheduling by Simulated Annealing. International Journal in Production Research, Vol. 34, No. 8 (1996) 2335-2351
    • (1996) International Journal in Production Research , vol.34 , Issue.8 , pp. 2335-2351
    • Boctor, F.F.1
  • 8
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen, K., Lecocq, H.: A New Efficient Simulated Annealing Algorithm for the Resource-Constrained Project Scheduling Problem and Its Multiple Mode Version. European Journal of Operational Research, Vol. 149 (2003) 268-281
    • (2003) European Journal of Operational Research , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 9
    • 0032117729 scopus 로고    scopus 로고
    • A tabu search approach for the resource constrained project scheduling problem
    • Thomas, P R., Salhi, S.: A Tabu Search Approach for the Resource Constrained Project Scheduling Problem. Journal of Heuristics, Vol. 4 (1998) 123-139
    • (1998) Journal of Heuristics , vol.4 , pp. 123-139
    • Thomas, P.R.1    Salhi, S.2
  • 10
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • Hartmann, S., Kolisch, R.: Experimental Evaluation of State-of-The-Art Heuristics for the Resource-Constrained Project Scheduling Problem. European Journal of Operational Research, Vol. 127 (2000) 394-407
    • (2000) European Journal of Operational Research , vol.127 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 11
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • Kolisch, R.: Serial and Parallel Resource-Constrained Project Scheduling Methods Revisited: Theory and Computation. European Journal of Operational Research, Vol. 90 (1996) 320-333
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 12
    • 0026822242 scopus 로고
    • An iterative scheduling technique for resource-constrained project scheduling
    • Li, K., Willis, R.: An Iterative Scheduling Technique for Resource-Constrained Project Scheduling. European Journal of Operational Research, Vol. 56 (1992) 370-379
    • (1992) European Journal of Operational Research , vol.56 , pp. 370-379
    • Li, K.1    Willis, R.2
  • 13
    • 0030574808 scopus 로고    scopus 로고
    • A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis
    • Özdamar, L., Ulusoy, G.: A Note on An Iterative Forward/Backward Scheduling Technique with Reference to a Procedure by Li and Willis. European Journal of Operational Research, Vol. 89 (1996) 400-407
    • (1996) European Journal of Operational Research , vol.89 , pp. 400-407
    • Özdamar, L.1    Ulusoy, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.