Exact algorithm for solving project scheduling problems under multiple resource constraints
-
Jiang, G., Shi, J.: Exact Algorithm for Solving Project Scheduling Problems under Multiple Resource Constraints. Journal of Construction Engineering and Management 131(9), 986-992 (2005)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.9
, pp. 986-992
-
-
Jiang, G.1
Shi, J.2
-
4
-
-
54249088030
-
Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling
-
Kim, J.L., Ellis, R.D.: Permutation-Based Elitist Genetic Algorithm for Optimization of Large-Sized Resource-Constrained Project Scheduling. Journal of Construction Engineering and Management 134(11), 904-913 (2008)
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.11
, pp. 904-913
-
-
Kim, J.L.1
Ellis, R.D.2
-
5
-
-
77954885293
-
The study of optimum engine shop visit scheduling via genetic algorithm method
-
Hsu, C.L., Wang, T., Chen, S.H.: The Study of Optimum Engine Shop Visit Scheduling via Genetic Algorithm Method. Journal of Aeronautics, Astronautics and Aviation, Series A 42(2), 141-148 (2010)
-
(2010)
Journal of Aeronautics, Astronautics and Aviation, Series A
, vol.42
, Issue.2
, pp. 141-148
-
-
Hsu, C.L.1
Wang, T.2
Chen, S.H.3
-
6
-
-
26044472796
-
A genetic algorithm approach for the time-cost trade-off in pert networks
-
Azaron, A., Perkgoz, C., Sakawa, M.: A Genetic Algorithm Approach for the Time-cost Trade-off in PERT Networks. Applied Mathematics and Computation 168(2), 1317-1339 (2005)
-
(2005)
Applied Mathematics and Computation
, vol.168
, Issue.2
, pp. 1317-1339
-
-
Azaron, A.1
Perkgoz, C.2
Sakawa, M.3
-
7
-
-
63549109485
-
A two-phase ga model for resource-constrained project scheduling
-
Chen, P.H., Weng, H.J.: A Two-phase GA Model for Resource-constrained Project Scheduling. Automation in Construction 18(4), 485-498 (2009)
-
(2009)
Automation in Construction
, vol.18
, Issue.4
, pp. 485-498
-
-
Chen, P.H.1
Weng, H.J.2
-
8
-
-
79951905049
-
A genetic algorithm with neighborhood search for the resource-constrained project scheduling problem
-
Proon, S., Jin, M.Z.: A Genetic Algorithm with Neighborhood Search for the Resource-Constrained Project Scheduling Problem. Naval Research Logistics 58(2), 73-82 (2011)
-
(2011)
Naval Research Logistics
, vol.58
, Issue.2
, pp. 73-82
-
-
Proon, S.1
Jin, M.Z.2
-
11
-
-
79960443998
-
Multi-objective optimization for equal batch splitting flexible job-shop scheduling problem with multiple process flows
-
Zeng, Q., Yang, Y., Liang, X.D., Ma, J.Q.: Multi-Objective Optimization for Equal Batch Splitting Flexible Job-Shop Scheduling Problem with Multiple Process Flows. Advanced Science Letters 4(4-5), 1808-1813 (2011)
-
(2011)
Advanced Science Letters
, vol.4
, Issue.4-5
, pp. 1808-1813
-
-
Zeng, Q.1
Yang, Y.2
Liang, X.D.3
Ma, J.Q.4
-
12
-
-
27144538861
-
-
Huang, D.-S., Zhang, X.-P., Huang, G.-B. (eds) ICIC 2005. Part I. LNCS Springer, Heidelberg
-
Liu, Z., Wang, H.: GA-based Resource-Constrained Project Scheduling with the Objective of Minimizing Activities Cost. In: Huang, D.-S., Zhang, X.-P., Huang, G.-B. (eds.) ICIC 2005. Part I. LNCS, vol. 3644, pp. 937-946. Springer, Heidelberg (2005)
