메뉴 건너뛰기




Volumn 8589 LNAI, Issue , 2014, Pages 241-252

Application of genetic algorithm and fuzzy gantt chart to project scheduling with resource constraints

Author keywords

fuzzy Gantt chart; genetic algorithm; project scheduling; resource constraints

Indexed keywords

ALGORITHMS; FLOW MEASUREMENT; GENETIC ALGORITHMS; GRAPHIC METHODS; INTELLIGENT COMPUTING;

EID: 84958538248     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/978-3-319-09339-0_24     Document Type: Conference Paper
Times cited : (5)

References (21)
  • 1
    • 24944560555 scopus 로고    scopus 로고
    • Exact algorithm for solving project scheduling problems under multiple resource constraints
    • Jiang, G., Shi, J.: Exact Algorithm for Solving Project Scheduling Problems under Multiple Resource Constraints. Journal of Construction Engineering and Management 131(9), 986-992 (2005)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.9 , pp. 986-992
    • Jiang, G.1    Shi, J.2
  • 2
    • 37249001774 scopus 로고    scopus 로고
    • Critical path scheduling under resource calendar constraints
    • Lu, M., Lam, H.C.: Critical Path Scheduling under Resource Calendar Constraints. Journal of Construction Engineering and Management 134(1), 25-31 (2008)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.1 , pp. 25-31
    • Lu, M.1    Lam, H.C.2
  • 4
    • 54249088030 scopus 로고    scopus 로고
    • Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling
    • Kim, J.L., Ellis, R.D.: Permutation-Based Elitist Genetic Algorithm for Optimization of Large-Sized Resource-Constrained Project Scheduling. Journal of Construction Engineering and Management 134(11), 904-913 (2008)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.11 , pp. 904-913
    • Kim, J.L.1    Ellis, R.D.2
  • 6
    • 26044472796 scopus 로고    scopus 로고
    • A genetic algorithm approach for the time-cost trade-off in pert networks
    • Azaron, A., Perkgoz, C., Sakawa, M.: A Genetic Algorithm Approach for the Time-cost Trade-off in PERT Networks. Applied Mathematics and Computation 168(2), 1317-1339 (2005)
    • (2005) Applied Mathematics and Computation , vol.168 , Issue.2 , pp. 1317-1339
    • Azaron, A.1    Perkgoz, C.2    Sakawa, M.3
  • 7
    • 63549109485 scopus 로고    scopus 로고
    • A two-phase ga model for resource-constrained project scheduling
    • Chen, P.H., Weng, H.J.: A Two-phase GA Model for Resource-constrained Project Scheduling. Automation in Construction 18(4), 485-498 (2009)
    • (2009) Automation in Construction , vol.18 , Issue.4 , pp. 485-498
    • Chen, P.H.1    Weng, H.J.2
  • 8
    • 79951905049 scopus 로고    scopus 로고
    • A genetic algorithm with neighborhood search for the resource-constrained project scheduling problem
    • Proon, S., Jin, M.Z.: A Genetic Algorithm with Neighborhood Search for the Resource-Constrained Project Scheduling Problem. Naval Research Logistics 58(2), 73-82 (2011)
    • (2011) Naval Research Logistics , vol.58 , Issue.2 , pp. 73-82
    • Proon, S.1    Jin, M.Z.2
  • 11
    • 79960443998 scopus 로고    scopus 로고
    • Multi-objective optimization for equal batch splitting flexible job-shop scheduling problem with multiple process flows
    • Zeng, Q., Yang, Y., Liang, X.D., Ma, J.Q.: Multi-Objective Optimization for Equal Batch Splitting Flexible Job-Shop Scheduling Problem with Multiple Process Flows. Advanced Science Letters 4(4-5), 1808-1813 (2011)
    • (2011) Advanced Science Letters , vol.4 , Issue.4-5 , pp. 1808-1813
    • Zeng, Q.1    Yang, Y.2    Liang, X.D.3    Ma, J.Q.4
  • 13
    • 77955715839 scopus 로고    scopus 로고
    • GA-based multi-objective optimization of finance-based construction project scheduling
    • Fathi, H., Afshar, A.: GA-based Multi-objective Optimization of Finance-based Construction Project Scheduling. Journal of Civil Engineering 14(5), 627-638 (2010)
    • (2010) Journal of Civil Engineering , vol.14 , Issue.5 , pp. 627-638
    • Fathi, H.1    Afshar, A.2
  • 14
    • 63549088269 scopus 로고    scopus 로고
    • A genetic algorithm-based method for scheduling repetitive construction projects
    • Long, L.D., Ohsato, A.: A Genetic Algorithm-based Method for Scheduling Repetitive Construction Projects. Automation in Construction 18(4), 499-511 (2009)
    • (2009) Automation in Construction , vol.18 , Issue.4 , pp. 499-511
    • Long, L.D.1    Ohsato, A.2
  • 15
    • 6344281398 scopus 로고    scopus 로고
    • Resource optimization using combined simulation and genetic algorithms
    • Hegazy, T., Kassab, M.: Resource Optimization Using Combined Simulation and Genetic Algorithms. Journal of Construction Engineering and Management 129(6), 698-705 (2003)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.6 , pp. 698-705
    • Hegazy, T.1    Kassab, M.2
  • 16
    • 34047265638 scopus 로고    scopus 로고
    • Applying fuzzy method for measuring criticality in project network
    • Chen, C.T., Huang, S.F.: Applying Fuzzy Method for Measuring Criticality in Project Network. Information Sciences 177(12), 2448-2458 (2007)
    • (2007) Information Sciences , vol.177 , Issue.12 , pp. 2448-2458
    • Chen, C.T.1    Huang, S.F.2
  • 17
    • 69749091300 scopus 로고    scopus 로고
    • Computing latest starting times of activities in interval-valued networks with minimal time lags
    • Yakhchali, S.H., Ghodsypour, S.H.: Computing Latest Starting Times of Activities in Interval-valued Networks with Minimal Time Lags. European Journal of Operational Research 200(3), 874-880 (2010)
    • (2010) European Journal of Operational Research , vol.200 , Issue.3 , pp. 874-880
    • Yakhchali, S.H.1    Ghodsypour, S.H.2
  • 19
    • 71849102314 scopus 로고    scopus 로고
    • Fuzzy multi-objective project management decisions using two-phase fuzzy goal programming approach
    • Liang, T.F.: Fuzzy Multi-objective Project Management Decisions Using Two-phase Fuzzy Goal Programming Approach. Computers & Industrial Engineering 57(4), 1407-1416 (2009)
    • (2009) Computers & Industrial Engineering , vol.57 , Issue.4 , pp. 1407-1416
    • Liang, T.F.1
  • 21
    • 84904686183 scopus 로고    scopus 로고
    • Buffer sizing technique for fuzzy critical chain scheduling
    • Tibet, China, August
    • Liu, Y.C.: Buffer Sizing Technique for Fuzzy Critical Chain Scheduling. In: Proc. of 2nd Intl. Conf. on Uncertainty Theo., Tibet, China, August 5-10 (2011)
    • (2011) Proc. of 2nd Intl. Conf. on Uncertainty Theo , pp. 5-10
    • Liu, Y.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.