메뉴 건너뛰기




Volumn 168, Issue 1, 2005, Pages 342-353

Project scheduling problem with stochastic activity duration times

Author keywords

Genetic algorithm; Project scheduling; Stochastic programming; Stochastic simulation

Indexed keywords

COMPUTER SIMULATION; COSTS; GENETIC ALGORITHMS; INTEGRATION; MATHEMATICAL MODELS; PROBLEM SOLVING; RESOURCE ALLOCATION; SCHEDULING; STOCHASTIC PROGRAMMING;

EID: 25644451090     PISSN: 00963003     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.amc.2004.09.002     Document Type: Article
Times cited : (83)

References (23)
  • 2
    • 0002395681 scopus 로고
    • Chance-constrained programming
    • A. Charnes, and W.W. Cooper Chance-constrained programming Management Science 6 1 1959 73 79
    • (1959) Management Science , vol.6 , Issue.1 , pp. 73-79
    • Charnes, A.1    Cooper, W.W.2
  • 3
    • 0005374191 scopus 로고
    • A network interpretation and a direct sub-dual algorithm for critical path scheduling
    • A. Charnes, and W.W. Cooper A network interpretation and a direct sub-dual algorithm for critical path scheduling Journal of Industrial Engineering 13 1962 213 219
    • (1962) Journal of Industrial Engineering , vol.13 , pp. 213-219
    • Charnes, A.1    Cooper, W.W.2
  • 4
    • 0002431201 scopus 로고
    • Deterministic equivalents for optimizing and satisficing under chance constraints
    • A. Charnes, and W.W. Cooper Deterministic equivalents for optimizing and satisficing under chance constraints Operational Research 11 1963 18 39
    • (1963) Operational Research , vol.11 , pp. 18-39
    • Charnes, A.1    Cooper, W.W.2
  • 5
    • 0005350580 scopus 로고
    • Critical path analysis via chance constrained and stochastic programming
    • A. Charnes, W.W. Cooper, and G.L. Thompson Critical path analysis via chance constrained and stochastic programming Operational Research 12 1964 460 470
    • (1964) Operational Research , vol.12 , pp. 460-470
    • Charnes, A.1    Cooper, W.W.2    Thompson, G.L.3
  • 6
    • 0000463458 scopus 로고
    • Minimizing resource availability costs in time-limited project networks
    • E. Demeulemeester Minimizing resource availability costs in time-limited project networks Management Science 41 10 1995 1590 1598
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1590-1598
    • Demeulemeester, E.1
  • 7
    • 0000788322 scopus 로고
    • On the expected duration of PERT type network
    • S.E. Elmaghraby On the expected duration of PERT type network Management Science 13 5 1967 299 306
    • (1967) Management Science , vol.13 , Issue.5 , pp. 299-306
    • Elmaghraby, S.E.1
  • 9
    • 11144332073 scopus 로고
    • A generalized network approach to project activity sequencing
    • R.J. Freeman A generalized network approach to project activity sequencing IRE Transactions on Engineering Management 7 3 1960 103 107
    • (1960) IRE Transactions on Engineering Management , vol.7 , Issue.3 , pp. 103-107
    • Freeman, R.J.1
  • 10
  • 11
    • 0001620447 scopus 로고
    • Critical path planning and scheduling, mathematical basis
    • J.E. Kelley Jr. Critical path planning and scheduling, mathematical basis Operations Research 9 3 1961 296 320
    • (1961) Operations Research , vol.9 , Issue.3 , pp. 296-320
    • Kelley Jr., J.E.1
  • 12
    • 0002866635 scopus 로고
    • The critical path method: Resources planning and scheduling
    • Muth Thompson Prentice-Hall Englewood Cliffs, NJ
    • J.E. Kelley Jr. The critical path method: resources planning and scheduling Muth Thompson Industrial Scheduling 1963 Prentice-Hall Englewood Cliffs, NJ (Chapter 21)
    • (1963) Industrial Scheduling
    • Kelley Jr., J.E.1
  • 13
    • 0015667795 scopus 로고
    • Another look at the PERT assumptions
    • T.C.T. Kotiah, and N.D. Wallace Another look at the PERT assumptions Management Science 20 1 1973 44 49
    • (1973) Management Science , vol.20 , Issue.1 , pp. 44-49
    • Kotiah, T.C.T.1    Wallace, N.D.2
  • 14
    • 0031342423 scopus 로고    scopus 로고
    • Dependent-chance programming: A class of stochastic programming
    • B. Liu Dependent-chance programming: a class of stochastic programming Computers and Mathematics with Applications 34 12 1997 89 104
    • (1997) Computers and Mathematics with Applications , vol.34 , Issue.12 , pp. 89-104
    • Liu, B.1
  • 15
    • 0031199598 scopus 로고    scopus 로고
    • Modelling stochastic decision systems using dependent-chance programming
    • B. Liu, and K. Iwamura Modelling stochastic decision systems using dependent-chance programming European Journal of Operational Research 101 1 1997 193 203
    • (1997) European Journal of Operational Research , vol.101 , Issue.1 , pp. 193-203
    • Liu, B.1    Iwamura, K.2
  • 17
    • 0035837601 scopus 로고    scopus 로고
    • Uncertain programming: A unifying optimization theory in various uncertain environments
    • B. Liu Uncertain programming: A unifying optimization theory in various uncertain environments Applied Mathematics and Computation 120 1-3 2001 227 234
    • (2001) Applied Mathematics and Computation , vol.120 , Issue.1-3 , pp. 227-234
    • Liu, B.1
  • 19
    • 11144284696 scopus 로고
    • Network planning with stochastic activity durations, an evaluation of PERT
    • F.A. Loostma Network planning with stochastic activity durations, an evaluation of PERT Statistica Neerlandica 20 1966 43 69
    • (1966) Statistica Neerlandica , vol.20 , pp. 43-69
    • Loostma, F.A.1
  • 20
    • 0002641538 scopus 로고
    • An analytical study of PERT assumptions
    • K.R. MacCrimmon, and C.A. Ryavec An analytical study of PERT assumptions Operations Research 12 1 1964 16 37
    • (1964) Operations Research , vol.12 , Issue.1 , pp. 16-37
    • MacCrimmon, K.R.1    Ryavec, C.A.2
  • 21
    • 0033357402 scopus 로고    scopus 로고
    • The project scheduling problem with irregular starting time costs
    • V. Maniezzo, and A. Mingozzi The project scheduling problem with irregular starting time costs Operations Research Letters 25 4 1999 175 182
    • (1999) Operations Research Letters , vol.25 , Issue.4 , pp. 175-182
    • Maniezzo, V.1    Mingozzi, A.2
  • 22
    • 0021161421 scopus 로고
    • Minimizing costs of resource requirements in project networks subject to a fixed completion time
    • R.H. Mohring Minimizing costs of resource requirements in project networks subject to a fixed completion time Operations Research 32 1 1984 89 120
    • (1984) Operations Research , vol.32 , Issue.1 , pp. 89-120
    • Mohring, R.H.1
  • 23
    • 11144304606 scopus 로고
    • The use of the compound Poisson in PERT
    • W.H. Parks, and K.D. Ramsing The use of the compound Poisson in PERT Management Science 15 8 1969 B-397 B-402
    • (1969) Management Science , vol.15 , Issue.8
    • Parks, W.H.1    Ramsing, K.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.