-
(2005)
GA-based Resource-Constrained Project Scheduling with the Objective of Minimizing Activities Cost
, vol.3644
, pp. 937-946
-
-
Liu, Z.1
Wang, H.2
-
13
-
-
77955715839
-
GA-based multi-objective optimization of finance-based construction project scheduling
-
Fathi, H., Afshar, A.: GA-based Multi-objective Optimization of Finance-based Construction Project Scheduling. Journal of Civil Engineering 14(5), 627-638 (2010)
-
(2010)
Journal of Civil Engineering
, vol.14
, Issue.5
, pp. 627-638
-
-
Fathi, H.1
Afshar, A.2
-
14
-
-
63549088269
-
A genetic algorithm-based method for scheduling repetitive construction projects
-
Long, L.D., Ohsato, A.: A Genetic Algorithm-based Method for Scheduling Repetitive Construction Projects. Automation in Construction 18(4), 499-511 (2009)
-
(2009)
Automation in Construction
, vol.18
, Issue.4
, pp. 499-511
-
-
Long, L.D.1
Ohsato, A.2
-
15
-
-
6344281398
-
Resource optimization using combined simulation and genetic algorithms
-
Hegazy, T., Kassab, M.: Resource Optimization Using Combined Simulation and Genetic Algorithms. Journal of Construction Engineering and Management 129(6), 698-705 (2003)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.6
, pp. 698-705
-
-
Hegazy, T.1
Kassab, M.2
-
16
-
-
34047265638
-
Applying fuzzy method for measuring criticality in project network
-
Chen, C.T., Huang, S.F.: Applying Fuzzy Method for Measuring Criticality in Project Network. Information Sciences 177(12), 2448-2458 (2007)
-
(2007)
Information Sciences
, vol.177
, Issue.12
, pp. 2448-2458
-
-
Chen, C.T.1
Huang, S.F.2
-
17
-
-
69749091300
-
Computing latest starting times of activities in interval-valued networks with minimal time lags
-
Yakhchali, S.H., Ghodsypour, S.H.: Computing Latest Starting Times of Activities in Interval-valued Networks with Minimal Time Lags. European Journal of Operational Research 200(3), 874-880 (2010)
-
(2010)
European Journal of Operational Research
, vol.200
, Issue.3
, pp. 874-880
-
-
Yakhchali, S.H.1
Ghodsypour, S.H.2
-
19
-
-
71849102314
-
Fuzzy multi-objective project management decisions using two-phase fuzzy goal programming approach
-
Liang, T.F.: Fuzzy Multi-objective Project Management Decisions Using Two-phase Fuzzy Goal Programming Approach. Computers & Industrial Engineering 57(4), 1407-1416 (2009)
-
(2009)
Computers & Industrial Engineering
, vol.57
, Issue.4
, pp. 1407-1416
-
-
Liang, T.F.1
-
20
-
-
79951823107
-
Fuzzy finish time modeling for project scheduling
-
Liu, Y.C., Yang, S.M., Lin, Y.T.: Fuzzy Finish Time Modeling for Project Scheduling. Journal of Zhejiang University-Science A 11(12), 946-952 (2010)
-
(2010)
Journal of Zhejiang University-Science A
, vol.11
, Issue.12
, pp. 946-952
-
-
Liu, Y.C.1
Yang, S.M.2
Lin, Y.T.3
-
21
-
-
84904686183
-
Buffer sizing technique for fuzzy critical chain scheduling
-
Tibet, China, August
-
Liu, Y.C.: Buffer Sizing Technique for Fuzzy Critical Chain Scheduling. In: Proc. of 2nd Intl. Conf. on Uncertainty Theo., Tibet, China, August 5-10 (2011)
-
(2011)
Proc. of 2nd Intl. Conf. on Uncertainty Theo
, pp. 5-10
-
-
Liu, Y.C.1
|