메뉴 건너뛰기




Volumn 4683 LNCS, Issue , 2007, Pages 177-186

Optimized research of resource constrained project scheduling problem based on genetic algorithms

Author keywords

Genetic algorithms; Multi task; Network planning optimization

Indexed keywords

MULTITASKING; OPTIMIZATION; PROBLEM SOLVING; SCHEDULING;

EID: 38049080631     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/978-3-540-74581-5_19     Document Type: Conference Paper
Times cited : (10)

References (10)
  • 1
    • 0031185451 scopus 로고    scopus 로고
    • Using Genetic Algorithms to Solve Construction Time-Cost Trade-Of Problems
    • Feng, C.-W., Liu, L., Burns, S.A.: Using Genetic Algorithms to Solve Construction Time-Cost Trade-Of Problems. Journal of Computingin Civil Engineering 11(3), 184-189 (1997)
    • (1997) Journal of Computingin Civil Engineering , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.-W.1    Liu, L.2    Burns, S.A.3
  • 2
    • 5244262334 scopus 로고    scopus 로고
    • Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization
    • Li, H., Love, P.: Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization. Journal of Construction Engineering and management 123(3), 233-237 (1997)
    • (1997) Journal of Construction Engineering and management , vol.123 , Issue.3 , pp. 233-237
    • Li, H.1    Love, P.2
  • 3
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of Resource Allocation and Leveling Using Genetic Algorithms
    • Hegazy, T.: Optimization of Resource Allocation and Leveling Using Genetic Algorithms. Journal of Construction and Management 125(3), 167-175 (1999)
    • (1999) Journal of Construction and Management , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 4
    • 38049038729 scopus 로고    scopus 로고
    • Two Decision-making Method of Multiple Resources Attributing Among Multi-projects
    • Yue, T., Zhong, W., Xu, N.: Two Decision-making Method of Multiple Resources Attributing Among Multi-projects. Systems Engineering Journal 14(3) (1997)
    • (1997) Systems Engineering Journal , vol.14 , Issue.3
    • Yue, T.1    Zhong, W.2    Xu, N.3
  • 6
    • 73349099266 scopus 로고    scopus 로고
    • Heuristic Mechod for Multiple Resource-Constrained in the Network
    • Sijun, B.: Heuristic Mechod for Multiple Resource-Constrained in the Network. Systems Engineering Theory and Practice (7) (2004)
    • (2004) Systems Engineering Theory and Practice , vol.7
    • Sijun, B.1
  • 8
    • 38049082834 scopus 로고    scopus 로고
    • Ren, L., Qingxin, C., Ning, M.: A Heuristic Algorithms for Resource-ConstrainedProject Scheduling, Journal of Engineering Management.supplement (2002)
    • Ren, L., Qingxin, C., Ning, M.: A Heuristic Algorithms for Resource-ConstrainedProject Scheduling, Journal of Engineering Management.supplement (2002)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.